HomeMy WebLinkAboutContract 49176-FP1 t
City Secretary49176 -FP1
Contract No.
FORTWORTH, Date Received Jul 10,2018
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: THE BLUFFS AT RIVER EAST
City Project No.: 100870
Improvement Type(s): Water ® Sewer
Original Contract Price: $211,313.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $211,313.00
c7w6Py Jul 2,2018
Joe Geer(Jul 2.20")
Contractor Date
CFO/Partner
Title
Rumsey Construction, LLC OFFICIAL RECORD
Company Name CITY SECRETARY
FI'e WORTH TX
Jul 3,2018
Russell Rows(Jul .20181
Project Inspector Date
SAHU fJu13,20181 Jul 3,2018
G .
Project Manager Date
,74ti ,ks�&'t/Lww� gf Jul 3,2018
Janie Scadett Morales(Jul 3,2018)
CFA Manager Date
SAAM,ALr Uk- Jul 3,2018
Susan Alanis(Jul 3,2018)
Asst. City Manager Date
Page 1 of 2
Notice of Project Completion
Project Name:THE BLUFFS AT RIVER EAST
City Project No.: 100870
City's Attachments
Final Pay Estimate 7-1
Change Order(s): ❑ Yes ® N/A
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety 8
Statement of Contract Time
Contract Time: 175 CD Days Charged: 298
Work Start Date: 8/28/2017 Work Complete Date: 6/21/2018
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name THE BLUFFS AT RIVER EAST
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100870
DOE Number 0870
Estimate Number 1 Payment Number 1 For Period Ending 6/28/1018
CD
City Secretary Contract Number Contract Time 176D
Contract Date Days Charged to Date 298
Project Manager NA Contract is 100.00 Complete
Contractor RUMSEY CONSTRUCTION,LLC
6617 VILLAGE SPRINGS DRIVE
PIANO, TX 75024
Inspectors OWEN / ROGERS
Thursday,lune 28,2018 Page 1 of 4
City Project Numbers 100870 DOE Number 0870
Contract Name THE BLUFFS AT RIVER FAST Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 6/28/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 TRENCH SAFETY 1364 LF $1.00 $1,364.00 1364 $1,364.00
2 DUCTILE IRON WATER FITTINGS 1.37 TN $4,500.00 $6,165.00 1.37 $6,165.00
W/RESTRAINT
3 8"PVC WATER PIPE 1087 LF $25.00 $27,175.00 1087 $27,175.00
4 8"PVC WATER PIPE,CSS BACKFILL 36 LF $50.00 $1,800.00 36 $1,800.00
5 FIRE HYDRANT 2 EA $4,000.00 $8,000.00 2 $8,000.00
6 CONNECTION TO EXISTING 4"-12"WATER 3 EA $10,000.00 $30,000.00 3 $30,000.00
MAIN
7 V WATER SERVICE 32 EA $1,150.00 $36,800.00 32 $36,800.00
8 8"GATE VALVE 6 EA $1,500.00 $9,000.00 6 $9,000.00
Sub-Total of Previous Unit $120,304.00 $120,304.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 POST CCTV INSPECTION 1075 LF $1.00 $1,075.00 1075 $1,075.00
2 MANHOLE VACUUM TESTING 12 EA $125.00 $1,500.00 12 $1,500.00
3 4"SEWER SERVICE 35 EA $300.00 $10,500.00 35 $10,500.00
4 8"SEWER PIPE 1075 LF $27.00 $29,025.00 1075 $29,025.00
5 EPDXY MANHOLE LINER 24 VF $200.00 $4,800.00 24 $4,800.00
6 4'MANHOLE 10 EA $3,000.00 $30,000.00 10 $30,000.00
7 4'DROP MANHOLE 1 EA $3,800.00 $3,800.00 1 $3,800.00
8 4'EXTRA DEPTH MANHOKE 24.2 VF $225.00 $5,445.00 24.2 $5,445.00
9 TRENCH SAFETY 1364 LF $1.00 $1,364.00 1364 $1,364.00
10 TRENCH WATER STOPS I EA $500.00 $500.00 1 $500.00
11 4'SHALLOW MANHOLE I EA $3,000.00 $3,000.00 1 $3,000.00
Sub-Total of Previous Unit $91,009.00 $91,009.00
Thursday,June 28,2018 Page 2 of 4
City Project Numbers 100870 DOE Number 0870
Contract Name THE BLUFFS AT RIVER EAST Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6/28/1018
Project Funding
Contract Information Summary
Original Contract Amount $211,313.00
Change,Orders
Total Contract Price $211,313.00
Total Cost of Work Completed $211,313.00
Less %Retained $0.00
Net Earned $211,313.00
Earned This Period $211,313.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment '$0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $211,313.00
Thun;day,June 28,2018 Page 3 of 4
City Project Numbers 100870 DOE Number 0870
Contract Name THE BLUFFS AT RIVER EAST Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 6/28/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / ROGERS Contract Date
Contractor RUMSEY CONSTRUCTION,LLC Contract Time 175 CD
6617 VILLAGE SPRINGS DRIVE Days Charged to Date 298 CD
PLANO, TX 75024 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $211,313.00
Less %Retained $0.00
Net Earned $211,313.00
Earned This Period $211,313.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $211,313.00
Thursday,June 28,2018 Page 4 of 4
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: The Bluffs At River East
PROJECT NUMBER: 100870
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
8" pvc 8" C900 PVC 1364 If
FIRE HYDRANTS: 2 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: yes
NEW SERVICES: I" I"copper 22 ea
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8"pvc: 8" pvc sewer 1075 If
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: yes
NEW SERVICES: 4" pvc sewer 35 es
TRANSPORTATION AND PUBLIC WORKS
� / The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 7 6012-6 311
FoRTWORTH..,
...
TRANSPORTATION AND PUBLIC WORKS
INSPECTION PUNCH LIST
1, 3+24 line B manhole needs to be rewiped
(2.)1+15 line B manhole needs to be rewiped
(3.)0+72 manhole needs hydralic slide
(4.)manholes at staions 0+50 and 6+03 on line A need to be rewiped.
(5.)storm inlet box at station 0+79 needs steps
(6.)inlets on storm line B at staion 0+14 and 4+35 need steps
(7.)storm inlet at staion 1+16 line A need steps
4�vqIAZI) � ZZ 1
Contractor
000,
Inspector
6PMETO
f�L& 1 TD 0011? LBIE pEQ- (M o F fiOr Wop-H S&S
No fvprHEf- ITEM