Loading...
HomeMy WebLinkAboutContract 50172-CO2 CFW Change Order Approval COAppr-02 Page 2 of 3 ETAR FORT NORTH. city of Fort Worth c NTREACC NO..- 50172 Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: COAppr-02 Date Started: 2018-08-06 City Sec. No.: 50172 Date Due: 2018-09-25 Project Name: 2014 CIP Year 3 - Contract 7 02695 DOE Numbers: Project Numbers: Project This is a combined paving, water/sanitary sewer main, Description: stormwater and box culvert improvements project in Eastern Hills and Lakewood addition neighborhoods. Project/Contract Compliance Mary Hanna City Inspector: Christopher Bell Manager: Contractor: Circle C Construction Company COUNCIL ACTION (If Required): M&C Log Name: N/A M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW/Stormwater $ 79,045.50 52002-0200431-5740010-c02695-c( 30 Total Cost: $ 79,045.50 Total Requested Days: 30 Approval Status: OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX t https:Hproj ectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?SiteI d=51500&ProcessI... 8/21/2018 FORTWORTH. City of Fort Worth Change Order Request Breakdown ProjectNamel 2014 CIP Year 3 Contract 4 �i� City Sec# 1 49738 Client Project#(sA 02694 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector Gary Deyon Change Order Submittal# Three Date 8/14/2018 Dept. Water Sewer TPW Contract Time Totals CD Original Contract Amount $1,251,960.00 $451,210.00 $1,871,200.00 $3,574,370.00 360 Extras to Date $49,277.00 $49,277.00 45 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,251,960.00 $451,210.00 $1,920,477.00 $3,623,647.00 405 Go to ADD&DEL Tabs to Enter CO Backup $0.00 $0.00 $36,709.00 $36,709.00 35 Revised Contract Amount 1,251,960.00 $451,210.00 1,957,186.00 $3,660,356.00 440 Original Funds Available for Change Orders $62,598.00 $22,561.00 $93,560.00 $178,719.00 Remaining Funds Available for this CO $62,598.00 $22,561.00 $44,283.00 $129,442.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.41% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,467,962.50 -- — JUSfIPIcATION(REASONS)FOR CM C3F;p – – Change order to increase the quantity sidewalk removal and replacement,:.-3 to over-runs in the eslirnaterl quantities. Sidewalk as been added as instructed in the`i�!iri due to the poor condition of the existing walks. The quantity of topsoil and block sod are also increased in the change order to account for the over-run. The 2'Surface Milling and 2"Type"D"HMAC is being deleted as a result of changing the work on NE 36th from a MOL to a POL method of replacement. Adds a pay item for the variable height sidewalk curb to be installed as needed in the field. At this time requesting an additional 35 calendar days due to increases in quantities and extra work added. City of Fort Worth Change Order Additions Project Name 2014 CIP Year 3 Contract 4 City Sec# 49738 Client Project# 02694 Contractor Statile&Winn,Inc. PM Mary Hanna Inspector Gary Deyon Change Order Submittal# Three Date 8/14/2018 ADDITIONS ty Unit Unit Cost Totai nit 3 Paving improvements 1 Remove Sidewalk TPW 7,333.00000000 F 18 4" oncrele Sidewalk TPW 2,721.00000000 SF 7. 25 Topsoil TPW 875.0000—MG CY 1.00 26 Block Sod Placement TPW 2,700,00000000 SY TC.75 39 Variable Height Sidewalk Curb( "to 2") TPW 5 . 0 0 LF 1 . Water $0.00 Sewer $0.00 TPW $87,304.00 Sub Total Additions Change Order Additions Page 2 of 4 FORTWORTH City of Fort worth -~V--- Change Order Deletions Project Name 2014 CIP Year 3 Contract 4 CitySec# 49738 Client Project# 02694 Contractor Stabile&Winn,Inc. PM Mary Hanna Inspector F Gary Deyon Change Order Submittal# Three Date 8/14/2018 DELETIONS ITEM ty nit nit ost ota nit among mprovements 5 2"Surface Millirg TPW 2,175.00000000 SY 5.0 =7 . 6 Butt Milling TPW 130.00000000 LF 11.00 15 2"Asphalt Pavement Type"D" TPW 2,735.00000000 SY 14.00 Water $0.00 Sewer $0.00 TPW $50,595.00 Sub Total Deletions $50,595.001 Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO A. Murillow Trucking Haul Off $2,000.00 C. Green Scaping SOD $2,000.00 Total $41000.00 Previous Change Orders CO# DATE AMOUNT One 4/30/2018 $0.00 Two 6/22/2018 $49,277.00 Total $49,277.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Mary Hanna, ., CFM,PMP Senior Pro' Manager OFFICIAL RECORD CITY SECRETARY FT.(NORTH,TX CFW Change Order Approval COAppr-02 Page 3 of 3 Approved: Yes Comments: User: Teri Skelly Date: 2018-08-06 2:12 PM AtWstad by: Approved: Yes Comments: IF Maty J. K �', ity f....Rr bUser: Mary Hanna Date: 2018-08-06 3:56 PM ��; :0 Approved: Yes *' Comments: User: Lane Zarate M&C: N Date: 2018-08-07 6:16 PM 1295: Nip •. Approved: Yes 7 Comments: User: Ricardo Matute Date: 2018-08-09 11:02 AM Approved: Yes Comments: User: Doug Wiersig Date: 2018-08-10 3:48 PM Approved: Yes Comments: User: Doug Black Date: 2018-08-17 6:38 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-08-20 10:08 AM Action Required: Please review and approve OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX https://projeetpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Processl... 8/21/2018 CFW Change Order Approval COAppr-02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/02695 - 2014 CIP Year 3 - Contract 7/Contractor/Change Orders/Change Order2 Breakdown.xlsm Attachments(0) No Attachments have been added to this form. RECEIVED 2018 CITY OF FORT WORTH CITY SECRETARY https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&ProcessI... 8/21/2018