HomeMy WebLinkAboutContract 48980-FP1 C1TY SECREIW CITY OF FORT WORTH a JUN 2 5 2018 cowrR,9►crNo. b` ,.r..,.. 560 � ""`�" " """ NOTICE OF PROJECT COMPLETION 5 6 11 1 o d�A �q Regarding City Secretary Contract. 48980, for the Caylor 5MG Ground Storage Tank Repair and Ra , which was requested by the Water Department and approved by City Council on February 14. 2017 through M&C C-28109, the Director of the Water Deparhment.upon the recommendation of the Construction Manager, Travis Tatum.P.E., Dunham kn ne =has accepted the project as complete. Final Payment Tsimate # 2 ) will be issued in accordance with Administrative Regulation C-6. Original Contract Price: $852,435.00 Amount of Approved Change Orders: 0.00 Revised Contract Amount: $852,435.00 Total Cost Work Completed. $813,865.00 Less Liquidated Damages: $24,250.00(@$250.00/Day) Less Pavement Penalty: 0.00 Total Contract Cost: $789,615.00 Less Previous Payments: $131,400.00 Final Payment Due: $658,215.00 Z6104!2018 Recommended for Acceptance Date Construction Manager,Dunham Engineering / 9 i Accepted Date Director,Water Department City Manager Date City Secretary Contract 7 '0.4152-4,`'' Q Date of Final Complgt1on Q `-V 4:- ate of mauty Start February 26.2018 & ° OFFICIAL REC&W,ry26.2018 CITY SECRETARY - FT.WORTH,TX ZOZbt'daSva&j wwooRPI X lyunoo LPSQd eld—`Jto oW$'�IR�+d HStN$17LLSI�I'J C ' C m N O 0 U o m z i a m c w m l'!'� T' o '� N IL G O W U W �1+ n m CD m E m a` w p !� V) LUV }U wnX V o O f' o E-S .9 Xtn � m m CU N � a 3 D m 3 > d c m m m Z (W ? E Z y W = n. Q -o L a U v w c�S pyo m U l9 25 b° f�6 .G 07 o I� 3 0 3 d U mc _ _ c v is m U D: r C o 1p N Y m ••°-. Z C C m J S G Q 06 M r co � o m ° rJ (n m E° W ¢ - 'o G m 3 N V m a °� c N S m z s, a m Q 0 VkiE U CO o .O` O y t m O v m E 'o w vO a Z OE a � $ o y y $ a� E cN Z A ~ $ a Wo > m CD .O .O.•yl! .A. pa( m a fD m c a 3 �C '� W c C a U > m 1 o LrJ C C p c m A 0 mi r' t O t. U Q A a a4) m ¢ m agoym d a. E - o c _ m _ U n t �. d `O v g a 3 ma J m d. o fmfoo �s ° � U U m 7 m ° 4•o c a r '� n Q Op $ m m N '� t1 m cn ppc Q U m m m o w .. c U y E U� m LL y C7 vii 41 $ W oLm" ' g n •y H c > S O m ` c5 � m mV c c .. m Ig . •� Cg = 3 V � N m c « m @ V CL v L ac c a w ° s N EQQ o m d c a $ d r. 3 E C m m c m c� a D 0 E �°C U m C mo 3 O is C m n v O) c � w � d °c UmzinUin WS m moQ W m € '280 m m n. d � C y c Z O O o 0 Q 7 d D J .2 co o CD 0 0 0 0 0 $ o N y0U Ur uoi o ui o O a w Z M t/1 o Z 0- L^ y N N m °i > rn [° (V O d Q O y . m to n n M o 0 0 0 C7 > U a rn 3 ° V o � c Q Q 0 �. � � M d - u9v> enfq � en ns en u9 E» u9 etsen m o t4 c m VQ � XO V t m= Oc (n O y C o O m } y� wr cW � d' Q 3 Of E '- v L 'C C �' C D F- W ;y 0 d 0 •9U.) a cn > aa t1i " o E Jl O Q u' c N m 5 = 8 m !g cW .7co m ¢ r LL E N Q. co • ETai U N to o U CL m m O d7 C N a s mrn E m m £ v E t L: m o 7 m V 1-- 0 C) � � L � � � t � o � � g � � o � 2 � �1 yr L `4d m U T O y m v 3 'g m m V C fn d a w N E w a m m 2 o 1 ." rn -j w m e � y � v d U1 ` C a c c w � a 9 a o a � c m 'o a ii O rn � > c d « L o Cg w y E '° E ui € •S '> m ° c E e a`! C p L) r+ 2a o o m ° c7 ?