HomeMy WebLinkAboutContract 51025 Received Date: 07/16/2018
Received Time: 8:13 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: Lackland Innisbrook,Inc., a Texas Corporation
Address, State,Zip Code: 3045 Lackland Rd.,Fort Worth,Texas 76116
Phone&Email: 817-502-2539 H dallen@lacklandholdings.com
Authorized Signatory,TitI;.J Don Allen, Secretary
Project Name: Innisbrook Place—Phase 3
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: North of WJ Boaz Road,East
Plat Case Number: None Provided Plat Name: Innisbrook Place
Mapsco: 32R Council District: 2
CFA Number: 2017-196 City Project Number: 101324
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Innisbrook Place—Phase 3 CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 1 of 11 FT.WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51025
WHEREAS, Lackland Innisbrook, Inc., a Texas Corporation , ("Developer"), desires to
make certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Innisbrook Place — Phase 3
("Project")within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3 OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 CITY SECRETARY
FT,WORTH, Tx
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) N_ Sewer(A-1) H. Paving(B) El_ Storm Drain(B-1) E. Street Lights & Signs
(C) M_
E.
-
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 4of11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify,and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 6of11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
R. IMMIGRATION AND NATIONALITY ACT
Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification Form
(1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and
supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate
procedures and controls so that no services will be performed by any Developer employee who is
not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND
HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO
VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,
SUBCONTRACTORS,AGENTS,OR LICENSEES.City,upon written notice to Developer,shall
have the right to immediately terminate this Agreement for violations of this provision by
Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Innisbrook Place—Phase 3
CFA No.: 2017-196 City Project No.: 101324
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 198,565.90
2.Sewer Construction $ 237,379.85
Water and Sewer Construction Total $ 435,945.75
B. TPW Construction
1.Street $ 595,437.40
2.Storm Drain $ 2,560.00
3.Street Lights Installed by Developer $ 59,212.50
4. Signals $ -
TPW Construction Cost Total $ 657,209.90
Total Construction Cost(excluding the fees): $ 1,093,155.65
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 8,718.92
D. Water/Sewer Material Testing Fee(2%) $ 8,718.92
Sub-Total for Water Construction Fees $ 17,437.84
E. TPW Inspection Fee(4%) $ 23,919.90
F. TPW Material Testing(2%) $ 11,959.95
G. Street Light Inspsection Cost $ 2,368.50
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 38,248.35
Total Construction Fees: $ 55,686.19
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,093,155.65
Completion Agreement=100%/Holds Plat $ 1,093,155.65 X
Cash Escrow Water/Sanitary Sewer-125% $ 544,932.19
Cash Escrow Paving/Storm Drain=125% $ 821,512.38
Letter of Credit=125%w/2yr expiration ptriod $ 1,366,444.56
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Lackland Innisbrook,Inc.,a Texas Corporation
4"1 chapa(Juu o1s1
esus J. C apa
Assistant City Manager DamAffe v
Date:Jul 12,2018 Dou Allen;Jun 22.201S)
Name: Don Allen
Recommended by: Title: Secretary
E� G Aftgef
Date: Jun 22,2018
Evelyn R erts(Jul 11,2019)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
