Loading...
HomeMy WebLinkAboutContract 47328-A1AR4 CFW Construction Allowance Request Approval CAAppr-05 Page 2 of 3 �R,�Lj1�- ►� i A��I FORTWORTHOclty of Fort Worth Construction Allowance Request Approval (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 4 Construction Allowance Request Approval No.: CAAppr-05 Date Started: 2018-05-17 Date Due: 2018-06-15 City Sec. No.: 47328-A1 Project Name: Montgomery Street from Camp Bowie to IH-30 Project Numbers: 02432 and 100218 DOE Numbers: 1 7389 Project Montgomery Street from Camp Bowie to IH-30 and Eastern Description: Arlington Heights Drainage Improvements Project/Contract Compliance Michael Weiss City Inspector: John Crowley Manager: - Contractor: Haydon Building Corp COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW Arterial Streets $ 43,260.51 39406 0200431 5740010 CO2432�L0 Total Cost:,,$ 43,260.51 Total Requested Days: 0 Approval Status: OFFICIAL RECORD CITY SECRETARY IRT.WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessId=5816&ActiveF... 7/31/2018 CFW Construction Allowance Request Approval CAAppr-05 Page 3 of 3 :Approved: Yes Comments: User: JoAnne Kamman Date: 2018-07-23 11:19 AM ;Approved: Yes ;Comments: iUser: Ricardo Matute Date: 2018-07-23 11:26 AM Approved: Yes Comments: User: Doug Wiersig Date: 2018-07-27 10:31 AM Approved: Yes Comments: User: Doug Black Date: 2018-07-30 8:05 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-07-31 8:42 AM Action Required: FORT AQ ....... ;!� U: �70 by i ecretary CAS• ser, Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. OFFICIAL RECORD Michael Weiss,P.E. CITY SECRETARY Senior Professional Engineer .WOITHI TX https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&ProcessId=5816&ActiveF... 7/31/2018 CFW Construction Allowance Request Approval CAAppr-05 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthgov/Infrastructure Proiects/02432 - Montgomery Street from Camp Bowie to IH-30/Contractor/Change Orders/Added Service 18 - Stockshow Temporary Transitions.pdf fortworthgov/Infrastructure Proiects/02432 - Montgomery Street from Camp Bowie to IH-30/Contractor/Change Orders/02432 - Construction Contingency Allowance Request #4 5-17-18.xls.xisx Attachments 101 No Attachments have been added to this than. X61 "31 17- 0� https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Processld=5816&ActiveF... 7/31/2018 o L - y X m aJ a° O O O O O O N 00 m Y H E } O m O 1— > U N �O M i O C N LSO N � L"D O M co c- O. 9 7 0 '~•1 N LOO n N N m 00 O ONE o c 00 to 01 c aEiE m n m n to H v*u* +n ti► an in u* .n v* v► v* v* c CD 0 oaoLn EL v 0 00 N N O p .•i > a u .