HomeMy WebLinkAboutContract 47353-A4 AMENDMENT NO. 4 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
COMMUNITY CENTERS EXPANSION PROJECT
(Eugene McCray &Handley-Meadow brook Community Centers Expansion)
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. 3S3`A4
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth ("City") and GSBS Batenhorst, Inc. ("Architect")
made and entered into City Secretary Contract No. 47353 (the Contract) which was
authorized by the City Council by M&C C-27564, the 15th day of December, 2015, for
Eugene McCray Community Center Expansion & Hand ley-Meadowbrook Community
Center Expansion; and Amendments No. 1 , 2, & 3 were administratively executed in the
total amount of $76,483.00 to perform the Handley-Meadowbrook plat submittal's
iSWM report, to revise approved schematic design plans, & to revise previously
approved parking layouts for both Community Centers, respectively; and
WHEREAS, further amendment is necessary to reimburse the Architect as part of the
design services agreement for additional design services to modify civil and
architectural construction plans to provide an additional accessible route at Handley-
Meadowbrook Community Center, and to provide the City of Fort Worth plans examiner
a written narrative for each drawing sheet that was affected by the parking lot changes
for both Community Centers.
NOW THEREFORE, City and Architect, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1 .
Article I, (6) — Scope of Services, a paragraph shall be added to read as follows:
Provide additional design services to revise the currently approved construction
plans for the Eugene McCray & Handley-Meadowbrook Community Centers
Expansion. The cost of this additional service is $1 ,340.00 and $1 ,933.00,
respectively, with no additional reimbursable expenses. The scope of services is
described more fully in both GSBS's letters, Attachment "H" dated June 6, 2018,
subject: "Re: Eugene McCray and Hand ley-Meadowbrook Community Centers",
and Attachment "I" dated June 26, 2018, subject: "Re: Handley-Meadowbrook
Accessible Ramp Addition".
2.
Article 11, (1) — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachments "H" & "I". Payment shall be considered full compensation for all
labor, materials, supplies, and equipment necessary to complete the services
described in Attachments "Id" & "I". However the total fee paid by the City shall
CUA I6 SFO not exceed a total of $257,456.00 which includes $10,000.00 for reimbursable
expenses, unless the City and the��sFCq�� ,9 for services and amend this Agreementnsultanttualac %din amount
aq� "I&L RECOM
Amendment No.4 CITY SECRETARYPage 1 of 2
Eugene McCray& Hand ley-Meadowbrook Community Centers Expansion �'�' WORTHI TX July 2018
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect.
Executed and effective this the day of 2018.
BY: BY:
CITY OF FORT WORTH ARCHITECT
GSBS Batenhorst, inn.
4JesuAJ. 0�7p�na )
Thomas E. Batenhc rst, AIA
Assistant City Manager Principal
Date: Date: 7/9/18
APPROV"L RtCOMMENDED:
By:
fop S ve Cooke, Director
Property Management Department
APPROVED AS TO FORM AND M&C No.: M&C Not Required
L€C ALITY
Zn
4/"' M&C Date: N/A
By:
ohn B. Strong
Assistant Cit ttornev
ATTE Form1295 Certification: N/A
Mary a er RT
City cr ary -i,0
Contract Compliance Manager:
By signing I acknowledge that I am the
* * person responsible for the monitoring
and administration of this contract,
XAS including ensuring all performance and
reporting requirements.
&-CW of,''cw_04�-O'
Brian R. Glass, AIA
Architectural 'Services "VIlanager
OFFICIAL RECORD
Amendment No.4 CITY SECRETARY Page 2 of 2
Eugene McCray&Hand ley-Meadowbrook Community Centers Expansion FT.WORTH,TX July 2018
,.^t'(A-NM V,"J ,k H 11
GSBS
June 6, 2018
Alfonso Meza
City of Fort Worth Property Management Department
401 W. 13th Street
Fort Worth, TX 76102-4616
Re: Eugene McCray and Handley/Meadowbrook Community Centers
Dear Alfonso,
Pursuant to the Contract executed for the "CITY OF FORT WORTH, TEXAS AGREEMENT FOR
ARCHITECTURAL SERVICES COMMUNITY ENTERS EXPANSION PROJECT" dated 12/15/15,
the following additional services proposal is presented for your review and consideration for
Professional Services as described below. The following is a summary of the change of work
as broken down on the Scope of Services Worksheets as provided.
Scope of Work (the Work): Provide written narrative of changes occurring to the original Bid
Documents and the updated Documents submitted for permit change instituting a reduction
in parking spaces on the two projects. The narratives will describe in detail, changed
documents already submitted for final approval. to the City of Fort Worth Development
Department.
Item 1: Narrative description of the site/civil changes derived from the parking space/lot
reduction on the sites.
