Loading...
HomeMy WebLinkAboutContract 51146 Received Date: 8/30/2018 Received Time: 9:08 a.m. Developer and Project Information Cover Sheet: Developer Company Name: - CENTEX HOMES Address, State,Zip Code: 9111 Cypress Waters, Suite 100,Coppell,TX 75019 Phone&Em=- 972-304-2800,clint.vincent@pultegroup.com Authorized Signatory,Title: Clint Vincent ,Division Vice President of Land Development Project Name: Lakepointe Ph.4 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: between Boat Club Rd Hwy 287 and west of Bailey Boswell Rd Plat Case Number: FPO 17-044 Plat Name: Lake Pointe/The Parks at Boat Club Rd. Mapsco:T 32M Council District: 7 CFA Number: 2017-169 City Project Number: 101282 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51146 WHEREAS,CENTEX HOMES , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Lakepointe Ph. 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project;and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the ImFFT. velo er City of Fort Worth,Texas RECORD Standard Community Facilities Agreement-Lakepointe Ph.4 CL CFA Official Release Date:02.20.2017 Page 2 of 11 TH, TX further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) M. Sewer(A-1) 0. Paving (B) 0, Storm Drain(B-1) X_ Street Lights & Signs (C) N. E. The Developer shall award all contracts for the, construction of the Improvements in accordance with Section Il,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 3 of 11 bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its of peers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. R. IMMIGRATION AND NATIONALITY ACT Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,DEVELOPER'S EMPLOYEES, SUBCONTRACTORS,AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name:Lakepointe Ph.4 CFA No.: 2017-169 City Project No.: 101282 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 450,108.20 2.Sewer Construction $ 269,162.00 Water and Sewer Construction Total $ 719,270.20 B. TPW Construction 1.Street $ 580,312.65 2.Storm Drain $ 204,408.00 3.Street Lights Installed by Developer $ 71,876.90 4. Signals $ - TPW Construction Cost Total $ 856,597.55 Total Construction Cost(excluding the fees): $ 1,575,867.75 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 14,385.40 D. Water/Sewer Material Testing Fee(2%) $ 14,385.40 Sub-Total for Water Construction Fees $ 28,770.80 E. TPW Inspection Fee(4%) $ 31,388.83 F. TPW Material Testing(2%) $ 15,694.41 G. Street Light Inspsection Cost $ 2,875.08 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 49,958.32 Total Construction Fees: $ 78,729.12 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,575,867.75 x Completion Agreement=100%/Holds Plat ' $ 1,575,867.75 Cash Escrow Water/Sanitary Sewer-125% $ 899,087.75 Cash Escrow Pavin /Storm Drain=125% $ 1,070,746.94 Letter of Credit=125%w/2yr expiration period $ 1,969,834.69 City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. DEVELOPER CENTEX HOMES A Nevada General Partnership CITY OF FORT WORTH By: Centex Real Estate Company,LLC A Nevada Limited Liability Company fka Centex Real Estate Corporation N Its: Managing Partner Jesus J.Chapa(Aug 29,2 18) Jesus J. Chapa Assistant City Manager Date: C.