Loading...
HomeMy WebLinkAboutResolution 1486~• RESOLUTION SUPPORTING SDHPT PLANS TO RECONSTRUCT IH 30/IH 35W INTERCHANGE AHD REALIGN IH 30 A Resolution ~~o~~oN No. ~~~'~ WHEREAS, the City of Fort Worth recognizes the need to improve its 1950's vintage thoroughfare system which does not have sufficient traffic capacity to carry present and predicted vehicle flow and does not incorporate presently acceptable highway safety standards; and, WHEREAS, the City of Fort Worth believes that construction of an adequate and appropriately designed system of freeways is necessary to assure the continual economic growth and development of the Fort Worth central city area; and, WHEREAS, vital elements in the freeway system are the junction of IH 30 and IH 35W, known as the "Mixmaster", and the section of IH 30 through the City of Fort Worth's Central Business District, known as the "Overhead'; and, WHEREAS, the State Department of Highways and Public Transportation has recognized the need to improve the aforementioned vital elements, including the realignment of IH 30_from its present "Overhead" location to a location between Vickery Boulevard and the Union Pacific Railroad (the "Vickery Alignment"); and, WHEREAS, the City of Fort Worth believes that there is an overriding public need to proceed with construction of the IH 30JIH 35W interchange and the realigned IH 30 connection; NOW, THEREFORE, BE IT RESOLVED: that the City of Fort Worth supports the State Department of Highways and Public Transportation's plans to reconstruct `the IH 30/IH 35W interchange and to relocate IH 30 from its present "Overhead" location to the proposed "Vickery Alignment"; and, BE IT FURTHER RESOLVED: that the City of Fort Worth urges the State Department of Highways and Public Transportation to proceed with final design and begin construction of the aforementioned improvements with all due haste. APPRDVED 8Y CITY COl1NCIL +~ov ~i ~ ~~~a. ~r ~ a~,a~, rte, crrr .or roar woars