� m m u' aFi Oi m m t C b V b U m U c S to 8 W d c C v a m y V O W 0. LL V a ° •c y c o 0 0 -E' m o o o d m t 'S ` �U ozcg � inH v� A r- � om V r2 al°- Hz -1 - N M v io cn n co rn o L a� C) 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' O M O O O p 0 0 0 0 0 0 0 0 0 0 0 0 0 In 1 0 0 0 tD n CD Q' O 0 to 0 0 0 0 0 0 0 0 0 0 0 0n 0 L6N O 0 (D O O O V O O LD O O O O M (O (D LO O O O N to O 00 c N tD O tO - N (A V_ 00 00 LO - O O n W V M O 0) - CO M '(p n t[q O CD CD N O M M n 69 69 6) 6) 6)69 6}69 69 63 69 69 64 69 64 6A 64 ffl 63 69 V3, 140 69 b 9 0 o O O N t t I I i I I c I I I e I e I '',, I O O I I CRO O N 2 � '� CO N U) a) @ LL (O C1 W t00 Op N t+7 IL 69 69 69 69 63 169 69 69 69 69 61 61 63'.6,69 69 6H 69 69 613-1 e916)I 1 Vs 0 o 0 0 - - 0 - -1 - - - - o o - - o o a X r o 00000000ppo00000c000a0 us ~ N N O n V O O O O O O O O O O O O O O O O O Nco m 0 0 0 to 0 0 O Cl) O `$ N r 00 C ID a 0 O O O O0 O O O O O O Co O O O O O O O Oa O O O l9 c +-� O O O O O O O O O O O O O O O O OO O O O O W Z ❑ co 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 tO t 0 0 0 6D ❑ W O O O O O O O O O O O O O O O O O LO N O O to O O O O O N O + O O V' O O Lf) O O O O M (D fD in O O O N LD O �- co � � F- C,� O a) w tD O L - (Vri C'tco oo to �- O 0 I- 0) -T',M' O 0 .- Cl) a9 U V U O F- a'N n tD N CD (D N W M n �- tD co 0 a a 0 0 o o v H Q Q d M U) U(n 69 69 63 63 69 64 63 6fl 6R V) 69 63 69 69 63 63 63 63 63 69 63'613 619 cc O T cn O LL a) N o ❑ 1 ) 1 t 1 e n i0 N - Z O d 63 63 69 63 fA 63 ffl 69 63 69�69 69 to 61) 63.69) 63 69 63 63 63 63 tR c to a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Co 0 E o t o 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0l o 0 0 0 0000uio0ooui000000tri 000 tri U O O C) O O N O O O tD N 0 0 0 0 0 0 tO N O O (O O W d O V' O O CD (O O O N M CD CO tO O O Cl N (n O W ❑ F+ ti CO to - Cl M M o W M O O n M � M O to � M 1� N N co co co Cl) Cl) n .- tD w r �- tD Q F 69 E9 69 6-3 69 69 69 63 63 69 6fl 63 63 63 6} 69 63 6) 69 69 63 tf3 63 0 N O O O O O O O U O _O O t 1 1in 0 I CD lO i t 1 f 1 1 1 0 .ru W O O n 0 tD n O O O O 114 n p O ❑ V-19 d n Q t0' N M O OD eO (D 0 Q N V r O` LL 69 69 63 69 6A 69 63 63 69 63 6} 6fl 69 69 63.69 69 69 69 66 63 63- - 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 O _T a cu 0 0 p 0 0 0 0 0 0 0 O O O O O O O O O O O O O E- d 0 0 0 0 0 0 Co 0 0 0 0 0 0 0 0 0 0 LO O O co O (b Z L1 O j O o 0 0 0 0 0 0 0 C C 0 0 0 O O O N O N O O M W lO (� CD 0 0 0 0 lD O O O O (h O O tO 0 C C (D N to O le @ L , tO O tO r N w r M M U) O O n CA V M (D N m � M N CD EU n LO N (D w N tD M M n M 'r �--' �-- LO LO d0 to 69 69 69 69 69 69 69 63 63 6o 64 69 69 63 69 63 69 69 69 63 69 6- 4a Q M E Q C W c = co p co co Va 0 � v LL L W f43 U of l0 = O N C l0 Q �' M N O N 0 W U N fD N c0 c U E tC) W ❑ O O to O N .(6 N C a N �j t0 E_ Z p .O li) 'V-U. c a O O E 'C Z m -?C w o a 0 od o �_ m o N > co O OCD E Nr O N 69 cl E c _15 - O M fa N N O O 0 0 O N O G� U_ U L°) L w (n 0 o a v f° m` o f c is Wcl oo m m CD -t 0 g 3 m o E = � ' 0 n to U'y : 0 0 'N 0 � N w 0. Orn a '� ❑ is U c `) ca is m 4 co c m U ..o N m o O U C U O "O U c E 0 0 (A X N i a rn o m E L o m to 0 N 0 on U E 0 3 4 m c c m (ten c mn o 0 0 2 v r rn to c U 61 L .EX_ `1 N rn /U N U U a) a) a) 0 C A U) w o m - - N a `o_ `o_ o a o `g g g - m m m m - c o c c E 1O ;° .o . c c Q- - - 0 U o 0 0 0 w ` 2 0 = o � � � 052 r �' o 0 to 0 a) U) 0 C E rnE E 0L) 0 c c cdwwW WSa: h c cc _ C oIt* ❑ *f6 3 61 Q Q m U Q m U ❑ O r N N M it LO E N M tO O 90 r V Q m 0 r; r; r` aioioioi � � QQQQQ 8 .0 h;> r r r IMPORTANT NOTICE r To obtain information or make a complaint: r r You may call Travelers Casualty and Surety Company of America and its affiliates' toll- free telephone number for information or to make a complaint at: r 1-800-328-2189 r You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: r 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtectiona)tdi.state.tx.us r PREMIUM OR CLAIM DISPUTES: r Should you have a dispute concerning your