(Zr Y4UM41 Clint Vincent(Aug 29,2018) Name: Clint Vincent Recommended by: Title: Division Vice President of Land Development .,R 0.,5 A,_29.2]19, Aug 29,2018 Evelyn Roberts/Jennifer Ezernack Date: Project Assistant Planning and Development Approved as to Form &Legality: Contract Compliance Manager: n, �A� By signing, I acknowledge that I am the "y7C4 person responsible for the monitoring and Richard A.McCracken(Aug 29,2018) Richard A.McCracken administration of this contract, including Assistant City Attorney ensuring all performance and reporting requirements. M&C No. Date: Janie oar/err Morales Form 1295: Janie Scarlett Morales(Aug 29,2018) Name: Janie Morales ATTEST: Title: Development Manager Mary-. Kayser Mary J.Kayser(Aug 29,2018) Mary J. Kayser/Ronald Gonzales City Secretary/Assistant City Secretary EOFFICIALECORD ETARY City of Fort Worth,TexasStandard Community Facilities Agreement-Lakepointe Ph.4 W, TX CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements l� Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate 1$ Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101 282 None City of Fort Worth,Texas Standard Community Facilities Agreement-Lakepointe Ph.4 CFA Official Release Date: 02.20.2017 Page 11 of 11 00 42 43_Proposal-Pelnp DAP-BID PROPOSAL Pape 5 of 179 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item fnfomlation Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT I:PAVING IMPR VEMENT 1 3213.0101 6"Conc Pvmt 32 13 13 SY 13784 $32.95 $454.182.80 2 3211.0501 6"Lime Treatment 32 11 29 SY 15304 $2.90 $44,381.60 3 9999.0014 Hydrated Lime Qa 30lbs/SY 00 00 00 TON 230 $158.00 $35,650.00 4 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 E4 1 $2,000.00 $2,000.00 5 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 1 $1,950.00 $1,950.00 6 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 1 $1,650.00 $1,650.00 7 3471.0001 Traffic Control 3471 13 MO 3 $1,500.00 $4,500.00 8 9999.0003 Remove Street Barricade&Connect to Ex 3441 10 EA 5 $550.00 $2,750.00 9 3213.0302 5"Conc Sidewalk 32 13 20 SF 6047 $4.75 $28,723.25 10 9999.0007 Street Name Blades 00 00 00 EA 7 $375.00 $2,625.00 11 19999.0009 Stop Sign(Excludes Post) 1000000 1 EA 7 $100.00 $700.00 12 9999.0010 Regulatory Sign Assemblies(installed on1000000 EA 3 $400.00 1,200.00 TOTAL NIT 1:PA N IMPR V MENT $580,312.65 UNIT I:PAVING IMPROVEMENTS &W,312.05 Total Construction Bid $50,312.;85 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 75 calendar days after the date when the CONTRACT commences to run as provided In the General Conditions_ END OF SECTION Gilco Contracting,Inc. Cm OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 Lakepotnte 4A_OTO CFA—Spec OC(s.45 00 42 4%AIDPOsa45V"Light DAP-NO PROPOSAL Papa a of 179 