Loading...
HomeMy WebLinkAboutContract 50552-A1 �1 CITY SECRETARY AMENDMENT No.1 CONTRACT NO. S� �Z G`�tG EGQ�P�� TO CITY SECRETARY CONTRACT No. 50552 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50552, (the CONTRACT) which was administratively authorized on the 21St day of March, 2018 in the amount of $ 8, 480. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: E. Lancaster at Beach Pedestrian Crossing Improvements; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 24, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $27, 780. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $36,260. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: OFFICIAL RECORD City of Fort Worth Professional Services Agreement Amendment Template CITY SKCRETAW CFW Official Release 9/19/2017 Page 1 of 3 I e WORTHS TX City of Fort Worth ENGINEER Kimley-Horn and Associates, Inc. Su Alanis Scott R. Arnold, P.E. Assistant City Manager Assistant Secretary DATE: 13 DATE: APPROVAL RECOMMENDED: Z� a C'j, Douglas 19. Wiersig, P.E. Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . 0'4` .............. Clint Hoover, P.E. Senior Professional Engineer APPROVED AS TO FORM AND LEGALITY: M&C: �-R�x Date: Douglas W. Black Assistant City Attorney ATTEST: Of �® Mary J. ays r City Secretary S OFFICIAL RECORD City of Fort Worth Wry■ SURA ' Professional Services Agreement Amendment Template WoRtif 'tea, TX CFW Official Release 9/19/2017 j Page 2 of 3 FID BREAKDOWN SHEET City Secretary No. 50552 Amendment No. 1 Department FID Amount TPW Total: City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 3 Kimley�7> Horn July 24, 2018 Clint Hoover, P.E. City of Fort Worth—Transportation and Public Works Department 200 Texas Street Fort Worth, Texas 76102 Re: Amendment#1 CSN 50552—Design Services for E. Lancaster at Beach Pedestrian Crossing Improvements Dear Clint: Kimley-Horn and Associates, Inc. ("Kimley-Horn"or"Consultant") is pleased to submit this Amendment #1 to the City of Fort Worth (City) to provide additional services for the design of the E. Lancaster at Beach Pedestrian Crossing Improvements. The following Scope of Services has been developed based on our discussions with the City. Scope of Services Kimley-Horn will provide the services specifically set forth below. Task 3—Intersection Schematic and Opinion of Probable Construction Costs (OPCC) Kimley-Horn will prepare two (2) intersection schematic to depict the two (2) options discussed with City staff at the coordination meeting held on July 18, 2018. OPCC's for each option will also be prepared. Task 4—Pedestrian Crossing Design Plans Kimley-Horn will prepare 90%and Final plans for the chosen alternative, in accordance with City and/or TxDOT standards and specifications. The improvements are anticipated to include: median nose modification on the west side, installation of actuated pedestrian equipment (pedestal poles, conduit, cable, pedestrian heads, push buttons, etc), and modification of curb ramps and sidewalk. Kimley-Horn will prepare for and attend one(1) plan review meeting with the City to discuss comments on the 90% plans. Kimley-Horn will also coordinate with TxDOT, as necessary, regarding their resurfacing project and to obtain a driveway permit. Kimley-Horn will prepare the construction task order package and attend the pre-construction meeting. Task 5—Construction Phase Services Kimley-Horn will perform the following tasks: - Attend bi-weekly construction meetings during construction. Up to four (4) meetings are included. - Review up to one (1) shop drawing and up to four(4) RFI's. 801 - - 950, Fort Worth, Texas K i m ey.'O H o r n Page 2 - Schedule and pay for the TDLR inspection of the project. Additional inspections due to construction deficiencies shall be paid by the Contractor. - Attend the punch list meeting and the final walk-through meeting. - Prepare record drawings upon receipt of Contractor red lines. Additional Services Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current hourly rates Schedule We will provide our services in a mutually agreed upon schedule following Notice to Proceed from the City. Additional services, if desired, will be performed in a timely manner upon authorization by the City. Fee and Expenses Kimley-Horn will perform the services in Tasks 3—5 for a not-to-exceed fee of$27,780. All permitting, application, and similar project fees will be paid directly by the Client. Kimley-Horn will not exceed the total maximum labor fee shown without authorization from the Client. We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. By: Scott R. Arnold, P.E. Project Manager, Assistant Secretary 801■iiiWiiilY Cherry Suite • Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for E.Lancaster at Beach Pedestrian Crosswalk Improvements City Project No.02670 Labor hours Ex ense Task Description Project Project Sr.Project Project Total Labor _ Total Expense Task No. Director Ma na er En ineer En ineer EIT CADD Atlminiatrative Cos[ Subconsultant Travel Fees Cost Tasty Sub Total Rate $230 $205 $115 $i55 $125 $100 $90 SBE Non-SBE 3.0 Intersection Schematic and OPCC D 2 0 D 14 D D $2160 $0 $0 $0 $0 $0 $2,160 3.1 Prepare Two 2 Schematics 1 10 $1,455 $0 $1,455 3.2 Prepare Two 2 OPCC's 1 4 $705 $0 $705 4.0 Pedestrian CrossingDesign Plans 0 13 4 0 132 0 0 $19,86 $0 $0 $0 $0 $D $19,665 4.1 Pre are 90%plans 2 2 80 $10,760 $0 $10,760 4.2 - Atlend 90%plan review meeting 2 2 $660 $0 $660 4.3 Prepare 100!plans 2 2 40 $5,760 $0 $5,760 4.4 TxDOT Coordination/Permit 6 6 $1,980 $0 $1,980 4.5 Construction Task Order Package 1 4 $705 $0 $705 5.0 Construction Phase Services 0 4 0 0 33 0 0 $4,945 $0 $600 $150 $0 $750 $5,695 5.1 Bi-Week) Construction Meetings(4 each 1 8 $1,205 $100 $100 $1,305 5.2 - Review ShopDrawin 1 $125 $0 $125 5.3 ReviewlRes and to RFPs 4 each) 2 8 $1,410 $0 $1,410 5.4 TDLR Inspection 4 $500 $600 $25 $625 $1,125 5.5 Punch List and Final Walk Throu h Meetings(2) 6 $750 $25 $25 $775 5.6 Record Drawings 1 6 $955 $0 $955 Totals ll 19 4 0 179 0 0 $26,970 $0 $600 $150 SO $750 $27,720 Project Summary Total Hours 202 Total Labor $26,970 Total Expense $750 MBEISBE Subconsultant $0 Nan-MBE/SBE Subconsultant $600 10% Sub Markup $60 MBEISBE Partici alion 0.0% Total Project Cost $27,780 City of Fort Worth,Texas Attachment El-Level of Effort Supplement PMO Official Release Date:8.09.2012 1 of 1