-L ILA � 3 � v ao N r 4 LD n of ' m mm c Q ai v E � kD m mv000rrl - � u N O ` 0°p Ol a [}' R Ln O Ln m T 3 M O Y LL Ln Ln Ln Ln e-i 'i N a a C 3 nv C m 0 Om E °p m r 3 Y - o in u* v*v* v} u* v► v* v► u* uF u* v m 0) t; H Y Z L v O ice+ O O O O O O O O n ¢ a ~ p 0J U m O n l 0 00 00 O N 00 3 E W a N cu W N 00 n 0 n n o0 N 00 0 0) a) L m Q x N V lO O) Ln N In LD LO a1 VI O Y Y Hc 3 ¢ r 00 co r, o r i ¢ v o op W v — E w o i v — Ln Lo ri n v O Lrl N N C O 01 C of v a > CL o of of In ca� � � v} u* v} v* � utu* inv► u} � v* vl � ii► v � c a E E x x ari v ari C u "' ° E E E x C r_ O O O O O O 2. C 00 00 W W C O O O O O Z tO .� O ''' *' 00 00 m W fd � Y O ' O O O O H N O -r- Y Y Y m rn In m m m Z m ar m i O aJ �I 3 x - .� L-L Lr Lr p V •o i m m '—` 10 ++ w m rn mm mv �* Y 3 3 m � ovtn ac } * v14 m3YpYg iF 3: a333v a a a L N Ln O O Ln Ln .-L W O V N Z E F' a) 0 0 0 0 0 0 0 O t' d4 .O d O Ln Lo ti Ln LO O m o0 Q m •O 0 0 0 0 0 0 0 p O C c Y Y Z O .i n m O of O O 01 ar p O G O O O C co p 3 N V LO N N LD 0o v Ql n L1 L U Ln 4m w O N o0 0 C W M E E C e i 00 O N N M O O w C y C N 01 n 0 LD M M C n a 3 o v Ln L: L: rn o L� .i c E � � � ao o LM ri ° M E 7 0. 00 M M n v N O N 00 Z Y v O N m 10 0 0 01 N C V = OJ W N Y n t\ 00 .� V1 0 w > U N M Ln O Ln 00 LL C — C O a) O O O O i a) .-i N M N O O Q a°+ � � C � r 4 3 I c C v. v1 vt v1 v. to .n.n v� v1 v► v. v) .n an v v O l v1. v► +n +n+n +n .n yr CJ ° ar r '^ o o u H m m ¢ aai D m u �e m C c U m c c N H m U o co � m CO E O N O Z N �, .D p tki N a o I v ar LLnnnnnnnn " x + o U a) - O 0 0 0 0 0 0 0 0 U O Q Q N N N N N N N N ate+ o AI N c y L 00 0 0 0 0 0 0 0 0 C (J u vL vL N 00 00 00 00 00 00 00 00 bo>` O M O u m [� N n .ti .ti N N N N N N W i N 7 > to C m O +, O a3i a'u CO.I U CO.I CO.I CO.I CO.I CO.I E Q O CO H U •yJ O 3y — N 0. > 0.00 00 00 00 N N N N O C C al N C y C U O ¢ C Z'ti ti 14 14 m m m m -k l .°a 2t SC YL 0 01 m C U O ¢ O H N ° •p ��O O O O N N N N ° m u u u o o « 3 Y o v o a, a) m � .o-i -4-4 CD o.i o,i U U U 2. Lu x c c c c v a c o c a v u o Y 0 0 0 0 0 0 0 0 _ _ > al N a) O 3 al m N m O c a) ate+ C .ti .ti .-1 .•i .•i .•i .•i .•i E p °0 ba to '^ E V ¢ O a . v 'O ar 0 0 0 0 0 0 0 0 0 C Ln O C c c v Y -O m m m m w Lm ,� ar (,� 0 0 0 0 0 0 0 0 C Y E Y Y Y U N m a) E > > � C ru u ¢ c c c c aL p Ln p n n n n n n n n Z 0 0 o ar u O p ro > H > N c = ar Ln Ln Ln Ln Ln Ln Ln Ln C 10 01 01 d Y y 3 Y O` O m N C N C C U 3 :D pi In In M M M M M M oa 01 O O Y Y Y m C p Ln O. d` N 9 LL •D LL O C 01 p R R -;r -T R � � MV o Li U m m m p o o c c LL. o y ,i� 0 0 0 0 0 0 0 0 Y U O O O O U ¢ Ui+ ° O m lL C LL C m C C �� 10 N N N N N N N 0 Y N 00 Lb `J C 9 '� '� ` O m I O 0 0 0 0 0 0 0 C m m m Y •p v Y > > to C m m .L' � oC0 a) N '-I Ci' 1,/y c c c ° ° > m E E v c > > Lp �L Llx v a Li u a ¢ OpC O` O Q u° n :� al LR1'.4 1A 9A Ed Lr. HEAVY CIVIL DIVISION ADDED SERVICES PROPOSAL #18 8200 Springwood Drive,Suite 230 IRVING,TX 75063 (972)739-6405 FAX-(972)264-1922 Lic.