Richard A MccracXeln requirements.
Richard A.McCracken(Jul 12.2018]
Richard A.McCracken 4-10M —k
Assistant City Attorney Janie Scarlet[Morales(Jul 11,2018)
M&C No. NSA Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A O
ATTEST: (i' ;O
Mary). ayser(Ju112, 018,
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secreta /4$
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Innisbrook Place—Phase 3 CITY SECRETARY
CFA Official Release Date:02.20.2017 FT.WORTH,TX
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
0 Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A:Water Improvements
Water Cost Estimate
fSG Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101324
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Innisbrook Place—Phase 3
CFA Official Release Date:02.20.2017
Page 11 of 11
Q
Z �
O
O
Q W N
O QN
Q
U O <Ld m
W 0 =
V) Q m w
Q OU z O
_ � O v o
n wo
z N o 0
W m o
U = N
gJ b83ONVH
W NOSN
�i 0 NMO U
m � � �
m
O 3SIM
p L- > E
w
r0 > o
Q L �
In m m
^ / ) N
V I V J
mI
Z
Z V �
Z
N O
CL c O
O O
N E •— M
N
.o
L
n Q
•M� O
W 3 u
LLJ `m
li U
O � O
d
N
m
d
O
m
rn
O O v
O
M
rel > LS
p 00 Q =
Z I` 0 Lli
i --
N Z F Ij
m , 9
Z- 99 LL
o F-- -� z
W W o00 �
(nom (Y
O \ O � N
D_ Q
O
� S � Cf) F— (D
WLR XQN - Q (�
Zs
l 11 W
Z l
6L // Ll \ \ W
1 \
oz
LZ � ! Sl
W
zz
s I / Lt, b�LO
o o £Z C L 1 ££ 94 Z O
_ 9 O
ZL
W O
/ —DQ
sZ a ,� ag L£ z //
19
Ir rl7,
0£ //
9Z 01
W I sZ u 1 zL UL
3NOlS�V3 m O
3�Iii0
/9 = N
U BOL ZZ l BZ S ,r l I £L I I // ." LLl
M
-4 F71 LZ Z gA LZ 9 1 /B°
LOJr I I I j 1 L9 I y I
£ 9Z L SL
��l i °Z i >
r 4 Q I SZ B l _I l 9L 99 U u U
I w Ncl6L I ol, II CL S9
O1 off g 4Z 0 6 1 _
< 4a ��
O 4- 7D j eL y CD I £z oL a9 E
�/ L £9
II_
CID LL O L w �F zz m g Q L
(lr1r B —I LZ o z9 m
1 / O 9 l� V) o
' ^ ZOl 1 1 � 1 1
VJ
_ 6 OZ ®L ° V
I I s L I I � l — 00 ^
Z
LID, __ n ZB C m
Ol 6L C9
zOOl l 4t tt BL Sl °I £9 6S O
v
V,^ o
N o
66 '� £L Zl LL 9L J l 49 99 I C•� m o
IE
B6 3h1i1 ON 1138 f1Hl ON l / 99 m q
LS
L6 96 S6 46 £6 Z6 l6 U06
L69 BB LB
•� L o
cn g mw3
x -
W -
o
zw z
WW W� Li zo
W 61
CD
W
n
U C s
O^
�O
N
In
0
O
a
0
O
� j
g 9SO
o o I a -
LC) � �1
00 L — 3 M N O
CD r, o I W N
Q
J ` _ Q
x � I xWN — z5 N
W WN BL W (nQ- L- N
W r—
cr) \ —
OF- 0z I `�- � , i \
W
Z 91 z i' \
a
W W
` III L
W s O Q
W Z6
0
Q o z
C)-
_
II % ;
con
;r
sZ l I LL e aq
r^ nx L£ Z [
I
96 0l Ih r ? O
I � I 0£
6
W 3AIdG 3NMS7V� 6Z b m O
- - A9 N
ZZ
L I � 8Z S r:JI I I £ o�
Q I I
a�
J [ol ` z Z FH Lz
1L I I SL L9 I i 1
I I £ I I� 9z L I
90 0Z
b o z 8 — 941 U E
w —
S 6l S I bZ I)o I [
o a l _
Or BL LL =9 £z L of BL= b9 .E
ry
M am LL QL 1 r zz L L I I�� £9 O L
W I� I � 9l (nB z ZL I I OB Z9 1-7
I_
(�
" 6 oz £L e� °
� --I I
Za-0L I II 6L bL zR ov � m
z I 11
pp l l bl • BL Sl m� £ BS ( _ O '� o
66 £L z Ll 91 b9 l BS� L
ss ss —
B6 i 3hIN N a N / Sg C � m
LS
99
L
L6 96 S6 b6 £6 Z6
L16 HO6 6B B9 LB qS _�
•� V/x �
O - MWS
x 3
w
ZN5 O O O
W U O o O
z Of JNim
LiW W W O Z o w N
�Z ?�=
WJ WZ ;< z
Li V) V)Q O c 0 o
ozo'
J 11
d
moo
0
LIM1
s.
IMIA
Li
FM
C-I I
I q__� q= qmN 1 1
� ��q q��-,ft _ � 1141 •
lap - q _ -
.. [oq q_ ] aq ate' q ..
CN ��BONN I ®q N -
C� C� �n
.. ��I No UP..,I 0� _
0-C
WN 4, J, M
-
J a c EE
• -
..
1
q LS
-
LLI
0
j 9S 9
I
O J U-) 9LLIJ ss s W
W Ib LLI U z Q
w k
� J � X m
W
W H 1W0 Li 00
CO 01� V O
- Lam. _-- lO
� U
LL' O rj W U W N - rcn
0 N
U 91 �I Z9 N
n \
6L L \� LL ! \
W II b
ZZ 4L
/ W
Q o £Z 94 /�/, z O
0
X/
O
n a :�b
LL >z I Z£
W / �\ UO
W O
it
9Z LL a L£ z �/ !' O
�r
I r L
o£
9z 0L 6
/OL
W 3AIHa 6z y_ I ZL O
� Q7
U1 69 \ N
ZZ l 1 BZW X r`1 I £L
-J Z Z r, LZ S bL
LOl 1
£ 1 I 9Z L i SL
90L oz > _ .
9L 59 U ()) E
`Y/ W C
y SOL 6l O LL
Os 1 4Z 6 —
bOl 11 = 1I Bl LL 9 £Z L OL 0 I 9L
O !
