Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 51210
Received Date: 09/06/2018 Received Time: 3:47 p.m. Developer and Project Information Cover Sheet: Developer Company Name: Mistletoe Station,LLC Address, State,Zip Code: 5501 —A Balcones Dr., Ste 302,Austin,Texas 78731 Phone&Email: 352-213-8700//lisa@saigebrook.com Authorized Signatory,Title: Lisa M. Stephens,President Project Name: Mistletoe Station Brief Description: Water, Sewer,Paving/Street Signs, Storm Drain, Street Lights ----AJProject Location: Mistletoe Blvd& Beckham Pl. Plat Case Number: FP-18-037 Plat Name: Mistletoe Station Addition Mapsco: Council District: 9 CFA Number: 2018-069 City Project Number: 101489 OFFICIAL RECORD CITY SECRETARY wQ"IfI rX City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 1 of 12 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51210 WHEREAS, Mistletoe Station, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Mistletoe Station ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station Eel lr�, i CFA Official Release Date:02.20.2017 tecvt"010 Page 2 of 12 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®_ Sewer(A-1) Z.Paving (B) ®. Storm Drain(B-1) ®, Street Lights& Signs (C) z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s),Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100°/x) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100°/x) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 3of12 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 4 of 12 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers,agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City,its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 5 of 12 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash inspection fees equal to four percent (4%) of the streetlight construction cost. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 6 of 12 and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. V. City will accept the Improvements constructed under this CFA as the City's infrastructure once the following conditions are met: (1) Developer completes construction of the Improvements in a good and workmanlike manner in accordance with the CFA Policy, City standards and the City-approved construction plans, specifications and conditions for the Project; (2) The Improvements have passed all inspections and testing required by the City; (3) City has received all documents necessary for accepting the Improvements, including but not limited to, affidavits of bills paid from Developer's contractors, all consents of surety executed by the surety evidencing that Developer's contractors have paid all their subcontractors and suppliers in full, lien waivers signed by Developer's contractors indicating that Developer has paid the contractors in full; and (4) Acceptance by the City of any off-site public infrastructure improvements that are necessary for the Improvements in this CFA to function properly. vi. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2) will not boycott Israel during the term of the contract. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 7 of 12 IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City,Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 8 of 12 Cost Summary Sheet Project Name: Mistletoe Station CFA No.: 2018-069 City Project No.: 101489 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 124,000.00 2.Sewer Construction $ 74,000.00 Water and Sewer Construction Total $ 198,000.00 B. TPW Construction 1.Street $ 283,000.00 2.Storm Drain $ 2,992,000.00 3.Street Lights Installed by Developer $ 40,000.00 4. Signals $ - TPW Construction Cost Total $ 3,315,000.00 Total Construction Cost(excluding the fees): $ 3,513,000.