premium or about a claim you should contact your Agent or Travelers first. If the dispute is not resolved, you may contact the Texas Department of Insurance. r r ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become apart or condition of the attached document and is given to comply with Texas legal and regulatory requirements. r r r r r r r r r (PN-042-B) Ed.10.18.07 r r WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER I POWER OF ATTORNEY TR"Q'VELE'`R S"Y Farmington Casualty Company� Y P Y St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company Attorney-In Fact No. 228661 Certificate No. 006731455 l KNOW ALL MEN BY THESE PRESENTS: That FarmingtonbCasualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance I Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc.,is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Anne Baker,J.Karl Sherrill,Jr.,and Robert J.Allonier t j S of the City of High Point State of North Carolina their true and lawful AttorneY(s)m- -Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings ntings obligatory in the nature thereof on behalf of the Companies i ° p s n their business of guaranteeing the fidelity of persons,guaranteeing the performance of �I contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. { i1 IN WITNESS WHEREOF,the Companies have caused this 10th his mstrumen P t to be signed and d their corporate seals to be hereto affixed,flus j day of March 2016 Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company a P Y Tr velers Casualty It and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company CASU'1� 1Y Wn. `2EINS'.,, Su s� cJSiY Ly0 �!•LORPORATf'yh• :�` ,; 1977 195 Vis„ � { =�: -- w HARTFORD i �'wtRrFaRDI "rttn a 1 a •S E A L '0'3 CONN. n CONN. g m 1896 ,�' .. i sEAZ:3 Q ANCu wc' 4°'IS '�'� i State of Connecticut By: City of Hartford ss. Rober[L.Raney, enior Vice President On this the 10th da of March 2016 Y before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury` Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. a;,.tlT In Witness Whereof,I hereunto set my hand and official seal. ( ,(/A, C , My Commission expires the 30th day of June,2016. � * Mane C.Terreault,Notary Public M 1 58440-8-12 Printed in U.S.A. 1 _WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUTTHE RED BORDER I ii WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any M of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of 120 _ ill'�'" r$ /7�� . Kevin E.Hughes,Assistant Seci tary i O ( T C o fit, Z C Pi ItyO0.PORAT�-'45 34` RPONgr''�< v t hM g �� i 19,8 2� 0 197? g ' � }�.SEAL;o", 'n; �'s _�_ o€ w H CCNNpCi GoNMRDN 1896 '-�•.SEAL::a� q, o a'•.•, y 6. D r ' ............a�^ �� �S..AH✓ 'L'5r, n uwx. To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the above-named individuals and the details of the bond to which the power is attached. t k WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 0061 19-1 MAINTENANCE BOND 13 Pagel of 3 Bond Number: 106601038 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Utility Service Co.,Inc. known as 7 9 "Principal"herein and Travelers Casualty and Surety Company of America ,a.corporate surety 10 (sureties,if more than one)duly authorized to do business in the State of Texas,known as 11 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of the State of Texas,known as"City"herein, 13 in the sum of Eight Hundred Fifty Two Thousand Four Hundred Thirty Five&00/Sollars 14 ($ 852,435.00 ),lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County,Texas,for