Loading...
HomeMy WebLinkAboutContract 49027-FP1 FORTWORTH. CITYSEM� CBCTNO. �� z TRANSPORTATION AND PUBLIC WORKS NOTICE OF PROJECT COMPLETION (Developer Projects) C�t� 7 / City Project NQ: 100009 (16 Regarding contract 100009 for � 7TH AVE AND WEST PULASKI ST PAVING&DRAINAGE IMPROVEMENTS as required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Price: Ste°, $1,004,986.85 Amount of Approved Change Orders: g N L q ' $22,279.91 Ns 1 h Revised Contract Amount: \ 0,0 $1,027,266.76 Cl a rA A ° x Total Cost Work Completed: c M a $1,027,266.76 O („IV1 �y W 3 �qy x as 8.4 v U ° t y (� i+ � o_ apl AVaA3U Hw v Recomme Acceptance Date Asst. Direct PW - Development Services a 4 , Accepted Date As Dir or, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT W ` Ass City Panager Date Comments: OFFICIAL RECORD CITY d®CRI TARP FT.VI offol YX ---- - L47 •�,1 Rev.9/22/16 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name 7TH AVE AND WEST PULASKI ST PAVING AND DRAINAGE MMPROVE Contract Limits Project Type DRAINGE&PAVING City Project Numbers 100009 DOE Number 1009 Estimate Number I Payment Number I For Period Ending 5/16/2018 CD City Secretary Contract Number 1100009 Contract Time 23(ED Contract Date 2/14!2017 Days Charged to Date 345 Project Manager NA Contract is 100.00 Complete Contractor PORT WORTH CIVIL 1675-B SOUTH MAIN STREEET KELLER, TX 76248 Inspectors DICKINSON / RUIZ r Thursday;May 24,2018 Page I of 5 A� City Project Numbers 100009 DOE Number 1009 Contract Name 7TH AVE AND WEST PULASKI ST PAVING AND DRAINAGE I1WPROV Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINGE&PAVING For Period Ending 5/16/1018 Project Funding UNIT I:DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Qaanity Total Qaanity Total ————————————————————————————— - 1 REMOVE 10'CURB INLET 2 EA $1,550.00 $3,100.00 2 $3,100.00 2 REMOVE 20'CURB INLET 1 EA $2,530.00 $2,530.00 1 $2,530.00 3 REMOVE 18"STORM LINE 24 LF $75.00 $1,800.00 24 51,800.00 4 REMOVE 21"STORM LINE 29 LF $80.00 $2,320.00 29 $2,320.00 5 REMOVE STORM DRAIN MANHOLE 1 EA $2,340.00 $2,340.00 1 52,340.00 6 21"RCP CLASS 1I1 46 LF $230.00 $10,580.00 46 $10,580.00 7 24"RCP CLASS 111 29 LF $243.00 $7,047.00 29 $7,047.00 8 10'CURB INLET 3 EA $7,800.00 $23,400.00 3 $23,400.00 9 20 CURB INLET 1 EA 513,500.00 $13,500.00 I $13,500.00 10 INLET SILT PROTECTION DEVICE 4 EA $210.00 $840.00 4 $840.00 -------------------------------------- Sub-Total of Previous Unit $67,457.00 $67,457.00 UNIT II:PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Qaanity Total Qaanity Total ----------------------._.—.__---------------- 1 REMOVE SIDEWALK 7786 SF $3.00 $23,358.00 7786 $23,358.00 2 REMOVE STEP 20 SF $145.00 $2,900.00 20 $2,900.00 3 REMOVE ADA RAMP 12 EA $1,165.00 $13,980.00 12 $13,980.00 4 REMOVE CONCRETE DRIVE 3268 SF $6.30 $20,588.40 3268 $20,588.40 5 REMOVE ASPHALT PVMT(CO#1) 2505 SY $28.95 $72,519.75 2505 572,519.75 6 REMOVE CONC CURB&GUTTER 1624 LF $12.25 $19,894.00 1624 $19,894.00 7 BARRIER FREE RAMP TYPE R-1(CO#1) 5 EA $4,885.00 $24,425.00 5 $24,425.00 8 BARRIER FREE RAMP TYPE P-1 5 EA $3,840.00 $19,200.00 5 $19,200.00 9 BARRIER FREE RAMP TYPE M-2 1 EA $4,655.00 $4,655.00 1 $4,655.00 10 4"CONC SIDEWALK 11152 SF $11.15 $124,344.80 11152 $114,344.80 11 F24"SID