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item Information Bidders Proposal Bidlist Item Specification Unitof Bid Description Section No. Measure Quantity Unit Price Bid Value N • Tag GIMPROVEM 1 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 34 41 20 EA 19 $939.70 $17,854.30 2 3441.3351 Furnish/Install Rdway Ilium TY 11 Pole 3441 10 EA 19 $1,472.70 $27,981.30 3 3441.3050 Furnish/Install LED Lighting Fixture(70 watt 34 41 20 EA 19 $317.50 $6,032.50 4 3441.1646 Furnish/Install Type 338 Atm 3441 20 EA 19 $226.80 $4,309.20 5 3441.1501 Ground Box Type B 3441 20 EA 1 $674.25 $674.25 6 3441.1410 NO 10 Insulated Elec Condr 34 41 20 LF 3,135 $0.96 $3,009.60 7 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 1,045 $9.15 $9,561.75 8 2605.3016 2"CONDT PVC SCH 80(B) 26 05 33 LF 120 $20.451 $2,454.00 JQTAL NIT I:STREET LIGHTING IMPROV'/EMENTS $71,876.90 UNIT 1:STREET LIGHTING IMPROVEMENTS $71L876.g0 Total Construction ffid $7176.80 Contractor agmes to complete WORK for FINAL ACCEPTANCE within 30 calendar days after the date when the CONTRACT commences to run as provided In the General Conditions. END OF SECTION Gilco Contracting, Inc. CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS.DEVELOPER AWARDED PROJECTS Form Vaslon Apra 2.2014 Lekporaa 4ALQTO CFA Spec Qt7a.ds OD 42 43_Pmpoeal-Ut&be% DAP-BID PROPOSAL Pot's 6 01 179 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project[tem Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Desciption Section No. Measure Quantity Unit Price Bid Value 1 •WATER1MPROVEMENTS 1 3311.0261 8"PVC Water Pipe 3311 12 LF 5,797 $21.40 $124,055.80 2 3312.3003 8"Gate Valve 33 12 20 EA 13 $1,300.00 $16,900.00 3 3311.0641 24"Water Pipe 3311 10,33 LF 807 $108.00 $87,156.00 4 3311.0642 24"Water Pipe,CSS Backfill 3311 10,33 LF 60 $120.00 $7,200.00 5 3312.3008 24"Gate Valve w/Vault 33 12 20 EA 1 $29,000.00 $29,000.00 6 3312.0108 Connection to Existing 24"Water Main 33 12 25 EA 1 $1,800.00 $1,800.00 7 3312.0001 Fire Hydrant 33 12 40 EA 6 $3,930.00 $23,580.00 8 3312.2003 1"Water Service 33 12 10 EA 137 $830.00 $113,710.00 9 3312.2103 11/2"Water Service 331210 EA 2 $940.00 $1,880.00 10 3312.4209 24"x 8"Tapping Sleeve&Valve 33 12 25 EA 1 $4,600.00 $4,600.00 11 3305.0109 Trench Safety 1330510 1 LFi 6,664 $0.10 $666.40 12 3311.0001 Ductile Iron Water Fittings w/Restraint 13311 11 TON 4 $7,`140.001 $28,560.00 13 13312-6002 6"Blow Off Valve 33 12 60 1 EA 1 $11,000-ool $11,000.00 1QJ&UNIT 1•WATER IMPROVEMENTS $450,108.20 N •SANITARY SEW R IMPROVEMENTS 14 3331.4115 8"Sewer Pipe 3311 10,33 LF 3,560 $26.00 $92,560.00 15 3331.4116 8"Sewer Pipe,CSS Backfill 3311 10,33 LF 70 $37.00 $2,590.00 16 3331.3101 4"Sewer Service .3331 50 EA 137 $660.00 $90,420.00 17 3339.1001 4'Manhole 33 39 10,33 EA 19 $2,700.00 $51,300.00 1a 3339.1002 4'Drop Manhole 33 39 10,33 EA 1 $3.300.00 $3,300.00 19 3339.1003 4'Extra Depth Manhole 33 39 10,33 VF 43 $110.00 $4,730.00 20 3301.0101 Manhole Vacuum Testing 3301 30 EA 20 $110.00 $2,200.00 21 3305.0109 Trench Safety 