payment of which sum well and truly be made unto the City and its 16 successors,we bind ourselves,our heirs,executors,administrators,successors and assigns,jointly 17 and severally,firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 theQ k day of FEB zuA ri y ,2012,which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein,to furnish all 22 materials, equipment labor and other accessories as defined by law,in the prosecution of the 23 Work,including any Work resulting from a duly authorized Change Order(collectively herein, 24 the"Work")as provided for in said contract and designated as Caylor SMG Ground Storage Tank 25 Repair and Repainting Project, City Project Number 02111; and 26 27 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans,specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH Caylor 5MG Ground Storage Tank Repair and Repainting Project STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number$2ltf Revised July 1,2011 I 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void; otherwise to remain in 5 full force and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work,it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 12 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort. 14 Worth Division; and 15 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 y 20 I d CITY OF FORT WORTH Caylor SMG Ground Storage Tank Repair and Repainting Project STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-GJ 17 Revised July 1,2011 NJ i 0061 19-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2instrument by duly authorized agents and officers on this the 1 day of F; r6otlef 3 .20 i 4 I 5 PRINCIPAL: I 6 Utility Service Co.,Inc. I 7 8 � 9 BY: u I 10 Signature 11 ATTEST: 0 N // Curt Dimsdale,Director of Bid Department o ���� \Gey..••• tl.;• ( *cipa ,. ecretary Shane Albritton Name and Title T • 0 �4 '; G F 0;� 6 Address: 535 Courtney Hodges Blvd 1w O �I ✓ = Perry,GA 31069 `7 CS 18 Z •.0.�C2$1. 20`\\; ess as to incipal SURETY: /tillITravelers Casualty and Surety Company of America P 23 - 24 25 / 26 Signature 27 28 J Karl Sherrill Jr., Attorney-in-Fact 29 ATTEST_: Name and Title 301 � AA.ILI� .C� 1Address: 1400 Eastchester Drive 32 ( Xsxamtwyxx Anita Chick,Witness as to Surety High Point NC 27265 33 34 35 Witness as to Surety Arne Baker Telephone Number: 336-878-7800 36 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH Cavlor 5AIG Ground Siorc e Tank Repair and Repainting Projec! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number.Ci.; Y Revised July 1,2011 /® + AFFIDAVIT THE STATE OF TEXAS § COUNTY OF Tr,-^-«4Aivi'��c��1S �§ BEFO,R.E ME,_ the undersigned authority, on this day personally appeared �' ��c.� � .�,�CAG\e , who being by me (Name) duly sworn, upon his/her oath deposed and said: I. My name is U'A �le I am the of LA XA�A e �. � J he (Title) Company Name) and am authorized to make this Affidavit with respect to City of Fort Worth Project No. W47-7 hereafter referred to as the "Project." 2. All persons, firms, corporations, and subcontractors furnishing labor and/or material on the Project have been paid in full. 3. The wage scale established by the City Council of the City of Fort Worth has been paid on this Project. 4. There are no claims for personal injury and/or property damages pending as a result of the Project. 