PVMT MARKING RAE(W) 112 LF $16.35 $1,831.20 112 $1,831.20 12 FURNISHANSTALL ALUM SIGN EX POLE I EA $685.00 $685.00 1 $685.00 MOUNT 13 FURNISIVINSTALL ALULM SIGN GROUND 7 EA $775.00 $5,425.00 7 $5,425.00 MOUNT CITY STD(CO#1) 14 REMOVE AND REINSTALL SIGN PANEL AND 11 EA $300.00 $3,300.00 11 $3,300.00 POST(CO#I) Thursday,May 24,2018 Page 2 of 5 City Project Numbers 100009 DOE Number 1009 Contract Name 7TH AVE AND WEST PULASKI ST PAVING AND DRAINAGE IMPROV Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 5/16/2018 Project Funding 15 8-LIME TREATMENT(CO#1) 3270 SY S17.95 558,369.50 3270 $58,369.50 16 71/2"CONCPVMT(CO#1) 2738 SY S137.75 $377,159.50 2738 5377,159.50 19 SWPPP DEVICES(SWPPP PLAN BY OTHERS) 1 LS S8,500.00 $8,500.00 1 $8,500.00 20 HMAC'TRANSITION 20 TN 5205.00 $4,100.00 20 S4,100.00 21 REMOVE STREET LIGHTS(8 EACH) I EA S6,320.00 $6,320.00 1 56,320.00 22 BARRIER FREE RAMP TYPE P-2 3 EA S3,840.00 $11,520.00 3 $11,520.00 23 BARRICADES AND TRAFFIC CONTROL 4 EA S5,125.00 S20,500.00 4 $20,500.00 3A REMOVE ADA RAMP(CO#1) 1 EA $2,340.00 52,340.00 1 $2,340.00 6A REMOVE CONCRETE CURBS/GUTTER(CO#1) 116 LF S25.65 $2,975.40 116 $2,975.40 11A 24"SLD PVMT MARKING HAE(W)(CO#1) 108 SY $38.55 $4,163.40 108 $4,163.40 25 6-CURB&GUTTER(CO#1) 173 LF 557.75 $9,990.75 173 $9,990.75 26 12-CURB&GUTTER(CO#1) 78 LF $67.45 $5,261.10 78 $5,261.10 27 REMOVE RIP RAP(CO#]) 156 SF $7.85 $1,224.60 156 $1,224.60 28 BARRIER FREE RAMP M-3(CO#1) 2 EA $5,665.00 $11,330.00 2 $11,330.00 29 INSTALL ALUM SIGN EX POLE 1 EA $488.00 $488.00 I $488.00 30 REMOVE SIDEWALK(TERRELL)(CO#1) 3089 SF $5.90 $18,225.10 3089 $18,225.10 31 4-CON.SIDEWALK(TERE1,L)(CO#1) 4407 SF 516.18 $71,305.26 4407 $71,305.26 32 BARRICADES TRAFFIC CONTROL(CO#1) 1 MO 57,876.00 $7,876.00 1 $7,876.00 33 REMOVE HANDRAIL(CO#1) 20 LF $29.00 $580.00 20 $580.00 34 SWPPP DEVICES(CO 01) 1 LS $475.00 $475.00 1 $475.00 -------------------------------------- Sub-Total ------------------ Sub-Total of Previous Unit $959,809.76 $959,809.76 nws*,May 24,2018 Page 3 of 5 City Project Numbers 100009 DOE Number 1009 Contract Name 7TH AVE AND WEST PULASKI ST PAVING AND DRAINAGE IMPROV Estimate Number 1 Contract Limits Payment Number 1 Project Type DRAINAGE&PAVING For Period Ending 5/16/2018 Project Funding Contract Information Sunnmary Original Contract Amount 51,004,986.85 Chanee Orders Change Order Number 1 $22,279.91 Total Contract Price 51,027,266.76 DataTotal Cost of Work Completed $1,027,266.76 C ctor Less %Retained $0.00 c.r Date 06 1 3 zu/6 Net Earned $1,027,266.76 iln tion Supervisor Earned This Period $1,027,266.76 l fj Retainage This Period $0.00 Date v ` w Less Liquidated Damages P et anager Days® /Day 50.00 i Date a& 3 t�i t LessPavement Deficiency $0.00 A s.Di Infrastructure Design and Construction Less Penalty $0.00 Date J (1 Less Previous Payment $0.00 '� Dire cting Department �1 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,027,266.76 Thursday,May 24,2018 Page 4 of 5 City Project Numbers 100009 DOE Number 1009 Contract Name 7TH AVE AND WEST PULASKI ST PAVING AND DRAINAGE IMPROV Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 5/16/2019 Project Funding Project Manager NA City Secretary Contract Number 1100009 Inspectors DICKINSON / RUIZ Contract