#A 108937,B-01 108085 DATE: 4/20/2018 HBC JOB NO: 21-0027-00 TO: City of Fort Worth RE: Montgomery Street:Stockshow Temp AC Transitions Attn:Michael Weiss,P.E. 200 Texas Street Fort Worth,TX 76102 COFW JOB#02432 FROM: Aaron Hazlett PROPOSAL: As requested,Haydon herewith submits a price to place temporary asphalt transitions for the 2018 Fort Worth Stockshow per design provided by FNI.The temporary asphalt installation will provide access to all Montgomery Travel Lanes,Side Streets,etc...The cost includes Reynold's Paving,Petrolmat(to protect new concrete),Dump Fees and Trucking. B.I.# DESCRIPTION QTY UNIT UNIT$ TOTAL N/A Montgomery Street:Stockshow Temp AC Transitions 1 LS $ 43,260.51 $43,260.51 see attached breakdown TOTAL $43,260.51 THESE ARE TRANSMITTED as indicated below: X For approval Approved as submitted Resubmit For your use Approved as noted Submit copies X As requested Returned for corrections Return prints Review and comment Resubmit for approval REMARKS: COPIES TO: FILE SIGNED: Aaron Hazlett Project Manager Heavy Civil Division 4DHAYDON Added Services # 18 COST BREAKDOWN PROJECT: Montgomery Street Improvements DATE: 04/20/18 OWNER: City of Fort Worth JOB NO: 21-0027-00 PROJECT#02432 DESCRIPTION OF WORK PERFORMED: Temporary Asphalt Transitions for 2018 Fort Worth Stockshow EQUIPMENT CODE DESCRIPTION HOURS S/T HOURS O/T RATE TOTAL $0.00 $0.00 $0.00 $0.00 EQUIPMENT SUBTOTAL $0.00 LABOR CODE DESCRIPTION HOURS S/T HOURS OR RATE TOTAL $0.00 $0.00 $0.00 $0.00 LABOR SUBTOTAL 0 MATERIALS CODE DESCRIPTION QTY UNIT RATE TOTAL $0.00 $0.00 $0.00 $0.00 MATERIAL SUBTOTAL $0.00 BID ITEM CODE DESCRIPTION QTY UNIT PRICE TOTAL N/A Reynolds's Paving-Place AC 370 TN $94.15 $34,835.50 N/A Reynolds Paving-Lay Petromat 1 RL $1,580.00 $1,580.00 N/A AEA Trucking-Dump Fees 10 EA $150.00 $1,500.00 N/A AEA Trucking-Trucking to Dump 20 HR $72.00 $1,440.00 BID ITEM SUBTOTAL $39,355.50 EQUIPMENT SUBTOTAL $0.00 15% MARKUP ON EQUIPMENT PER 9.7.1.4......................................................... $0.00 TOTALEQUIPMENT........................................................................................................................................... $0.00 LABORSUBTOTAL... ...................... ................................................................................ $0.00 55% MARKUP ON LABOR. FOR BURDEN PER 9.7.1.2........................................ $0.00 25% MARKUP ON LABOR. FOR SUPERVISION, OVERHEAD, ETC. PER 9.7.1.- $0.00 TOTALLABOR..................................................................................................................................................... $0.00 MATERIAL SUBTOTAL...................................................................................................... $0.00 25% MARKUP ON MATERIALS PER 9.7.1.3.......................................................... $0.00 TOTALMATERIALS............................................................................................................................................. $0.00 SUBCONTRACTOR SUBTOTAL....................................................................................... $39,355.50 5% MARKUP ON SUBCONTRACTORS PER 9.7.1.5............................................. $0.00 TOTALBID ITEM.................................................................................................................................................. $39,355.50 SUBTOTAL............. $39,355.50 General Liability,Auto Insurance,etc... (.88%).................................................................................................... $346.33 General Contractors Bond (.90%) $354.20 Contractors Fee 8% $3,204.48 TOTAL PRICE PER THE DESCRIPTION ABOVE $43,260.51 4x,260.51 ��pp REVISIONS ♦ Ig .—ALL L—AN —ALL l talYW .p, se CRESTLINE Ads AIO .W.tL tYWVY - O O EMENi g° CR C . 'Y.t.b1.K.q y I .(„•' 'SEE STREET tLatiT, _ aorF T nom'¢ < (SEE sEiEErr90)i 1FREESE STik 145.OLE! _ M INICNOLS OFF."1%LT - END!COtOa[T[CURB E, I - �a639.5] F WALLOLIALL EEL wNL wT» \ - ROW X52] LN10 f 3 Y, l 8 L.__ - - 0 28­L 35 LEGEND PC ITA, J 9.I,/EXISTING•.m- - - .. CpfJETE OLYEII.Y ANDCCINCET[9 ALK N O I. P N - H.fASUPE aiROVELENi$ CAPE RANI S o PLMSJ •TYPE P-1 0 Y ® IREF.LADUSGPE F sra,uJ•]].50 R (YONTGOYERY sr i, 'm^ t4P V U3 TNp(E.1. E RAO IA A yQTEP1 a (],500 P91 qIx+a IE9M AT q"O.G.E.W ✓' .. a /tBLG" . « `r rlrx H4C TR.NSITCN llJ ED N u]�Eo_ NIS 00 s• a 41 m W m Sia.N M OY GEr L o'(w..q'"aOTmAA°ro a.aT?ane wm V OCT52B. OFF.3r.33'P �lf.3J 20' i Q 22.50Pi V x Y1�TMTiq.YlEm 9WL K FELTNfsmn I�1.•I.�tM11t aYi Y{O'anue ulFss°TMY�TYM1II a < .. ._.-.-...:.:..•.,.- - i —..._---•--••----•-----••—•-- ---•--••-----•— °"` Y qRa Pa.ar Wn ... _ • Y `RfOPOSEU POW Z S —_- BEIrIVVI -144+50 AND 9TA BASED ON REMOVAL LIM - i a Yr xo• av 3 Ol CONSTRUCTED CONCRETE LIMITNauaxT.L SCALE 0 z A e VERTICAL SCALE CONSTRUCTION NOTES .,�,,.�.�,AAAA..,W.. .�«�.•,.�.•>,.