E
P
Ll ZZ 11 I4ry
6L £5 O L
W mrc
LZ zL Zo Ic7cKT z9 m
' ^ ZOL — 9L 9 Z7 U) a
0z £L L9 19 I V
Z
E]
I I s L 1 I z9 C'
c9 I O�
I 0 l I I 6l 4l 1 1
i
Z41II "� 1
OOL it 9 65£
O
6 C
L
cDr 6 '� 1 Cl ZL I I Ll 91
. m
86I 13AIHPON 2138 f1Hl ON 1 59 0
W
� o
99 s
L696 S6 46 £6 Z6 lfi O6 fi9 89 L8
II o
m LTJ -
U
H LI
_ O
CJ�c O^
�Jry
70
3U ZOa �
OZa
5 m g n
al Z_
o
za
0
0
LS
S
9 V/
.. .. Z li
s SS Sw w r
\ �.. m N w
L 3 M (� C O
W N
29
p N
9L 11 Z9
zl 11 I �
LL
oz I i �
F I � sl z
os
<ro ZZ
z g
£z I I
i
I EI £L
" 9 I Sb O
= x 44 v o
4ZLLL i i Zl L I I Z t / W O
ILLJ
sz j LL s Fn I !—t c z / �� �� )y O O
NN
r S L L
O
I F I 0£ £ l LL 1(0
9Z I OL
6 I I I I
---- ---- I 1 OL
w WHO 3N01SWJ 6z q I ZL O
m
U90t IZZ l I BZ S F £L `69
I I � / � m
4
� I I I 4L es i I
Lol F� I LZ I LZ s I I I
£ I I 9Z L I I sL I I
I I pZ I
sot I I I I I > I
4 I ISZ B I I 9L 99 I U o
Sol j BL I I I p I
Nell
6
I LL
BL S4990 a
40l BLs £Z LCO wI o iI
.�•W
m mO I I >Z :2 ¢9 z aL
rioll ol L wDo LL �
®E
w
muj
9 I tZ ZL I z oB Z9 I Z I
,C" I I sl
V I I I
/ ) I I o i
J 6 OZ £L I I Ls Ls I I
z Lol I I SL I I
I I I I I
I OLI 6L 4 I Z9 OB I m
o0t I i 4L L I 9L t J I £9 6s I I O
66 7 £l zL I Ll 9l ) l 49 BS I l �-
----
� a
96 I� WHO ONV-lH3ev4nHla0N j 99
LS T
99 r
L6 95 96 46 £6 Z6 l6 U.. 6B 89 LO S ern_ `o
c : o
W w 3
U
3�Fr a
r,pc
vaiJmI
<Vz N
a� 0'z ❑ d
�� o m fou �
W Z
> J W W
W p� �
Z
O
tO
II b D {? LS n
0
' I p ..__ F ___..__..{CD
`1 Q
9 z
W
\ mLd
4 �
LLJ
LLJ
J Bl ii z9 (n N
Ll V)
/Awry •
oz (D v
/ 9l ( \ / w J
\ s
p iLij
I sl £ '� ✓ /
o� £Z
I I 9 � //C'�' O
�1 bZ Z l Z£ r 4 % \\ U
LL L L r A i> /r W O
X. a/
sz I I ll x.- I / / N/ � /' � O
B =a l£ z 'fib O
I F" 1 /
IM 11
1 L Seo
9Z I Ol 6 0 £ I /
w zL
3nlaa 3Nols7V3 I 6z b m O
U qb
N
V, m
xa bL �99
LOL �� LZ z 4 Z S �/ 1
£ 9Z L 9
L9
I I oz I I
90l I I I > I
9L 1 _o
b o B y�i01 +- U 0) 9
r a �bo
Obol m Bt ll 9 £Z L ail m L3 D� o' W E
L ? Pm �[=
£ l p k� Ll L w h� ZZ I= S'9 > O L g
rP o ) z
zol 9l B Z1m rn
V/
Z 0
1 0l II 6l bl ZB 09 I'I ' (oz ttt
ro
ool l st xql £e 6s rn
� o
66 —£l — Zl Ll 9l l aB ss ;� c: o
h
26 3nIa0 aNVIa3ewnHlaoN i Se + o
a
NJ L6 96 S6 46 £6 Z6 H16 06 68 BB
W W
a
�0 0
To -
�� 4U¢ (n
3� 0 11
�z
G u' O O v
o zi
0
00 42 43
DAP-BID PROPOSAL
Page 1 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Propose-
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS SHEET 5-7
1 3311.0261 8"PVC Water Pipe 3311 12 L.F. 3941 $21.85 $86,110.85
2 3312.3003 8"Gate Valve 33 12 20 EA. 9 $1,137.00 $10,233.00
3 3312.0001 Fire Hydrant 33 12 40 EA. 5 $3,700.00 $18,500.00
4 9999.0001 Remove 8"Plug and Connect to Existing 00 00 00 EA. 2 $500.00 $1,000.00
5 3312.2003 1"Water Service 33 12 10 EA. 116 $656.00 $76,096.00
6 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2.2 $2,564.00 $5,640.80
7 13305.0109 Trench Safety 33 05 10 L.F. 3941 $0.25 $985.25
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT I:WATER IMPROVEMENT $198,565.90
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 Bid Sheet.As
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Biddels Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS SHEET 8-13
1 3331.4115 8"PVC Sewer Pipe 33 31 20 L.F. 3565 $38.29 $136,503.85
2 9999.0002 Connect to Existing Sewer Manhole 33 39 20 EA. 2 $1,065.00 $2,130.00
3 3339.1001 4'Manhole 33 39 10 EA. 11 $2,840.00 $31,240.00
4 3339.1003 4'Extra Depth Manhole 33 39 10 V.L.F. 29
5 3331.3101 4"Sewer Service 3331 50 EA. 116 $511.00 $59,276.00
6 3301.0002 Post-CCTV Inspection 3301 31 L.F. 3565 $1.75 $6,238.75
7 3301.0101 Manhole Vacuum Testing 3301 30 EA. 11 $100.001 $1,100.00
8 3305.0109 Trench Safety 33 05 10 L.F. 3565 $0.251 $891.25
10
11
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $237,379.85
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fotm Version September 1,2015 Bid Sheet.xls