Date 2/14/2017 Contractor FORT WORTH CIVIL Contract Time 230 CD 1675-B SOUTH MAIN STREEET Days Charged to Date 345 CD KELLER, TX 7624E Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,027,266.76 Less %Retained $0.00 Net Earned $1,027,266.76 Earned This Period $1,027,266.76 RataiRage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15%. $0.00 Balance Due This Payment $1,027,266.76 Thursday,May 24,2019 Page 5 of 5 DEVELOPER-AWARDED-PROJECT QH"GE ORDER PROJECT NAME: 7th Avenue and W.Putaald Street CHANGE CONTRACT: A Drainage. B P"nq ORDER No: CFA# 2016=001 CITY PARTICIPATION: NO CITY PROJECT# 100009 DOE# NVA B1 WATER PROJECT 111, 59601-5310350-OW0430.100000.001SW SEWER PROJECT# 59007-5310350-0700430.1OOD09-0013W - FILE# K•2M14 INSPECTOR: James Ruiz Phone No: 817-6757574 PROJECT MANAGER: Aaron LON,P.E. Phone No: 817-392-7818 CONTRACT UNIT WATER 6EVYER PAVWO DRAINAGE sTREETLIO11T6 CONTRACT 0—lop. wiops+ OOvsiepsr DOvMopsr Dsvuopu DAYS Cost a Cop Cost Cost ORIGINAL CONTRACT S97T,529A$ 667,457.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE 50.00 30.00 $937,529.65 467,457.00 $0.00 AMOUNT OF PROP.CHANGE ORDER f221T6.91 REVISED CONTRACT AMOUNT $0.00 $see $6s9,909.re $6x,457.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UK R 30.00 f0.00 $959 606.76 507.467.00 $0.00 REVISED COST SHARE Dev.Cost: $1.027,26:6.76 L TOTAL REVISED CONTRACT _ $1,027,266.76 Revised:10.12.2011 Page 1 You are directed to make the foll-int Ulan es v1 the contract documents: CITY BID REM PAY ITEM 1 a QUANTITY QNI1 ITEM OESCNPTIOM UNIT PRICE TOTAL 3mA 0241.0300 1 EA Remove ADA Ram $2.340.00 $2.340.00 5 0241.1100 1276 SY Remove Asphalt Pvmt $28.95 $7,990.20 6-A 0241.1300 116 LF Remove Cone Cur63Guiter $25.65 $2.975.40 7 3213.0501 1 EA Barrier Free Ramp.Type R-1 51.885.00 54.885.00 11-A 3217.0501 10B SY 24"SLD Pvml M HAE 538.55 54.163.40 13 3441.4003 4 EA FumishAnstell Alum Sign Ground Mount City Std. $77500 53,100.00 14 3441.4110 7 EA Remove and Reinstait SIV Panel and Post 5300.00 $2,100.00 15 3211.0502 110 SY 8Ume Treatment $17.65 1 4SI.963.50) 15 9998 0001 264 SV _ 7 112'Cone Pvml $137.75 $36.366.00 17 9988.0002 2EA SY Concrete Crosswalk Paving t Peach- $28380 S71 882.00 18 9998.0003 270 SY Concrete Crosewldk Border Paving'Light Blue" $291.W 578.570.001 25' 3218.0101 173 LF B'Curb and Gutter 557.75 %9,9W.75-- 25* 9989.0006 78 LF 12 Curb and Gutter $67.45 $5.261.10 27' 0241.0800 150 SF Remove RiA Ran $7.85 51.224.60 28' 3213.0505 2 EA Bwdsr Free Ramp.Type M-3 55.885.00 511.33080 29' 3441.4007 1 EA Instal Akan Sign Ex Pole Mount S48B.00 $488.00 30' 0241.0100 3069 SF I Remove SWewMk W.Terrell) 55.90 $15.225.10 31• 3213.0301 4407 SF 4"Cone Sidewalk Torres $16.10 1 $71305.26 32' 3471.0002 1 MO Sartlades end Tra010 Coned ON.T $7.076.00 57.076.00 33' 9999.0007 20 LF Remove Handrail 529.00 5580.00 34' 9899.0004 1 LS SWPPP Devices @ Terns 5475.00 5475.00 TOTAL $22,279.91 NOTE:""DENOTES A NEW PAY REM REASONS FOR CHANGE ORDER l:Intersection or 7M Avenue and West Terrek Avenin changed to mnmin e+fsfing. 