0,, - �s� �,— Name Subscribed and sworn to before me on this \ �^ day of Not�Pubinand for the State of Texas(-,,eri 11\k C� CRISTYL SMITH tary PAMIC-S ate d Geotel® 11T:Comm. Peach County EVkee Sep.19,2021 AFFIDAVIT OF BILLS PAID AND LIEN WAIVER BY CONTRACTOR The undersigned Utility Service Company Inc. ("Contractor"), having furnished material and/or performed labor in connection with the construction of Caylor SMG Ground Storage Tank Repair& Repainting Proiect ("Project")of certain improvements located at 1300 North Cavlor Road Keller TK 76244 ("Property")for an inconsideration of the payment to the contractor of the sum hereinafter specified does hereby acknowledge and release as follows: Upon the receipt of $682,465 being payment on Invoice#2 dated 4/4/2018 for materials and/or labor performed by the Contractor for the Project(the"Work");contractor will waive and release any and all liens, rights and interests(whether choate or inchoate,and including,without limitation,all mechanic's and materialmen's liens under the Constitution and the statutes of the "Property"state) which are or may be owed,claimed or held by Contractor in and to the Property and the improvements constructed thereon by reason of the Work. Contractor represents,warrants, and certifies that all bills owed by the Contractor for materials furnished and labor performed in connection with the Work have been or will be fully paid and satisfied. If for any reason a lien or liens are filed for materials or labor against the Property by virtue of the Contractor's participation in the Project by any person claiming by,through,or under the Contractor, then Contractor will immediately obtain a settlement of such lien or liens and obtain and furnish to the owners of the Property a release thereof. Executedlk 20�. Contractor Name Utilitv Service Co.. Inc. By: y Title: t<< Witness Subscribed and sworn to before me under my official seal of office this day of 4�m CR' T t'MITH Notary Sign t re tmy Publk-Slele ofor8la Peach Countyy Comm.E P Sep.19,2621�r�avvas,Msr�.nrs suet May 4, 2018 Travis C. Tatum P.E. Dunham Engineering 12815 FM 2154, Suite 150 College Station, TX 77845 RE: Caylor 5MG Ground Storage Tank Repair & Repainting Project, Fort Worth, TX Dear Mr. Tatum: Please consider this letter as a request for an extension on the project due to weather delays. As of December 22, 2017, Utility Service Company, Inc. (USCI) had requested a total of 34 additional days due to inclement weather. USCI further requests an additional 30 days due to inclement weather (16 days due to rain & 14 days due to cold weather) and 2 days due to holidays (Thanksgiving & Christmas). A list of all days has been attached to this letter. The request for delays does not include any Sundays, which are considered as `No Inspection' days. USCI is requesting a total of 66 delayed days for the project. The project was completed, and the tank filled on February 26, 2018. The project was 163 days over time from the contract completion date of September 16, 2017. After accounting for the weather delays and / the holidays the project was over time by 97 days. At $250/day, USCI estimates a potential of $24,250 in Liquidated Damages for the project. Although the project was delayed, USCI requests that Liquidated Damages are not assessed. USCI completed the project and delivered a quality project. USCI went above & beyond to satisfy the city's requests as a sign of good faith and to deliver a project to the customers satisfaction. Sincerely, 4rsp� Apury Aggarwal Project Engineer Utility Service Co., Inc. 535 Courtney Hodges Boulevard P O Box 1350 Perry, GA 31069 Local:478.987.0303 1 Toll-Free: 800.223.36951 Fax:478.987.9657 1 utilityservice.com