HomeMy WebLinkAbout032276 - Construction-Related - Contract - Henneberger Construction, Inc. i FCITY SECRETARY O RT WO RT H CON TRA C , NO o�QQt3�P-TNF4s� CITY SECR Y D.O.E. FILE SPECIFICATIONS AND i 'r9PJp,JG C69NTRACT DOCUMENTS FOR Jr'Y PLAYGROUND IMPROVEMENTS AT: SUMMERFIELDS CHISOLM PARK i PROJECT NAME PROJECT NUMBER D.O.E.NO. SUMMERFIELDS CHISOLM PARK C280/541600/804470004080 4665 i IN THE CITY OF FORT WORTH TEXAS i MIKE MONCRIEF CHARLES BOSWELL .. MAYOR CITY MANAGER RANDLE HARWOOD, ACTING DIRECTOR i PARKS AND COMMUNITY SERVICES i PARKS AND COMMUNITY SERVICES DEPARTMENT PLANNING AND RESOURCE MANAGEMENT DIVISION i FUNDING OF PROJECT BY i CITY OF FORT WORTH 2004 CAPITAL IMPROVEMENT PROGRAM MARCH 2005 i 0:010A PROM@ evily ��CARDAff 42 WWW1 CFWN*t*rq Rome I Council Agenda I M&C I Employee Directory I Morning Report I Ads I PRS I IT Online I Depactnivrits I Site Map Print M&C COUNCIL ACTION: Approved on 8/4/2005 DATE: 8/4/2005 REFERENCE NO.: **C-20886 LOG NAME: 80SCHISHOLM CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of a Contract with Henneberger Construction, Inc., for Park Development at Summerfields Chisholm Park RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Henneberger Construction, Inc. in the amount of$124,071.60 (Base and Alternate Bid) for the park development at Summerfields Chisholm Park. DISCUSSION: The 2004 Capital Improvement Program (CIP) Proposition Two, Parks, Recreation and Community Services Improvements, allocated $1,881,000.00 for reserve park site development at 13 park sites with $154,500.00 allocated for Summerfields Chisholm Park. Park development will include a playground, group shelter, walkways, and benches. The Parks and Community Services Department (PACSD) held public meetings on November 11, 2004 and February 2, 2005 for input on the park master plan and selection of the preferred playground prototype. Upon selection of the preferred prototype, PACSD staff proceeded with preparation of the construction documents. This project was advertised for bid on May 5 and 12, 2005. On June 2, 2005, the Purchasing Division received six responses. City staff recommends accepting the low bid of$124,071.60 submitted by Henneberger Construction, Inc. The adjusted Base bid of$94,058.60 includes construction of a concrete walkway and slab and installation of playground equipment. Bid alternates totaling $30,013.00 includes construction of a 24' by 24' group shelter, picnic tables, benches and a baseball backstop. The original base bid submitted by Henneberger included funding for a basketball goal installed over the slab which was deleted in order to allow the construction of the group shelter as requested by the neighborhood. Contract time is 55 working days with construction to begin in October 2005 and anticipated completion in February of 2006. In addition to the contract cost, associated contingency funding for construction inspection, project management, and possible change orders is $11,925.00. M/WBE - Henneberger Construction, Inc. is in compliance with the City M/WBE Ordinance by committing to 18% M/WBE participation. The City's goal on this project is 16%. The annual budget impact associated with this project is $6,204.00 for repair and maintenance of the improvements. This represents 5% of the total construction contract. Summerfields Chisholm Park is located in COUNCIL DISTRICT 4. ADDENDUM #1 Park Development at Summerfields Chisholm Park TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL COVER PAGE Replace with attached. Title of project has been modified. PROPOSAL Pay Item #3 for Installation of Concrete Trail Paving has been changed from a Lump Sum to a Square Foot (SF) bid item. Add Pay Item #4 Installation of Basketball Goal. Use the ENTIRE attached Proposal and submit with sealed bid. END OF ADDENDUM #1 Bid Opening Date: Thursday, June 3, 2005. Acknowledge the receipt of this Addendum on your Proposal. 7 By: Eric Seebock, Project Manager Release Date: May 17, 2005 05/27/05 10:38 FA)[ 871 5724 CITY OF FT WORTH 0002/004 ADDENDUM #2 Park Development at Summerfields Chisholm Park TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL NOTICE TO BIDDERS 5. AWARD OF CONTRACT Revise calendar days from 65 to 70. Replace with attached page. Add attached PROJECT DESIGNATION SIGN. Please note BID OPENING DATE IS THURSDAY JUNE 2, 2005, not June 3 as noted in Addendum#1. END OF ADDENDUM#2 Bid Opening Date: Thursday, June 2, 2005. Acknowledge the receipt of this Addendum on your Proposal. By: 4�� Eric Seebock, Project Manager Release Date: May 27, 2005 05/27/05 10:39 FAX 871 5724 CITY OF FT WORTH 121004/004 5. AWARD OF CONTRACT The City reserves the right to reject any or all bids and waive any or all formalities. The City will-aware] one contract with a combination of base bids and/or alternates, which is most advantageous to the City. No bid may be withdrawn until the expiration of 70 calendar days from the day bids are opened. The award of contract, if made, will be within 70 calendar days after the opening of bids, but in no case will the award be made until all necessary investigations are made as to the responslbllity of the bidder to whom the contract will be awarded. RANDL.E HARWOOD, ACTING DIRECTOR CHARLES BOSWELL PARKS AND COMMUNITY SERVICES DEPARTMENT CITY MANAGER MARTY HENDRIX CITY SECRETARY By Eric Seebock, Senior/ Project Manager (817) 871-5742 Thursday May 5, 2005 Thursday May 12, 2005 NOTICE TO BIDDERS ADDENDUM#2 06/01/05 15:41 FAX 871 5724 CITY OF FT WORTH U002/003 ADDENDUM #3 Park Development at Summerfields Chisholm Park TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL PROPOSAL PAY ITEM 8 Delete (See Plan Sheet 9) Replace with (See Plan Sheet 8 Detail A)for safety surfacing material Installation. For wear mat installation refer to manufacturer. Alternate Bid Items Add PAY ITEM 4 Installation of Baseball Backstop (See Plan Sheet 2) Replace Page 4 with attached. Please note this project is a Fifty Five (55)Working Day contract, not a Sixty (60) Working Day contract as noted in the pre-bid meeting. Refer to PROPOSAL Paragraph D. END OF ADDENDUM#3 Bid Opening Date: Thursday, June 2, 2005. Acknowledge the receipt of this Addendum on your Proposal. c B , Y: Eric Seebock, Project Manager Release Date: June 1, 2005 06/02/05 08:51 FAX 871 5724 CITY OF FT WORTH /0002/003 ADDENDUM #4 Park Development at Summerrields Chisholm Park TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL Alternate Bid Items Add PAY ITEM 4 Installation of Baseball Backstop (See Plan Sheet 2) Replace Page 4 with attached. This was a typographic error on Addendum #3 END OF ADDENDUM #4 Bid Opening Date: Thursday, June 2, 2005. Acknowledge the receipt of this Addendum on your Proposal. By: 6ESAL - Eric Seebock, Project Manager Release Date: June 2, 2005 05/02/05 10:42 FAX 871 5724 CITY OF FT WORTH 10002/003 RE-ISSUE ADDENDUM ##4 Park Development at Summerflelds Chisholm Park TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. DISREGARD PREVIOUS ADDENDUM#4. I apologize for any inconvenience. PROJECT MANUAL Alternate Bid Items Add PAY ITEM 4 Installation of Baseball Backstop (See Plan Sheet 2) This was a typographic error on Addendum#3 Add PAY ITEM 5 Installation of 6' Park Bench on 3' x 7' Slab (See Plan Sheet 3) Add PAY ITEM 6 Installation of 6' Park Bench (See Pian Sheet 3) Replace Page 4 with attached. END OF ADDENDUM#4 Bid Opening Date: Thursday, June 2, 2005. Acknowledge the receipt of this Addendum on your Proposal. By: e�05/0�_ Eric Seebock, Project Manager Release Date: June 2, 2005 TABLE OF CONTENTS 1. NOTICE TO BIDDERS 2. SPECIAL INSTRUCTIONS TO BIDDERS 3. PROPOSAL 4. CITY OF FORT WORTH M/WBE ENTERPRISE SPECIFICATIONS 5. 2002 AGC NORTH TEXAS CONSTRUCTION INDUSTRY WAGE SURVEY 6. WEATHER TABLE 7. VENDOR COMPLIANCE TO STATE LAW 8. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION 9. TECHNICAL SPECIFICATIONS DIVISION 1 -GENERAL REQUIREMENTS SECTION 01100- SUMMARY OF WORK SECTION 01135- CONTRACT TIME SECTION 01140- ALTERNATIVES SECTION 01150- PAYMENT TO CONTRACTOR SECTION 01300- SUBMITTALS SECTION 01400- QUALITY CONTROL SECTION 01410- TESTING SECTION 01500- TEMPORARY FACILITIES AND CONTROLS SECTION 01640- PRODUCT OPTIONS SECTION 01700- PROJECT CLOSEOUT SECTION 01800- CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS DIVISION 2-SITE WORK SECTION 02140- SITE UNDERDRAINS SECTION 02200-SITE PREPARATION SECTION 02300- EARTHWORK SECTION 02537- WOOD FIBER PLAYGROUND SURFACING SECTION 02840- TURF SODDING SECTION 02860- PLAYGROUND EQUIPMENT SECTION 02870- SITE FURNISHINGS SECTION 02930- SEEDING DIVISION 3-CONCRETE SECTION 03300- CAST-IN-PLACE CONCRETE 10. CERTIFICATE OF INSURANCE 11. BIDDER'S STATEMENT OF QUALIFICATIONS 12. PERFORMANCE BOND 13. PAYMENT BOND 14. MAINTENANCE BOND 15. CONTRACT NOTICE TO BIDDERS Sealed Proposals for the following: PARK DEVELOPMENT AT: DOE NO. SUMMERFIELDS CHISOLM PARK C280 / 541600 /804470004080 4665 Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Division Office until 1:30 p.m., Thurs., June 2, 2005, and then publicly opened and read aloud at 2:00 p.m. in Council Chambers 2nd floor— N.E. corner of City Hall. Plans, Specifications and Contract Documents for this project may be obtained at the Park Planning section, Parks and Community Services Department, 4200 South Freeway, Suite 2200, Fort Worth, Texas 76115-1499. Documents will be provided to prospective bidders for a deposit of$50 per set; deposits shall be made in the form of a check or money order. Each prospective bidder shall receive a deposit refund on the first two plan sets if the documents are returned in good condition within _ 10 days after bids are opened. Any additional plan sets shall require a non-refundable deposit. These documents contain additional information for prospective bidders. All Bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of the prevailing wage rates, and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code, Section 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. ' 1. Minority/Women's Business Enterprise Participation Goals In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the M/WBE Office or from the Office of the City Secretary. The bidder shall submit the MBE /WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM and /or the JOINT VENTURE FORM ("Documentation) as appropriate and must be received no later than 5:00 P.M., five (5) City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit documentation at the reception area of the managing department, Department of Engineering, 2nd floor, City Hall, and shall obtain a receipt. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. The following list is provided to assist bidders in obtaining the services of M/WBE vendors qualified to provide such services/materials for this project. A listing of qualified M/WBE vendors may be obtained at the City of Fort Worth M/WBE office, 3rd floor City Hall. 5. AWARD OF CONTRACT The City reserves the right to reject any or all bids and waive any or all formalities. The City will award one contract with a combination of base bids and/or alternates, which is most advantageous to the City. No bid may be withdrawn until the expiration of 55 calendar days from the day bids are opened. The award of contract, if made, will be within 55 calendar days after the opening of bids, but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom the contract will be awarded. RANDLE HARWOOD, ACTING DIRECTOR CHARLES BOSWELL PARKS AND COMMUNITY SERVICES DEPARTMENT CITY MANAGER MARTY HENDRIX CITY SECRETARY Eric Seebock, Senior/ Project Manager (817) 871-5742 Thursday May 5, 2005 Thursday May 12, 2005 ✓da illi p �=Ly o SPECIAL INSTRUCTIONS TO BIDDERS 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after the contract has been awarded. To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. -- 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal,and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided,without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. _ 3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting Parks and Community Services Department telephone number indicated in the Notice to Bidders. Bids that do not acknowledge all applicable addenda will be rejected as non-responsive. (See Item G in the Proposal.) 4. AWARD OF CONTRACT: The Contract may not necessarily be awarded to the lowest bidder of the Base Bid. The Parks and Community Services Department shall evaluate and recommend to the City Council the best bid based on the combined benefits of total SPECIAL INSTRUCTIONS TO BIDDERS - 1 - Construction of the City of Fort Worth, Texas, concerning liquidated damages for late completion of projects. 