HomeMy WebLinkAboutContract 48945-FP2 FORTWORTH,
� CITY SECRETARY
JUL 16 2018 CONTRACT N0, �-
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION ,Jr-p C/d I — 6 0 30
(Developer Projects) lI ,
City Project Ns: 100309
4.f-#w'90
Regarding contract 100309 for BAYLOR ALL SAINTS MEDICAL CENTER as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the'recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project as complete.
Original Contract Price: $20,509.43
Amount of Approved Change Orders: Ne
Revised Contract Amount:
Total Cost Work Completed: $20,509.43
51 I l
Recom d for Acceptance Date
Asst. Di to , TPW - Development Services
/T mlille
Accepted Date
Asst. or, W ER DEPARTMENT
LC/ t
Ass . ity M ager Date
Depart e t of TP&W Con t.Services
CPN# Date
Project Manager
C 6 Risk Managemen C a
D.O.E. Brotherton
Q � �o'% CFA Morales/Scanned
Gutzler/Scanned _ OFFICIAL RECORD
FtEGE�v�� The Proceeding people have been Contacted CITY SECRETARY
< 9�,� concerning the request for final payment&have
released this project for such payment. FT.WORTH,TX
V.
� � Clearance Conducted By Qiaa16 A
sl JUL 16 20181
1 0 6 3 09
City Project Numbers 100309 DOE Number 0309
Contract Name BAYLOR ALL SAINTS MEDICAL CENTER Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER For Period Ending 5/16/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / SAMANIEGO Contract Date
Contractor MEDCO CONSTRCTION Contract Time 50 CD
4005 CRUTCHER ST.,SUITE 200 Days Charged to Date 361 CD
DALLAS, TX 74246 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $20,509.43
Less %Retained $0.00
Net Earned $20,509.43
Earned This Period $20,509.43
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $20,509.43
Wednesday,May 16,2018 Page 4 of 4
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BAYLOR ALL SAINTS MEDICAL CENTER
Contract Limits
Project Type WATER
City Project Numbers 100309
DOE Number 0309
Estimate Number 1 Payment Number 1 For Period Ending 5/16/2018
CD
City Secretary Contract Number Contract Time 5(TD
Contract Date Days Charged to Date 361
Project Manager NA Contract is 100.00 Complete
Contractor MEDCO CONSTRCTION
4005 CRUTCHER ST.,SUITE 200
DALLAS, TX 74246
Inspectors LAYER / SAMANIEGO
Wednesday,May 16,2018 Page 1 of 4
City Project Numbers 100309 DOE Number 0309
Contract Name BAYLOR ALL SAINTS MEDICAL CENTER Estimate Number I
Contract Limits Payment Number 1
Project Type WATER For Period Ending 5/16/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
----------- - -- ---------------------------
1 REMOVE 8"WATER LINE 110 LF $21.16 $2,327.60 110 $2,327.60
2 SALVAGE 6"WATER METER 1 EA $1,000.00 $1,000.00 1 $1,000.00
3 SALVAGE WATER SAMPLING STATION 1 EA $1,500.00 $1,500.00 1 $1,500.00
4 8"PVC WATER PIPE 48 LF $31.97 $1,534.56 48 $1,534.56
5 12"GATE VALVE 1 EA $2,145.47 $2,145.47 1 $2,145.47
6 12"X 8"TAPPING SLEEVE&VALVE 2 EA $4,312.50 $8,625.00 2 $8,625.00
7 TRENCH SAFETY 48 LF $7.85 $376.80 48 $376.80
8 CONNECTION TO EXISTING 4"-12"WATER 2 EA $1,500.00 $3,000.00 2 $3,000.00
MAIN
Sub-Total of Previous Unit $20,509.43 $20,509.43
--------------------------------------
Wednesday,May 16,2018 Pale 2 of 4
City Project Numbers 100309 DOE Number 0309
Contract Name BAYLOR ALL SAINTS MEDICAL CENTER Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER For Period Ending 5/16/2018
Project Funding
Contract Information Summary
Original Contract Amount $20,509.43
Chante Orders
Total Contract Price $20,509.43
1
'1 Date �, V Total Cost of Work Completed $20,509.43
Coit,aJtor Less %Retained $0.00
Date Net Earned $20,509.43
C/Yc�
Inspection Supervisor Earned This Period $20,509.43
/ Retainage This Period $0.00
Date
Proj Mger Less Liquidated Damages
rn Days @ /Day $0.00
Date �IA LessPavement Deficiency $0.00
Asst. r/TPW / Less Penalty $0.00
1. Date Less Previous Payment $0.00
Director/ ontracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $20,509.43
Wednesday,May 16,2018 Page 3 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.: 1
NAME OF PROJECT: Baylor All Saints Medical Center
PROJECT NO.: 100309 CONTRACTOR: Medco
DOE NO.: N/A
PERIOD FROM: /,55//7. TO: 5/3//3 FINAL INSPECTION DATE: 3-May-18
WORK ORDER EFFECTIVE:5/8/2017 CONTRACT TIME: 50 o WD o CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
361
PERIOD
PREVIOUS
