WHEREAS, the City of Fort Worth ("City") and MWH Americas, Inc ("Engineer") made
and entered into City of Fort Worth City Secretary Contract No. 29129, ("Contract") which was
authorized by the City Council by M&C 19708 on the 12th day of August, 2003; and
WHEREAS, the Contract involves professional services for the following project:
Implementation Services Associated with the Maintenance Management System
; and
WHEREAS, it has become necessary to amend the Contract to include an increased
scope of work and/or revised maximum fee.
NOW, THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the contract:
1.
Article I Section A of the Contract is amended to include the additional engineering
services specified Attachment A-2 attached hereto and incorporated herein, as authorized by the
City Council in M & C 20807 on the 21s` June, 2005, a copy of which is attached hereto and
incorporated herein. The cost to the City for the additional services to be performed by the
Engineer shall not exceed $400,000. The cost includes a cost budget of$358,400 and a fixed fee
amount of$41,600.
2.
Article II of the Contract is amended to provide for an increase in the maximum fee to be
paid to Consultant for all work and services under the Contract, as amended, so that the total fee
to be paid by City for all work and services shall not exceed the sum of $6,563,207. The total
cost includes a cost budget of$5,910,634 and a fixed fee amount of$682,573.
3.
All other provisions of the Contract that are not expressly amended herein shall remain in
ORIGINAL.
full force and effect.
Executed on this the3lJ' daY of a0A , 200_'�).
ATTEST: CITY OF FORT WORTH
B
Marc WOtt
City Secretary Assistant Cit anager
APPROVED AS TO FORM
CONSULTANT:
MWH AMERICAS, INC
309 West 7th Street, Suite 1010
Fort Worth, TX, 76102
7
( � By:
. C���44
Assistant Oty, 1knorney Name: Donald L. jkith
C
M&C: -�O� a Ty Title: President
Date: to S
AOX
CITY 4N`C11RE11Jff
FT. � JF"TH, Tef.
Attachment A-2
Amendment No. 3 to City Secretary Contract No. 29129
Scope of Services
The role of MWH Americas Inc ("ENGINEER") and its appointed sub-consultants
("PROGRAM TEAM") under this contract amendment will be to provide Program
Management, Provision of Best Practice Advice, Quality Assurance and Quality Control
services. In addition, the ENGINEER and PROGRAM TEAM shall develop a series of
MAXIMO custom reports, provide MAXIMO training and support services, design and
implement an interface between MAXIMO and the City 's Buyspeed purchasing system
and load GIS wastewater asset data for the 1-820 Loop Area into MAXIMO.
The contract amendment will be executed within Phase 1 of the Water Information
Technology (WIT) Program and is scheduled for completion in December, 2005.
Task 14.1 - Development of Custom MAXIMO Reports—the ENGINEER and
PROGRAM TEAM shall convene a workshop to identify and prioritize the required
custom MAXIMO reports for the Water Department's Field Operations Division. The
ENGINEER and PROGRAM TEAM shall identify and short list those custom reports that
can be developed within the budget allocated for this task. The ENGINEER and
PROGRAM TEAM shall gain agreement from the Water Department to the proposed
custom report short list. The ENGINEER and PROGRAM TEAM shall design, configure,
test and implement the agreed upon custom MAXIMO reports including all associated
training. The report development effort is based on 40 hours of functional and 250 hours
of technical report development.
Task 14.2— GIS Pilot Studv—the ENGINEER and PROGRAM TEAM shall, in
conjunction with Water Department and Engineering Department staff, provide a once —
only load of the wastewater data (i.e. pipes, manholes, basins and sub-basins) for the 1-
820 Loop Area into MAXIMO. It has been assumed that the Geographic Information
System (hereinafter "GIS") geodatabase will contain all relevant wastewater data (i.e
pipes, manholes, basins and sub-basins), that a unique asset-id has been assigned and
that all data has been reviewed and approved through the Water Department's map
sheet acceptance and sign-off process (mSAP) prior to being provided to the
ENGINEER and PROGRAM TEAM. The task does not include the development of a GIS
to MAXIMO interface for synchronization of the wastewater assets once they have been
loaded into MAXIMO.
Task 14.3—MAXIMO Functional and Technical Support—the ENGINEER and the
PROGRAM TEAM shall provide a mixture of on-site functional, business process,
training support and technical support to Water Department Field Operations Division
staff on an as-needed basis and as approved by the Water Department's Program
Manager. The support is based on 160 hours of functional, business process and
training support and 90 hours of technical support.
Task 14.4 - Engineering Department Data Conversion Project Mana eq ment- the
ENGINEER shall provide consulting services to work in-house with the Engineering
Department's bulk data conversion team for up to 20 hours per week over a fifteen-week
period. The services provided will include:
L?1� VJA
❑ A Single GIS Technical Memorandum comprising the following:
❑ A comprehensive set of Business Rules and use cases for software
development for an Asset ID Management System (80 hrs)
❑ A comprehensive set of Business Rules and use cases for software
development to carry out the editing of the GIS features during the data
maintenance phase (40 hrs)
❑ A memo describing the Map Publishing Strategy (16 hrs)
❑ A comprehensive set of Business Rules and use cases for any software
development to achieve the necessary clarity of the individual map sheets (20
hrs)
❑ Any additional general consultation such as advice, attendance at meetings,
etc (28 hrs)
❑ Advice and recommendations to conduct a GIS/MMS Data Load Pilot Study
(40 hrs)
❑ An Organization Chart showing the transition from Data Conversion to Data
Maintenance (16 hrs) —this will be incorporated into the Task 4 GIS Data
Maintenance Technical Memorandum
❑ A Gantt chart of the overall GIS Project Schedule (60 hrs) —this will be incorporated
into a separate Technical Memorandum
Task 14.5—Design and Implementation of a MAXIMO to Buyspeed Interface—the
ENGINEER and the PROGRAM TEAM shall design, configure, test and implement an
interface between MAXIMO and the City's Buyspeed purchasing system for purchase
orders only. The interface will support the Water Department's Field Operation's
warehouse to eliminate double entry of purchase order information between the
MAXIMO and Buyspeed systems. The task does not include the development of a
MAXIMO to MARS interface for synchronization of the financial transactions or loading
of historical purchase order records into MAXIMO. The City will be required to provide
resources to make any necessary modifications within Buyspeed to accept data from
and to push date to MAXIMO.
Task 14.6 - Supplementary Services—the ENGINEER and PROGRAM TEAM will
provide additional software, hardware, program management or consulting services to
the Water Department upon authorized written agreement from the Water Department's
Program Manager up to the amount budgeted for this Task item.
�N ;a^G,r o
E Via
'' 'i Gil, n''"t
Attachment A-2
Amendment No. 3 to City Secretary Contract No. 29129
Task 14 Budgets
The following are the budget allocations for each of the tasks as defined in Attachment
A-2 - Scope of Services. These budget allocations represent the ENGINEER'S estimate
for each task and transfer of allocations between tasks is authorized after notification by
ENGINEER to the City, providing transfers do not change the total budget amount.
Changes to the total budget will be performed through amendments to the Agreement.
Task# Task Title Cost Budget Allocation
14.1 MAXIMO Custom Report Development $66,400
14.2 GIS Pilot Study $51,100
14.3 MAXIMO Functional and Technical Support $83,600
14.4 GIS Data Conversion Project Management $65,400
14.5 MAXIMO to BuySpeed Interface $119,200
14.6 Supplemental Services $19,300
Total $400,000
Page 1 of 3
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/21/2005 - Ord. No. 16479-06-2005
DATE: Tuesday, June 21, 2005
LOG NAME: 60MWH3 REFERENCE NO.: **C-20807
SUBJECT:
Authorize the Transfer of Funds, Adoption of Appropriation Ordinance and Authorize the Execution
of Amendment No. 3 to Agreement with MWH Americas, Inc., for Implementation Services
Associated with the Maintenance Management System
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer $400,000.00 from the Water & Sewer Operating Fund to the Water Capital
Project Fund in the amount of $400,000.00;
2. Adopt appropriation ordinance increasing estimated receipts and appropriations in the Water Capital
Project Fund in the amount of$400,000.00; and
3. Authorize the City Manager to execute Amendment No. 3 to the agreement with MWH Americas, Inc.
(City Secretary No. 29129) for the provision of services to develop additional Maintenance Management
System (MMS) implementation and interface components for a total cost not to exceed $400,000.00.