Item 2: Narrative of the Landscape/Urban Forestry changes derived from the parking
space/lot reduction on the sites.
Basic Services:
Design Phases:
No Change to original contract.
Bidding:
No Change to original contract..
Contract Administration:
No Change to original contract.
Consultants:
No Change to original contract.
Owner's Consultants:
No Change to original contract.
Cost of the Work:
Appropriate costs associated with Scope of Work changes as noted above.
Not Included:
375 WEST 200 SOUTH 7291 GLENVIEW DRIVE
SALT LAKE CITY,UT 84101 FORT WORTH,TX 76180
P 801.521 8600 , 817.589.1722
I-801 521.7913 817.595.2916 www.gsbsarchitects.com
No Change to original contract.
Compensation:
We propose to complete the Scope of Work Changes to the Eugene McCray and
Handley/Meadowbrook Community Centers described above for a stipulated sum for Basic
Services of:
Item 1 (Architect 2) Not to exceed 4 hrs at $145= $580.00
Item 2 (Landscape Architect 3) Not to exceed 8 hrs at $95= $760.00
If additional services are required by the Owner the Architect will provide a written proposal
for approval and authorization in writing by the Owner to proceed with such work.
Reimbursable Expenses:
No Change to original contract.
Design Schedule:
As mutually agreed by all parties.
Accessibility:
No Change to original contract.
Energy Code Compliance:
No Change to original contract.
Sincerel
ITk ,
omas E. Batenhorst, AIA
GSBS Architects
G SNB�S adadSTANDARD HOURLY BILLING RATES ARC
JUNE 1,2015
ARCHITECT Architect 1 $225.00
Architect 2 $145.00
Architect 3 $115.00
Architect 4 $95.00
LANDSCAPE Landscape Architect 1 $145.00
ARCHITECT Landscape Architect 2 $115.00
Landscape Architect 3 $95.00
Landscape Architect 4 $65.00
INTERIOR DESIGNER Interior Designer 1 $90.00
Interior Designer 2 $75.00
Interior Designer 3 $55.00
Interior Designer 4 $45.00
URBAN PLANNER Urban Planner 1 $145.00
Urban Planner 2 $115.00
SUSTAINABILITY & Sustainability Services/Energy Specialist 1 $145.00
ENERGY CONSULTING Sustainability Services/Energy Specialist 2 $125.00
SERVICES Sustainability Services/Energy Specialist 3 $95.00
Sustainability Services/Energy Specialist 4 $80.00
ILLUSTRATOR/ Architectural Illustrator` $125.00
GRAPHIC DESIGNER Graphic Designer 1 * $115.00
Graphic Designer 2 ` $75.00
ARCHITECTURAL Architectural Technician 1 $95.00
TECHNICIAN Architectural Technician 2 $85.00
Architectural Technician 3 $65.00
Architectural Technician 4 $55.00
Architectural Technician 5 $45.00
OFFICE TECHNICIAN Office Technician 1 $55.00
Office Technician 2 $45.00
Office Technician 3 $35.00
"A surcharge will be billed in addition to Standard Hourly Rate for computer renderings, models, mock-ups&
graphic presentations. Charge to be determined at the time of the request for specific.services.
Hourly rates are subject to periodic adjustment.
375 WEST 200 SOUTH 7291 GLENVIEW DRIVE
SALT LAKE CITY, UT 84101 FORT WORTH,TX 76180
P.801.521.8600 P.817.589.1722
F.801.521.7913 F.817.595.2916
GSIBS ARCHITECTS W
Sustainable Design Excellence FIN
�-77�G►-�!��i.l'f '� � i l
G SB S
June 26, 2018
Alfonso Meza
City of Fort Worth Property Management Department
401 W. 13th Street
Fort Worth, TX 76102-4616
Re: Hand ley/Meadowbrook Recreation Center Accessible Ramp addition
Dear Alfonso,
Pursuant to the Contract executed for the "CITY OF FORT WORTH, TEXAS AGREEMENT FOR
ARCHITECTURAL SERVICES COMMUNITY CENTERS EXPANSION PROJECT" dated 12/15/15,
the following additional services proposal is presented for your review and consideration for
Professional Services as described below. In anticipation of the urgency of the work, Civil
proceeded with the design prior to final approval.
Scope of Work (the Work): Change of Scope for the Handley / Meadowbrook Recreation
Center- Provide for the walk area north of the Dumpster screen wall to be a ramp instead of
the designed walk and steps.
Item 1: (Civil) See attached actual hours proposal. $1,230.00+10% markup $1353
Item 2: (Architectural) 4 hours X $145 $580
Basic Services:
Design Phases:
No Change to original contract.
Bidding:
The Architect has no responsibility in the bidding or negotiation phase of the Work.
Contract Administration:
No Change to original contract except see below for projects not running concurrently.
Consultants:
No Change to original contract.