LAP BIDPP
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS SHEETS 33 8.38-40
1 3137.0104 Medium Stone Riprap,dry 31 3700 S.Y. 64 $40.00 $2.560.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT III:DRAINAGE IMPROVEMENT $2,560.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 Bid Sheet.xls
00 42 43
DAP-BIDPROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT IV:PAVING IMPROVEMENTS SHEETS 24-30
1 3213.0101 6"Conc Pvmt 32 13 13 S.Y. 13184 $35.50 $468 032.00
2 3211.0501 6"Lime Treatment 3211 29 S.Y. 14042 $3.70 $51,955.40
3 3211.0400 Hydrated Lime 3211 29 TON 253 $173.00 $43 769.00
4 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA. 8 $1 916.00 $15328.00
5 3213.0501 Barrier Free Ramp,Type M-2 32 13 20 EA. 2 $1 664.00 $3,328.00
6 3213.0501 Barrier Free Ramp,Type P-1 32 13 20 EA. 2 $1,500.00 $3,000.00
7 3441.4006 Install Alum Sign Ground Mount 3441 30 EA. 9 $378.00 $3,402.00
8 3213.0301 4"Conc Sidewalk 32 13 20 SF 56 $7.00 $392.00
8 9999.0006 Remove Barricade 00 00 00 LF 58 $4.00 $232.00
8 9999.0004 Road Barricade(Type III) 00 00 00 EA. 1 $877.00 $877.00
8 9999.0005 Yellow Safety Bollard 00 00 00 EA. 2 $381.001 $762.00
11 9999.0007 Traffic Control 00 00 00 MO 5 $872.00 $4,360.00
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT IV:PAVING IMPR&EMENT9 $595,437.40
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 Bid Sheet.xls
004243
DAP-BID PROPOSAL
Page of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Pr(
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT V:STREET LIGHTING IMPROVEMENTS SHEETS 41-42
2605.3016 2"Sch 80 PVC(includes Trenching& 26 05 33
1 Backfill) L.F. 765 $9.52 $7,282.80
2 3441.1410 NO 10 Insulated Elec Condr 3441 20 L.F. 2295 g$295.50
$4,567.05
3 3441.3002 Rdwy Illum Assmbly TY 8,11,D-25,and D- 3441 20 EA. 15 $23,250.00
4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 3441 20 EA. 15 $16,567.65
5 3441.3201 LED Lighting Fixture 34 41 20 EA. 15 $4,432.50
6 3441.1646 Furnish/Install Type 33B Arm 3441 20
15 $207.50 $3112.50
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $59,212.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 Bid Sheei.xls
00 42 43
DAP-BID PROPOSAL
Page 6 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Unit of Bid
No. Description Section I Measure Quantity Unit Price Bid Value
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENT
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 Bid Sheet.xls
00 42 43
DAP.BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project item Information Bidder's Proposal
Bidlist Icm Specification Unit of Bid
No. Description SeUioI No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT l:WATER IMPROVEMENTS SHEET 5-7 $198,565.9_0
UNIT It:SANITARY SEWER IMPROVEMENTS SHEET 8-13 $2_37,379.85
UNIT III:DRAINAGE IMPROVEMENTS SHEETS 33&38-40 _$2,560.00
UNIT IV:PAVING IMPROVEMENTS SHEETS 24-30 _$595,437.40
UNIT V:STREET LIGHTING IMPROVEMENTS SHEETS 41-42 $_5_9,212.50
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid $1,093,155.65
� - 2-
Contractor
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 100 calendar days after the date when the
CONTRACT commences to run as provided in the General Coaditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS.DEVELOPER AWARDED PROJECTS
Form Vmion Sepl4mha 1.2015 Bid Shawls
COMPLETION AGREEMENT—LENDER FUNDED
This Completion Agreement("Agreement)is made and entered into by and among the City
of Fort Worth ("City"), and Lackland Innisbrook, Inc., a
, a Texas ("Developer"), and Simmons Bank sucgessozbymergelrto South st Bank
("Lender"), effective as of the date subscribed by the City's City Manager or Assistant City
Manager. The City,the Developer and the Lender are hereinafter collectively called the"Parties".