�..,., TEMPORARY 11NB TRAVEL LANE ASPHALTTRANSITION APPROX.5.5' OFF.lf LT STA 0.56 .,..,. CONSTRUCTED ELEV 'LT "'"° ELEV.B`,y u HORIZONTAL&VERTICAL CONTROL�mwz CONCRETE PAVEMENT STA D+W ST OFF.A 5S'FiT Z:'"" D _. . .»: Om 5.6 RT ELEV.1.5• ,....wr<,. �,R.,�,•ro.•�.:.° CONSTRUCTED CONCRETE ELEV.i.r EXISTING PAVEMENT 1. PAVEMENT TO BE CLEANED AFTER TEMPORARY ASPHALT IS REMOVED TYPICAL PLAN VIEW OF TEMPORARY PAVEMENT TRANSITION CFS OF FORT WORTH•TEXAS (ASSUMING E'VERTICAL DIFFERENCE BETWEEN EXISTING TRANSPORTATION AND PUBLIC WORKS TYPICAL SECTION WITH TEMPORARY ASPHALT PAVEMENT AND CONSTRUCTED PAVEMENT) TRANSPORTATION PROGRAMMING F 1 &CAPITAL PROJECTS DIVISION w N MONTGOMERY STREET � Ll PAVING PLAN AND PROFILE O S'. STAIIh50TOSTA III GO IU- � 0yc;E p RAy AN — •N UL REVISIONS " PR. rt �'o»�n 8 �R FREESE x RE �Ng m� �9NICHOLSng N.4 r ; xsTNG ROW F s 5 e. 0 PR0°OSED RE,- j•,; i o •I LEGEND J WALL u ni •� -�.\ / o ® V THIGH COOICRETE ORVERAY of 1 p .�, .. .a.• "�..•�.'• %. ..:-ul. ..L. !.k_. " TCONCRETE IET-A C- r • .. •• MOWN - HARD CAPE NPRUVENENTS Q „._ - 1. N (REF.LANDSCAPE PLANS) RET SHEET 93 FOR SPLITTER i ^ .4 ® (SAW PW WITH i.°RREEeAR AT I-1.)p^ GLw STA we•36.lt- ISLAM OAR:NSONAL COITROL N 00 - WO 8 sef "D•OD 151,00 N a•TNIX wAc TRANSITION IrrPE OI orts 6, MCHC CWa RAIAP TRTMI SKITTER MAM v t��tl ,!E TO SAM Or OA uaLit PC IT. NT•ee)e PT STA.N9-a.ee R V Off.23.10'Ri Off.32'50'RT a A�L Icf .—TE S SNALL e[FR]➢KIeFtD m' ` ! fJ.J H I ALL AOM.0 An ARE s'RAOse"^•o,MRRB IOTm _ V _ _ a NaRST jw—ARE P RApOs VATL33 Z . ...•,..�', ..___—___.._.. _.._._._..__._.._.._.._.._.. _._ A=TnTw FRoa<CT IARTs • .. - cLwe Aw , Ruoscc 6' --- -cxrsrwc ROK.• .8 mlAu. 0'0 4 ,A TYPE C-] IRCNENEOr CUR II CCURTuOUD KIa1 ERE - �•Z� I M 50.1TTER OIL AM j a'Sr K C o a' 20' •a y N LAPSFORO LANE j HORIZpI.AL SCALE Z LIP OVENENTS (SEE SHEET 93) r' < VERTICAL SCALE C�ON�sSTRUCTION NOTES i ME U u'HORIZONTAL&VERTICALCONTROL,n 3 CRY OF FORT WORTH,TEXAS E TRANSPORTATION AND PUBLIC WORKS 1 TRANSPORTATION PROGRAMMING i &CAPITAL PROJECTS DIVISION w n g MONTGOMERY STREET > PAVING PLAN AND PROFILE � STA IA7i O TO STA 151+50 T OFU 2E O L]92 REVISIONS AN lGOF= mown .v s mA : �ZE �9} K `". '�' MEESE TULSA WAY �£NICNOLS YPROSE—TS b.t041f.K tqf " WL 1)131 K W -- n¢.tssly K p WALL(WAI-1- INWG"•, —PRO EET 901 - DRL.GT, WDLL .. �-' _ so.]t Wvu,Tx Tf o9 aps PL STA TLT 6THCK CONCRETE CRIVEWA 1 .0 %w . ......efm OFF.29 `LEGENp �•�.. ... 1� / • Y —TING NOW .155.84.69 ® % 2]52'Li 2��[az3�-�65 (REF.TYRCALSEGTONK� WALK uS CUB...YP O L4J'J:AS (RE]FF..L"SCAPE PLANS) . .•. .• • .