7 EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No. 7400 (Fort Worth City Code Section 13-A-21 through 13-A-29)prohibiting discrimination in employment practices. 8 WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City of Fort Worth, Texas, and set forth in Contract Documents for this project. Disregard if Federal Wage Rates are applicable to this project. If Federal Wage Rates are applicable to a project, the Contractor shall comply with all items identified in the attached Contractor's Packet. For further information regarding this packet,contact the Intergovernmental Affairs/Grants Management Division, Finance Department at (817)871-8365 or 871-8387 9. FINANCIAL STATEMENT: A current certified financial statement shall be provided to the City as outlined in the Notice to Bidders for use by the CITY OF FORT WORTH in determining the successful bidder. This statement is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 10. INSURANCE: Within ten days of receipt of notice of award of contract,the Contractor must provide, along with executed contract documents and appropriate bonds, proof of - insurance for Workers Compensation(statutory); Comprehensive General Liability ($1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance ($1,000,000 each accident on a combined single basis or$250,000 property damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide coverage on"any auto", defined as autos owned, hired, and non- owned). Additional lines of coverage may be requested. If such a request is made after bid opening, Contractor shall be entitled to additional compensation equal to 110%of the additional premium cost. For worker's compensation insurance requirements, see Special Instructions to Bidders - Item 16. ADDITIONAL INSURANCE REQUIREMENTS: A. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. B. Certificates of insurance shall be delivered to the City of Fort Worth, contract - administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. C. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. D. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change poo -to . sy,-,:. ;.. SPECIAL INSTRUCTIONS TO BIDDERSJ�, �I_ -3- Ee "Texas resident bidder" means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if the project is funded in whole or in part with federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder. 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. The MEB/WBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor/Waiver Form and the Good Faith Effort Form and or the Joint Venture Form, as applicable,must be submitted no later than 5:00 p. in. five (5)City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Department of Engineering("Managing Y Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive. Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the m M/WBE firm(s)to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name of M/WBE firm utilized 3. Scope of Work to be performed by the M/WBE firm 4. Monetary amount of work to be performed by the M/WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. Throughout the duration of this project, the Contractor comply with the M/WBE Ordinance by complying with the following procedures: • A M/WBE Participation Report Form must be submitted monthly until the contract is completed. The first report will be due 30 days after commencement of work. The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month,place a "0" or "no participation" in the spaces provided, and provide SPECIAL INSTRUCTIONS TO BIDDERS -5. z will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. = 13. PROTECTION OF TREES PLANTS AND SOIL• All property along and adjacent to the Contractor's operations including lawns, yards, shrubs,trees, etc., shall be preserved or restored, after completion of the work,to a condition equal or better than existed prior to start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any . work(trimming, removal,or root pruning) can be done on trees or shrubs growing on public property including street Rights-Of-Way and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5705. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be _. assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is recommended. 14. BIDDER'S STATEMENT OF QUALIFICATIONS A. QUALIFICATION OF BIDDERS: Prime Bidder and all sub-contractors to be used by the bidder in the performance of this project shall be required to demonstrate experience necessary to successfully perform the proposed scope of work. The Prime Bidders' specific(1)experience, (2) stability and(3)history of performance on projects of a similar nature and scope will be considered. The BIDDERS STATEMENT OF QUALIFICATIONS shall be provided to the City as outlined in the Notice To Bidders and as noted in the specifications for the purpose of evaluating the Prime bidder/subcontractors qualifications. ` B. PRIME BIDDER/ SUBCONTRACTOR QUALIFICATIONS 1. Demonstrate experience as either general or sub-contractor on a minimum of three (3)projects similar in scope within the last three (3) years. 2. Provide listing of surety company(s)which issued bonds for previous projects identified as demonstrated experience. 3. Provide name of surety company to be used for this project. T 4. Provide a current certified financial statement as prepared by an independent Certified Public Accountant. a 5. Name and qualifications for the site superintendence of the work. 6. Identify at least 50%of work which is to performed by the Prime Bidder with its own organization and work crews under its superintendence. 7. All sub-contractors intended for use on this project shall also demonstrate similar project scope experience (three similar projects in scope within last three years) necessary to successfully perform their respective portion of work on this project. SPECIAL INSTRUCTIONS TO BIDDERS -7- _ a. Name and qualifications for the site superintendence of the work. b. Knowledge in appropriate task sequencing. c. Intended staffing requirements to construct the work within the contract time allowed. 15. OZONE ALERT DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "OZONE ALERT DAYS". Typically,the Ozone Alert season within the Metroplex area runs from May through September, with 6:00 a.m. - 10:00 a.m. being critical ozone forming periods each day. The Texas Natural Resource Conservation Commission (TNRCC)in coordination with - the National Weather Service, will issue the Ozone Alert by 3:00 p.m. on the afternoon prior to the alert day. On designated Ozone Alert Days, the Contractor shall bear the responsibility of being aware that such days have been designated Ozone Alert Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires substantial use of motorized equipment. However, the Contractor may begin work earlier if such work minimizes the use of motorized equipment prior to 10:00 a.m. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Ozone Alert Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. 16. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers Compensation shall be as follows: A. Definitions: Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement(TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project,for the duration of the project. _ Duration of the project- includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project("subcontractor" in 406.096) - includes all persons or entities performing all or part of the services the contractor has undertaken r to perform on the project, regardless of whether that person has employees. This includes,without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include,without limitation,providing, hauling, or delivering equipment or materials, or providing labor,transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors,office supply deliveries, and delivery of portable toilets. - SPECIAL INSTRUCTIONS TO BIDDERS -9- B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project,the contractor must,prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The contractor shall obtain from each person providing services on a project, and provide to the City: (1) a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. E. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or — personal delivery, within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage,based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the project,for the duration of the project; (2) provide to the contractor,prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; — SPECIAL INSTRUCTIONS TO BIDDERS - 10- (3) provide the contractor, prior to the end of the coverage period,a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person or entity with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the t person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. The providing of false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract terminated if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 3 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: SPECIAL INSTRUCTIONS TO BIDDERS - 11 - REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers'compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at(512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." END OF SECTION SPECIAL INSTRUCTIONS TO BIDDERS - 12- PROPOSAL 7rO: MR. CHARLES R. BOSWELL City Manager Fort Worth,Texas 7FOR: PARK DEVELOPMENT AT: DOE NO. SUMMERFIELDS CHISOLM PARK C280 / 541600 /804470004080 4665 "Pursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the plans, specifications, and the site,understands the amount of work to be done, and hereby proposes to+do all the work and fiunish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the ^inspection and approval of the Parks and Community Service Department Director of the City of Fort Worth. +The "approximate quantity" category is for information purposes only. The Contractor shall be paid on the basis of actual "installed quantities on non lump sum items. Additionally,the Contractor shall be aware that the Proposal contains both Lump Sum and Unit Price items. -If the lowest bid received exceeds the funds budgeted for the project,the City reserves the right to decrease the quantities contained in any line item or to eliminate any specific line items before award of the contract in order to bring the work within budget. By submitting a bid, the bidder acknowledges the City's right to adjust or eliminate line items prior to the - award of contract. Further,by submitting a bid,the bidder agrees to honor each line item bid price without recourse to the City in the event line items are adjusted or eliminated. Upon acceptance of this proposal by the City Council,the bidder is bound to execute a contract and furnish, if applicable, Performance,Payment, and Maintenance Bonds approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums,to-wit: BASE BID ^PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID 4: Unit One—SUMMERFIELDS CHISOLM PARK 1. 1 LS Installati n of Project Sign Per Contractors' Packet (See Specifications) Dollars & Cents per LS $ Lump Sum $ 2. 1 LS Site Excavatio Grading to include Hydroseed &2' Solid Sod B d @(See Plan Sheets 5 & 6) Dollars& Cents per LS $ Lump Sum $ 3. ILS Installation of Concrete it Paving @(See Plan Sheet 3) Do lars& Cen per LS $ Lump Sum $ PROPO L 1 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID 4. 1265 SF Installation orConcrete Paving V(See Plan _ Sheet 3) Dollars& Cents per SF $ $ 5. 1 EA Installation of Accessible Ramp @(See Plan Sheets 3 & ) Dollars & Cents per EA $ $ 6. 274 LF Installation of Conc ete Mow Strip @(See Plan Sheets 3 &7) Dollars& *— Cents per LF $ $ 7. 1 LS Installation of Safety rfacing Material W/Wear Mats @(See Ian Sheet 9) Dollars& ents per LS $ Lump Sum $ 8. 1 LS Installation of Sub Drain ystem,w/ 13"x 13" Precast Concrete Catch B sin @(See Plan Sheets 6, 7& 8) D llars& Ce is per LS $ Lump Sum $ 9. 1 EA Specified Play Structure and Whirl Installed @ (See Plan Sheet 7) Doll rs& Cent per EA $ $ 10. 1 EA Specified Two(2) Bay Swing stalled @ (See Plan Sheet 7) Dollars Cents pe EA $ $ Total Base Bid $ r PROPOSAL -2- 05/17/05 15;09 FAX 871 5724 CITY OF FT WORTH U005/008 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL [TEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID BASE BID 'AY APPROX. DESCRIPTION OF ITEMS WITH BID UNff TOTAL TEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID Unit One—S[TIVIlVIERFIELDS CHISOI.M PARK 1. 