WITNESSETH:
WHEREAS, the Developer owns that certain tract of real property that contains
approximately 22.122 acres that is located in the City, the legal description of which tract of real
property is marked Exhibit"A"—Legal Description, attached hereto and incorporated herein for
all purposes ("Property"); and
WHEREAS, the Developer intends to develop the Property as an addition to the City
through plat FP 017-037 or I- ,,N/A: and
WHEREAS, the Developer and the City have entered into a Community Facilities
Agreement relating to the development of Innisbrook Place Phase 3 ("CFA"); and
WHEREAS, the City has required certain assurances of the availability of funds to
complete the water and sewer utilities, streets/paving, storm drain, street lights and street signs for
the development of the Property ("Improvements"), and
WHEREAS, in order to provide such assurances as have been required by the City, the
Lender has agreed to advance certain funds to the City for Hard Costs (which term is hereinafter
defined)subject to,and in accordance with,the terms,provisions and conditions of this Agreement;
and
WHEREAS, the Developer has granted to the Lender as additional security for the Loan
(which term is hereinafter defined) a security interest in all plans and specifications for the
development of the Property(collectively,the "Plans"); and
WHEREAS, the Parties desire to set forth the terms and conditions of such
accommodations as are described above.
NOW THEREFORE,for and in consideration of the benefits to be derived from the mutual
observance by the Parties of the terms and conditions hereof, and for and in consideration of Ten
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 1 of 16
Dollars($10.00)and other good and valuable consideration,the receipt,adequacy and sufficiency
of which are hereby acknowledged,the Parties agree as follows:
1. Recitals. The foregoing recitals are true, correct and complete and constitute the
basis for this Agreement and they are incorporated into this Agreement for all purposes.
2. The Completion Amount. The City and the Developer agree that the Hard Costs
required to complete the Improvements in the aggregate should not exceed the sum of ONE
MILLION NINETY-THREE THOUSAND ONE HUNDRED FIFTY FIVE DOLLARS AND
SIXTY FIVE CENTS Dollars { 1,05;155 , hereinafter called the "Completion Amount".
Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of the
Improvements may vary as a result of change orders agreed to by the Parties, but such variances
for the purposes of this Agreement shall not affect the Completion Amount as used herein.
3. Adjustments to the Completion Amount. The Lender may from time to time make
advances to the Developer for the development of the Property under the development loan that
has been made by the Lender to the Developer for the purpose of financing the costs of constructing
the Improvements for the Property (the "Loan") subject to, and in accordance with, the terms,
conditions and provisions of the Loan Documents (which term is hereinafter defined) evidencing
and securing the Loan. Some of those advances shall be for Hard Costs as specified in the
"Approved Budget" relating to the Loan, a copy of which Approved Budget is marked Exhibit
"B", attached hereto and incorporated herein for all purposes, with the Hard Costs line items
highlighted. The term"Hard Costs"shall mean the actual costs of construction and installation of
the Improvements. To the extent that advances under the Loan are for the payment of Hard Costs,
the Completion Amount shall be deemed reduced, dollar for dollar. The Lender may withhold
statutory retainage from any advances under the Loan or pursuant to this Agreement. All such
retainage withheld, to the extent it is attributable to Hard Costs, shall also reduce the Completion
Amount dollar for dollar. All retainage withheld by the Lender for Hard Costs that are advanced
to the City pursuant to this Agreement shall be released to the City as provided in the Texas
Property Code upon expiration of the statutory retainage period.
4. Completion by the Developer. The Developer agrees to complete the
Improvements on or before the date for completion that is established in the Loan Documents plus
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 2 of 16
thirty(30) days (the"Completion Date"), in accordance with the CFA,the Plans approved by the
Lender and the City and all documents evidencing or securing the Loan (collectively, the "Loan
Documents"). For the purposes of this Agreement, the development of the Property shall be
deemed complete upon acceptance by the City of the Improvements. The City shall promptly
notify the Lender and the Developer upon such acceptance.
