Loading...
HomeMy WebLinkAboutContract 47242-CO1 FORT WORTH. City of Fort Worth CITY SECRETARY ,�2H-a _ �� Change Order Request Breakdown CONTRACT NO. — Project Name 2014 CIP Concrete Sidewalk Contract 3 City Sec# 1 47242 Client Project#(s)l 02602 Contractorl Ameguin Group, Inc PM Tariqul Islam Inspectorl Gary Deyon Change Order Submittal# 0 Date 6/7/2018 Dept. TPW Water Storm Contract Time Totals CD Original Contract Amount $458,404.15 $0.00 $0.00 $458,404.15 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $458,404.15 $0.00 $0.00 $458,404.15 180 Amount of Proposed Change Order $63,624.26 $0.00 $0.00 $63,624.26 426 Revised Contract Amount $522,028.41 $0.00 $0.00 $522,028.41 606 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $63,624.26 $63,624.26 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 13.88% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $573,005.19 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order is to cover the costs of additional work at various locations.Additional work on the sidewalk contract was due to unforeseen items;that became obstacles to install sidewalk in preexisting Right-Of-Ways.7"Remove/Replace Concrete Paving along with Curb&Gutter/ Asphalt was added to improve drainage issues on Foard and Baylor;where 5'combination walks was installed.6"Curb Back of Sidewalk was needed for grading issues on residential properties at various locations(Stark,Truman,Sarah Jane).Sidewalk 3 also experienced stoppage from Council and Residents @ Starks and Mims that required two public meeting and 4 months delay.The results included Unclassified Excavation,and reestablishing the Right-Of-Way to"As Was"or better than before on Mims. Removal of(Historic Stonewall, Concrete Stairs, Flumes,and Chain Link fences)on Stark,were all decisions made during the meeting.After the completion of contract,a couple of months were needed to finalize completed quantities.Subsequently,426 days are added to the contract to compensate for the added activities. z RECEIVED AUG 2 1 2018 OFFICIAL RECORD CITY OF FORT WORTH CITYSECREFARY CITY SECRETARY FT.WORTH,TX FORT WORTrt City of Fort Worth -�"!`��-- Change Order Additions Project Name 2014 CIP Concrete Sidewalk Contract 3 City Sec# 47242 Client Project# 02602 Contractor Arreguin Group,Inc PM Tariqul Islam Inspector.F Gary Deyon Change Order Submittal# Date 6 7/2018 ADDITIONS Ty Unit MUnitCost otaemove ep ace oncrete aving29 6" urb Back of Sidewalk TPW 1,184.100 LF30 toneWall Demo TPW 1: 000000 L 31 Chain Leak Fence Removal TPW 48.00 0 LFRemove and Replace Concrete tairs TPW 1.5 190000 F33 Uncassi ie Excavation TPW 1. 00 0 Ls Asphalt Sawcut and Removal TPW 1.00000000 L $5,625.00 35 Flume Remove/Replace TPW 20.0 00 SF 44.00 36 emove and Reset Traffic ign TPW 1.00000000 L $3007 37 etaining Wall Demo TPW 3.00000000 EA $500.00 TPW $63,624.26 Water $0.00 Storm $0.00 ub Total Additions 3,62 .2 Change Order Additions Page 1 of 1 FOR WORTH City of Fort Worth —`1r---- Change Order Deletions Project Name 2014 CIP Concrete Sidewalk Contract 3 CitySec# 47242 Client Project# 02602 Contractor Arreguin Group,Inc PM Tariqui Islam inspectorF Gary Deyon Change Order Submittal# T Date 67/2018 DELETIONS ITEM DESCRIPTiON DEP I ty Unit Unit Cost Total TPW Water Storm Sub Total Deletions 1902000 Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 CFW Change Order Approval COAppr-01 Page 1 of 3 Routinq Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/02602 - 2014 CIP Concrete Sidewalk Contract 3/Contractor/Change Orders/Change Order 1 2602 Sidewalk 3 2018.x1s Attachments(D No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 8/20/2018 CFW Change Order Approval COAppr-01 Page 2 of 3 FORT WORTHe C'ay OfrFor Worth nge Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: COSub-01 Change Order No.: COAppr-01 Date Started: 2018-08-10 City Sec. No.: 47242 Date Due: 2018-08-31 Project Name: 2014 CIP Concrete Sidewalk Contract 3 Project Numbers: CO2602 DOE Numbers: Project Install sidewalk and ramps at various locaitons Description: Project/Contract Compliance Tariqul Islam City Inspector: Gary Deyon Manager: Contractor: Construction COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 63,624.26 34014 0200431 5740010 426 CO2602 C03883 Total Cost: $ 63,624.26 Total Requested Days: 426 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Processl... 8/20/2018 CFW Change Order Approval COAppr-01 Page 3 of 3 Approved: Yes Comments: User: Vanessa Arreguin Date: 2018-08-10 4:57 PM Approved: Yes A77 by. Comments: User: Tariqul Islam Date: 2018-08-13 2:30 PM s ary J. Kar, ity S O 4, Approved: Yes Comments: tj User: Riad Nusrallah Date: 2018-08-13 5:11 PM TEXPS Approved: Yes M&C: N Comments: User: Lauren Prieur 1295. 1,j Date: 2018-08-14 4:05 PM Approved: Yes Comments: User: Doug Wiersig Date: 2018-08-14 5:08 PM Approved: Yes Comments: User: Doug Black Date: 2018-08-17 8:53 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-08-20 10:08 AM Action Required: OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/20/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tariqul Islam Graduate Engineer Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX