Loading...
HomeMy WebLinkAboutContract 28006-A7 RECEIVED CITY SECRETARY REC AUG E I E AMENDMENT No.7 CONTRACT NO. CITYOFFORTWORTH TO CITY SECRETARY CONTRACT CITYSECRETARY WHEREAS, the City of Fort Worth (CITY) and Dannenbaum Engineering Corporation, (ENGINEER) made and entered into City Secretary Contract No. 28006, (the CONTRACT) which was authorized by M&C C-19172 on the 30th day of July, 2002 in theamount of $721,899.76; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $111,800 .52 which was authorized by M&C C-19936 on January 20 , 2004, Amendment No.2 in the amount of $329,406.00 which was authorized by M&C C-22535 on November 27 , 2007 , Amendment No. 3 in the amount of $96,825 .00 which was authorized by M&C C-23578 on June 9, 2009 and Amendment No. 4 in the amount of $60,835.00 which was authorized by M&C C- 24794 on March 22, 2011, Amendment No. 5 in the amount of $149,012.00 which was authorized by M&C C -28110 on February 14, 2017, Amendment No. 6 in the amount of $63,751 .00 which was administratively authorized on October 11 , 2017; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 12 , 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $21,860 .00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall bean amount of $1,555,389.28. 3. OFFICIAL.RECORD CITY SECRETARY +r,WOIRTH,TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth MDanneum Engineerin Corporation, Jesus J. Chapa Wayn G. Ahrens, P.E. Assistant City Manager Executive Vice-President DATE: 7-1 DATE: APPROVAL RECOMMENDED: C(- a L Christopher Harder, P.E. Acting Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee tle: Project Manager MSC: N/A 96�2k Date N/A Douglas W. Black Senior Assistant City Attorney `. ,. AT , ry J. Kayser City Secretary TEA �.. OFFICIAL.RECORD CITY SECRETARY FT.WORTH,TX DANNENBAUM ENGINEERING CORPORATION 2501 PARKVIEW DRIVE,SUITE 670, FORT WORTH,TEXAS 76102 June 12, 2018 Mr.John Kasavich, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76102 Re:Sanitary Sewer M-257&325 Middle&Upper Village Creek Parallel Relief Alignment Study&Design City Secretary Contract No. 28006-Amendment No.7 City Project No. 01333 DEC Project No. 3642-32 Dear Mr. Kasavich: Dannenbaum Engineering Corporation, (Dannenbaum or ENGINEER) is pleased to provide the City of Fort Worth (CITY) with Amendment No.7 for the Sanitary Sewer Main 257 & 325 Middle and Upper Village Creek Parallel Relief Alignment Study contract (the PROJECT). The CITY has asked Dannenbaum to perform additional services under this contract for: 1) Additional Tree Survey — Preparing additional tree survey within Deer Creek Park to cover alignment adjustments made within the Park since the original contract design survey. 2) Additional TRWD Easement Parcels — Preparing additional permanent sanitary sewer and access easements and temporary construction easement parcels created as a result of a transfer of property ownership to Tarrant Regional Water District (TRWD)for a portion of project Parcel 11 west of IH-35W. This property transfer occurred after the current easement parcel documents had been submitted to the City. 3) Revised Deer Creek Park Reservation Parcels—Preparing revised permanent and temporary construction reservation parcels within Deer Creek Park to cover alignment revisions made within the Park to reduce impacts to existing trees and proposed Park improvements known as "Capital Improvements at Deer Creek Park, City Project No. 100418" (Park Project). 4) Additional management and design services associated with Deer Creek Park - Additional meetings, coordination and design revisions related to reducing impacts to existing trees and the proposed Park Project improvements. These services are necessary because: 1) Alignment adjustments in Deer Creek Park associated with site visits and discussions with Water Department and Park & Recreation Department (PARD) staff required that the tree survey be extended to additional areas within the Park. 2) Additional permanent and temporary construction easement parcels were created as a result of a transfer of property ownership to Tarrant Regional Water District (TRWD)for a portion of project Parcel 11 west of IH-35W. This property transfer occurred after Dannenbaum submitted the current easement parcel documents to the City. 3) Based on meetings and discussions with Park & Recreation Department (PARD) and Water Department staff, alignment revisions are required in Deer Creek Park to adequately protect existing trees and the referenced Park Project improvements. 4) A portion of the Park Project's proposed playground and concrete trail improvements that encroach on a portion of the currently proposed M-325 temporary construction easement alignment as established in coordination with PARD in September,2012. Dannenbaum was notified on 3/28/18 that the Park Project was going to bid on 3/29/18 and was provided the Park Project construction plans at that time. PARD with Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.7 DEC No.3642-32 Page 2 of 4 the Water Department's concurrence asked Dannenbaum to investigate ways to reduce impacts to trees and the Park Project improvements. Dannenbaum's investigations resulted in meetings with various construction contractors and PARD and Water Department staff. From these meetings, Dannenbaum prepared design revisions to reduce Park impacts, which were then presented to and approved by PARD and Water Department staff. The additional services required are as follows: 1) Additional Tree Survey - Additional tree survey within Deer Creek Park to cover alignment adjustments made within the Park since the original contract design survey, is to be performed by ANA Consultants, LLC (ANA). This work is classified as Special Services under former Part 2-Main 325 Design Phase and current Work Phase 51 of the contract.The scope of work is described in Attachment A.—Subconsultant's Scope of Work. Fee=$2,960(Lump Sum). 2) Additional TRWD Easement Parcels — Add permanent sanitary sewer and access easements, and temporary construction easement parcels created as a result of a transfer of property ownership to Tarrant Regional Water District (TRWD) for a portion of project Parcel 11 west of IH-35W that occurred after the current easement parcel documents had been submitted to the City. This work is to be performed by ANA, and is classified as Special Services under former Part 2-Main 325 Design Phase and current Work Phase 51 of the contract.The scope of work is described in Attachment A—Subconsultant's Scope of Work. Fee=$3,200.00(Lump Sum). 3) Revised Deer Creek Park Reservation Parcels—Revise permanent and temporary construction reservation parcels within Deer Creek Park to cover alignment revisions required to adequately protect existing trees and referenced proposed Park Project improvements. This work is to be performed by ANA Consultants, LLC (ANA). This work is classified as Special Services under former Part 2-Main 325 Design Phase and current Work Phase 51 of the contract.The scope of work is described in Attachment A.—Subconsultant's Scope of Work. Fee=$700 (Lump Sum). 4) Additional management and design services associated with Deer Creek Park — Additional meetings, design studies,correspondence,exhibits,easement and design changes associated with reducing impacts to existing trees and the proposed Project Park improvements within Deer Creek Park. Fee=$15,000.00 (Time &Materials). Dannenbaum will perform/manage the work described in the items above forthis Amendment in accordance with the original Contract. We recommend that the City increase the budget by$21,860 for these additional services as follows: The recommended breakdown for survey Items, 1)through 3),for subconsultant ANA is: Description Fee %Amend No. 7 Additional Tree Survey $2,960 14.33% Easement Revisions $3,900 17.84% Total(Work Phase 51) $6,860 31.38% The recommended breakdown for engineering design and management services, Item 4),for Dannenbaum is: Description Fee Design/Mgmt/Coord. $15,000 Total (Work Phase 33) $15,000 Overall M/WBE Fees and%of Contract are also presented in attached Exhibit B,Tab Exhibit B-3A Fee Summary. \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amendment exhibits\main 325 sa7 cover letter rev04.docx Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.7 DEC No.3642-32 Page 3 of 4 The following table summarizes the Fee per Work Phase breakdown: Work Phase Fee 33 (Design/Coordination) $15,000 51(Survey) $6,860 Total $21,860 These Services are presented in further detail in attached Exhibit B,Tab Exhibit B-3. The following table summarizes our recommended budget revisions and shows the revised contract amount: Current Contract Through Revised Contract Amend No.6 Description Amend No.7 Original Work New Work Original Work New Work Phase Phase Phase Phase Part 1-Alignment Study $145,727.46 $145,727.46 - $145,727.46 $145,727.46 Part 2-Main 325 Design $1,072,879.99 $860,116.99 $1,072,879.99 $860,116.99 Work Phase 51(Survey) $44,000.00 $6,860.00 - $50,860.00 Work Phase 33(Design,Design Support) - $168,763.00 $15,000.00 $183,763.00 Part 3—Village Creek Basin Rehab Part 4 $231,929.54 $231,929.54 Part4—Main 238 Basin Rehab $82,992.29 $82,992.29 Total Project $1,533,529.28 $21,860.00 $1,555,389.28 The following table summarizes original and supplemental agreement dates,fee and scope for this contract: Contract Summary to date: Description Date Amount Description Original Agreement 7/30/2002 $721,899.76 1 Supplemental Agreement#1 1/20/2004 $111,800.52 Addition&Modification of Various Lines 2 Supplemental Agreement#2 12/26/2007 $329,406.00 Main 325 Design 3 Supplemental Agreement#3 9/1/2009 $96,825.00 Addition and Modification of Alignment 4 Supplemental Agreement#4 4/12/2011 $60,835.00 Revise Align.East of Huguley(Surv,Esmt,EID) 5 Supplemental Agreement#5 3/5/2017 $149,012.00 Realignment of 7075 LF of Main 325 6 Supplemental Agreement#6 10/11/2017 $63,751.00 Incr.Pipe Size to 48",Util.Locates,Access Esmts. 