1 LS Installation of Project Sign Per Contractors' Packet @(See S eciflcations) Dollars $ _Sum $_ 44,t�-o o 2. 1 LS Site Excavation/Grading to include Hydroseed &2' Solid Sod Band @(See Plan Sheets 5 & Dollars-& mer LS $ Lum Sum S n 3. z35nonof Concrete Trail Paving @(See Plan Sh t 3) Dollars*- , ,aip� .-I�t, ofs S Lump Sum 4. 1 LS 1 E4 Installation of Basketball Goal @(See Plan _ Sheet 4) Dollars' Fps PeF-I S Lump Sum PROPOSAL ADDENDUM#1 -2- 05/17/05 15:09 FAX 871-1744 CITY OF FT WORTH /2006/008 PAX'' APPROX. DESCRIPTION OF FMMS WITH BID UNIT TOTAL ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID 5. 1300 SF Installation of Concrete Paving @(See Plan Sheet_ 3) 6" Dollars& Cents per Sl~ $ lf�..4li S tfg34. 00 6. 1 EA Installation of HC Accessible Ramp @(See Dollars`&. -G $ 0 0 7. 274 LF Installation of Concrete Mow Scrip @(See --Yj r _ Dollars & S �D Cents per LF $ 21.40 $ �2d S. 1 LS Installation of Safety Surfacing Material W/Wear Mats @(See Plane Sheet 4) llars� 6s per LS $_Lump Sum S ? O t) a 9. 1 LS Installation of Sub Drain System,w/ 13"x 13" Precast Concrete Catch Basin @(See Plan Sheets 6, 7 & 8) .� llars� aper LS S Lump Suns $do— � ,p 10. IEA Specified lay Structure and Whirl Installed @ t}�► 10 ° �► L a (See Plan.5hce 7) (3V1ZK.15E- 419'" 71"k- llars�t �� /D7 ` e aper EA92 n 11. 1 EA Specified Two(2)Bax Swing Installed @ (See Plan Sheet 7) J6V fZ9Lr, 3 g`v spa )! Dollars& 1 1 3`( Cents per EA $ $ -'��'Etc, Total Base Bad $ . PROPOSAL ADDENDUM#1 -3- 08/02/05 10:38 FAX 871 5724 CITY OF FT WORTH 0003/003 1 PAY APPROY. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM QUANTITY PRICE WRnTEIN IN WORDS PRICE AMOUNT)BID Alternates Bid Items 1- 1 LS Installation of 24' x 24' SQ Series Metal Pavilion(See Plan Sheet 4)@a �ollars-dr Dom. �i-s-s. rum @ems per LS $ Lump Sum $ /7. 5o'D 3 EA Installation of 8' ADA Picnic Table under V � (See Plan.Sheets 4&8)(g ollarss�. AAYt-tf4k-� A' ttsper EA $ 7�v3►• $ v� .ao 180 SF Installation of Concrete Paving(for each yt Picnic Table if not under Pavilion)@ (� Dollars & �-- Cents per SF $ �► 7 $ <110 o . 1 EA Installation of Baseball Backstop(See Plan Dollars& Guts per EA $ �'3-o — 4 EA Installation of 6' Park Bench on 3'x 7' Concret Slab(See�lan Sheet 2) @ Dollars& Cents per EA $ T 3q. ►. 2 EA Installation of 6' Park Bench(See Plan Sheet 2) @ ollar5.� tUUSMLbests per EA $ Jt^ $ /wr p 'ro .� g(p t-r o PROPOSAL. ADDENDUM#f4 -4. AY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL ITEM QUANTITY PRICE WRITTEN IN WORDS PRICE AMOUNT BID "Alternates Bid Items 1. 1 LS Installation of 24' x 24' SQ Series Metal Pavilion @(See Plan Sheet 4) Dollars& Cents per LS $ Lump Sum $ 2. 3 EA Installation of 8' ADA Picnic Table under Pavilion @(See Plan Sheets 4&8) Dollars& Cents per EA $ $ 3. 180 SF Installation of Concrete Paving(for each Picnic Table if not under Pavilion) @ Dollars& Cents per SF $ $ PROPOSAL -3- L�►�`i� v' Lt�S 'F�;i�; A. This contract is issued by an organization that qualifies for exemption pursuant to the provisions of Article 20.04(F)of the i Texas Limited Sales,Excise and Use Tax Act. B. The Contractor performing this contract may purchase,rent or lease all materials,supplies,equipment used or consumed in the performance of the contract by issuing to his supplier an exemption certificate in lieu of the tax,said exemption certificate complying with State Comptroller's ruling tax,said exemption certificate complying with State Comptroller's ruling#95-0.07. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to the provisions of the State Comptroller's ruling#95.09 as amended to be effective October 2, 1968. C. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractor or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278,as amended by City ordinance 7400(Fort Worth City Code Sections 13-A-21 through 13-A-29),prohibiting discrimination in employment practices. D. The undersigned agrees to complete all work covered by these contract documents within Fifty Five(55)Working Days after the date for commencing work as set forth in the Notice to Proceed to be issued by the Owner and to pay not less than the 2002 AGC North Texas Construction Industry Wage Survey. Contract time incorporates playground equipment/delivery time and is to run concurrently with site construction to be performed prior to receipt of _ equipment and subsequent installation. E. Within ten(10)days of receipt of notice of acceptance of this bid,the undersigned will execute the formal contract and will deliver applicable Surety Bonds for the faithful performance of this contract. The attached deposit check in the sum of $ Dollars($ )is to become the property of the City Fort Worth,Texas,or the attached Bidder's Bond is to be forfeited in the event the contract and applicable bonds are not executed within the time set forth,as liquidated damages for delay and additional work caused thereby. F In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous price for construction thereof to the City or to reject the proposal. G. Receipt is hereby acknowledged of the following addenda: No. 1 _ No.2_ V No. 3 ✓ No.4_ Respectfully submitted, y ( O IST Z UGTIotd 1&I (Company Name) By(Authorized Signature) Date: L f (D,5— Address: SAddress: -7 (A Ll _ M&L-L,A Is T' Telephone: (Zl -jLt I- 2,61o2 SEAL(if corporation) PROPOSAL -4- 08/21/05 10:21 FAX, 871 5724 CITY OF FT WORTH [a 003 06/08/2005 18:56 FAX Q 002 Q T VSO TH City of Fort worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the taentract is=51000 or morn,the MIVYBE goal Is applicable. _ If the total der value of the contract is less thm 525,000,the LVAGE goal is not_appR01le• POLICY STATEMENT It Is the policy of the Cly of Fort Worth to ensure the full and equitable participation by Minority and Woml:n Business EnIWPftses'(MNVBE)in the procurement of all goods end secviees to I to City on a contractual basis. All n:culremenls and regulations stated In the City's current IVtinortly and Women Business Enterprise Ordiflanea apply to this bid. [ililV W PMECT GOALS r The CWq MBE/WBE goal on this project is 1%of the base bid value of the aontao. COMPLIANCE TO BID SPECIRCATIONS On City contracts of 325,000 or more,bidders are required to comply with the intent of the CWs NVME O-dinance by either of the following: 1. Meet or exceed the above stated lW WBE goal,or 2. Good Faith Effort doewrienkNflon,or, 3. Waiver documentation,or, 4. Joint Velrture. SUB_MjITAL OF REQUIRED DQCUMNTATLON TIM appIScable document must be received by the Managing DepartmenK Within the following tunes allocatniI,in order for the entire bid to be considered responsive to the specifications. 1. 5ubcorrbactorUVIMatlon Form,if goal is received by 5:00 pm., fire (5) city business dqs aiier the bid met or exceeded: opening date exdveive of the bid opening date. 2. Good Faith Effort and Subeontmctpr received by 5=. p.m., five (5) City business days aiier the bid ✓ Utilization Form,if participation is lees than opening dale,exclusive of the bid opening date. stated sal: 3. Good Faith Effort and Subcontractor received by 3:00 p-m_,frve (5) City husinam days a1:e r the bid Utilisation Form,If no MNVBE amici anon: opening date,excluty"of the hid v in date. 4. Prime Comm terWalver Form,ffm will received by &W p.m., five (5) City business days altar the bid erl'orm 811 subcontactinamplerworlL OVening date,exclusive of the bid opening data. 5. Joint Venture Foran,if utifte a joint venture received by 5:00 p.m., five (5) City business days at:3 r the bid to met or exceed goaL L)pefflng date exclusive of the bid ning date, FAILUM TO cOMPLY WIT'1•I THE cnys rawlpL ORDINANCE,WILL Mui.Y IN THE 010 BEING COi+ NOWRESPONSwE To SPEGIFICATIONe Any quear9'orts,please contact the 1111WBE Office at(917)382-Glad. wFi ba !•vnliflr i 06/21/05 10:21 FAX 871 5724 CITY OF FT WORTH Z 004 . 005 06/09/2007 16:56 FAX ATT 1�'�HMENT I C Page 1 of 3 F K`r W, City of Fort Worth Good Faith Effort Form rRiMZ COWANY NkRfl CbEck appaRbin blew to,dmrft prim 1',R0n TNAM— A+L1N/Dl ;�1�M-I•LWIDHpi SOM A4.e?.t rLeDP5 t"-.441[60WK ?AcP—ir 8(DDATF °O CWSNM8EjPftJcctGezU PROJECT NUAI i .0 yun 16- -=N4 to wem 1VIM%V pumdapdits fpd yam have sabwu iwcft amdlar=Dpwr;rwiunairn'or if year l)8E p*r Wpoidon is leis Amu rhe Cky's pmjmt XmL yen must completr;this 6Drm. . If the bidder's method of complism"wK the MMBE goal is based upon demonstratiou of 9 "good faith effort", the bidder will have the burden of correctly and accurately preparisS and sidaitting the docamentabou required by the City. Compliance with each item, 1 thru 6 below, shall satiety the Good Faith Effort regdirtmant absent proof of fraud,iutentioual and/or knowing wisrepresentatit,Q the fat"or intentional discrimioLmdon by the bidder. 1M Failure to complete this form, in ifa ent7rety wlth supporting documentation, and rec:�lved by lila Managing bepartrmut on or before 6:00 pmL five (S) City businnss days alter bid opening txclusivs of bid opadno date,will result in the bid hei2g considered non-responsive to bid speclficgtlons i Piense list emelt and avert subcontracting an&or supplier opportunity)for the e:gnpletion of this project,rW rdless of whether it is to be provided by a MIW BE or non-M1WB I:. O NOT .LST NAMES OF_ SI On Combined Projects, list mch subcontracting ant )r supplier opportuafty through the tier. (Use addi*naI sibs ' ne ) List of Subcontracting Opportualties List of Supplier Opportun.ties iJA A J FLA" ' luau-DW90103 06/21/05 10:21 FAX 871 5724 CITY OF FM—xQ$TH 0005 Food oe/09/2005 18:56 FA8 A'f 410HAIMI71C Page 2 of 3 2) Obtain a egrrent(not more than tbree(3)months old ftm the bd open date)list of M/WBE subm;n tractors and/or suppliers from the City s MMBE Ofcs ee Date of L,,bdog !_[ �No 3.) Did you solicit bids from M/WBE firms,within the sabeoatr:cbag and/or supplier areas prevional:I Isted,at least /ten aleadar days priorbo bid opeafo�by mafi,esdaeive of tee day the bids are opened? Y Yds (1(yt%aunts M/WW sm7 atiq W fuctude mme affirm and add"and a AsU(wvy orkttw mole&) No 4) Did you solicit bids from AMX9 Tum.,wWo the sabcontraodng and/or supplier ares vrpvfionsl:: fisted,al least /ten calendar days prior to bid opening by telephone,e=Insive of the day the bids are opened' Y Yes (7fps,adsa not to todnde M"of MIWU Ana gp_mm aaaacd.preps amnberand elk"d 9w of i,.) No NO2E: A facsimile rimy be used to comply with either 3 or 4,but may not be used for both. I F a fapiirrWe� is used, attach the fax contmnadon, which is to provide MMM name, date, time, fa lumber shd documentation frx: NCTE: E the list of N/1 Mr*for a particular subcooftctinglsupplier opporplt h Is ten (1ii) or less, the bidder must contact the entire fist to be in coMpl'iance with questions 3 and 4. If the list of IY MBEs for a particular subcol buMng/supplier opportunity Is ten(10) or more,the bidder must contW:;d least two- thirds wdthirds (213) of the list wNhIn such area of opportunity, but not leas than ten to be in toi n sliance with questions 3 and d. 5.) Did you provide plans and specifications to potestfal M/VVM or Information regarding the WOO A of plans and getilleadous in order to assist the MIWBE27 Yes ---No 6.) Submit doeumentation if M/WRE quotes were rejected. 311e doeumentatioa submitted shoed be it the formw of .an alMidavit,iacinda a detailed explanation of why the M/WBE was rejected and my supporting a mminestation the bidden Wishes to be considered by the Cit). In the event ora boas fide dispute concerning qui it n,the bidder win provide for confidential L c�aeet!s:c to sad Inspection orany relevant documentation by CA y personnel. lege use adiwaxal SAMM i and Company Name Telephon Contact Person ;Scope of Work Reasoc I br e Rt:eel i c in bmle-2 W .rio qtl Rsw,0srseas 06/21/05 10;21 FAX 871 5724 CITY OF FT WORTH 9 006 — [it 005 06/09/2005 15:56 FAX ATT:Li.`HMEMY 1G Rage 3 of 3 AR=0NAL jiFORMA2j0N: Plam a provide addillonal information you.foal wR1 fanner explain your good aud bonest efforts to obts I r M/WBE participation on this project Lo a The bidder further agneas to provide, directly to the City upon request, co,r plebe and accurate iinformation regarding actual work performed on this contract, tt s payment thereof and any proposed changes to the originat arrangements submitted with this bid. The bidder also agrees to alloy an audit and/or examination of any books, r!a•.ords and files held by their company that will substantiate the actual work perform ad on this contract, by an authorized officer or employee of the City. Any iatentiional and/or knowing misrepresentation of facts will be grounds for ton ainating the contract or debarment frau City work for ■ period of not lees than three (3) years and for initiating action under Federal, State or Local laws omneerniag fate statements. A,,jy failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible aftror and barred from partidipiting in City work Or a period of time not less than one(1)year. The undersigned eartiRes that the information provided and the Al/"E(s) lisb:e- was/were contacted in good faith. It is understood that any M/WBE(s)-listed in Attachmen° 1C will be contacted and the reasons for not uaiing them will be verged by the Gay's M/WBE Of i�. C%64TH Aut orized Signature Printed Signature ME05 i D@Ew"C PeCO5 r PieDJ T Title Contact Name and Title(if diiierent) Ai W L.� c-1,4,_I m c 21434~ Company Name Phone Number t'ax Nnmber "7/244 W clsrmat-F, 13e , G-(,..I (4ew Sc-GLel'>_ t- ,1st ►- a. Address Email Address City/StftWZip Date Rev,MUM 06/21/05 10:21 FAX. 871 5724 CITY OF FT WORTH 0 007 Boos o6/o9/2005 16:57 FAZ /TTACHMFNT 7A page 1 ON FORT WORTH City of Fort'Worth Scbcon ctors/Supoliem Utiliation Form PRISE COMPANY MANX: Cbc&spplirs0le blvd lo descrU p i em IAJe PROiECTNd ` M/W/bHE tier-M/W/D7� CJ I[S�� r � gm DA aty's M/WSE Project Goal: Hiaro's AVWMPRMECt N 11 SM L -io t Cc oro Identify mall Subcontractors/supplfers you will use on this project Failure to complete this form, In lts entimy with requested documentation, and received by 'tlte Managing Department on or before 5:00 p.m.five(5)City business days after bid opening,exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offerer agrees to enter Into a formal agreement with the MNVBI= firms; listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. Ta intantional and/or knowing misrepresentation of facts is grounds for consider�on of dmqualiftcafion and*R result in the bid being considered non-responsive to bid specifications Ml"U listed toward meeting the project goal mast be located m the nihe M co"marls *Um or ci r t rently dome business in the mwkstplace at the One of bid. Markaplaw is the geoguolo t"a of Terram,Parker.Johnson,Collin,Dallas, Denton,Ellis,Kauftnw and Rockwall counties. Jden*each Tier level. T7ter is the level of subcontracfing below the prime conftwtor,i.e.,a dh=ps:r,Hent froRn the prime contractor to a subcontractor is Considered 161 tier,a paymad by a subeoatractor to its supplier i i�oasidercd��d der ALL Ml"Es MUST BE CERTIFIED BEFORE CONTRACT AWARD_ Certification means those faros, located or doing business at the Gme of bid opening within the Madcetp1 m• that have been determined to be boonfide minority or worpen businesses by the Nor&Cel Tom Reglowl C itificaun Agent (NCTRCA),or the Texas DepaRment of TibnpomObn(TX DOT),lnglrwmy division. DismK=uged Business Edtacprlse(DBI-)is synouymus with Mlaotit fWamert Business Enterprise GAMBE). If hautlthg services are utilized,the pd=will be given credit as long as the MIWBE listed owns and :•I mmanes at least one fully licensed and operational truck to be used on the Contract, The MIW BE may lease truth,s from another MUWBE firm,including WWBE ownez--operatoM and receive full M/WBE credit. 'The MMSPS may lus m trucks from � non-WWBEs, including owner-operators, but vAll only reoeive credit for the tt:es and coau lion. mmed by the M/WBE as outlined in the least agrearnent Rev.5MI03 06/21/05 10:21 FAX 871 5724 CITY _OF FT WORTfL_ 9 008 06/09/2006 16:57 FAX IM007 A TTACHMrcNT 9A Fola wORTH t/o�w Pege 3 of a Prim am rcWked to Wanttfyi►M suboomrrvWWsMNert.t+og0rfflrsa of gMq iA„Minority,Wa=a and non-Do,']rEs. Mcoa list MIWHE Amn ffim me additinml sheets if neoomay. cerOfleatloe (check one) t SUIBCONTRACT'OWSUPPLER T Company None I sr T Detail Dealt Address e w a X 1 Subcontracting Work Supplies Purchased D i I arAmount TelephonelFax r g a T 0 ti E R O E c T E A 1$30 �!�. S3�• 30 34R ry -t 04 Ne. 75 12f"44.'W�Z - s. . AMf)c) .tea 7 sl 33- 2.1-7 Rev_5!30/03 06/21/05 10:21 FAX 871 5724 CITY OF FT WORD@009 06/09/2006 16:57 FAX VA 008 A MACa-M&W7 is FORT�WORT'H" Paye 4 of 4 Total Dollar Amount of M/WDE SubcontractoralSuppoem Total Dollar Amount of Non-MWIM SubconiracroWSuppliers TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS The Contractor will not make additions, deletions, or substitutions to this certified list without the prior airproval of the Minority and Women HnsirLss Enterprise Office Manager m designee through the submittal of a,Request,1 i r Approval o ChavelAddilrom Any unjustified change or deletion shall be a material breach of contract and may result:s i debarment in or accord wirh the procedures outlined in the ordinance. The contractor shall submit a detailed explaaat:cn of how the requested change/addition err deletion will affect the eornmilIed M/WBB goal if to detail explanadon is i ue t subm tted,it vnE affeot dw&W compliance determination. By 10FLAng a signattue to this fwm the Offeror further agrees to provide,directly to the City upon retim 1,complete and accurate mfibmullon regarding actual work performed by all suboontsaetors, moluding M/W/DBE(a f anfangenxnts submitted with the bid. The Offeror also agrees to allow an audit andlor examination of any books,recon:,and files held by their company, The bidder agrees to allow the transmission of interviews with owners,principals,ofiaa:acs,employees and applicable subcontractorsisuppliersleaohacton participating on the cont am drat will substantiate t:ao actual work performed by the M/W/DBIr(s)on fliis contract,by an authotimd officer or employ"of the CIty. Any hr trional and/or knowing=&representation of facto will be grounds for terminating the contract or delrarmtat from City w:i k for a period of not less than three(3)yews and for juMa131ig action under Fedeal, Scare or Local laws concerning f i6e sntements. Any fradure to comply with this ordinance and create a maerial breach of contract may resuh in a deft-aunagon of an irresponsible Offeror and barred from participating in City work for a period of time not less than one(1)3_,r &ktL,,,a�gQ-- C�-(P-r4tA Aat1wrind Siondum Pf4d!(% nalilPa "� costar dIe(itatabne.0 ._ Ciy tft%4, c- lC. X14. ?;41 ;'-14 341 35'6 7 OOaapaallQaa,e Tr]aoaa�eaeQ/or)t� '�1?.� t,N i r-1E1�141...1✓ p!2 � Ga�N Fl��' � �B c:���.-r�Ar�, Ad&= a asO,Aeareo U14Lira,�j ,71C 73 j Jv��F q 2005 Dow REV.awfa3 2002 AGC North Texas Construction Industry Wage Survey Average Hourly Health 8 j Total .. Classification Rate Welfare Pension Vacation package AC Mechanical $17.55 _ _ � � $1.67 j $0.38 � $0.21 j $19_81_ AC Mechanical Helper $10.74 $1.70 ! $0.28 $0.18 $12.90 I Acoustic Ceiling Installer $14.26 $0.38 $0.20 $0.15 $14.99 Acoustic Ceiling Installer Helper $10.53 $0.20 $0.14 $0.09 i $10.96 Bricklayer/Stone Mason $19.29 $1.62 $0.33 $0.00 $21.24 Bricklayer/Stone Mason Helper $13.07 $0.35 i $0.00 $0.00 ; $13.42 Carpenter -_ $15.76 - $1.17 _ ( $0.47T $0.36 $17.76 i Carpenter Helper $11.69 1 $0.46 $0.27 $0.22 $12.64 Concrete Finisher $14.29 $0.40 ; $0.22 $0.00 i $14.91 Concrete Finisher Helper $10_09_ $0.20 $0.00 $0.00 $10.29 - --- --- -------- - ---- -'--- i---- --- -- --t -- ----- - ----T--- -$ _.. Concrete Form Builder $12.16 $0.36 $0.03 $0.02 $12.57 Concrete Form Builder Helper $8.81 $0;00 _ _-$0.07 $0.04 - -$8.92 Drywall Taper $13.25 ! $0.89 $0.68 $0.32 $15.14 .g ---t - --.------ - - - -- - Drywall Taper Helper $8.00 $0.00 -$0.25 - $8.50 _ M Electrician $19.79 $1.88 - $0.32 I $0.61 $22.60 Electrician Helper i $12.95 $1.59 $0.13 $0.19 ; $14.86 m Electronic Technician $20.06 $1.31 $0.79 $1.34 $23.50 l Electronic Technician Helper $1227 $1_07 - $0.79 $1.59 $15.72 Floor Layer(Carpet) $15.17 $0.60 $0.32 $0.17 $16.26 Floor Layer(Resilient) $15.94 j $0.00 $0.00 f $0.00 $15.94 Floor Layer Helper ; $11.00 $0_00 $0.00 $0.00 $11.00 Glazier I $14.35 _^-$0_92-----' $0.16- _-$0.40 -' -- $15.83 - -- -- +--- - -- �' Glazier Helper $10.32 ! $0.85 $0.23 $0.21 $11.61 T-- Pipe Insulator -_ - II $15.05 $0_94 - - $0.76_ 1___$0.14 --$16.89-_- Pipe Insulator Helper I $10.12 $1_13 _ $0.12 ; $0.00 $11.37 _ Laborer Common I $9.21 $0.54 1 $0.07 $0.09 $9.91- = Laborer Skilled $11.59 $0.82 $0.04 $0.16 $12.61 10/7/2002 G-AGC 2002 Wage Survey.xls 2002 Building Trades 1 2002 AGC North Texas Construction Industry Wage Survey Averaqe Hourly Health & ! Total Classification Pension Vacation j Rate Welfare Package Lather -- j $15.94 $0.23 ! $0.02 $0.17 - $16.36 Lather Helper $11.12 $0.45 - -; $0.04 $0.33 $11.94 Metal Building Assembler $14.29 $5.62 $0.99 , _$0.49 -I $21.39 Metal Building Assembler Helper $9.33 I $2.60 $0.04 I $0.14 $12.11 Painter $12.86 $0.89 ; $0.62 $0.16 $14.53 i Painter Helper $8.66 $0.50 $0.31 $0.06 -$9.53 Pipefitter $1822 $1.59 $0.39 $0.41 ! $20.61 Pipefitter Helper 1 $12.90 $11.72 _$0.09 $0.43 $15.14 Plasterer $16.16 $0.75 $0.02 I $0.18 $17.11 _ Plasterer Helper $9.98 I $0.29 $0.02 i $0.21 ; $10.50 Plumber $19.25 $1.53 x$0.49 $0.20 $21.47 r Plumber Helper _ -$11.74 i $1.18 $0.18 $0.21 $13.31 Reinforcing Steel Setter $13.00 $0.00 $0.00 ' $0.00 $13.00 Reinforcing Steel Setter Helper $9.31 $0.00 $0.00 $0.00 $9.31 Remediation Worker $11.75 I $0.00 $0.00 ! $0.00 + $11.75 ----------- ------�- ---------+---- -------;--.- --�---- ---- -_: Roofer $15.33 $0.52 $0.00 $0.06 $15.91 Roofer Helper $10.24 $0.44 $0.00 $0.00 $10.68 Sheet Metal Worker $15.73 I $1.62 $0.36 $0.29 $18.00 Sheet Metal Worker Helper $10.53 $1.38 I $0.30 $0.24 $12.45 Sheetrock Hanger - $13.37- $0.43 I -$0_12_ _I $0.26 _ 1 $14`18 Sheet rock Hanger Helper $9.48 I_- $0.16 $9.76 -- - � i-- $0.01 �----��=��-----'-•---------------- � Fire Sprinkler Fitter $17.86 1 $2.17 $0.91 $0.30 $21.24 Fire Sprinkler Fitter Helper $13.33 I $2.18 $0.66 i $0.41 $16.58 Steel Worker Structural ` $16.20 $1.18 ' $0.30 $0.15 $17.83 Steel Worker Structural Helper $11.71 $2.05 $0.16 $14.43 I Concrete Pump $17.00 I $0.00 ! $0.00 $0.15 ! $17.15 Crane,Clamshell, Backhoe, I Derrick, D'Line Shovel $16.07 $1.11 1 $0.30 $0.05 $17.53 10/7/2002 G-AGC 2002 Wage Survey.xls 2002 Building Trades 2 2002 AGC North Texas Construction Industry Wage Survey Classification Average Hourly Health & Pension Vacation I Total Rate Welfare Package Forklift $12.62 $0.91 $0.36 $0.05 i $13.94 Foundation Drill Operator $17.55 $1.23 $0.41 i $0.00 $19.19 Front End Loader I $13.27 I $0.58 $0.00 $0.04 $13.89 Truck Driver $12.66 $0.79 $0.13 _ $0.11 $13.69 Welder I $15.88 $0.93 $0.02 ; $0.21 $17.04 Welder Helper $11.25 $0.45 $0.05 $0.17 $11.92 1017/2002 G-AGC 2002 Wage Survey.xls 2002 Building Trades 3 WEATHER TABLE AVERAGE DAYS INCHES SNOW/ICE MONTH RAINFALL(1) RAINFALL(2) PELLETS (3) JANUARY 7 1.80 1 FEBRUARY 7 2.36 MARCH 7 2.54 APRIL 9 4.30 0 MAY 8 4.47 0 JUNE 6 3.05 0 JULY 5 1.84 0 AUGUST 5 2.26 0 SEPTEMBER 7 3.15 0 OCTOBER 6 2.68 0 NOVEMBER 6 2.03 0 DECEMBER 7 1.82 ANNUALLY 80 32.30 1 (1) Average normal number of days rainfall,0.01" or more. (2) Average normal precipitation. (3) One inch (I")or more. * Less than one-half inch (1/2"). Unseasonable weather is defined for contract purposes as rain/snow days which exceed the average number of days or inches of rainfall in any given month. This table is based on information recorded at the former Greater Southwest International Airport, Fort Worth,Texas,covering a period of 18 years. Latitude 32°50'N, Longitude 97°03' W, elevation (ground) 537 ft. VENDOR COMPLIANCE TO STATE LAW Section 2252.002,Texas Government Code,provides that, in order to be awarded a contract as low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal place of business are outside of the State of Texas)bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the State in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. _ Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate office is in the State of Texas. Please Check or mark with an "X" BIDDER: By: Company (please print) " Signature: (please print) Title: (please print) City/ State Zip THIS FORM MUST BE RETURNED WITH YOUR QUOTATION VENDOR COMPLIANCE TO STATE LAW BIDDER'S STATEMENT OF QUALIFICATIONS Finn Name: Date Organized: ❑ PARTNERSHIP ❑ CORPORATION Address: City: State: Zip: Telephone Number: Fax Number: Number of years in business under present name: Former name(s) of organization: CLASSIFICATION: ❑ General ❑ Building ❑ Electrical ❑ Plumbing ❑ HVAC — ❑ Utilities ❑ Earthwork ❑ Paving ❑ Other LIST A MINIMUM OF THREE SIMILAR COMPLETED PROJECTS WITHIN LAST THREE YEARS PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE BIDDER'S STATEMENT OF QUALIFICATIONS VIM SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME/TELEPHONE NUMBER OF OWNER y_ NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME /TELEPHONE NUMBER OF OWNER NAME/TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION PROJECT NAME AND LOCATION NAME /TELEPHONE NUMBER OF OWNER NAME /TELEPHONE NUMBER OF SURETY AMOUNT OF CONTRACT COMPLETION DATE SCOPE OF WORK DESCRIPTION BIDDER'S STATEMENT OF QUALIFICATIONS -2- 2. LIST CONSTRUCTION SUPERINTENDENT'S NAME AND CONSTRUCTION EXPERIENCE: 3. LIST ALL LABOR SUBCONTRACTORS (attach additional pages as needed) SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME /TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. BIDDER'S STATEMENT OF QUALIFICATIONS -3- SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/ CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. SUBCONTRACTOR NAME TRADE PREVIOUS PROJECT EXPERIENCE/CONTACT NAME/TELEPHONE NUMBER A. B. C. Note 1. Section 8.1 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth will be enforced. 2. The Prime Bidder selected for this project shall submit Letters Of Intent executed between the Prime Bidder and any and all subcontractors to be utilized on this project within five working days of being recognized as the overall qualified low Prime Bidder by the City. Subsequent substitution of sub-contractors must be approved by the City. 3. Prime Bidder shall include financial statement in this submittal. BIDDER'S STATEMENT OF QUALIFICATIONS -4- TO THE EMPLOYER/CONTRACTOR: Pursuant to Texas Worker's Compensation Commission Rule 110.110(d)(7), a contractor engaged in a building or construction project for a government entity is required to post a notice on each project site informing all persons providing services on the project that they are required to be covered by workers' compensation insurance. The notice required by this rule does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Commission rules. This notice must: (1) be posted in English, Spanish and any other language common to the employer's employee population; (2) be displayed on each project site; (3) state how a person may verify current coverage and report failure to provide coverage; (4) be printed with a title in at least 30-point bold type and text in at least 19-point normal type; and (5) contain the exact words as prescribed in Rule 110.110(d)(7) without additional words or changes. Gv'il[nnl RG The notice on the reverse side meets the above requirements. Failure to post the notice as required by this ' rule is a violation of the Act and commission rules. The violator may be subject to administrative penalties. REQUIRED WORKERS' COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee. Call the Texas Workers' Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage. COBERTURA REQUERIDA DE COMPENSACION PARA TRABAJADORES La ley requiere que cada persona trabajando en este sitio o proporciona servicios relacionados con este proyecto de construccion tiene que estar cubierto por aseguranza de compensacion para trabaj adores. Esto incluye personas que proporcionan, cargan, entregan equipo o materiales o proporcionan mano de obrra, transportan, o cualquier servicio relacionado con este proyecto, sin considerar la identidad del patron o estado del empleado. Llame a la Comision Tejana de Compensacion para Trabajadores al 512- 440-3789 para recibir informacion de los requerimientos legales de cobertura, para verificar si su patron le ha proporcionado la cobertura requerida o para reportar falta del patron en proporcionarle cobertura. TECHNICAL SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01100- SUMMARY OF WORK The Contractor shall supply all superintendence and shall perform all work and furnish all labor, equipment, materials and incidentals necessary and complete all work as described in the plans and specifications. All construction and other work shall be done by the Contractor in accordance with the best engineering and construction practices for the skill or trade involved. The work to be accomplished under these plans and specifications for: Playground Renovations at Summerfields Chisholm Park(Mapsco No. 35-M)includes: Site grading and installation of new playground equipment,park amenities and concrete sidewalk as per construction documents. These plans and specifications were prepared by the Parks and Community Services Department. The Department of Engineering will administer the contract and furnish inspection. In addition to project performance stated above, the Contractor shall also be responsible for: 1. Setting all project layout dimensions and final finish grade elevations in accordance to plans. All such survey work shall be performed by a Registered Surveyor in the State of Texas and verification provided to the City that such survey work complies with plans and specifications. 2. Attend all project progress meetings as scheduled by the City and provide updated project schedules within 3 calendar days upon request by the City. The applicable items contained in the Standard Specifications for Street and Storm Drain s Construction for the City of Fort Worth,Texas, shall apply to this contract just as though each were incorporated in these documents. Where the provisions or specifications contained in those documents are contrary to this publication,this publication shall govern. In case of conflict a between plans and specifications, the plans shall govern. A copy of the Standard Specifications for Street and Storm Drain Construction can be purchased at the office of the Transportation and Public Works Department, 1000 Throckmorton Street, 2nd Floor,Municipal Building, Fort Worth,Texas. The Contractor shall provide all permits and licenses and pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work. The Contractor shall contact the City of Fort Worth's Development-Plans Exam Section for a determination of applicable permits or variances required for this project. GENERAL REQUIREMENTS - I - SECTION 01135- CONTRACT TIME 1.01 PROGRESS AND COMPLETION Upon receipt of a notification letter and the executed construction contract,the Contractor shall be responsible for scheduling a preconstruction conference, which shall be held no later than ten working days from the date of the notification letter. At the time of the preconstruction conference, a construction start date shall be established and indicated in the Notice to Proceed (Work Order) issued by the Engineering Department. The Contractor shall begin the work to be performed under the contract on or before ten working days from the date the Work Order is issued. The Contractor shall carry the work forward expeditiously with adequate forces and shall complete it within the period of time stipulated in the contract. 1.02 LIQUIDATED DAMAGES This project shall be completed within the specified days allowed. If project construction "- exceeds the allotted contract time, liquidated damages will be assessed as stipulated in the City of Fort Worth Standard Specification for Street and Storm Drain Construction. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall — attempt to resolve the differences within 30 calendar days. SECTION 01140 - ALTERNATIVES = The City reserves the right to abandon, without obligation to the contractor, any part of the a project (subject to conditions set forth in Section 01150 - Payment to Contractor) or the entire project at any time before the Contractor begins any construction work authorized by the City. SECTION 01150-PAYMENT TO CONTRACTOR, PROJECT ACCEPTANCE & — WARRANTY 1.01 SCOPE OF PAYMENT: The Contractor shall accept the compensation as provided in the contract in full payment for furnishing and paying for all materials, supplies, subcontracts, labor,tools and equipment necessary to complete the work of the contract; for any loss or damage which may arise from the nature of the work from the action of the elements, or from any unforeseen difficulty which may be encountered in the prosecution of the work,until the final acceptance of the work by the City; for all — risks of every description connected with the prosecution of the work; for all expenses and damages which might accrue to the Contractor by reason of delay in the initiation and prosecution of the work from any cause whatsoever; for any infringement of patent, — trademark or copyright, and for completing the work according to the plans and/or specifications. The payment of any current or partial estimate shall in no way affect the obligations of the Contractor to repair or remove, at his own expense, the defective parts of the construction or to replace any defective materials used in the construction, GENERAL REQUIREMENTS -2- and to be responsible for all damages due to such defects if such defects or damages are discovered on or before the final inspection and acceptance of the work. 1.02 Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 1 st day and 15th day of each month that the work is in progress. Estimates will be - paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net invoice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. 1.03 It is understood that the partial pay estimate amounts will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Payment of any partial pay estimates shall not be an admission on the part of the Owner of the amount of work done or of its quality or sufficiency or as an acceptance of the work done; nor shall same release the Contractor of any of its responsibilities under the Contract Documents. 1.04 The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this Contract. 1.05 Retainage-For contracts of less than $400,000 at the time of execution, retainage shall be 10 percent. For contracts of$400,000 or more at the time of execution, retainage shall be 5 percent. The Contractor will receive full payment for work, less retainage, from the City, on each partial payment period. Payment of the retainage will be included with the final payment after acceptance of the project being complete. 1.06 Contractor shall pay subcontractors in accord with the subcontract agreement within five business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payment to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. 1.07 Contractor hereby assigns to City any and all claims for overcharges associated with this contract which arise under the antitrust laws of the United States, 15 U.S.C.A. Sec. 1 et seg(1973). 1.08 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work GENERAL REQUIREMENTS _-. -3 as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of — work to be done or materials to be furnished by the 25 percent or more,then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. 1.09 PAYMENT FOR EXTRA WORK: Extra work performed by the Contractor, that is —' authorized and approved by the City Engineer, will be paid for under "Change orders" made in the manner hereinafter described, and the compensation thus provided shall be accepted by the Contractor as payment in full for all labor, subcontracts, materials, tools, equipment and incidentals, and for all supervision, insurance, bonds and all other expense of whatever nature incurred in the prosecution of the extra work. Payment for extra work will be made under one of the following types of"Change orders" to be selected by the — City: A. Method "A". By unit prices agreed upon in the contract or in writing by the Contractor and City Engineer and approved by the City Council before said extra work is commenced subject to all other conditions of the contract. B. Method "B". By a lump sum price agreed upon in writing by the Contractor and City Engineer and approved by the City Council before said extra work is commenced, subject to all other conditions of the contract. a C. Method "C". By actual field cost of the work, plus 15 percent as described herein below, agreed upon in writing by the Contractor and City Engineer and approved by the City Council after said extra work is completed, subject to all other conditions of the contract. In the event extra work is to be performed and paid for under Method "C", the actual field costs of the work will include the cost of all workmen, foremen,timekeepers, mechanics and laborers working on said project; all used on such extra work only, plus all power, fuel, lubricants, water and similar operating expenses; and a ratable proportion of premiums on performance and payment bonds,public liability, —. workmen's compensation and all other insurance required by law or ordinance. The City Engineer will direct the form in which the accounts of actual field cost will be kept and will recommend in writing the method of doing the work and the type and kind of equipment to be used,but such extra work will be performed by the Contractor as an independent contractor and not as an agent or employee of the City. The 15 percent of the actual field cost to be paid the Contractor shall cover and compensate him for profit, overhead, general supervision and field office expense, GENERAL REQUIREMENTS -4- and all other elements of cost and expense not embraced within the actual field cost as herein specified. The Contractor shall give the City Engineer access to all accounts, bills, invoices and vouchers relating thereto. 