2. Cwb torrid at NE interseclion o/71h Avenue and PiMM Street modiTled to aecolnerodate ad3 ing fiber We vault 3:Crou"A s(InlersecWris changed Iran colored concmle pavemel 10 regWar concrete pavement,Added sMated crosswalk to Termg Avanua and Royiudale SL Added Pedestrian Cros"slgra of All Street crossings, 3:Sidewalk added and wkW*d Shap Hast Terrell Avenue. A8'd 9lbck ramps added to crosswalk across West Tanotl Avenue. Curb rmnp added to southwest ksorsteaion of T~Avenue and 61h Avenue. APPROVED:; APPROVED: IConat+"En9f-) fDet+►'9+e7 ( � ti ��f�1L/C�'- 1" 'S Revised:10-12-2011 {,kJ 1 � Page 2 \)J\ 3y..() Name: Na+nw },, Tilt:DtSL.4'AfTwo; TWm: Redssd:10.12-2011 Page 3 CONSENT OF OWNER SURETY COMPANY ARCHITECT TO FINAL PAYMENT CONTRACTOR SURETY AIA DOCUMENT G707 OTHER Bond Na. 22?30" PROJECT: 7th Avenue&W.Pulaski Street (name,address) TO(Owner) [ City of Fort Worth ] ARCHITECTS PROJECT NO: 1000 Throckmorton Street Fort Worth,TX 76102 CONTRACT FOR: Construction [ ] CONTRACT DATE: CONTRACTOR: Fort Worth Civil Constructors,LLC P.O.Box 164513 Fart Worth,TX 76161 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) North American Specialty Insurance Company 5200 Metcalf OPN111 Overland Park,KS 66202 , SURETY COMPANY, on bond of(here insert name and address of Contractor) Fort Worth Civil Constructors,LLC P.O.Box 164513 Fort Worth,TX 76161 , CONTRACTOR, hereby approves of the final payment to the Contractors,and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here insert name and address of Owner) City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 ,OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 30th day of May , 2018 North American Specialty Insurance Company Surety Company Signature of Authorized Representative (Seal): Andrea Rose Crawford Attorney-In-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTORS AFFTDAVIT OF PAYMENT OF DEM AND CLAIMS, Current Edition AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL PAYMENT APRIL.1970 EDITION ATA ONE PAGE 1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 New York Ave.,NW,WASHINGTON,D.C. 20006 SWISS RE CORPORATE SOLUTIONS NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY WESTPORT INSURANCE CORPORATION GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS,TI•IAT North American Specialty Insurance Company,a corporation duly organized and existing under laws of the State of New Hampshire,and having its principal office in the City of Overland Park,Kansas and Washington International Insurance Company a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Overland Park,Kansas,and Westport Insurance Corporation,organized under the laws of the State of Missouri,and having its principal office in the City of Overland Park,Kansas each does hereby make,constitute and appoint: SAMMY JOE MUL LIS,JR.,JOHN WILLIAM NEWBY,CHERI LYNN IRBY,WILBERT RAYMOND WATSON,MICHAEL L.TULLIS.SANDRA LEST RONEY.D 9BRA LES MOON, ANDREA ROSS CRAWFORD,MARY JO ZAKRZBW3KI,JAMES B.ROOBR3,JR.,TROY RUSSELL KEY AND LINDA MICHELLE STALDSR JOINTLY OR SEVERALLY Its true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies,as suety,on contracts of suretyship as are or may be required or permitted by law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the amount of ONE HUNDRED TWENTY FIVE MILLION($125,000,000.00)DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on March 24,2000 and Westport Insurance Corporation by written consent of its Executive Committee dated July 18,2011. "RESOLVED,that any two of the President,any Senior Vice President,any Vice President,any Assistant Vice President, the Secretary or any Assistant Secretary be,and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached." \�\\\1\IIIUTVtllqu a r" �``\OQ�-6p0 / `G'� "'tiaPtii /'ts Ey ` J Cs�^ �r.,yy G rye''•. 