DISCUSSION:
On August 12, 2003, (M&C C-19708) the City Council authorized the implementation of a series of strategic
information technology systems within the Water Information Technology (WIT) Program for a contract
amount not to exceed $2,803,107. The implementation includes: the migration of paper-based water and
sewer data into the City's Geographic Information System (GIS), the implementation of a Customer
Relationship Management (CRM) System to support customer service and billing operations and the
implementation of a Maintenance Management System (MMS) that will help manage the lifecycle costs of
the Water Department's assets and improve the future management and planning of water and sewer
infrastructure.
As of June 10, 2005, the WIT Program is approximately 95% complete with the successful implementation
and deployment of the new CRM System and the MMS System for use by Water Department Customer
Service and Field Operations staff. The WIT Program remains on budget and will be completed in July
2005, approximately three months ahead of schedule.
In reviewing the outcomes from the MMS business process development phase of the WIT Program a
number of additional system development and system interface initiatives have been identified. These
initiatives would add significant value to the new MMS System implementation by further improving the
efficiency of Water Department staff thereby generating significant time savings within their day-to-day work
activities. Other benefits would include the more timely and efficient reporting of sewer system
performances to the Texas Commission on Environmental Quality (TCEQ), assistance in an affirmative
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 8/26/2005
Page 2 of 3
cMOM defense to the US Environmental Protection Agency (EPA) and improved management and planning
of water and sewer infrastructure. The four areas of development include:
1. Maximo Custom Report development — an initial amount of custom report development time was
included in the original WIT Program scope of work; however, during the business analysis, metrics
assessment and system development phases, additional custom reports were identified as being required
by department staff for the day-to-day management and performance reporting associated with the water
and sewer infrastructure and to assist with regulatory reporting to the TCEQ;
2. GIS Pilot project — the final MMS system will be based on the GIS asset inventory for both water and
sewer facilities. In order to better coordinate the full implementation of the completed GIS system,
cooperatively being developed by the Water Department and the Department of Engineering (DOE), a pilot
project to incorporate sewer asset information into the MMS is being recommended. This pilot project
would provide a greater understanding of collection system asset operation and performance, support the
timely and efficient reporting of sewer system performance to TCEQ, assist in an affirmative cMOM defense
to the EPA and improve the future management and planning of water and sewer infrastructure;
3. GIS Data Conversion Project Management—this includes the provision of a GIS consultant to work in-
house at the City for a fifteen week period to assist the Water Department and DOE with management of
the GIS data conversion project; and
4. Maximo to Buyspeed interface — this includes the development of a system based interface to
Buyspeed to eliminate repetitive entry of inventory ordering, replenishment and receivables information into
the Maximo MMS, the Buyspeed purchasing system and the MARS financial system, thereby improving the
efficiency of warehouse staff and eliminating possible data entry errors within these information systems.
M/WBE — A waiver of the goal for M/WBE subcontracting requirements was requested by the department
and approved by the M/WBE Office because the application of the provisions of this ordinance will impose
an economic risk on the City or unduly delay acquisition of the goods or services.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon approval and completion of recommendation 1 and the adoption of
the appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the
Water Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
1&2) 1) PE45 538070 0609020 $400,000.00
P162 472045 060162151030 $400,000.00
$400,000.00
2) $400,000.00 P162 531200 060162151030
P162 531200 060162151030
Submitted for City Manager's Office by: Marc Ott (8476)
Originating Department Head: S. Frank Crumb (Acting) (8207)
Additional Information Contact: S. Frank Crumb (Acting) (8207)
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 8/26/2005