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,960.00 D. Water/Sewer Material Testing Fee(2%) $ 3,960.00 Sub-Total for Water Construction Fees $ 7,920.00 E. TPW Inspection Fee(4%) $ 131,000.00 F. TPW Material Testing(2%) $ 65,500.00 G. Street Light Inspsection Cost $ 1,600.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Tota/for TPW Construction Fees $ 198,100.00 Total Construction Fees: $ 206,020.00 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 3,513,000.00 Completion Agreement=100%/Holds Plat $ 3,513,000.00 Cash Escrow Water/Sanitary Sewer—125% $ 247 500.00 X Cash Escrow Paving/Storm Drain=125% $ 4,143 750.00 X Letter of Credit=125%w/2yr expiration period $ 4,391,250.00 City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 9 of 12 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Mistletoe Station,LLC Jesus J.Chapa(Aug 23,2018) Jesus J. Chapa Assistant City Manager Date: 08/23/2018 Lisa Stephens(Aug 23,2018) Name: Lisa M. Stephens Recommended by: Title: President yv Date: 08/23/2018 Evelyn�ug 23,2018) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form & Legality: administration of this contract, including ensuring all performance and reporting Rid A MzG,ackNt, requirements. Richard A.McCracken(Aug 23,2018) Richard A. McCracken Assistant City t1 Attorney Nathan Benson(Aug 23,2018) M&C No. Name: Janie Morales Date: 08/23/2018 Title: Development Manager Form 1295: Off' FART ATTEST: Mary J.K r(Au ,2018) Mary J. Kayser/Rona Go les City Secretary/Assista eta OFFICIAL RECOM CITY 88`CRETAItY' City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station PT.WoRrit,rX CFA Official Release Date:02.20.2017 Page 10 of 12 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Final Construction Costs (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 11 of 12 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 10 1489 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Mistletoe Station CFA Official Release Date:02.20.2017 Page 12 of 12 -A TRINITY PAR 0 PROPOSED cn SITE z D 3 30 N W RO LE ECKHA w o � m O w O w 05� IST ETO BLVD •�¢ ccn ccn w feO U- N w O w Q PA K PL CE AVE cn z ORE$T PARK w 0 N .T.S. mom HALFF VICINITY MAP MISTLETOE STATION 4000 FOSSIL CREEK BLVD FORT WORTH,TEAS 7B,37-2710 DATE: 06/01/2018 LM-0: 32590 FORT WORTH, TEXAS TEL(817)FIRM SF-422 TBPE FIRM 1FJt2 111 I .I I , • A OWN . i �•.� , ARR 15'WATER EASEMENT 111 • � - A LEGEN C PROPOSED EXISTING WATER DATE 06/01/2018 FAV0- 32590 C r '1 I . 'MEMO = I i i : i I i : C 1�4i► til, ��\ � �� •1 1 1�. s : - 0./• Eta �I ■� ori ■il MAO i r � - r 1 �I r r I r � • E IMORMIN 015 u. r . II `© 111 � • � ..�-• • 11�cLEGEND: w �/� • • •, :7PROPOSED STORM EXISTING STORM MEMO Will II • I I' r •-kv,-, f �l►\3� f�:p� � J7 III �!� �• I 9�►i��_� ut --- , �. •ri lot •�'.c�1 1=1=1�`� I` STORM DRAINi "Bl" 1 � I I `��■ iii � "'�� ♦ -iii��'1, .� � ■ ..•.• 1/1 • OUNTED TO EXISTING OWER POLE oil - POSED PEDESTRIAN LIGHTING r STREET LIGHTS EXHIBIT "C" r OEM • > � mill IN& c . - . 1-40IN � I ♦ - . .� .■ \�����iii��u� ■sem am kl IN kyj I W-1 Lei Usk 1�1 : � ' 1. 1 1 : • • 1 •- •- oo a2'n DAP-BID PROPOSAL Pap 1 d3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project It=Inralnetim Biddces Proposal Bidlist Item No. Daafptim Spwi6camon Section No. Unit of M me Bid Quantity Unit Prim Bid Value UNIT 1:WATER IMPROVEMENTS 1 0241.1011 Remove 4"Water Line 02 41 14 LF 35 8.57 300.00 2 0241.1015 Remove 12"Water Line 0241 14 LF 139 8.63 1 200.00 3 0241.1016 Remove 16"Water Line 0241 14 LF 232 9.18 2.130.00 4 0241.1302 Repave 6"Water Valve 0241 14 FA 1 560.00 560.00 5 0241.1510 Salvage Fire Hydrant 0241 14 FA 1 400.00 400.00 6 3305.1004 24"Casing Oen Cul 33 05 22 LF 53 244.40 12 953.00 7 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.32 7,282. 