Loading...
HomeMy WebLinkAboutContract 49738-CO3 CFW Change Order Approval COAppr-03 Page 2 of 3 Cit of Fort Worth CITY SECRETARY FO RT WO RT H y CONTRACT NO. Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 3 Change Order No.: COAppr-03 Date Started: 2018-08-14 City Sec. No.: 49738 Date Due: 2018-10-03 Project Name: 2014 CIP Year 3 — Contract 4 Project Numbers: 02694 DOE Numbers: Project This project includes combined paving, water and sanitary Description: sewer replacement in Diamond Hills Jarvis area. Project/Contract Compliance Mary Hanna City Inspector: Gary Deyon Manager: Contractor: Stabile & Winn, Inc. COUNCIL ACTION (If Required): M&C Log Name: N/A M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 36,709.00 34014-0200431-5740010-c02694-c( 35 Total Cost: $ 36,709.00 Total Requested Days: 35 Approval Status: OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 8/21/2018 FORT WORTH® City of Fort Worth Change Order Request Breakdown Project Namel 2014 CIP Year 3 Contract 4 City Sec# 1 49738 Client Project#(s)l 02694 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector Gary Deyon Change Order Submittal# Three Date 8/14/2018 Dept. Water Sewer TPW Contract TimeTotals CD Original Contract Amount $1,251,960.00 $451,210.00 $1,871,200.00 $3,574,370.00 360 Extras to Date $49,277.00 $49,277.00 45 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,251,960.00 $451,210.00 $1,920,477.00 $3,623,647.00 405 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $36,709.00 $36,709.00 35 Revised Contract Amount 1,251,960.00 $451,210.00 $1,957,186.00 $3,660,356.00 440 Original Funds Available for Change Orders $62,598.00 $22,561.00 $93,560.00 $178,719.00 Remaining Funds Available for this CO $62,598.00 $22,561.00 $44,283.00 $129,442.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.41% MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $4,467,962.50 JU5TIFICATION NEASONS)FOR CRAME ORDER {� order to increase the quantity of sidewalk removal and replacement due to over-runs -the estimated quan.itiuv Wewall,as been added as instructed in the due to the poor condition of the existing walks, The quantity of topsoil and block sod are also increased in the change order to account for the over-run. The 2"Surface Milling and 2"Type"D"HMAC is being deleted as a result of changing the work on NE 36th from a MOL to a POL method of replacement. Adds a pay item for the variable height sidewalk curb to be installed as needed in the field. At this time requesting an additional 35 calendar days due to increases in quantities and extra work added. City of Fort Worth Change Order Additions Project Name 2014 CIP Year 3 Contract 4 City Sec# 49738 Client Project# 02694 Contractor Stabile R Winn,Inc. PM Mary Hanna nspector Gary Deyon Change Order Submittal# Three Date 8/14/2018 ADDITIONS I I EM DESCRIPTION DEPT Qty Unit U nitCost Total Unit Paving Improvements 1 Remove Sidewalk TPW 7,333.00000000 SF 1 oncrete Sidewalk TPW 2,721.0000 000 SF 5 Topsoil TPW 75. 0 0 00 CY 26 Block Sod Placement TPW ,7 0000 SYVariable Height SidewalkCurb(6"to 12") TPW 5 . 00000 LF Water $0.00 Sewer $0.00 TPW $87,304.00 Sub Total Additions 7,304. 0 Change Order Additions Page 2 of 4 FOR I WOR t_H City of Fort Worth Change Order Deletions Project Name 2014 CIP Year 3 Contract 4 CitySec# 49738 Client Project# 02694 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector Gary Deyon Change Order Submittal# Three Date 8/1 412 0 1 8 DELETIONS Qty Unit Unit Cost Total Unit 3 Paving Improvements 5 2' urface Milling TPW ,175. 0 SY 5.00 75. 6 Butt Milling TPW 130. 00 0 0 LF 11.00 15 2'Asphalt Pavement Type"D' TPW 2,735,00000000 SY 14.0 Water $0.00 Sewer $0.00 TPW $50,595.00 Sub Total Deletions $50,595.0u Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO A. Murillow Trucking Haul Off $2,000.00 C. Green Scaping SOD $2,000.00 Total $4,000.00 Previous Change Orders CO# DATE AMOUNT One 4/30/2018 $0.00 Two 6/22/2018 $49,277.00 Total $49,277.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. A� Mary Hanna, P.E. ,PMP Senior Projec nlr E ECORDETARYH, TX E F F CFW Change Order Approval COAppr-03 Page 3 of 3 Approved: Yes Comments: User: Jerry Henderson Date: 2018-08-14 2:47 PM Attested by: Approved: Yes Comments: User: Mary Hanna J. a Date: 2018-08-14 3:41 PM Approved: Yes U _ Comments: User: Lane Zarate Date: 2018-08-16 9:43 PM P M&C.- Approved: Yes f A Comments: 1295: User: Ricardo Matute Date: 2018-08-17 9:41 AM Approved: Yes Comments: User: Doug Wiersig Date: 2018-08-17 11:43 AM Approved: Yes Comments: User: Doug Black Date: 2018-08-17 9:05 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-08-20 10:07 AM Action Required: Please review and approve OFFICIAL.RE a CITY SECRETARV FT.WORTHS TX https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Processl... 8/21/2018 CFW Change Order Approval COAppr-03 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/02694 - 2014 CIP Year 3 — Contract 4/Contractor/Change Orders/Change Order#3 Breakdown.xlsm Attachments(0) No Attachments have been added to this form. A RECEIVED AUG 2 ': 2018 CIIYOFFORT WORTH CRYSECRETRRY https:Hprojectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 8/21/2018