5. Completion by the City. In the event that either: (A) the development of the
Property is not completed by the Completion Date for any reason whatsoever,or(B)the Developer
is in default under the Loan,then the Lender, at its sole option,may request the City to complete
development.The City may,at its sole option and at the cost and expense of the Developer,within
10 days from receipt of Lender's request, notify Lender that it will undertake to complete the
Improvements and the City shall then commence, pursue, and complete the Improvements in a
reasonably timely, diligent and workmanlike manner in accordance with the Plans, subject to the
terms of this Agreement. The Lender and the Developer agree that the City may use the Plans as
necessary to complete the Improvements.
If the City does not timely elect to complete the construction of the Improvements or if the
Lender does not request the City to complete construction of the Improvements, then the Lender
may at its election terminate this Agreement, or at its option, proceed to complete the
Improvements, or foreclose on any of its collateral, or take any and all such action as may be
provided under the Loan Documents.
6. Advance of Completion Costs to the City and Delivery of Hard Costs Collateral to
the Citv. In the event the Lender has requested the City and the City has elected to complete the
Improvements,Lender shall transfer to the City all remaining undisbursed Hard Costs specified in
the Approved Budget within 10 days of the date that the City elected to complete and provided
Lender with written notice of such election.
The Developer hereby authorizes and instructs the Lender to make the transfer of any
remaining undisbursed Hard Costs specified in the Approved Budget to the City within 10 days of
notification that the City elects to complete the Improvements.
In the event the cost to complete the Improvements exceeds the moneys transferred to the
City, City shall notify Lender and Developer in writing of the need of additional funds. The
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 3of16
additional funds required to complete the Improvements shall be delivered to the City within 10
business days following notification to Lender and Developer. Failure to deliver the additional
funds shall relieve the City of the obligation to complete the Improvements, in which event City
shall use the Hard Costs funds in its possession to pay the contractor(s)all funds due it/them. Any
remaining undisbursed Hard Costs shall be returned to Lender within a reasonable time.
7. Completion by the Lender. The Lender may, at its discretion, but shall not be
obligated to, undertake to complete the Improvements if there is any default under any Loan
Documents in lieu of requesting the City to complete the Improvements. If the Lender elects to
complete the Improvements, any Hard Costs it expends shall, dollar for dollar, reduce the
Completion Amount.
8. Easements. In the event the City or the Lender undertakes the completion of the
Improvements, the Developer(and to the extent necessary the Lender) grants to the City and the
Lender open access to the Property and shall execute and deliver such temporary easements over
and across the entirety of the Property for the purpose of access and use for the completion of the
construction of the Improvements in accordance with this Agreement. To the extent requested by
the City and the Lender, written temporary construction easements in form acceptable to the City
and the Lender shall be executed by the Developer and filed of record. Nothing in this paragraph
shall reduce any rights of the Lender or obligations of the Developer under the Loan Documents.
9. Lender's Rights. Nothing in this Agreement shall affect any portion of the Lender's
collateral for the Loan or limit or impair the Lender's right to foreclose the same or deal with the
collateral as it elects in accordance with the Loan Documents.
10. Satisfaction of the City Requirements. The City agrees that the assurances and
covenants contained in this Agreement satisfy all requirements of the City with respect to
Developer's performance bond or other financial security in connection with the development of
the Property and the completion of the Improvements that are contained in the CFA or in any other
agreement relating thereto, and the City hereby accepts the assurances and covenants contained
herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the
provisions of this Agreement shall control.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 4 of 16
11. Termination. This Agreement shall terminate upon the earlier to occur of the
following: (a) acceptance by the City of the Improvements; (b) mutual written agreement of
all of the Parties; or(c)the reduction of the Completion Amount to zero. However, release of the
plat shall be governed by paragraph 12 hereof and termination pursuant to (b) or (c) of this
paragraph 11 shall not require the City to release the plat.
12. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat
of the Property until the Improvements are completed and accepted by the City and all Hard Costs
contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence
from the Developer showing that all Hard Costs contractors have been paid, including but not
necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time
file the final plat for the Property in the Plat Records of the county where the Property is located.
The purpose of the City retaining the final plat of the Property as provided herein is to guarantee
the Developer's obligations under the CFA are completed.
13. Construction Contracts. Developer agrees to include in each Construction contract
that it enters into for the completion of the Improvements the following:
a.A statement that the City is not holding any security to guarantee any payment for work
performed on the Improvements;
b. A statement that the Property is private property and that same may be subject to
mechanic's and materialman's liens;
c.A requirement that each contractor contracting with the Developer release the City from
any claim that is related to the Property of the Improvements; and
d. A requirement that each contractor contracting with the Developer include in each
subcontract the statements contained in a., b., and c. above.
14. Miscellaneous.
A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the
Parties without the prior written consent of all the other Parties.