3leven rsur, wen a rY grain erser ons Company ~f• Z +; '.Z c o SEAL •n &Seeder Vice PraWetp efNwth Awericw Specialty Lsurruree Cewpwq• L h�EPtL _ Us SEAL :qoa p'; r^' •arrriwvJw►re"rrt4rrrw�er-i�rwrreCwpwurawl u Tl, 913 �rr0.� '� f+ .......... f IIWreA Ir,aratrriw rttMteleantite•nr.Lyw •• & //�U ptt11111\ luta a s s Vim�eerrwN i y hLor""caricsim Wnwai Cir IN WITNESS WHEREOF,North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation have caused their official scats to be hereunto affixed,and these presents to be signed by their authorized officers this this 12 day of January ,20 18 . North American Specialty Insurance Company Washington International Insurance Company State of Illinois Westport Insurance Corporation County of Cook ss: On this 12 day of January .20 18,before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty insurance Company and Senior Via President of Westport Insurance Corporation and Michael A.Ito Senior Vice President of Washington International Insure=Company and Senior Via President of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation,personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. [ KIAL SAL � `1 M KENNY No"P&A)k-State of 0ltruti' My Cww2"2021 rt>'nw M.Kuarasy.NoWy Fvblic t I, Jeffrey Goldberg , the duly elected Vice President and Assistant Secretary of North American Specialty Insurance Company,Washington International Insurance Company and Westport Insurance Corporation do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North American Specialty Insurance Company,Washington International Insurance Company and Westport lnswaaee Corporation which is still in full force and effect. IN WITNESS WHEREOF,I have set my hand and affixed the seals of the Companies this 30th day of A&W .20 18 . JeRcey Goldktg.Vice President&Assistau Secretary of W ashielpoa lmenis6ow lnswanceCompwy& North Awerican Specialty Inswatce Company&Vice President A Assistant Secretary of Westport Insumree Corporation North American Specialty Insurance Company Washington International Insurance Company Westport Insurance Corporation TEXAS CLAIMS INFORMATION IMPORTANT NOTICE ADVISO IMPORTANTE In order to obtain information or make a complaint: Para obtener informacion o para someter un queja: You may contact Jeffrey Goldberg,Vice President Puede comunicarse con Jeffrey Goldberg,Vice — Claims at 1-800-338-0753 President—Claims,al 1-800-338-0753 You may call Washington International Insurance Usted puede Ilamr al numero de teiefono gratis de Company and/or North American Specialty Insurance Washington International Insurance Company and/or Company's and/or Westport Insurance Corporation North American Specialty Insurance Company's and/or toll-free number for information or to make a Westport Insurance Corporation para informacion o complaint at: para someter una queja al: 1-800-338-0753 1-800-338-0753 You may also write to Washington