9� AMENDMENT N0.5 CITY SECRETARY
CONTRACT NO.. `I 3 S�3- V-1
TO CITY SECRETARY CONTRACT
V
a >�� the City of Fort Worth (CITY) and Teague Nall and Perkins,
N .
Inc },�c�� NGINE R) made and entered into City Secretary Contract No. 43893,
�-, (the 'CONTRACT) which was authorized by the City Council by M&C C-25936 on
the 23rd day of October, 2012 in the amount of $563, 730 . 92; and Amendment
No. 1 which was authorized by the City Council by M&C C-26486 on the 7th
day of October, 2013 ; Amendment No. 2 which was administratively
authorized by the City on the 8th day of June, 2015; and Amendment No. 3
which was authorized by the City Council by M&C C-27775 on the 21st day
of June, 2016; and Amendment No. 4 which was administratively authorized
by the City on the 6th day of February, 2017; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Chapel Creek Bridge over Interstate Highway 30
WHEREAS, it has become necessary to execute Amendment No. 5 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated April 11, 2018, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$45, 905 . 50.
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $967, 522.42 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
Page -1- CITY :-ECREURY
FT. WiD1ah j TX
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
I a � Teague Na 1 and Perkins, Inc.
Su an lanis Ty ton, P.E.
As ant City Manager Vice President
DATE: c� DATE: 5 2 18
APP VAL REC�OM\MEN'DE'D
L...J• W
Dougla W. Wiersig, P.E.
Director, Transportation and Public Works Department
APPROVED AS TO FORM AND LEGALITY: M&C: A14
Date: /J) a
ouglas W. Black
Assistant City Attorney
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
f or the monitoring and administration of this contract,
ATTEST: / ®FCT �/�j including ensuring all performance and reporting requirements.
ry J. K er * ichael Weiss, P. E.
City Secr tart' ` .. enior Professional Engineer
OFFICIAL.WORD
Co'-4-\AZ4 �4+4-3 3 CITY SEC FMY
S Page -2- F'.WORT �'x
tnp
teapue nail&perkins www.tnpinccom
April 11,2018 surveyors engineers
landscape architects
Mr. Michael Weiss, P.E.
City of Fort Worth
Transportation& Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
RE: IH 30 at Chapel Creek Boulevard Bridge replacement
Fee Proposal for Contract Amendment No. 5
DOE Number 901
CSJ: 0918-48-722
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced
contract based on additional services to add utility adjustment monitoring and verification to
the project scope. The following is a brief description and cost for the additional services to
be provided on this project:
I. Project Management:
Teague, Nall and Perkins will be required to perform additional project management
services to coordinate with utility owners, City of Fort Worth and TxDOT. TNP will.
1. Status Reports: The Engineer shall provide the State with a status report for all
utility adjustments on a monthly basis. The State will provide the status report
format to the Engineer.
2. Review Payment Request: The Engineer shall review all payment requests for
conformance with the utility estimate and verify the work has been performed.
Fee: $5,000.00
II. Traffic Control Plan Revisions at Sonic Driveway
Teague, Nall and Perkins will revise traffic staging to provide a temporary driveway at
the Sonic entrance along Chapel Creek Blvd.
1. Meet with business representatives and City and coordinate with TxDOT
2. Revise TCP plans.
Fee: $3,610.00
Fort Worth�1 100 Macon Street�Fort Worth,Texas 76102�817.336.5773 �- Dallas-17304 Preston Road,Suite 1340-Dallas,Texas 75252-214.461.9867
Denton-1517 Centre Place Drive,Suite 320-Denton,Texas 76205-94D.383A 177 . Sherman-200 North Travis Street,Suite 500-Sherman,Texas 75090-903.870.1089
Registered by the Texas Board of Professional Engineers,Firm No.F-230- Registered by the Texas Board of Professional Surveyors,Finn No.100116-00
Mr.Michael Weiss,PE
April 11,2018
Page 2 of 3
III. Construction Phase Services
ENGINEER will support the construction phase of the project as follows.
1. The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
2. The ENGINEER shall review shop drawings, samples and other submittals
submitted by the contractor for general conformance with the design concepts and
general compliance with the requirements of the contract for construction. Such
review shall not relieve the Contractor from its responsibility for performance in
accordance with the contract for construction, nor is such review a guarantee that
the work covered by the shop drawings, samples and submittals is free of errors,
inconsistencies or omissions. The ENGINEER shall log and track all shop
drawings, samples and other submittals.
3. As requested by the CITY, the ENGINEER shall provide necessary
interpretations and clarifications of contract documents and review change orders.
ASSUMPTIONS
8 submittal reviews are assumed.
• 8 RFI's are assumed.
• 5 Change Orders are assumed.
Fee: $29,820.00
IV. Utility Coordination (Lump Sum)
1. Utility Conflict Review. As requested by the CITY, the ENGINEER will review
utility conflicts determined in the field and coordinated utility adjustments or
design changes to resolve the conflict.
2. Design Revisions. The ENGINEER will coordinate with the utility company to
accurately locate the potential conflict and develop revised design plans to be
executed through a Change-Order to resolve utility conflicts.
Fee: $6,800.00
Mr.Michael Weiss,PE
April 11,2018
Page 3 of 3
Summary of Contract Amendment Fee:
I. Project Management $5,000.00
II. Traffic Control Plan Revisions at Sonic Driveway $3,610.00
III. Construction Phase Services $29,820.00
IV. Utility Coordination $6,800.00
V. Other Direct Expenses $675.50
Total Contract Amendment Amount $45,905.50
Schedule:
Construction completion is scheduled for January 2019.
Sincerely,
tnp
teague nall& perkins
a4 xa&-�
Jo W. Atwood, P.E.
Director Transportation
CC File: FTW12583
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2018-357277
Teague Nall and Perkins, Inc.
Fort Worth,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 05/22/2018
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
43893
Engineering Services fo Chapel Creek Bridge over Interstate Highway 30
Nature of interest
4
Name of Interested Parry City,State,Country(place of business) (check applicable)
Controlling I Intermediary
Berry, Mark Fort Worth,TX United States X
Vickery, Gary Denton,TX United States X
Schmitt, Chris Allen,TX United States X
Wilhelm, Scott Fort Worth,TX United States X
Hilton, C.Ty Fort Worth, TX United States X
Jones, Michael Fort Worth, TX United States X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION t
My name is -J A:bjtP4nd and my date of birth is 3�Z( /
My address is 3411 At.&swvrA4% C-i NCT�•wttd ��, ?GO t 6 Us A
(street) (city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct.
Executed in TAfrAv l County, State of TG)COLS ,on the 22 day of MAL4_,20_"%_.