B. Notice. Any notice required or permitted to be delivered under this Agreement shall be
deemed received on actual receipt by the appropriate party at the following addresses:
(i) Notice to the City shall be addressed and delivered as follows:
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 5 of 16
City of Fort Worth
Planning and Development Department
200 Texas Street
Fort Worth,Texas 76102
Attention: CFA Division
Janie Morales,Development Manager
Email: Janie.Morales@fortworthtexas.gov
Confirmation Number: 817-392-7810
and/or
Attention: CFA Division
Email: cfa@fortworthtexas.gov
Confirmation Number: 817-392-2025
With a copy thereof addressed and delivered as follows:
Richard A. McCracken
Office of the City Attorney
City of Fort Worth
200 Texas Street
Fort Worth,Texas 76102
Confirmation Number: 817-392-7611
(ii) Notice to the Developer shall be addressed and delivered as follows:
Lackland Innisbrook,Inc.
3045 Lackland Rd.
Fort Worth,TX 76116
Email: dallen@lacklandholdingscom
(iii) Notice to the Lender shall be addressed and delivered as follows:
Simmons Bank successor by merger to Southwest Bank
2200 West 7t`Street Suite 112
Fort Worth,Texas,76107
Email: alec.harry:@simmousbanKcom
A party may change its address for notice upon prior written notice to the other parties pursuant to
the terms hereof.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 6 of 16
C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the
laws of the State of Texas.
D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties
and their respective legal representatives, successors and assigns.
E. Legal Construction. In case any one or more of the provisions contained in this Agreement
shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such
invalidity, illegality, or unenforceability shall not affect any other provision of this
Agreement, and this Agreement shall be construed as if such invalid, illegal, or
unenforceable provision had never been contained in this Agreement.
F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of
the Parties with respect to the subject matter hereof and supersedes any prior
understandings or written or oral agreements among the Parties concerning the subject
matter hereof, provided, however, that this Agreement shall not supersede, amend or
modify any of the Loan Documents or any portion thereof.
G. Amendment. This Agreement may only be amended by a written instrument executed by
all of the Parties to his Agreement.
H. Headings. The headings that are used in this Agreement are used for reference and
convenience purposes only and do not constitute substantive matters to be considered in
construing the terms and provisions of this Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015
Page 7 of 16
ACCORDINGLY, the City of Fort Worth, Developer and Lender have each caused this
instrument to be executed in quadruplicate in each entity's respective name by its duly
authorized signatories effective as of the date executed by the City's City Manager or his/her
designee.:
CITY OF FORT WORTH: DEVELOPER:
Lackland Innisbrook, Inc. , a Texas
Corporation
s J.Chapa(Jul 1 018)
Jesus J. Chapa
UdY1i fl/.L�fZ
Assistant City Manager Don Allen(Jun 22,2018)
Name:
Title:
Date: Jul 12,2018
Approved as to Form and Legality: Date: Jun 22,2018
LENDER:
Richard A. MoCragen Simmons Bank successor by merger to
Richard A.McCracken(Jul 12,2018) Southwest Bank
Richard A. McCracken
Assistant City Attorney
ATTEST: Alec Barry(Jul 10,201;.
Name:
Title: AM=
M.J.�ayser(Jul12, 01B) Contract Compliance Manger
Mary J. Kayser
City Secretary By signing I acknowledge that I am the
person responsible for the monitoring and
M&C: administration of this contract, including
Date: ensuring all performance and reporting
requirements.
"fAA4;9-sca.,_L'err-Marey
Js ie Scarlett ldorales(Jil 11,20181
Janie S. Morales
Development Manager
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 8 of 16
T1MLH:_LJM!_. the Guarantor of the Development Loan, is executing this Completion
Agreement for the sole purpose of acknowledging that advances that are made by the Lender
pursuant to this Completion Agreement shall be deemed to be advances that are made under the
Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement
that was executed by
GUARANTOR
Tim [_� Fleet
Tim H.Fleet(Jun 25,2018)
By:
Name:
Title:
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 10 of 16
List of Exhibits to the Completion Agreement
Attachment 1 —Changes to the Standard Completion Agreement
Exhibit A-Legal Description
Exhibit B - Approved Budget
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 11 of 16
ATTACHIVIENT"1"
Changes to Standard Completion Agreement
None
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 12 of 16
EXHIBIT A
STATE OF TEXAS §
COUNTY OF TARRANT §
WHEREAS Lackland Innisbrook, Inc. being the owner of a tract land situated in the City Fort
Worth,Tarrant County,Texas to wit:
BEING a tract of land situated in the A. Roberts Survey,Abstract No. 1262,Tarrant County,Texas
and being all of the remainder of a tract of land described by deed to Lackland Innisbrook, Inc., as
recorded in Document No. D217177177 of the Deed Records of Tarrant County, Texas
(D.R.T.C.T.) and being more particularly described by metes and bounds as follows: (Basis of
bearing being U.S. State Plane Grid - Texas North Central Zone (4202) NAD83 as established
using the Western Data Systems RTKNet Cooperative Network. Reference frame is NAD83(2011)
Epoch 2010.0000. Distances shown are U.S. Survey feet displayed in surface values).