7 Supplemental Agreement#7 Pending $21,860.00 Revise Deer Creek Park Esmt Parcels,Add TRWD Esmt Parcels Mgmt/Dgn Revisions-Deer Creek Park Total 1 $1,555,389.28 It is proposed that fu nding for this amendment be drawn from the previously approved contract Amendment No. 5 (dated 3/5/2017) budget for the acquisition of Easement Parcels 15PE(r01) and 15CE(r01) (Reference Exhibit C—Amendment 5—Exhibits 4 and 5 )which are located on Deer Creek Park, property owned by the City of Fort Worth. A cost of$123,954 was inadvertently assigned to cover acquisition costs for these two reservation parcels and is included in the Amendment No. 5 budget (Reference Exhibit D—City Council Action Ref No.C-28110,dated 2/14/2017). Since the two reservation parcels are located on City property,there is no easement acquisition cost associated with them, and the$123,954 amount is available to cover the contract budget increase for this amendment(No. 7)of$21,860, plus the previous Amendment No. 6 (dated 10/11/2017)fee of$63,751. \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amend ment exhibits\main 325 sa7 cover letter rev04.docx Sanitary Sewer Main 257&325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design-Amendment No.7 DEC No.3642-32 Page 4 of 4 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, Dannenbaum Engineering Corporation Digitally signed by Douglas E Guinn Date:2018.06.12 13:39:03-05'00' Douglas E. Guinn, P.E. Sr. Project Manager DEG/JCP Attachments: Attachment A—Subconsultants'Scope of Work Exhibit B—Summary of Manhours and Project Fees Exhibit C—Amendment 5—Exhibits 4 and 5 Exhibit D—City Council Action Ref No. C-28110,dated 2/14/2017 \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amendment exhibits\main 325 sa7 cover letter rev04.docx ATTACHMENT A \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amendment exhibits\main 325 sa7 cover letter rev04.docx Attchment A—Subconsultant's Scope of Work ADDITIONAL TREE SURVEY(DEER CREEK PARK) Scope of Work -Field tie and show tree locations,species and trunk diameters within the noted boundary on the attached exhibit (within the Temporary Construction and Permanent Easements),for all trees trunk sizes 6" and larger. Deliverable shall consist of an AutoCAD design base file on Main 325 Parallel Relief Sewer project datum and using the same project symbology as provided in prior CADD submittals. Tree Survey Field Work- 16 hours @ $160/Hour= $2,560.00 Tree Survey Office Work-4 hours @ $100/Hour= $400.00 ADDITIONAL EASEMENT PARCEL(TRWD) Scope of Work -Provide documents necessary for the acquisition of one (1)additional permanent sanitary sewer easement,one (1)additional access easement and one(1)additional temporary construction easements, located west of IH-35W owned by Tarrant Regional Water District, and revisions to one (1) permanent sanitary sewer easement,one (1)access easement and one (1) temporary construction easement, previously prepared for property owned by W1 & LL Luck. Provide two (2) signed and sealed real property descriptions and maps of survey for each easement to be acquired. Two (3) new easements +Two (3) revised easements=$3,200.00 REVISED RESERVATION PARCEL(DEER CREEK PARK) Scope of Work -Revise one (1)temporary construction and one (1) permanent sanitary sewer reservation documents within Deer Creek Park to coincide with sanitary sewer alignment revisions made to reduce impacts to existing trees and proposed improvements within Deer Creek Park, identified as City Project No. 100418. Provide two (2)signed and sealed real property descriptions and maps of survey for each easement to be dedicated. Two (2) revised easements =$700.00 EXHIBIT B \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amendment exhibits\main 325 sal cover letter rev04.docx EXHIBIT B-3 Page 1 of 4 (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES -SUPPLEMENTAL AGREEMENT NO. 7 SANITARY SEWER MAIN 257&325 MIDDLE & UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY & DESIGN CITY PROJECT NO. 01333 DOE NO. 3650 Phase Scope of Services Fee SUBCONSULTANT % M/WBE I-Design Services Part 1 Alignment Study, Part 2 Main 325 Design Engineering $ 15,000.00 $ - 0.0% Survey(ANA) $ 2,960.00 $ 2,960.00 100.0% Easement Adustments(ANA) $ 3,900.00 $ 3,900.00 100.0% Geotechnical (Geotel) $ - $ - 0.0% $ - 0.0% TOTAL $ 21,860.00 $ 6,860.00 31.4% Proposed M/WBE Subconsultants Fees % M/WBE TOTALS $ 6,860.00 31.4% Exhibit B-Summary of Manhours and Project Fees(Amendment 7)r04.x1sx 6/10/2018 EXHIBIT B-3A FEE SUMMARY Page 2 of 4 (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES -SUPPLEMENTAL AGREEMENT NO. 7 SANITARY SEWER MAIN 257&325 MIDDLE& UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY&DESIGN CITY PROJECT NO.01333 DOE NO.3650 BASIC ENGINEERING DESIGN FEE: FEE SUBCONSULTANT %M/WBE Deer Creek Park Coordination/Design Changes $ 15,000.00 $ - 0.0% SUBTOTAL(BASIC ENGINEERING DESIGN FEE) $ 15,000.00 $ - 0.0% SPECIAL SERVICES Field Survey(ANA Consultants) $ 2,960.00 $ 2,960.00 100.0% Easement Adjustments(ANA Consultants) $ 3,900.00 $ 3,900.00 100.0% Environmental(Blanton) $ - $ - 0.0% Geotechnical(Geotel) $ $ 0.0% 0 $ - $ - 0.0% SUBTOTAL(SPECIAL SERVICES) $ 6,860.00 $ 6,860.00 100.0% CONSTRUCTION SERVICES Construction Phase Services $ - $ - 0.0% As-Built Drawings $ - $ - 0.0% SUBTOTAL(CONSTRUCTION SERVICES) $ - $ - 0.0% REPRODUCTION/DIRECT EXPENSES 8 Sets Review Plans $ - $ - 0.0% 16 Sets Preliminary Plans(Utility Clearance) $ - $ - 0.0% 50 Sets Construction Plans $ - $ - 0.0% 50 Sets Specifications $ - $ - 0.0% As-Built Plans $ - $ - 0.0% 1 Set Mylar Plans $ - $ - 0.0% AUTO EXPENSE $ - $ - 0.0% Mounted Exhibits for Public Meetings $ - $ - 0.0% SUBTOTAL(REPRODUCTION) $ - $ - 0.0% 10%SUB-CONTRACTOR MARK-UP $ - TOTAL LUMP SUM FEE(THIS ADDENDUM) $ 21,860.00 $ 6,860.00 31.4% Exhibit B-Summary of Manhours and Project Fees(Amendment 7)r04.xlsx 6/10/2018 EXHIBIT B-3A FEE SUMMARY Page 3 of 4 PROPOSED MIWBE SUBCONSULTANTS (THIS ADDENDUM) PROPOSED SERVICES FEES %CONTRACT ANA Consultants Survey $ 6,860.00 31.4% Blanton&Associates Environmental $ - 0.0% Geotel Geotechnical $ - 0.0% TOTAL M/WBE(THIS ADDENDUM) $ 6,860.00 31.4% PROJECT TOTALS FEE M/WBE %M/WBE Original Contract $ 721,899.76 $ 203,001.00 28.1% Amendment#1 $ 111,800.52 $ 26,672.00 23.9% Amendment#2 $ 329,406.00 $ 130,728.00 39.7% Amendment#3 $ 96,825.00 $ 48,760.00 50.4% Amendment#4 $ 60,835.00 $ 31,240.00 51.4% Amendment#5 $ 149,012.00 $ 99,239.00 66.6% Amendment#6 $ 63,751.00 $ 7,850.00 12.3% This Amendment $ 21,860.00 $ 6,860.00 31.4% TOTAL LUMP SUM FEE(PROJECT TOTAL) $1,555,389.28 $554,350.00 35.6% TOTAL M/WBE(CITY M/WBE GOAL=18%) $554,350.00 35.6% Exhibit B-Summary of Manhours and Project Fees(Amendment 7)r04.xlsx 6/10/2018 MANHOURS Page 4 of 4 DANNENBAUM ENGINEERING CORPORATION SUMMARY OF MANHOURS BY CLASSIFICATION SUMMARY OF TOTAL PROJECT FEES-SUPPLEMENTAL AGREEMENT NO.7 M-325 ENGINEERING DESIGN&SUPPORT SVCS.-1)SURVEY/EASEMENTS;2)DEER CREEK PARK COORDINATIONIDESIGN CHANGESIMANAGEMENT AMENDMENT N7 DEC ESTIMATED MANHOURS PER TASK BY CLASSIFICATION TOTAL TOTAL TASK DESCRIPTION OF WORK TASK QUANTITY PROJ SENIOR STRUCT/ PROJECT SR DGN TECH. QA/Q, MHIs COST CODE PRINCIPAL MGR ENGR HYOR ENG ENGR TECH. CARD REVIEW SECTY PER PER QNTY UNIT $270.00 $230.00 $185.00 $150.00 $120.00 $1%00 $60.00 $185.00 $65.00 TASK TASK DESIGN PHASE ENGINEERING 0120 PROJECT MANAGEMENT 1 LS 12.0 12.0 2,780.00 0103 CONFERENCES/COORDINATION 5 EA 15 15 16 46.0 7,985.00 2400 FINAL DESIGN COVER SHEET 0 SHEET 0.0 0.00 GENERAL CONSTRUCTION NOTES 0 SHEET 0.0 0.00 GENERAL SEWER NOTES 0 SHEET 0.0 0.00 .FRCP GENERAL NOTES 0 SHEET 0.0 0.00 LOCATION MAP 0 SHEET 0.0 0.00 SHEET LAYOUT&CONTROL 2 SHEET 1.0 4.0 8.0 1.0 14.0 2,035.00 SAN.SEWER PLAN&PROFILE 2 SHEET 1.0 4.0 8.0 2.0 15.0 2,220.00 SAN.SEWER DETAILS 0 SHEET 0.0 0.00 SW3P DETAIL SHEETS 0 SHEET 0.0 0.00 TRAFFIC CONTROL PLANS 0 SHEET 0.0 0.00 OPINION OF PROBABLE CONSTRUCTION COST 0 LS 0.0 0.00 BID PROPOSAUSPECIFICATIONS 0 LS 0.0 0.00 0.0 0.00 0.0 0.00 GRAND TOTAL 4 0.0 29.0 23.0 0.0 0.0 320 0.0 3.0 0.0 87.0 15,000.00 0.00% 33.33% 26.44% 0.00% 0.00°h 36.78% 0.00% 3.4546 0.00% 100.00% DIRECT LABOR COSTS: $ 15,000.00 SUBCONTRACTORS FIELD SURVEY(ANA)(MANBE) $ Zs 0.00 EASEMENT ADJUSTMENTS(ANA] (MANSE) $ 3,900.00 ENVIRONMENTAL(BLANTON)(MM/BE) $ - GEOTECHNICAL(GEOTEL)(MANSEI $ - MANBE Participation: 31.4% TOTAL SUBCONTRACTOR COSTS $ 6,860.00 0%SUBCONTRACTOR MARKUP $ - TOTAL DEC COSTS(LABOR+MARKUP) $ 15,000.00 TOTAL COSTS(DEC+SUBS) $21,860.00 Exhibit B-Summary of Manhours and Project Fees(Amendment 7)r04.xlsx 6/10/2018 EXHIBIT C \\us-ftw-fs01\data\ftwdata\projects\1210\3642-32\admin\agreement\supplemental#7\amendment exhibits\main 325 sa7 cover letter rev04.docx --PRQP UPDATEIIALLCNM II I (CONTRA TAMEN MEfyT�10. 5) II i IPL ALIGNSIENT -- 103 -- I� PERM ESMT ` `— I 30'(T1P) A X41 203B Inoas 205 B 6ECOPIDCRO68ING , , ,-'Pp I -� 80'(17P) r PROPOSED 2000 ALIGNMENT AIJGNAEPd?r I 105C 106A 206C PERH Es.HT 40'cryp) PERM E6MT / -�I,r..T. �•�•s rc _ 1 10'(T1P) ••,L,"=EXISTE6.HTJ�� I TOWER 102 , I 20. ONCOS �'ONCOH nM, n^..,.• I 201 —.7 INITLII. 100'(TYP� [ I ie o•. ALIGNMENT m � 3� 4r . II LHUGULEY ' I'Sti•I I yt I HOSPITAL I `� EASEMENT ACQUISITION EXHIBIT CTAT DEPART RTMENTS WATER DEPARTMENT FOR UPDATED ALIGNMENT VILI I,AN RA°RARIELI �N MAN 325TNOPARALLELP1 0-070 SEWER WATER PROECT NO,P170-O7017074W.10 mTr�Q1°'''V10 Rn THE nx�io•ars DATA SHOWN HERE 15 APPROXIMATE AND SUBJECT TO UPDATED SURVEY 0.0.E PROJECT NO.3550 '2�1_0S TEMPOR TEMPORARY CONSTREPERMANENT UCTIONREASEMENT R ELL516D•I,„DT11 DAN N E N BAU M SOUARE FOOTAGE IN ACCOMPANYING EXCEL SPREADSHEET. M325 Amendment Nn,5 Proposed E°semenlsaly,EahiElt C-1 ENGINEERING CORPORATION T.6 P FlRM REGISTRATION W41 °Are°7/L7IIS - -E d ra, cva,°vw-=."n� .- NP. nza Amendment S-Exhibit S This spreadsheet is an estimate of square footages for the easements anticipated for the proposed Amendment No.5 revised alignment of Main 32S. Note that this assumes that where permanent easements are adjacent to the 150'wide TRWD IPL easement,that the closest 60'of the 150'easement width cannot be used as a temporary construction easement and that this will need to be acquired as temporary construction easement for the Main 325 project.Only easements for this revised alignment are included.This spreadsheet accompanies the"Exhibit 4-Easement Acquisition Exhibit For Updated(Amendment No.5)Alignment" Amendment No.5 Permanent Easements Estimated Estimated Parcel Owner(At Time of Survey) SF cost($)* 14PE(r01) 26,627 66,568 Oncor Electric Delivery Co.,VOL 3539 PG 642 and VOL 6175 PG 135,DRTCT 15PF(rol) 37,676 94,190 City of Fort Worth,1000 Throckmorton St.TAD Account#07658680 101 12,013 30,032 Oncor Electric Delivery Co.,VOL 3625 PG 321 and VOL 6597 PG 713,DRTCT 102 36,127 90,318 Adventist Health Systems/Sunbelt Inc. d/b/a Huguley Memorial Medical Center,Tract 1 VOL 9144 PG 1217 DRTCT 103 71,976 179,940 Adventist Health Systems Sunbelt Inc. d/b/a Huguley Memorial Medical Center,TCCI No.D20S351192,OPRTCT 104 22,146 55,365 Sharon R.Luck-4356 Salix Court,Fort Worth,Texas 76109,TCCI No.D214000601,OPRTCT 105 51,683 129,208 William J.Luck&Dorothy Luck Credit Trust, 7108 Camp Bowie Blvd Fort Worth,TX 76116 VOL 12610 PG 60S DRTCT 106 8,238 0 City of Fort Worth,1000 Throckmorton St.TCCI No.D212172218,OPRTCT 107 20,105 S0,263 Lewisville 7 Partners,LTD.,Tract 1(Remainder)VOL 16555,PG 31 DRTCT Total 286,591 695,882 *Note: Estimated $2.50/51' permanent easement cost used was provided by the Tarrant Regional Water District(TRWD) based on their costs for nearby IP easement acquisition.Estimated$0.50/SF temporary construction easement costs is based on discussions with the City of Fort Worth Water Department staff as to a reasonable estimated value of 20%of permanent easement cost.Dannenbaum Engineering makes no warranty on the level of accuracy or applicability of this unit price to these easement parcels.If a greater level of accuracy and/or applicability of these unit costs is desired,an appraisal should be conducted by a real estate professional qualified in pipeline appraisals. Page 1 of 2 Amendment 5-Exhibit 5 Amendment No.5 Temporary Construction Easements Parcel EstimatedEstimated Cost aced Owner(At Time of Survey) SF 14CE(r01) 39,924 19,962 Oncor Electric Delivery Co.,VOL 3539 PG 642 and VOL 6175 PG 135,DRTCT 1SCE(r01) 59,529 29,764 City of Fort Worth,1000 Throckmorton St.TAD Account#07658680 201 18,021 9,010 Oncor Electric Delivery Co.,VOL 3625 PG 321 and VOL 6597 PG 713,DUCT 202 54,352 27,176 Adventist Health Systems/Sunbelt Inc. d/b/a Huguley Memorial Medical Center,Tract 1 Vol 9144 PG 1217 DRTCT 203A 93,537 46,769 Adventist Health Systems Sunbelt Inc. d/b/a Huguley Memorial Medical Center,TCCI No.D205351192,OPRTCT 203B 14,398 7,199 Adventist Health Systems Sunbelt Inc. d/b/a Huguley Memorial Medical Center,TCCI No.D205351192,OPRTCT 204 27,446 13,723 Sharon R.Luck-4356 Salix Court,Fort Worth,Texas 76109,TCCI No.D214000601,OPRTCT 205A 35,371 17,686 William 1.Luck&Dorothy Luck Credit Trust, 7108 Camp Bowie Blvd Fort Worth,TX 76116 VOL 12610 PG 60S DRTCT 205B 46,499 23,250 William J.Luck&Dorothy Luck Credit Trust, 7108 Camp Bowie Blvd Fort Worth,TX 76116 VOL 12610 PG 605 DRTCT 206 1,388 694 City of Fort Worth,1000 Throckmorton St.TCCI No.D212172218,OPRTCT 207A 9,299 4,650 Lewisville 7 Partners,LTD.,Tract 1(Remainder)VOL 16555,PG 31 DRTCT 2078 30,353 15,177 Lewisville 7 Partners,LTD.,Tract 1(Remainder)VOL 16S5S,PG 31 DRTCT Total 430,117 215,058 Grand Tota! 716,708 910,941 *Note: Estimated $2.50/SF permanent easement cost used was provided by the Tarrant Regional Water District(TRWD) based on their costs for nearby IPL easement acquisition.Estimated$0.50/SF temporary construction easement costs is based on discussions with the City of Fort Worth Water Department staff as to a reasonable estimated value of 20%of permanent easement cost.Dannenbaum Engineering makes no warranty on the level of accuracy or applicability of this unit price to these easement parcels.If a greater level of accuracy and/or applicability of these unit costs is desired,an appraisal should be conducted by a real estate professional qualified in pipeline appraisals. Page 2 of 2