Owner's Consultants:
No Change to original contract.
Cost of the Work:
Appropriate costs associated with Scope of Work changes as noted above.
Not Included:
No Change to original contract.
Compensation:
We propose to complete the Scope of Work Changes to the Hand ley/Meadowbrook
Recreation Center described above for a stipulated sum for Basic Services of $1933.00
375 WEST 200 SOUTH 7291 GLENVIEW DRIVE
SALT LAKE CITY,UT 84101 FORT WORTH,TX 76180
F 801 521 8600 f- 817.589.1722
r 801 521.7913 t 817.595.2916 www.gsbsarchitects.com
If additional services are required by the Owner the Architect will provide a written proposal
for approval and authorization in writing by the Owner to proceed with such work.
Reimbursable Expenses:
No Change to original contract.
Design Schedule:
As mutually agreed by all parties. However, both projects were accounted to run concurrently
thus saving the Owner Construction Administration fees. If the projects are no longer running
concurrently during the CA Phase, Owner agrees to revisit this item for appropriate
compensation to perform the Work.
Accessibility:
No Change to original contract.
Energy Code Compliance:
No Change to original contract.
Sincerel ,
T omas E. Batenhorst, AIA
GSBS Architects
'
�� �� U� ��
�� .� u� .� ��
����
VI
STANDARD HOURLY BILLING| NG RATES
/uws 1,2015
Agc*vTscT Architect $225/00
Architect $145.00
Architect $115,00
Architect $85.00
LANDSCAPE Landscape Architect l $145.00
ARCHITECT
Landscape Architect 2 $35.00
Landscape Architect 3 $85.00
Landscape Architect 4 $65.00
INTERIOR DESIGNER Interior Designer l $90.00
Interior Designer 2 $75.00
Interior Designer 3 $55.00
Interior Designer 4 $45.00
URBAN PLANNER Urban Planner l $145.00
Urban Planner 2 $115.00
susnA|mAo|uTYa Sustainability Services/Energy Specialist l $145.00
smsmGY comsucT|mG Sustainability Services/Energy Specialist 2 s125.00
ssnv|css Sustainability Services/Energy Specialist 3 $95.00
Sustainability Services/Energy Specialist 4 $80.00
ILLUSTRATOR/ Architectural Illustrator^ $125.00
GRAPHIC DESIGNER
Graphic Designer l ^ $115.00
Graphic Designer 2 ^ $75.00
Architectural Technician $8500
�g���TscTum*� �
TsC*m|c|Aw Architectural Technician 2 $85.00
Architectural Technician 3 $65.00
Architectural Technician 4 $55.00
Architectural Technician 5 $45.00
OFFICE TECHNICIAN Office Technician l $55.00
Office Technician 2 $45.00
Office Technician 3 $35.00
°Asurcharge will bebilled in addition to Standard Hourly Rate for computer renderings, models, mock-ups&
graphic presentations. Charge tobedetermined atthe time ofthe request for specific services.
Hourly rates are subject to periodic adjustment.
s/,WEST zovSOUTH ,zv, sLsw,/sw ux/,s
SALT LAKE CITY, UT 84101 FORT WORTH, TX 76180
r).801.521.8600 P. -- -^
80.suoo,a F.
msas ARCHITECTS MA
G S B S la
6/27/2018
Fee for: Handley/Meadowbrook Recreation Center 2015-115-00
SCOPE OF SERVICES INCLUDES: Contract:47353
I Modifications for accessible ramp in place of north walk-scope not in original scope for the parking lot changes
2.
3.
4
SCHEDULE
NA
DESIGN PHASE ARCHITECTURAL sr PM
ESTIMATED HOURS Arch? Arch2 Arch4 lArchI 1Arch2 Tech Cler2 rotals
400 4.00
000
0.00
0.00
000
0.00
Total Man Hours 0.00 400 0.00 0.00 000 0.00 0.00 000 000 0.00 4.00
DESIGN PHASE ESTIMATED FEES:
Archl 0 hours @ 522S/hour= s0
Arch2 4 hours @ SI4S/hour= $580
Arch4 0 hours @ 595/hour= s0
LArch1 0 hours @ $145/hour= s0
LArch2 0 hours @ $115/hour= so
Tech3 0 hours @ 56S/hour= 5o
Cler2 0 hours @ S45/hour= s0
4 hours@ S145 av`/hour= $580
CONSULTANT FEES
MEP
Civil $1,230
Structural
Other 10%markup of consultants $123
Fee w/o Reimbursables $1,353
OTHER
Travel-Estimated Cost (Billed under original contract)
Reimburables-Estimated Cost (Billed under original contract)
Total Additional Services Fee $1,933
6/27/2018-I of I
t-rolect 16908 HANDLEY MEADOWBROOK COMMUNITY CENTER EXPANSION Date 05/16/2018
ADDITONAL SERVICE 02
396 ADA Ramp-Hourly Phase Status:Active
WIP-Bill As Time&Expense Billing Cutoff: To Bill
Billing Type:Time&Expense Date Units Rate Amount Units Amount:71
Leba WIP Status:Billable
Project Engineer
Akar Pokhrel
Billable Time 05/11/2018 4.00 100.00 400.00 4.00 400.00
Billable Time 05/14/2018 6.00 100.00 600.00 6.00 600.00
Billable Time 05/15/2018 0.50 100.00 50.00 0.50 50.00
Subtotal 10.50 1,050.00 10.50 1,050.00
Senior Associate
Brent E.Lewis
Billable Time 05/10/2018 1.00 180.00 180.00 1.00 180.00
Subtotal 1.00 180.00 1.00 180.00
Labor total 11.50 1,230.00 11.50 1,230.00
12001 N. Central Expressway, Suite 300 Dallas,Texas 75243 214/739-8100
Steve Gill
From: Kumazawa, Naoto <Naoto.Kumazawa@fortworthtexas.gov>
Sent: Monday, May 07, 2018 5:07 PM
To: Meza,Alfonso; Steve Gill
Cc: Diestel,James; Isaacs, Don M;Glass, Brian R.