PERIOD
FT
OTALSO DATE 361
*REMARKS:
17
L6,/-
CONAACTOR DATt INSPECTOR DATE
V ENGINEERING DEPARTMENT
(D The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 J�
(817)392-7941 •Fax: (817)392-7845
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Baylor All Saints Medical Center
PROJECT NUMBER: 100309
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
8" PVC 48
FIRE HYDRANTS: VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT Bond #PRF9234140
Project: Baylor All Saints Medical Center—ED Expansion
To (Owner):
City of Ft Worth, Texas
and Baylor Scott & White Health
200 Texas Street
Ft Worth, TX 76102 Contract For: See above
Contract Date:
Contractor:
MEDCO Construction, L.L.C.
In accordance with the provision of the Contract between the Contractor and the Owner as
defined above, the Colonial American Casualty and Surety Company
1299 Zurich Way, 5"'Floor
Schaumburg, IL 60196
,Surety Company,
on bond of MEDCO Construction,L.L.C.
4005 Crutcher St. #200
Dallas, TX 75246
,Contractor
hereby approves of the final payment to the contractor and agrees that final payment to the
contractor shall not relieve the Surety Company of any of its obligations to
City of Ft Worth,TX and Baylor Scott& White Health
200 Texas Street
Ft Worth, TX 76102
,Owner
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 13th day of June, 2018.
Colonial American Casualty and
Surety Company
Wit
i
Tracy TuckeIr, ey-in-Fact
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the ZURICH AMERICAN INSURANCE COMPANY,a corporation of the State of New
York,the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,a corporation of the State of Maryland, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by
DAVID MCVICKER,Vice President,in pursuance of authority granted by Article V, Section 8,of the By-Laws of said Companies,which
are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate,
constitute, and appoint Tracy TUCKER,W. Lawrence BROWN, Kevin J. DUNN, Steven TUCKER and Bennett BROWN, all of Ft.
Worth, Texas, EACH its true and lawful agent and Attorney-in-Fact,to make, execute, seal and deliver, for, and on its behalf as surety,
and as its act and deed: any and all bonds and undertakings, EXCEPT bonds on behalf of Independent Executors, Community
Survivors and Community Guardians. and the execution of such bonds or undertakings in pursuance of these presents,shall be as binding
upon said Companies, as fully and amply,to all intents and purposes, as if they had been duly executed and acknowledged by the regularly
elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York,New York.,the regularly elected officers
of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly
elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own
proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8,of
the By-Laws of said Companies,and is now in force.
IN WITNESS WHEREOF, the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND,this 23rd day of January,A.D.2018.
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
08A
a oEPps-'�Y9\�Itw/fF
7. SecretLary is Vice President
Michael McKibben David McVicker
State of Maryland
County of Baltimore
On this 23rd day of January,A.D.2018,before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, DAVID
MCVICKER,Vice President, and MICHAEL MCKIBBEN, Secretary, of the Companies, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith,that
he/she is the said officer of the Company aforesaid,and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies,and that
the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said
Corporations.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed my Official Seal the day and year first above written.
'11111111�```
Constance A.Dunn,Notary Public
My Commission Expires:July 9,2019
POA-F 168-2829B
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Aaron Autin,
Project Manager Of MEDCO Construction LLC, known to me to be a
credible person,who being by me duly sworn, upon his oath deposed and
said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Baylor All Saints Medical Center- ED Expantion
BY
` Aaron Autin
Subscribed and sworn before me on this date 22 of June, 20 8.
Notary Public ��,,• 8°��'G •,,,
Tarrant, Texas \.. yT
010
Cn
or-
2'
FS,03„2,x,,,,