1.10 DELAYS: If delay is caused by specific orders given by the City to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. 1.11 CLAIMS AND DAMAGES: Any claims for extra work or for any other related matter or cause must be made in writing to the City Engineer within seven calendar days from and after the cause or claim arises. Unless such claim is so presented, it shall be held that the Contractor has waived the claim, and he shall not be entitled to receive pay thereof. 1.12 TRANSPORTATION: No allowance or deduction will be made for any charge of freight rates. No allowance for transportation of men, materials or equipment will be allowed. 1.13 ACCEPTANCE AND FINAL PAYMENT: The City, upon receipt of the Director's "Certificate of Completion" and "Final Estimate" and upon receipt of satisfactory evidence from the Contractor that all subcontractors and persons furnishing labor or materials have been paid in full and all claims of damages to property or persons because of the carrying on of this work have been resolved, or the claims dismissed or the issues joined, shall certify the estimate for final payment after previous payments have been deducted and shall notify the Contractor and his surety of the acceptance of the project. Bills Paid Affidavit and Consent Of Surety shall be required prior to final payment becoming due and payable. In the event that the Bills Paid Affidavit and Consent Of Surety have been delivered to the City and there is a dispute regarding (1) final quantities, or(2) liquidated damages, the City shall make a progress payment in the amount that the City deems due and payable. On projects divided into two or more units, the Contractor may request a final payment on one or more units which have been completed and accepted. On delivery of the final payment,the Contractor shall sign a written acceptance of the final estimate as payment in full for the work done. All prior partial estimates shall be subject to correction in the final estimate and payment. 1.14 WARRANTY: The Contractor shall be responsible for defects in this project due to faulty workmanship or materials, or both, for a period of two (2)years beginning as of the date that the final punch list has been completed and the project accepted by the City as of the date the final punch list has been completed, as evidenced by a written ar5v0'11'.LID GENERAL REQUIREMENTS -5- 11?Y aU1�J statement signed by the Contractor and the City. The contractor will be required to replace, at own expense, any part, or all,of this project which becomes defective due to these causes. SECTION 01300 - SUBMITTALS Prior to construction, the Contractor shall furnish the Parks and Community Services Department a schedule outlining the anticipated time each phase of construction will begin and be completed, including sufficient time for turf establishment(if applicable) and project clean-up. The Contractor shall submit to the Project Manager shop drawings, product data and samples required in specification sections. Refer to Section 01640— 1.02. SECTION 01400 - QUALITY CONTROL The Contractor will receive all instructions and approvals from the Director of Engineering and/or his assigned inspectors. The inspector will be introduced to the contractor prior to beginning work. Any work done at the direction of any other authority will not be accepted or paid for. Final approval for the finished project shall be given by the Director of Engineering, City of Fort Worth. The Contractor or a competent and reliable superintendent shall oversee the work at all times. The superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the Contractor. SECTION 01410 -TESTING All tests made by the testing laboratory selected by the City will be paid for by the City. In the event manufacturing certificates are requested, they shall be paid for by the Contractor. SECTION 01500-TEMPORARY FACILITIES AND CONTROLS The Contractor shall take all precautions necessary to protect all existing trees, shrubbery, sidewalks, buildings, vehicles, utilities, etc., in the area where the work is being done. The Contractor shall rebuild, restore, and make good at his own expense all injury and damage to same which may result from work being carried out under this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the Owner to be accurate as to location and depth; they are shown on the plans as the best information available from the owners of the utilities involved and from evidences found on the _ ground. The Contractor shall determine the exact location of all existing utilities and conduct his work to prevent interruption of service or damages. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES GENERAL REQUIREMENTS -6- A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet, shall be placed inside and outside vehicles such as cranes, derricks, power shovel, drilling rigs,pile drivers, hoisting equipment or similar machinery. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." Equipment that may be operated within six feet of high voltage lines shall have an insulating cage-type guard about the boom or arm, except backhoes or dippers, and insulator links on the lift hood connections. When necessary to work within six feet of high voltage electric lines, the Contractor shall notify power company (TU Electric or the appropriate power supplier)to erect temporary mechanical barriers, de-energize the line, or raise or lower the line. The contractor shall maintain a log of all such correspondence. The Contractor is responsible for all costs incurred. SECTION 01640 - PRODUCT OPTIONS 1.01 GENERAL For review and approval of products to be used on this project, send submittals to: Eric Seebock,Project Manager (817)871-5742 Parks and Community Services Department 4200 S. Freeway Suite 2200 Fort Worth, Texas 76115-1499 1.02 PRODUCTS LIST A. Within five (5) Working Days after commencement of work,the Contractor shall submit to the Project Manager two (2)copies of complete list of all specified products and submittals for review and approval. B. All specified manufacturer's products listed in the Equipment Schedule in the construction plans have been previously reviewed and approved in conformance to playground prototype designs approved for use in the City of Fort Worth. C. All equipment specified (composite play structures, arch swings, buck-a-bouts, spring animals, whirls) which comprise the various playground prototype options has been designed to conform to both the Consumer Product Safety Commission (CPSC) guidelines and Americans With Disabilities Act (ADA)requirements and as such, no other product equipment shall be considered. GENERAL REQUIREMENTS -7- C. For products specified under reference standards, include with listing of each product: 1. Name and address of manufacturer 2. Trade name 3. Model or catalog designation 4. Manufacturer's data a. Performance and test data b. Reference standards D. Specified material shall not be ordered by the Contractor until such time product material submittals have been received, reviewed and approved by the project consultant and/or City. SECTION 01700 - PROJECT CLOSEOUT 1.01 CLEAN -UP — The Contractor shall make final clean-up of the construction area,to the satisfaction of the Parks and Community Services Department, as soon as construction in that area is — completed. Clean-up shall include removal of all construction materials, pieces of concrete, equipment and/or other rubbish. No more than five(5)days shall elapse after the completion of construction before the area is cleaned. Surplus materials shall be disposed of by the Contractor, at this own expense, and as directed by the Parks and Community Services Department. Cleaning of equipment by Contractor or Subcontractor, such equipment as cement mixers,ready-mix trucks,tools, etc., shall take place in an area designated by the Parks and Community Services Department. SECTION 01800 -CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel a at the project site for contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify,hold harmless and defend, at its own expense,the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents,employees, subcontractors, licensees or invitees,whether or not any such injury, damage or death is caused, in whole or — in Part, by the negligence or alleged negligence of Owner, its officers,servants or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract,whether or not any such injury or damage is caused in whole or in Part by the negligence or alleged negligence of Owner, its officers,servants or employees. GENERAL REQUIREMENTS -8- — In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either(a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or(b)provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems appropriate,refuse to accept bids on any other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. END OF DIVISION R GENERAL REQUIREMENTS -9- SECTION 02140 -SITE UNDERDRAINS PART I -GENERAL 1.01 SCOPE: Work in this section includes furnishing all labor, materials, equipment, and services required to construct underdrains to the required lines, grades, and cross sections as specified - herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE: A. Section 02300 - Earthwork. B. Section 03300 - Cast-in-Place Concrete PART2 - PRODUCTS 2.01 UNDERDRAIN PIPE: Pipe and fittings shall be flexible, corrugated tubing manufactured of high-density polyethylene resins and conforming to ASTM Product Specifications F-405 and F-667. Drainage tubing shall be as manufactured by Advanced Drainage Systems (ADS), Inc., of Columbus, Ohio. The local manufacturing plant which will provide a list of suppliers is in Ennis,Texas -telephone (972) 878-9600. A. Perforated Pipe: Perforations shall be linear slots cut radially into the tubing wall between corrugations. Perforated pipe will be furnished complete with the Cerex nylon "Drain Guard" screen. The screen will completely surround the pipe and will have a lapped,welded longitudinal joint. i B. Non-Perforated Pipe: Non-perforated pipe shall be used for collector lines which convey the water from perforated pipe to the concrete inlet or outfall. C. Fittings: All couplings, reducers, tees, ells, plugs,caps, and other fittings shall be non- perforated and shall be of the same manufacturer as the drainage tubing. A fitting shall be used at each pipe junction/termination, as appropriate. 2.02 FILTER MATERIAL: Filter material for use in backfilling trenches over and around underdrains shall consist of 1/2" to 1" washed stone free of organic or other deleterious matter. 2.03 FILTER FABRIC: Filter fabric to line and lap over gravel filled subdrain trench shall be Mirafi 140N drainage fabric as manufactured by Celanese Corporation, (800) 223-9811, or approved equal. PART 3 - EXECUTION 3.01 VERTICAL AND HORIZONTAL CONTROLS: A. The Contractor shall establish or shall employ a licensed surveyor to establish all lines and grades necessary for each stage of the work described herein. SITE IJNDERDRAINS ' ' +i`,t rv�.J' '✓ 02140 B. Provide blue tops for reference in dressing trench bottoms at intervals not to exceed 30 feet along the centerline of each trench. 