BEGINNING at a found 5/8 inch capped iron rod marked `BHB INC" (CIRF) for the northeast
corner of Lot 56,Block 2, Innisbrook Place, an addition to the City of Fort Worth,Tarrant County,
Texas, as shown on plat recorded in Document No. D217049634 of the Plat Records of Tarrant
County, Texas (P.R.T.C.T.) and being in the south line of Lot 1, Block 1, Boswell High School
Addition, an addition to the City of Fort Worth, Tarrant County,Texas as shown on plat recorded
in Cabinet A, Slide 8557, PRTCT;
THENCE South 89°58'31" East, with the common line between said Lot 1 and the north line of
the said Lackland Innisbrook, Inc.,tract,passing at a distance of 665.50 feet a found 1/2 inch iron
rod for the southeast corner of said Lot 1, same being the southwest corner of a tract of land as
described by deed to Lorin Albert Boswell, Jr., as recorded in Volume 6868, Page 2233,
D.R.T.C.T., and now continuing with the common line between the said Lorin Albert Boswell, Jr.,
tract and the said north line, in all for a total distance of 820.53 feet to a found 5/8 inch capped
iron rod marked "LINK FIELD RPLS 5594" for the northeast corner of the said Lackland
Innisbrook, Inc., tract, same being the northwest corner of a tract of land as described by deed to
Coburn Farm, Ltd., as recorded in Document Number D203387533,D.R.T.C.T.;
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 13 of 16
THENCE South 00°28'56"East,departing the said common line and with a common line between
the said Lackland Innisbrook,Inc.,tract and the said Coburn Farm,Ltd.,tract,a distance of 828.46
feet to a CIRF;
THENCE over and across the said Lackland Innisbrook, Inc., tract the following courses and
distances:
South 89°31'08"Wes, a distance of 15.00 feet to a CIlRF;
South 00°28'56"East, a distance of 487.36 feet to a CIRF;
South 89155'19"West, a distance of 355.20 feet to a CIRF;
along a curve to the right having a central angle of 05°06'49", a radius of 425.00 feet,an arc length
of 37.93 feet, and a chord which bears North 87°26'15"West, a distance of 37.92 feet to an CIRF
for the southeast corner of Lot 1, Block 12 of the aforementioned Innisbrook Place addition;
THENCE with the common line between the said Lackland Innisbrook, Inc., tract and the said
Innisbrook Place addition the following courses and distances:
North 31°47'19"East, a distance of 101.31 feet to a CIlRF;
North 58°12'41"West, a distance of 110.00 feet to a CIRF;
North 31°47'19"East, a distance of 26.36 feet to a CIlRF;
along a curve to the left having a central angle of 03°03'16", a radius of 275.00 feet, an arc length
of 14.66 feet, and a chord which bears North 30'15'42"East, a distance of 14.66 feet to a CIRF;
North 6I°15'56"West, a distance of 50.00 feet to a CIRF;
along a curve to the right having a central angle of 03°47'58", a radius of 225.00 feet,an arc length
of 14.92 feet, and a chord which bears South 30°33'40"West, a distance of 14.92 feet to an CIRF;
South 76°47'19"West, a distance of 14.14 feet to a CIRF;
North 58°12'41"West, a distance of 272.73 feet to a CIRF;
North 13°12'41"West, a distance of 14.14 feet to a CIRF;
North 31'47'19"East, a distance of 15.50 feet to a CIRF;
North 58°12'41"West, a distance of 50.00 feet to a CIlRF;
South 31'47'19"West, a distance of 15.50 feet to a CIRF;
South 76°47'19"West, a distance of 14.14 feet to a CIRF;
North 58'12'41"West, a distance of 124.66 feet to a CIRF;
North 31°47'19"East, a distance of 55.00 feet to a CIRF;
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 14 of 16
North 23014'05"East,a distance of 71.07 feet to a CIRF;
North 05139'18"East, a distance of 68.85 feet to a CIRF;
North 00°28'52" West, a distance of 701.33 feet to the POINT OF BEGINNING and containing
963,205 Square feet or 22.112 Acres of land more or less.
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 ME
CFA Official Release Date:07.01.2015
Page 15 of 16
EXHIBIT B
APPROVED BUDGET
Section I
Water $198,565:90
Sewer $237;379.85
Subtotal $435,945.75
Section 11
Interior Streets $595,437.40
Storm Drains $2,56.0-00
Subtotal $597,997.40
Section III
Street Lights $59,212.50
Sub-total $59,212.50
TOTAL $1,093,155.65
City of Fort Worth,Texas
Standard Completion Agreement—Lender-Funded Revised 09.07.2017 JLE
CFA Official Release Date:07.01.2015