Loading...
HomeMy WebLinkAboutContract 48102-A1 CITY SECRETARY AMENDMENT No. 1 CONTRACT N0. 1 - At 79 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 48102, (the CONTRACT) which was authorized by M&C C-27864 on the 9th day of August, 2016 in the amount of $1,274,494 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Crowley Relief M-325 Sanitary Sewer Interceptor for Village Creek Basin; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 6, 2018 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $12 ,375 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,286,869. 00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY 8ECRETARY Page FT.WORTMI YX -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED : ENGINEER City of Fort Worth���. Teague al and Perkins, Inc. Jesus J. Chapa Ty Hilton, P.E . Assistant City Manager Vice President DATE: E DATE : APPROOV�AL RECOMMENDED: L/ g, L Chris Harder, P.E. Acting Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee 6JACUAL94\. czhol 19 Titl : Project Mana Douglas W. Black Senior Assistant C,±-�y Attorney ATT T: FF ry, J. s r ; City Se t ry Form 1295 No. N/A * M&C No. N/A AS M&C Date: N/A OFFICIAL,RECORD CITY SECRETARY Page -2- FT.WORTH,TX tnpwww.tnpinc.com June 6th, 2018 engineers surveyors landscape architects Mr. Rakesh Chaubey, P.E. City of Fort Worth Water Department 311 W Tenth Street Fort Worth, Texas 76102 Re: Fee Proposal for Contract Amendment No. 1 — Crowley Relief M-325 Sanitary Sewer Interceptor for Village Creek Basin City of Fort Worth Project No. 100276 (TNP Project No. FTW 16077) Dear Mr. Chaubey: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services required. The following is a brief description and cost for the additional services to be provided on this project: I. Easement Document Preparation After easement documents were created for this project and before easements could be acquired, a portion of a large tract of land was sold to another owner. This has required several proposed easements to be split between the original property, Parcel 9 in the attached exhibit, and the new property, Parcel 16. Listed below are the additional tasks that are required outside of the original Contract scope due to the sub-division of the property. 1. New Easement Documents — an additional four (4) easement documents are required for the easements located in the newly created Parcel 16. See easements 16-PE1, PE2, TCE1, and TCE2 on attached exhibit. 2. Revised Easement Documents—major revisions are required on five (5) of the easements located within the original Parcel 9. See easements 9-PE1, PE2,TCE1, TCE2, and TCE3 on attached exhibit. Minor revisions are required to one easement located within the original Parcel 9, Easement 9-TCE4. 3. Property Survey— one day of field work and mapping will be required to tie the new property comers for Parcels 9 and 16. II. Deliverables: 1. The Engineer shall provide the following: a. Four(4)signed and sealed sets of 8.5"x 11"easement documents(survey exhibit and metes and bounds)for ten easements. Ill. Fee Proposal for Contract Amendment No. 1: $ 12,375 TNP proposes a fixed fee of$12,375 to accomplish the scope of services described above. 1. Four new easement documents- $4,000.00 2a. Five revised easement documents- $ 5,000.00 2b. One easement document with minor revisions- $ 500.00 3. Additional property survey- $ 1,750.00 4. Additional Coordination and Sub Mark-up- $ 1,125.00 Fort Worth-5237 N.Riverside Drive,Suite 100 Fort Worth,Texas 76137-817.336.5773 Allen-625 Watters Creek Boulevard,Suite M300—Allen,Texas 75013 Donlon-1517 Centre Place Drive,Suite 320-Denton,Texas 7-6205 Registered by the TBPLS- 10011600 Fort Worth—10194381 Allen— 10011601 Denton I Registered by the TBPE Finn No.F-230 IHI. M/WBE Utilization: TNP commits $11,250 of the work covered under this amendment to a certified SBE firm. With this amendment, the overall M/SBE commitment will now be increased to 12.7%, above the City's M/WBE goal of 10%. Total Contract Amendment No. 1: $12,375 Summary of Contract Fee: Original Contract Amount: $1,274,494 Amendment No. 1 $ 12,375 Revised Contract Amount $1,286,869 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Andrew Luce, P.E. Senior Project Manager Attachments: 1)Easement Layout Exhibit iw •" F N.DEER Yx ______ * f'.,Ly 11 JfLLe'1� f a'PAA17L l�fE2 s' I�'•wr = AA l -� SCP JB'S5,J15 #,y,1lEI sr IttJV I ,GREEK d t I SUECOUCH' •# ? lOIATE w 'v4'1r Isar *I Ph1]°7z•SS L-.JZs A> U= I PRt1P 11.55.N-S15-A A,^ PART J I�' I 2 Eaemmt 10 Owner Oenurlrrfomwtian FO MyAddre Legg Oeatpd- __- - PMMII sten p E 4epeW YaOila.�„Mn3m AAA, h]SJH �Mltatl3r,Oe.Aef,TA>®6 Fnv v'i 50%UntliWded nteren --_— PXOmSE➢LSE1Eg ¢j 9x.559.sn rn,IR66 cmwl<,h oundM�ACvmttl9HTnaali•»nm3r PROP,1aRYAARr-NT PROP.PFIIWNEMi EAREIEIIT 2 Imga•n11.nM1d pYr�;m.lns RTWORTH �_ P.�R Pr n, Cly ct FaM Wadl,Te aR � n--rr•e�.0 I^=ion �� � ' ~` Crawley Relief M�'15 .R.,t ..._�N��� N A SanJary Sewer Inleraplor far Y11age Creek Basin �g m mn a`� �0 W Proposed Easement Layout '