33 05 10 LF 3,630 $1.00 $3,630.00 22 3301.0002 Post-CCTV Inspection 33 01 31 LF 3,630 $1.40 $5,082.00 _ 23 3339.0001 Epoxy Manhole Liner 33 39 60 VF 1 35 $210.00 $7,350.00 24 9999.0000 Connect to Existing 8"Sewer 00 00 00 EA 5 $600.00 $3,000.00 25 3305.0113 Trench Water Stops 33 05 15 EA 10 $300.00 $3,000.00 TOTAL UNIT It:SANITARY SEWER IMPROVEMENT $269,162.00 Cm OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vaalm Apr12.2n14 Lakepa"o 4A_QTO_CFA-SP-CAYt S 004243 PropoeaWHities DAP-SID PROPOSAL Papa 7 of 179 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application UNIT III:STORM DRAIN IMPROVEMENTS 26 3341.0201 21"RCP,Class 111 3341 10 LF 72 $56.50 $4,068.00 27 3341.0205 24"RCP,Class III 3341 10 LF 591 $65.00 $38,415.00 28 3341.0302 30"RCP,Class III 3341 10 LF 672 $82.00-- $55,104.00 29 3341.0305 33"RCP,Class 111 3341 10 LF 249 $96.00 $23,904.00 30 3349.5001 10'Curb Inlet _33 49 20 EA 2 $3,900.00 $7,800.00 31 3349.5002 15'Curb Inlet 33 49 20 EA 10 $5,500.00 $55,000.00 32 3349.0001 4'Storm Junction Box 33 49 10 EA 2 $4,500.00 $9,000.00 33 9999.0011 33"Sloped End Headwall 00 00 00 EA 1 _$2,100.00 $2,100.00 34 3137.0101 Concrete Riprap 31 37 00 SY 50 $48.50 $_2,425.00 35 3305.0109 Trench Safety 330510 LF 1.5841 $0.501 $792.00 36 3349.7002 5'Drop Inlet 33 49 20 EA 1 $4,900.00 $4,900.00 37 9999.0012 Remove 4'Drop Inlet _000000 LS 1 $550.00 $550.00 38 0241.3016 Remove 27"Storm Line 0241 14 LF 35 $10.00 $350.00 TOTAL UNIT III:STORM DRAINE $204,408.00 UNIT I:WATER IMPROVEMENTS $450,108.20 UNIT IL SANITARY SEWER IMPROVEMENTS $269,162.00 UNIT III:STORM DRAIN IMPROVEMENTS $204,408.00 Total Construction Did $923,678.20 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 190 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION Bumsco Construction,Inc. CITY OF FORT WORTH STANDARO CONSTRUCTION SPEUnGATION DOCUMENTS-UEVELOPER AWARDED PROJECTS Form Version April 2.204 Lakepainte 4kQTO_CFA,_Spec OLysAs Z - O � Y X111 oY F-0 .. oaxN Lc), rco --- °W FC i ° � P�O�,Z� i i P vRR O ° m ----- O ---------- W < ,co�Z _ co 0 o O -------- m oa P��o N0 ' COP p p OQ --i --- O� I O — I w Q I I � I m J I OC/)m � Q UJ I } I a. x J I 0 ---------- W I LI ~ > � OHVO N30 °� I - i w W F o z m > N W O W W F t W F-I I _ D cU o W xco?N, JI -- o � � I WO v � � 2 I CITYI O w _ J }p �-i GVOb S12�3aOb N`dWMC a W< ctI I W -joO, I mJ --- 12i0� --- Of =W ' m ofCO Oa J m ---------- ' - U cimi amo ldoa a 7i W Q � m o� N °( �_ MZQc Uw W �pWm YC� U QW?aN O J = �U)C) ~ Q QAC) 2 IL O � a W aaa � Y U Q Y Q v 0< QJ 0 m O ry- W m 2 LLI J Q F U o O z � O z ............................. co W t' • �� R R S r W Z O ' R a �Q � ♦ K ♦ J � j DOF-N o ! W O i 'O'LLJ "� QW MIA i JHOCA > J Fyj Q o��Z 9 — O OZ �_0 , Oa co CO LL IL 0O LU 3 teG03 S 8 � R R � co 6i a Z 7) Q A e ' r s (ter _ ®•v... — d X cn e , > `8 1 aR / '•® . W u mon 8 > X co �.._.._.■ R ••, W O WWF-$ O�v • ®' I< W~z� W N c/) >m S = • - i s • r W � m � • Nn Z O v -W03 O W g :'O 1 I0 ujui z J w � j a ci a r...._.. .. ' �.._.. AI SN M.K ^M It 1SIX3 •, �� I ,B •, a 7 ` ® W m Z Q s AZO p w F- ♦®• Z UZ�O , Fn CO ?