3.02 UNDERDRAINS: Trenches for underdrains shall be dug after the subgrade is prepared. The excavation of each trench shall begin at its outlet and proceed toward its upper end. The trench must not be excavated below the proposed grade line. Trenches will be cleaned of all loose material and their bottoms will be dressed and fine graded to blue tops set as previously described. Trenches shall be lined with filter fabric and underdrain pipe shall be set on the trench bottom. All fittings shall be securely coupled and all open ends will be capped. The pipe shall be carefully covered with the gravel filter material and the filter fabric shall be lapped over the trench. Care shall be taken not to damage the pipe or its fabric filter screen. Underdrain pipe shall be connected to solid pipe joints and to outfall at the concrete structure/collar as indicated in the plans. Care shall be taken not to loosen or cave-in the trench walls. Any such damage will be excavated and will be backfilled in mechanically tamped lifts not to exceed eight inches and will be re-constructed. 3.03 SETTLEMENT: After the trench has been backfilled it shall be thoroughly soaked. This process shall be repeated two times allowing the backfill material to dry twenty-four hours before wetting again. END OF SECTION SITE UNDERDRAINS 02140 -2- SECTION 02200 - SITE PREPARATION PART 1 - GENERAL 1.01 SCOPE: Work in this section includes furnishing all labor,materials, equipment and services required for clearing and grubbing,demolition, and removal and disposal of items as specified herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE: A. Section 02300 - Earthwork B. Existing Conditions, Removal and Demolition Items. PART 2—PRODUCTS 2.01 No products are required to execute this work, except as the Contractor may deem necessary. PART 3—EXECUTION 3.01 CLEARING AND GRUBBING: A. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials from the project site or from limited areas of construction specified within the - site. B. In general, clearing and grubbing shall be performed in advance of grading and earthwork operations and shall be performed over the entire area of earthwork operations. C. Unless otherwise specified on the plans, all trees and shrubs of three inch(3") caliper or less(caliper is the diameter as measured twelve inches (12") above the ground) and all scrub growth, such as cactus, yucca, vines, and shrub thickets, shall be cleared. All + dead trees, logs, stumps, rubbish of any nature, and other surface debris shall also be cleared. D. Buried material such as logs, stumps, roots of downed trees that are greater than one and one half inches (1-1/2") in diameter, matted roots, rubbish,and foreign debris shall t be grubbed and removed to a minimum depth of twenty four inches (24") below proposed finished grades. z E. Ground cover consisting of weeds, grass, and other herbaceous vegetation shall be removed prior to stripping and stockpiling topsoil from areas of earthwork operations. Such removal shall be accomplished by "blading" off the uppermost layers of sod or root-matted soil for removal. SITE PREPARATION 02200 - 1 - 3.02 PAVEMENT REMOVAL: A. Bituminous and concrete pavements shall be removed to neatly sawed edges. Saw cuts shall be full depth. If a saw cut in concrete pavement falls within three feet(3') of an en existing score joint, construction joint, saw joint, cold joint, expansion joint, or edge, the concrete shall be removed to that joint or edge. All saw cuts shall be parallel and/or perpendicular to the line of existing pavement. If an edge of a cut is damaged subsequent to saw cutting,the concrete shall again be sawed to a neat, straight line for the purpose of removing the damaged area. B. Concrete curb and gutter shall be removed as specified above. No section to be replaced shall be smaller than thirty inches (30") in length or width. 3.03 UTILITIES REMOVAL: In general, those utilities on the site that are to be removed and that belong to the Owner shall be removed by the Contractor. The Owner is responsible for arranging the relocation or removal of other utilities owned by utility companies or other parties. 3.04 MINOR DEMOLITION: There may be certain items on the site such as old building foundations, fences, and other undetermined structures and improvements that must be removed before construction can commence. Unless otherwise specified, such items become the property of the Contractor for subsequent disposal. 3.05 USE OF EXPLOSIVES: The use of explosives will not be permitted in site preparation operations. 3.06 BACKFILLING: All holes, cavities, and depressions in the ground caused by site preparation operations will be backfilled and tamped to normal compaction and will be graded to prevent - ponding of water and to promote drainage. Should any excavated hole or cavity be required to be left open over night,the Contractor shall be responsible to provide barriers and /or coverings to enhance on site accident prevention measures. 3.07 DISPOSAL OF WASTE MATERIALS: A. Unless otherwise stated, materials generated by clearing, grubbing, removal, and demolition shall be known as "waste" or "spoils" and shall be removed from the site and disposed of by the Contractor. Similar materials may be unearthed or generated by earthwork operations or by subgrade preparation. Unless otherwise specified any merchantable items become the property of the Contractor. END OF SECTION SITE PREPARATION 02200 -2- SECTION 02300 -EARTHWORK PART1 -GENERAL 1.01 SCOPE: Work in this section includes furnishing all labor, materials,equipment, and services required to construct, shape, and finish earthwork to the required lines, grades, and cross sections as specified herein and on the plans. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Section 02200 - Site Preparation. B. Grading Plan: Refer to plan sheets. 1.03 METHOD OF PAYMENT: Earthwork is a necessary and incidental part of the work. The total cost will be included in the Bid Proposal. Payment will be made on a Lump Sum basis only. PART 2 - PRODUCTS 2.01 UNCLASSIFIED EXCAVATION: Unclassified excavation shall consist of all excavation, unless separately designated, within the limits of the work. Unclassified excavation includes all material encountered regardless of its nature or the manner in which it is to be excavated. 2.02 UNCLASSIFIED FILL A. Unclassified fill shall consist of all fill within the limits of the work. All suitable native materials removed in unclassified excavation, or similar imported materials, shall be used insofar as practicable as unclassified fill. Properly deposited, conditioned, and compacted fill is hereinafter referred to as "earth embankment." B. Rock: Minor quantities of rock not greater than four inches in greatest dimension are permissible in fill materials used to construct earth embankment. Minor quantities of rock of greater dimensions may be placed in the deeper fills in accordance with the State Department of Highways and Public Transportation requirements for construction of rock embankments,provided such placement of rock is not immediately adjacent to structures or piers. Also,rock may be placed in the portions of embankments outside the limits of the completed graded width where the size of the rock prohibits their incorporation in the normal embankment layers. 2.03 TOPSOIL 4 On-Site Topsoil: Topsoil shall consist of an average depth of six inches (6") of native surface soil left in place after the ground cover of herbaceous vegetation and other objectionable matter has been cleared by "blading," as specified in Section 02200, "Site Preparation." Topsoil may be greater or less,than the upper six inches(6") in depth. EARTHWORK 02300 2.04 IMPORTED FILL = A. Imported fill materials shall be used for the construction of earth embankment in the event that(1)the volume of unclassified excavation is less than the volume of fill — required for earth embankment and/or(2)the condition of materials removed in unclassified excavation makes them unsuitable for use in the construction of earth embankment. t B. The Contractor shall haul and place imported fill obtained from off-site sources as necessary to construct the embankment and various other details of the construction z plans. All costs related to such imported fill will be included in the contract price, and no additional or separate payment for imported fill will be due the Contractor. C. A sample of the proposed imported fill must be provided by the Contractor and be approved by the Owner. In general,imported material must be equal to or better than native material in quality and engineering characteristics. The Architect/Engineer may also require the Contractor to provided a material analysis test of the proposed fill. 2.05 SELECT MATERIALS A. Select materials shall be imported from offsite sources,unless they are available from specifically designated areas on the site as marked on the plans. 2.06 UNSUITABLE MATERIALS A. Topsoil, select material, imported fill, or unclassified fill will be declared as _ "'unsuitable" by the Owner if, in his opinion, any of the following conditions or matter and particles are present to a degree that is judged detrimental to the proposed use of the material. 1. Moisture 2. Decayed or undecayed vegetation 3. Hardpan clay, heavy clay, or clay balls 4. Rubbish 5. Construction rubble 6. Sand or gravel 7. Rocks,cobbles, or boulders 8. Cementious matter 9. Foreign matter of any kind B. Unsuitable materials will be disposed of as "waste" as specified in Section 02200. C. Wet Material: If fill material is unsatisfactory for use as embankment solely because of high moisture content,the Architect/Engineer may grant the Contractor permission to process the material to reduce the moisture content to a usable optimum condition. _ EARTHWORK 02300 -2- PART 3 -EXECUTION 3.01 SITE PREPARATION: In general, "site preparation," as specified in Section 02200, shall be performed in advance of grading and earthwork operations and shall be completed over the entire area of earthwork operations. 3.02 TOPSOIL A. The removal and storage of topsoil shall occur after site preparation is complete and before excavation and embankment construction begin. Likewise, topsoil will be replaced after excavation and embankment construction are complete. B. Removal: Topsoil shall be stripped to an average depth of six inches (6")from areas where excavation and embankment construction are planned. Topsoil may be obtained from greater depths if it is uncontaminated by the substratum and it is of good quality, in the opinion of the Architect/Engineer. C. Storage: Topsoil shall be stored in stockpiles conveniently located to areas that will later receive the topsoil. Stockpiles shall be out of the way of earthwork operations in locations approved by the Owner or Architect/Engineer. Stored topsoil shall be kept separate from other excavated materials and shall be protected from contamination by objectionable materials that would render it unsuitable. D. Timing: Topsoil will not be replaced(deposited) until construction activities are complete that would create undesirable conditions in the topsoil, such as overcompaction or contamination. Trenching for items such as electrical conduit and irrigation pressure lines must be complete before topsoil replacement may begin. D. Replacement: Topsoil will be deposited in a single layer or lift. It will be placed, processed, compacted, and graded to leave a finished layer of topsoil not less than five inches in depth. Unless otherwise indicated,topsoil will be replaced over all areas of earthwork(including slopes), except where pavement is planned. F. Grading: Topsoil will be final graded to the elevations shown on the plans. Fine grading will be accomplished with a weighted spike harrow, weighted drag, tractor box - blade, light maintainer, or other acceptable machinery. All particles of the finish grade shall be reduced to less than one inch in diameter or they shall be removed. All rocks of one inch or greater shall also be removed. Grading operations and equipment will be such that topsoil does not become overcompacted. Bulldozer blades and front-end loader buckets are not acceptable devices for topsoil grading operations. Final grading within five feet of constructed or installed elements shall be hand raked. G. Acceptability: Finished areas of topsoil are satisfactory if they are true to grade, true in plane, even in gradient(slope), uniform in surface texture, and of normal compaction. Areas of loose granular pockets or of overcompacted soils are not acceptable and will be reworked. Finished areas will promote surface drainage and will be ready for turfgrass planting. EARTHWORK 02300 -3- SIIp���ILti'1152'�6� FY, pg 'd1\�'I�GrYI f YEN. 3.03 UNCLASSIFIED EXCAVATION A. All excavated areas shall be maintained in a condition to assure proper drainage at all times, and ditches and sumps shall be constructed and maintained to avoid damage to the areas under construction. B. Surplus Material: 1. Surplus excavation is that quantity of material that may be left over after the grading plan is executed, and all earthwork operations, including excavation, embankment construction, topsoil replacement, and final grading, are completed. Any other surplus material shall be disposed of as "waste" as specified in Section 02200. All such cost for removal shall be considered as incorporated into Earthwork costs C. Excavation in Rock: The use of explosives will not be permitted. Unless otherwise indicated on the plans, excavation in solid rock shall extend six inches (6") below required subgrade elevation for the entire width of the area under construction and shall be backfilled with suitable materials as indicated on the plans. 