9 613.00 8 13311.0161 6"PVC Water Pipe 3311 12 LF 53 31.57 1,673.00 9 3311.0241 8"Water Pipe 33 11 10.33 11 12 LF 32 28.13 900.00 10 3311.0451 12"DIP Water 3311 10 LF 94 36.00 3,384.00 11 3311.0461 12"PVC Water Pie 3311 12 LF 160 56.04 8,966.00 12 3311.0561 16"PVC C905 Water Pie 3311 12 LF 171 53.071 9.075.00 13 3312.0001 Fire Hydrant 33 12 40 FA 2 2.510.001 5,020.00 14 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 1 5.234.001 5.234.00 15 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 2 4.186.00 8.372.00 16 3312.2203 2"Water Service 33 12 10 EA 2 2,755. 5,511.00 17 13312.2501 3"Water Meter and Vault 33 12 11 EA 1 18,860. 18 860.00 18 J 3312.3002 6"Gate Valve 33 12 20 FA 2 837.00 1,674.00 19 13312.3005 12"Gate Valve 33 12 20 EA 6 2,025.00 12 150.00 20 13312.3006 16"Gate Valve w/Vault 33 12 20 EA 1 16 025.00 16 025.00 TOTALNI I:WATER IMPROVEMENT61124 000.00 UNIT 1:SANITARY EWER I PROVEMENTS 1 0241.2012 Remove 6"Sewer Line 02 41 14 LF 19 26.32 500.00 2 0241.2021 Repave 24"Sewer Line 02 41 14 LF 590 15.99 9,436.00 3 0241.2202 Remove 5'Sewer Manhole 0241 14 FA 1 500.00 500.00 4 3301.0001 Pre-CCTV Inspection 3301 31 LF 609 2.52 1,532.00 5 3301.0002 Post-CCN Inspection 33 01 31 LF 142 7.89 1,120.00 6 3305.0107 Manhole Adjustment,Minor 33 05 14 FA 1 3,147.00 3.147.00 7 3305.0113 Trench Water Stops 33 05 10 EA 2 835.50 1,671.00 8 3305.1006 36"Casing Oen Cut 33 05 22 LF 47 297.87 14000 9 3331.4215 15"Sewer Pie 33 11 10,33 31 12,33 31 20 LF 95 116.33 11 241.00 10 3331.4317 24"Sewer Pipe 33 11 10,33 31 13,33 3120,33 3121 LF 47 258.981 12 172.00 11 3339.0001 Epoxy Manhole Liner 333960 VF 28 215.43 6.032.00 12 3339.1101 5'Manhole 33 39 10,33 39 20 EA 1 10,500. 10 500.00 13 3339.1103 5'Extra Depth Manhole 34 39 10,33 39 20 VF 22 97.68 2,149.00 TOTAL UNI It:SANITARY SEWER IMPROVEMENTS 74 000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECDTCATION D UWNTS.DEVELOPER AWARDED PROTECTS 00 42 43_M Rapual DAP Rev 1 From Vmaim sgoabr 1,2015 W 42 43 DAP-BID PROPOSAL P.V 2 d3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Pmject it..Information Bidder,Ptopoul Bidlist Item No. D-ption Spmificatim Section No. Uuit of m.- Bid Quantity Unit Pda Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 0241.0500 Repave Fence 0241 13 LF 475 7.39 3,510.00 2 0241.1000 Repave Cone Pvmt 0241 15 SY 302 22.85 6,900.00 3 0241.4001 Remove 10'Curt Inlet 0241 14 EA 2 516.00 1,032.00 4 3125.0101 SWPPP t 1 acre 31 25 00 LS 1 25 000.00 25 000.00 5 3137.0101 Concrete Riprap 31 37 00 BY 302 126.00 38 052.00 6 3137.0103 Large Stone Ri ra,grouted 31 37 00 SY 1100 184.58 203 033.00 7 3305.0112 Concrete Cotler 33 05 17 EA 4 4_000 00 16_000 00 8 13341.0103 18"RCP,Class III 3341 10 LF 26 197.46 5,134.00 9 3341.0207 24"RCP,Class V3341 10 LF 152 392.64 59 682.00 10 3341.1403 7x5 Box Culvert _ 3341 10 LF 287 589.41 169 162.00 11 3341.1605 9x8 Box Culvert 3341 10 LF 34 1.421.001 48 314.00 12 3341.2005 10x8 Box Culvert 3341 10 LF 1234 429.40 529 880.00 13 3341.2207 12x10 Box Culvert 3341 10 LF 665 1,348.1 896 515.00 14 3349.0102 4'Manhole Riser 33 49 10 EA 3 1,688.6 5,066.00 15 3349.5001 10'Curb Inlet 33 49 20 EA 2 5,069.0 10 138.00 16 9999.0000 Gravel Paving Removal 99 99 00 SY 1513 2.31 3,500.00 17 9999.0020 Orifice