-. m 6 HCN CONC M PAD(BUS SHELTER) STA 151•]5 0 PC STA 154.63.70 CURB FAY W ® !].500 P511 WITH R4 REBAR AT b O.0 E.W R CONSTRUCT OFF.23]LT Y 3 . '� 6•THICK HI G TRANV—(TYPED) t PC STA,Nt•66 3] CONCRETE F U)K WITH 1 P 5 .155.54.50 J 3 TA OFF.23.50 R! E YONTGpERv ST PLATE COVER AHp �R Cq• P 5 Sa•Oa 00'LT 1 1� //' 0 yl J•00w COHI{Ci F%00 BPWi-� ri4•p0 OF 339'Li 15im _1__�_____—. • �_ _ _ - ��_ _7 o0Au 0I MB UNLESS Pi _7T. 3a g 5iAtO.6ST[ III _ OFF.]3.50'RT PC STA,b3.84 at w N Ex. (L A Tn�.yy¢�6 rERFm BY j 3. "T�EBm�uTfl 9i M OFF.2.40'RT OFF J552'RL Q a Atl—ATs ARE e'RAm uMEsS ni.E—loim �RT] tpe ANE 30 RAOBa u3Ess 3 µ y RE 5T 15 RD a �W 1.0 iA.1N•419] 950 RT m MOVE AND IFELOC iF - 155.85.6] Z %pV5fE4]SIGN 'P OF J]as RT • - - .. �� _ TO PRN05m dAOE m S AOAST Ex6M NAHI4E5 iMR -'• YµH 60155 SNSRN i0 > PROPos6O NOW bq OLFSi1:ii2.82 .4 •- -•• 00 - f C III A:1 K fiA w•zi xe ¢ T sTA w•]6.a6 E%KT%C �a10 OFF 0.98'Rr OFI.4800 Ri \ R R„:^� oU 0 0 20' w 33 3 PC a1A W 05.80 _-R� w 5TA.154•N fi].49.]5'RT di120NTAL SCALE RE310VE AND—OCATE NF.46.00 Ai - PC STA.1S2•a7.21 E%.STEEL SWING GATE oNQ ,. PiSTA:155.6 31 0� OFF.4T DO- Yij OFF. 12'NT „L' —CAL SCALE 9 CONSTRUCTION NOTESMom Z � L..,��w.,�t,a.�M.�.ri � uN E nut HORIZONTAL&VERTICAL CONTROL m N'�I.c'�'`me a-A- CITY OF FORT WORTH.TEXAS 2 TRANSPORTATION AND PUBLIC WORKS 3 TRANSPORTATION PROGRAMMING F i &CAPITAL PROJECTS DIVISION w g F MONTGOMERY STREET kSE f PAVING PLAN AND PROFILE O STA 151+50 TO STA 156400 F s` , 9n]92 REYNOLDS ASPHALT & CONSTRUCTION COMPANY Since 1981 P.O.Box 370 * Euless,TX 76039 Metro(817)267-3131 * Fax(817)267-7022 ***Change Order Pricing** Montgomery Street Fort Worth,Texas Haydon Building Corporation Attn: Aaron/Jon TEMPORARY WIDENING Quoted; 11/27/17 9:23 AM Estimated Unit Bid Item Description Quantity Unit Bid Extension C001.0 4"HMAC TEMPORARY DETOUR 370.00 TON $ 94.15 $ 34,835.50 QUALIFICATIONS: 1 Excludes tax,bond,engineering/layout,barricades/traffic control,clearing/grubbing,excavation/ embankment,subgrade prep,concrete work,sawcuts,removals/hauloff,permits/inspection fees, utility adjustments/relocations,pavement markings/striping,proof rolling,testing,dewatering, cleaning/sweeping,detour maintenance/removal,milling,stringline and AGC dues. 3 Includes ONE(1)move-in. Additional moves billed at$6500/each. 4 Includes tack coat. 5 All prices are based on a mutually agreed upon construction schedule,and ample access to project site,without interference by others,during construction. 6 HMAC subgrade must be acceptable for paving. No subgrade preparation is included. 7 Excludes stringline. We will pave from a string if one is provided. 