3.04 EARTH EMBANKMENT A. Earth embankment is defined as embankment composed of suitable materials removed in unclassified excavation and/or imported fill. The construction of embankment includes preparing the area on which fill is to be placed and the depositing, conditioning, and compaction of fill material. B. General: Except as otherwise required by the plans,all embankment shall be constructed in layers approximately parallel to the finished grade of the graded area,and each layer shall be so constructed as to provide a uniform slope as shown on the grading plan. Embankments shall be constructed to correspond to the general shape of the typical sections shown on the plans, and each section of the embankment shall correspond to the detailed section or slopes established by the drawings. After completion of the graded area, embankment shall be continuously maintained to its finished section and grade until the project is accepted. C. Preparation: Prior to placing any embankment, all preparatory operations will have been completed on the excavation sources and areas over which the embankment is to be placed. The subgrade shall be proof rolled to detect soft spots, which if exist, should be reworked. Proof rolling shall be performed using a heavy pneumatc tired roller, loaded dump truck, or similar piece of equipment weighing approximately twenty five (25)tons except as otherwise specified for tree protection and areas inaccessible to vehicular compactors. Stump holes or other small excavations in the limits of the embankments shall be backfilled with suitable material and thoroughly tamped by approved methods before commencing embankment construction. The surface of the ground, including plowed, loosened ground,or surfaces roughened by small washes or otherwise, shall be restored to approximately its original slope by blading or other methods, and,where indicated on the plans or required by the Owner, the ground surface,thus prepared, shall be compacted by sprinkling and rolling. EARTHWORK 02300 -4- D. Scarification: The surface of all areas and slopes over which fill is to be placed, other than rock, shall be scarified to a depth of approximately six (6")inches to provide a bond between the existing surface and the proposed embankment. Scarification shall be accomplished by plowing, discing, or other approved means. Prior to fill placement, the loosened material shall be adjusted to the proper moisture content and recompacted to the density specified herein for fill. E. Benching: Scarification is normally adequate for sloping surfaces. However, in certain cases where fill is to be placed against hillsides or existing embankment with slopes greater than 4:1,the Owner may direct the Contractor to key the fill material to the existing slopes by benching. A minimum of two feet(2') normal to the slope shall be removed and recompacted to insure that the new work is constructed on a firm foundation free of loose or disturbed material. F. Depositing: Fill material shall be placed in horizontal layers or lifts, evenly spread, not to exceed eight(8") inches in loose depth before conditioning and compaction. Unless otherwise permitted, each layer of fill material shall cover the length and width of the area to be filled and shall be conditioned and compacted before the next higher layer of fill is placed. Adequate drainage shall be maintained at all times. G. Watering: At the time of compaction, the moisture content of fill material shall be such that the specified compaction will be obtained, and the fill will be firm, hard, and unyielding. Fill material which contains excessive moisture shall not be compacted until it is dry enough to obtain the specified compaction. H. Compacting: Each layer of earth fill shall be compacted by approved tamping or sheepsfoot rollers, pneumatic tire rollers, or other mechanical means acceptable to the Owner. Hand-directed compaction equipment shall be used in areas inaccessible to vehicular compactors. I. Grading: Embankments shall be constructed in proper sequence and at proper densities for their respective functions. All embankment serves in one capacity or another as subgrade(e.g.,under topsoil, under concrete and asphalt pavement, under structures, etc.). Accordingly, the upper layer of embankment shall be graded to within plus or minus 0.10 foot of proper subgrade elevation prior to depositing topsoil, and prior to the construction of pavements, slabs,etc. 3.05 DENSITY CONTROL A. Earth Embankment in General: Earth embankment shall be compacted in lifts at a minimum of ninety percent (90%) of Standard Density ASTM D698 with plus four - percent (4%) or minus two percent(2%)percentage points of optimum moisture content. B. Earth Embankment Under Structures and Pavement: The top six (6") inches of natural earth comprising the subgrade for structural slabs or for areas of pavement shall be ninety five percent (95%) to ninety eight percent(98%) of Standard Density ASTM EARTHWORK 02300 -5- D698 with the moisture content at minus two percent(2%)to plus four percent(4%) of optimum moisture content. 3.06 MOISTURE MAINTENANCE: The specified moisture content shall be maintained in all embankments that are to function as subgrade for structures, areas of pavement, or for select embankment. After completion of the embankment,the Contractor shall prevent excessive loss of moisture in the embankment by sprinkling as required. Loss of moisture in excess of two E percent(2%) below optimum in the top twelve inches(12")of the fill will require that the top twelve inches (12") of the embankment be scarified, wetted,and recompacted prior to placement of the structure, select fill or pavement. If desired,the Contractor may place an asphalt membrane of emulsified or cutback asphalt over the completed embankment and thus eliminate the sprinkling requirement. 3.08 TOPSOIL REPLACEMENT: Topsoil shall be carefully placed to avoid any displacement or damage to the subgrade. If any of the subgrade is rutted, damaged or displaced it shall be restored prior to placing topsoil. Topsoil shall be replaced as specified herein per Item 3.02. END OF SECTION EARTHWORK 02300 -6- SECTION 02537-- WOOD FIBER PLAYGROUND SURFACING PART I—GENERAL 1.01 SCOPE Surfacing tasks for wood fiber surfacing with drainage system includes all labor, - materials and equipment necessary for, and pertinent to, the work to be done. Work will be accomplished in a thorough and workmanlike manner. The specified product will be applied strictly in accordance with the manufacturer's recommendations. 1.02 DESCRIPTION OF SYSTEM A. Wood fiber playground surfacing material to be Zaeger Bros. provided by The Playwell Group, Inc.,2750 Northaven Road, Suite 103, Dallas, Tx 75229, 1-800-726-1816, or approved equal. PART 2—PRODUCTS 2.01 MATERIALS A. WOOD FIBRE SURFACING 1. Surfacing shall be a mix of random-sized hardwood fibres selected from durable hardwood tree stock. Softwood fibres, standard wood chips or bark mulch will not be acceptable. 2. To allow for compaction,the following formulas must be used to .- determine the correct number of cubic yards: 8" deep: Sq. ft. of playground x 0.0375. Twelve inches deep: Sq. ft. of playground x 0.05. 3. Bidder will guarantee sieve analysis of wood fibre as follows: Greater than 85 percent passing 3/8" sieve. Less than 50 percent passing#60 sieve. -_ 4. Wood fibre shall have no recycled wood from pallets or waste wood and no twigs, bark, leaf debris or other organic material incorporated within. B. DRAINAGE FABRIC I. Product used shall be FibarFelt, DuraLiner, or aproved equal polyester nonwoven engineering geotextile fabric. 2. Bidder will provide enough material to allow for 12" overlap on all seams. C. DRAINAGE MATRIX I. 4"diameter ADS perforated pipe with sock installed within the subgrade gravel trench as indicated on plans. WOOD FIBER PLAYGROUND SURFACING 02537 - 1 - D. WEAR MATS I. Product used shall be per playground equipment manufacturer's recommendation and meet ASTM F 1292-91 playground surfacing standard for a drop height not to exceed 3.5 feet. Must be installed under all swings and slides to preserve warranty. Method of installation/ anchorage shall be per manufacturer's recommendations. PART 3 -SPECIAL REQUIREMENTS 3.01 QUALITY CONTROL A. The Bidder will provide the engineered wood fiber system to be constructed exactly according to manufacturer's installation instructions. B. The Bidder will provide the owner or its designated contractor with all necessary licenses prior to start of construction in accordance with U. S. Patents. C. Supplier must provide test results for impact attenuation in accordance with ASTM F1292-93; Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment. Results must be provided for new material and for 5-year-old material. D. Testing must show "g" ratings of not more than 155g for the 8" thick system, or 120g for the 12" system at 12' fall heights, and HIC values of less than 1,000 for both new and 8-year-old material. E. Product must be wheelchair accessible and meet the requirements of the 1990 Americans with Disabilities Act(ADA) in accordance with ASTM PS83-97. F. The Bidder will provide copies of flammability testing procedures and results using(i) Section 1500.44 of the Federal Hazardous Substance Act, Title 16, _ Chapter II, Subchapter C, for rigid and pliable solids,and (ii) 16 CFR Part 1630 Standard for the Surface Flammability of Carpets and Rugs(FF 1-70), Modified Procedure. Testing should be performed by an independent testing laboratory. G. The Bidder will provide copies of testing procedures and results of(i)new shredded wood fibre,and(ii) shredded wood fibre not less than five years old taken from an existing site,performed by an independent testing source using the ASTM F 1292-91 playground safety surfacing standard. H. The Bidder will provide at least three references of handicapped-accessible playgrounds that have been installed with said surface. WOOD FIBER PLAYGROUND SURFACING 02537 -2- = 3.02 WARRANTY All materials and labor under this Section shall be installed by a contractor authorized by ` the manufacturer. Safety surface shall be warranted for labor and materials for a period of no less than two years. Written warranty must be submitted by the manufacturer and the authorized installer. PART 4—EXECUTION A. PREPARATION Installer shall thoroughly examine the site and specifications, carefully checking the dimensions before starting work. B. SUBGRADE 1. The subgrade shall be graded a minimum of 1 percent. It is not recommended that the surfacing system be installed on a grade greater than 10 percent. All roots, stones, and vegetation shall be removed. 2. The drainage matrix must be connected to the drainage system. 3. The first 6" of subgrade shall be compacted to at least 95 percent of the dry density, as determined by the provisions of AASHTO or T 205, as modified in 203.24. C. APPLICATION: 1. Wood fiber surfacing system with gravel and subdrain. Install per plans and specifications. a. Aggregate Drainage Material 1. Install subdrain trench per plan. 2. Cover subgrade with washed stone, 1/2" to 3/4" diameter, at a uniform depth of three inches. 3. Install drainage fabric over drainage aggregate, overlapping all seams by at least 12". Cut to fit around equipment as necessary and overlap seams as previously mentioned. 4. Install wood fiber safety surfacing at a uniformed compacted depth of 9". Contractor shall be responsible for applying additional material as required in order to maintain safety surface finish elevation and anticipated settling for a period of sixty(60) days following project acceptance. END OF SECTION WOOD FIBER PLAYGROUND SURFACING 02537 -3-