Plate 99 99 10 I FA 1 6,500.0 6,500.00 18 9999.0030 Repave 120"Storm Pipe 0241 14 1 LF 737 39.23 28 913.00 19 9999.0040 Remove 60"Storm Pipe 0241 14 LF 125 37.49 4 686.00 20 9999.0040 Remove 24"Storm Pipe 0241 14 LF 23 26.781 616.00 21 9999.0050 VX 18'Junction Box 33 41 10 EA 1 30,075.001 30 075.00 22 9999.0060 12.5'X 31'Junction Box 3341 10 FA 1 70 190.00 70 190.00 23 9999.0070 13'X 10'Junction Box 3341 10 EA 1 39 125.00 39 125.00 24 1 9999.0080 10x8 Box Culvert With Trough Inlet C-I-P 33 41 10 LF 377 1,805.03 680 495.00 25 9999.0090 TxDOT Headwall PW-1 HW=11 33 49 40 Flt 1 32 794.00 32 794.00 26 19999.0100 TxDOT Headwall PW-1 HW=13 33 49 40 FA 1 77 688.00 77 688.00 TOTAL UNIT 111:DRAINAGE IMPROVEMENTS 2,992,000.00 UNIT IV:PAVING IMPROVEMENTS 1 0241.0500 Remove Fence 0241 13 LF 260 4.62 1,200.00 2 0241.1000 Remove Conc Pvmt 0241 15 BY 899 11.35 10 200.00 3 0241.1100 Remove Asphalt Pvmt 0241 15 BY 2125 8.38 17 800.00 4 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 534 3.00 1 600.00 5 3110:0102 W-12"Tree Removal 31 1000 FA 10 590.00 5,900.00 6 3110.0103 12"-18"Tree Removal 31 1000 FA 4 600.00 2,400.00 _ 7 3110.0104 18"-24"Tree Removal 31 10 00 EA 4 600.00 2_400 00 8 3110.0104 24"and Larger Tree Removal 31 1000 FA 2 600.00 1,200.D0 9 13201.0201 Asphalt Pvmt Repair Beyond Defined Width,Residential 3201 17 SY 7261 141.05 102 400.00 10 13211.0501 6"Lima Treatment 321129 SY 1063 18.06 19200.00 11 3213.0103 8"Conc Pvmt 32'1313 SY 1063 52.87 56 200.00 12 3213.0301 4"Conc Sidewalk 32 13 20 SF 1813 6.62 12,000.D0 13 3213.0506 Barrer Free Ramp,Type P-1 32 13 20 FA 4 3,500.00 14,000.D0 14 3216.0101 6"Conc Curb and Gutter _ _ 32 16 13 LF 273 19.78 5 400.00 15 3217.0001 4"SLD Pvmt Markin HAS 32 17 23 LF 825 1.45 1,200.00 16 3217.0004 4"BRK Pvmt Markin HAS 32 17 23 LF 178 2.81 500.00 17 3217.0501 24"SLD Pvmt Markin HAE 32 17 23 LF 262 2.86 750.00 18 3217.1007 Lane Legend Sharrow 33 17 23 FA 21 750.00 1,500.00 19 13217.2002 Raised Marker TY Y 32 17 23 FA 51 100.00 500.00 20 3217.4201 Fire Lane Markin 32 17 23 LF 1490 2.05 3 050.00 21 13441.4006 Install Alum Sign Ground Mount 34 41 30 FA 7 1,000.0 7 000.00 22 13441.4108 Remove Sin Panel and Post 3441 30 FA 2 50.00 100.00 23 3471.0001 Traffic Control 3471 13 MO 12 1,375.0 16 500.00 TOTAL UNIT IV:PAVING IMPROVEMENTS 283 000.00 CM OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROI Fan Ve,im 9epmibr 1,]m13 W 42 U_Bid NW.W_DAP Rev I W 4143 DAP-BID PROPOSAL Pam 3 ora SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item InfOrmati® Bidder's Proposal Bidlist Item No. Descriptio[ Specification Section No. Unit OfMessore Bid Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 3441.1757 Fumish/Install Rdwy Ilium Foundation TY 11 34 41 20 EA 6 2.000.00 12 000.00 2 3441.3028 Fumish/Install Oleander Pole and Luminare 34 41 20 EA 61 4 541.67 27 250.00 3 3441.3051 Fumish/Install LED Lighting Fixture 137 watt ATB2 Cobra Head 34 41 20 EA 1 750.00 750.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS 40000.00 Bid Summary UNIT I:WATER IMPROVEMENTS 124 000.00 UNIT II:SANITARY SEWER IMPROVEMENTS 74 000.00 UNIT III:DRAINAGE IMPROVEMENTS 2,992,000.00 UNIT IV:PAVING IMPROVEMENTS 283000.00 UNIT V:STREET LIGHTING IMPROVEMENTS 40 000.00 Total Construction Bid 3,513,000.00 Contractor agrees to complete WORK for FINAL ACCEPTANCE within®calendar drys after the dam when the CONTRACP commences to run as provided In the General Conditions. END OF SECTION CRY OP FORT WORTH STANDARD CONSTRUCTION RPECDTCATION DOCUL ENS-DEVELOPER AWARDED PROIE.C1R From Veeim Seplmtw 1,11115 W4243 B l Pmpn DAP Rev 1