8 Items are bid per current COFW specifications. NO MARSHALL MIX. REYNOLDS ASPHALT & CONSTRUCTION COMPANY Since 1981 P.O.Box 370 * Euless,TX 76039 Metro(817)267-3131 * Fax(817)267-7022 ***Change Order Pricing*** Montgomery Street Fort Worth,Texas Haydon Building Corporation Attn: Aaron Quoted: 12/13/17 8:01 AM Estimated Unit Bid Item Description Quantity Unit Bid Extension C001.2 LAY PETROMAT(500 SY/ROLL) 1.00 ROLL $ 1,580.00 $ 1,580.00 QUALIFICATIONS: 1 Excludes tax,bond,barricades/traffic control, and liquid asphalt below paving fabric. I N V O I C E # 9978 Terms: Due Upon Receipt Billed to: HAYDON BUILDING CORP PO#: 21-0027 8200 Springwood Dr.Ste 230 Irving,TX 75063 Invoice Total: $15,036.00 Truck Truck TIME Hours/ Date Ticket# Type Number Location IN OUT Loads Rate Amount Due 3/30/2018 d52873 end-dump 5003 210027 7:00 AM 4:30 PM 9.50 $ 72.00 $ 684.00 3/30/2018 d77460 end-dump 802 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 3/30/2018 d76285 end-dump 5010 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 3/30/2018 d77531 end-dump 5002 210027 7:00 AM 5:30 PM 10.50 $ 72.00 $ 756.00 3/30/2018 d77508 end-dump 5001 210027 7:00 AM 4:30 PM 9.50 $ 72.00 $ 684.00 3/30/2018 d76190 end-dump 5044 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 4/2/2018 d52874 end-dump 5003 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 4/2/2018 d74576 end-dump 091 210027 7:30 AM 4:00 PM 8.50 $ 72.00 $ 612.00 4/2/2018 d75643 end-dump 5005 210027 7:30 AM 4:30 PM 9.00 $ 72.00 $ 648.00 4/2/2018 d76287 end-dump 5010 210027 7:30 AM 5:00 PM 9.50 $ 72.00 $ 684.00 4/2/2018 d77533 end-dump 5002 210027 7:30 AM 4:30 PM 9.00 $ 72.00 $ 648.00 4/2/2018 d51165 end-dump 5001 210027 7:30 AM 5:00 PM 9.50 $ 72.00 $ 684.00 4/4/2018 d51935 end-dump 5012 210027 7:00 AM 5:30 PM 10.50 $ 72.00 $ 756.00 4/4/2018 d51935 end-du m 5012 210027 dump fees 1.00 $ 150.00 $ 150.00 4/4/2018 d57009 end-dump 1416 210027 7:00 AM 5:00 PM 10.00 $ 72.00 $ 720.00 4/4/2018 d20078 end-dump 1723 210027 7:00 AM 4:30 PM 9.50 $ 72.00 $ 684.00 4/4/2018 d20078 end-dump 1723 210027 dump fees 2.00 150.00 300.00 4/4/2018 d20031 end-dump 040 210027 7:00 AM 4:30 PM 9.50 $ 72.00 $ 684.00 4/4/2018 d20031 end-dump 040 210027 dump fees 2.00 150.00 300.00 4/5/2018 d51936 end-dump 5012 210027 7:00 AM 4:30 PM 9.50 $ 72.00 $ 684.00 4/5/2018 d51936 end-dump 5012 210027 dump fees 1.00 150.00 150.00 4/5/2018 d59563 end-dump 097 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 4/5/2018 d59563 end-dum 097 21 027 dum fees 2.00 150.00 30 .00 4/5/2018 d57007 end-dump 1416 210027 7:00 AM 4:00 PM 9.00 $ 72.00 $ 648.00 4/5/2018 d71310 end-dump 040 210027 7:00 AM 5:00 PM 10.00 $ 72.00 $ 720.00 $ 15,036.00 4. £. A '7ta caltastatiac Specializing in: Wet Batch,Concrete,Dirt,&Asphalt Submitted:4/5/2018 Page 1 of 1 Invoice#:9978