Subject: HMCC - pedestrian route at north of dumpster closure
Attachments: HMCC ADA Ramp.pdf; D546.pdf
Alfonso, Steve,
I would like to request revising something which I indicated in my email on May 2 when responding
to Steve's email regarding Urban Forestry and Parking Changes.
ADA ramp is necessary instead of a stair between the northeast corner of the building and the
existing playground/covered picnic area.
Elevation gap between the door at NE corner of building and existing pavement is approx. 3.5 FT.
It seems to be possible to replace the stair with one 1/12 slope ramp with handrails and a slope less
than 5% as shown conceptually below.
EX. R A YCROUND
t,
/ rn
W
1112 SLOPE 20%
62864 Wl RAIL LANDING MAX 5%
62920
630.02 { 630 75 PROW STAIRS 6JJ.45 W/ 4 A/S£RS
62950
MPSfER PAO, t
C7URAL PLANS \ ,
6?9 891C
629 38G 629 JS 619 30 r"ice
6J1007C
630 50G
1
EX.
I' Ebl COVERED
PICNIC AREA
Also, the attached PDF is the preliminary examination that I did, and it seems to work.
Need of ADA accessible circulation between the center and the existing playground/picnic area has
been addressed during the design process, and GSBS has consistently recognized the need.
I
At 50% CD, an ADA ramp was proposed just next to a stair, but it was abandoned because it
damages the rood zone of existing tree.
At 95% CD, GSBS proposed to have an ADA route with a ramp through the parking lot until 100%
CD set.
The recent parking lot redesign eliminated this ADA ramp, and the stair remained.
50% CD 95% CD
Vl-%,
� 7
• :iL A
r � .•at 9 o rte_
41/
! . Y.'jM 4JYn , L
The attached proposed scheme requires a retaining wall at the edge of the ramp for the lower half of
the ramp for which City's standard detail D546 can be utilized, which is also attached.
A part of dumpster enclosure will become a retaining wall for this, so that, it may need to be revised
as well.
Thank you
Naoto Kumazawa
Landscape Architect
Park & Recreation Department
Planning and Resources Management
Direct: 817-392-5742
Cell: 817-880-5137
Dept.: 817-392-5700
Fax: 817-392-5724
4200 South Freeway, Suite 2200
Fort Worth, TX 76115-1499
Naoto.Kumazawa@fortworthtexas.gov
City of Fort Worth — Working together to build a strong community.
FORT WORTH.
PARK AND RURFAMN Follow Fort Worth
2
f,r � 1N3wnpoa a °0
N 6681SNOD � 0
o m z�
.�a : > 3
� t ; o,oa�WZfJRn o _
M M C
d z S u3=xuuwWg9 l
`Q )] -—�-■ _ a "ir.,
A.
. O-Wjb."XV ops l
33w 31N VH
_ _— .00 err, ��`—•"'
x1111
to0.NDN � i
.r
al
loll
5�
3 Y
s 3 z a- - rn
U11cc
m r C7 t
33 U
0 � J
16 E
E
12A,
� ,oil gi
'= �
01
i
0
� a U
r oc
IC Mf14)
/
Lo
W
C)
r` ! O
1
O
i 61 Y
L O
w
o N
(0
c� cle) __ z
rY) N M W N Y
N N
c'7 tY? N CO
O Cfl �
O LL
CDLr) V Q
i 000
op =
O (C) NN(D 0
Q. ,- t0 t0 O
f. �a rZ
O
0 O
Q) _1 O
ill
J. dj O
N ''�• O Q U
o - >