International Usted tambien puede escribir a Washington Insurance Company and/or North American Specialty International Insurance Company and/or North Insurance Company and/or Westport Insurance American Specialty Insurance Company and/or Corporation at the following address: Westport Insurance Corporation al: 1450 American Lane 1450 American Lane Suite 1100 Suite 1100 Schaumburg,IL 60173 Schaumburg,IL 60173 You may contact the Texas Department of Insurance Puede escribir al Departmento de Seguros de Texas to obtain information on companies,coverages, para obtener informacion acerca de companies, rights or complaints at: coberturas,derechos o quejas al: 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Insurance: Puede escribir al Departmento de Seguros de Texas: P.O.Box 149104 P.O. Box 149104 Austin,TX 78714-9104 Austin,TX 78714-9104 Fax: (512)475-1771 Fax: (512)475-1771 Web: hfn_//www_tdi.statA.tx_tis Web: httn://wvuw.tdi.stata.tx.us Email:ConsumerProtection@tdi.state.tx-us Email:ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un or about a claim you should first contact the reclamo,debe comunicarse con el Washington Washington International Insurance Company and/or International Insurance Company and/or North North American Specialty Insurance Company and/or American Specialty Insurance Company and/or Westport Insurance Corporation. If the dispute is not Westport Insurance Corporation primero. Si no se resolved,you may contact the Texas Department of resueive la disputa,puede entonces comunicarse Insurance. con el Departmento de Seguros de Texas. ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA This notice is for information only and does not Este aviso as solo para proposito de infromacion y no become a part or condition of the attached se convene an parte o condicion del documento document. adjunto. AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Austin Alumbaugh, President Of Fort Worth Civil Constructors, LLC,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons,firms, associations,corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Cook Children's- South Campus Improvements-71h St&Pulaski St 02316-S-0237 Austin Alai ba gh Subscribed and sworn before me on this date 30th of May,2018. JANE RATLIFF lJatary Puoic,state of Texas Comm.Expires 08.11.2019 N tary Public %: a�`�'' Notary ID 6126060 a ant Co, "Texas FORTWORTH. TRANSPORTATION AND PUBLIC WORKS INSPECTION PUNCH LIST 1. Steps need to be attached to inlets(2) 2. Storm Drain Inlet with one manhole needs to be replaced and two manhole's added. Co rac r I ector FORTWORTH rev 03/05/07 r� -7 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: 7th Ave&Pulsaki St Improvements PROJECT NO.: 100009 CONTRACTOR: Fort Worth Civil Contracto DOE NO.: N/ Al PERIOD FROM:06/06/17 TO: 05/16/18 FINAL INSPECTION DATE: 26-Mar-18 WORK ORDER EFFECTIVE:6/6/2017 CONTRACT TIME: 345 CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASO DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 0 345 345 PERIOD PREVIOUS 0 0 0 0 345 345 PERIOD TOTALS 0 0 0 0 345 345 TO DATE *REMARKS: C NT CT ATE INS CTOR DATE ENGINEERING DEP TMENT The City of Fort Worth•1000 Throckmorton ffitreet•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845