- Q • > Z ZWWLL2 Q o z x rl- Y > W 2 Q X W C)3: CD u- i J W J W Z WtLQoa00 04 ~Q Q W Q J m02i() > _ a p w H w W of O H �F�wZO a Z U Q U U) Q W>pZ=�j o J of X of X w X I d W d W d W o W o' J I I I U I I 1 m fn I I I g 41i I 1 I X d I 1 I w cD .......................................................................................................................... � I � I 171 I T� w Ocfl z N 0�w 0� Z LU Of H- Q oc, �Hfn LU ,5ow QOw 0- = 3z fAJw 1 n °� $ ,•fit y a �/ dw J a 1 h ,•'�. - �/ lye' z c%i w Q LU ® ♦• J8.8 1 E C � /a / • �°� � w Fp�nC a�O YY 8y , iiQ w W ^^ W 1 �/+ •�N /• • ®o ma U WL�N Vi 0 d'U)z fes. /•� = • y�U= w v a�(Do3 z O w0MLUZ Finapw O w • • Z < • •' p w • •' �/ Q oo W W 2 LU Q Ya z Q i (1) �: J LLI J W a w (n Do w z Q a w w 0 U) � O U) r- a- w � � w m U a ( w a ................................................................•......................... �' � � •• , s a r—e Z i �S O � � O O F da Ls r� 0 64 W 0; �� w ID C5 LL G v — R R ' o .Q•.r / Q R • �' w x W 0♦ _t0� O J S W mO�S Qv i♦ • W Wo O =W Z Q (n C7 o-C7 o ♦ OW wo N Y �G 0• e J_ N W of(nzr ® O LL Of O •, © Z O v :• e Lu- co O w i 12 - LLu a L.._.._ 'e• o W ♦a m z Q Q w d. Q 'o o o w W 2 w J a Ya C O J Q ro O W > J N G J v C a. W O � a O _ } z a z m a m m W L J JCL Q o J m Q Q Q m w W U m o w N co co 2 M J i U CO — U w o ----------- .............................. -----...... ................................................................... w . ••� . I WI Q Z QZ + �'s f0 1 oa '1 m ✓ J alz N ®+ �cwn w < Now +; nitl a Z CD Ir m 03 LL ;• �a�� WLU ~ t ELL �■■�■. 7 �� ,�, • iER 0]co NL) w O Lzu C', 1 �v / y Uwz�03 w a:co ' z a (no >rn � o � /• , • 02uiZ W O v Cl) Ci Cl) LL •• • ; . I J (- M o CD i w Q W • J o w Q a Z =�•' ? = Q O w �o a � aa Z W = o z o o < Ya LL LL LL 1 J N O p 0 0 a O w Q L H O Q Q r (9 aaa w O O O J 0� X a w a y m c W o J ~ C') U m U) U X Z a Wo ........................................................................................................................... o O c nM 1 Cl) 1 I O _ oN ,2 oW=� 1 LLA < ��ow Q J x z U, CLO) CH O C,) 04 _ Oa E ' I ' G QGO �, � •�` � t"ea ®e. fY �"� •®. � Q • �/I '0 W .,.� • ��' vvr 1 Q W Ci • , J H C', LL mon8 1 > O C'4 C) W W � 1 moo. 0 m On gN/ W o cnz& 1 o O LJ. 2 x W O v • 1 womwz 3.1 m�a4W O LWL /• • Q LL r O I I J , i • m •` z Q o ui e• W ® = W = = U Qa J N 2' W w Q ( W U) w o aWE— Z W w a H V O D o w a w M v _m CO wz w U a. 00 w ......................................................................................................... I m • � I s Z .- LU :W �"' O s ON ZM�N J • 3��00 i o3 LLI Q ' 0 3 0 a \ 'J _ m wox oo LL 1 o a .9 LU x 1 �� ., • ., J H > e (\� o. J• n J x .� .Yam I w u 00 0 m • �s,�• ad �m ow 0 WW F 9`az'gg UWp3 -- W ��Zr- /• /• ; 4Q¢ZO �m J m=WZ w O v O' (5LuZ LL • oki O It • LLJ Z w CD 2 U) Q YCL cW z z / Q m G n J N Z I F— w W Q Z W Z a (D w (n W J LLJ O i U) F- 0 Vb W co M J � X U CL w m cn �z U Q X Q w o