Loading...
HomeMy WebLinkAboutContract 29961-A2 4 P'5C�51V151) AMENDMENT No.2 CITY SECRETARY SEP-62018 CONTRACT NO. 2Qc*t - t� Z OF�� M' TO CITY SECRETARY CONTRACT CIIySq�waRri� WHEREAS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No.29961, (the CONTRACT) which was authorized by M&C C-20006 on the 23rd day of March 23 , 2014 in the amount of $740, 698 . 02; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $18 , 600 . 00 administratively authorized on March 6, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Main 34, 100, D100 Drainage Area Sanitary Sewer System Evaluation Study and Improvements; and WHEREAS, it has become necessary to execute Amendment No.2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 30, 2018 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $129, 940 .00 (Sewer: $107 ,087 .50; Water: $22,852 .50) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $889,238 . 02 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT.WORTH,TX _ w EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER RJN Group, Inc. %r- - — — �)" el ��5(yXI Jesus J. Chapa Daniel Jac son, P.E. Assistant City Manager Vice President DATE: P S' -/8 DATE: g( Z a APPROVAL RECOMMENDED: Chris Harder, P.E. Assistant Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: C-28795 Date: August 14, 2018 Forza 1295 No. 2018-355071 .9�y� Douglas W. Black Senior Assistant City A J. Kayser City Secretary ; x OFFICIAL RECORD CITY SECRETARY Page -2- FTS WORTH,TX r i N ,-�roui) www.rjn.com Excellence through Ownership May 30, 2018 Mr. John Kasavich, P.E. Project Manager Fort Worth Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Main 34, 100, and D100, Drainage Areas Sanitary Sewer System Evaluation Study and Improvements Project Additional Services Contract Amendment No. 2 City Project No. 02397, City Secretary Contract No. 29961 RJN Project No. 18192701 Mr. Kasavich: Please find attached, Contract Amendment No. 2 requesting additional project funding to the M-34, 100 and D100 Drainage Areas Sanitary Sewer Evaluation Study and Improvements Project (City Project No. 02397) in accordance with the original Engineering Agreement approved by Council on March 23, 2004 (M&C C-20006). as amended; and as modified by the administratively authorized Amendment No. 1 on March 6, 2015. City staff has directed RJN to modify the scope of work of this project to design approximately 550 linear feet of 16-inch waterline replacement of old cast iron pipe and 450 linear feet of 12-inch sanitary sewer replacement to increase the sewer capacity of the existing 8-inch sanitary sewer located in 8th Street between Commerce and Jones Streets in order to serve a new 40 story condominium and mixed-use commercial building at 912 Commerce Street and future downtown redevelopment projects. Additional water valves will need to be "engineered" and plans developed so that they can be installed in critical sections of the water system in the vicinity of the 811 St. project area prior to constructing the new waterline replacement. The reconstruction of 8th St. is not presently defined and as such, is not included in this amendment request. The remaining project budget from Amendment No. 2 will be used to complete some supplemental SUE investigations to clarify the location of existing electric and fiberoptic duct banks in several intersections along Houston Street adjacent to the DS105 sanitary sewer as well as for locating an existing storm sewer crossing in Grove at 6th Street and to secure full Utility Clearance allowing for the finalization of sanitary sewer rehabilitation plans and specifications for the remainder of the utility replacement/rehabilitation project locations located in the Central Business District (CBD) of downtown Fort Worth. r j n -r���,�. www.rjn.com Excellence through ownership These additional services are further summarized as follows: U4 L Task,-L,' ) , a .� .�. 44 1.0 Project Management: $ 17,626.00 $ 60.00 $ 17,686.00 2.0 Conceptual Design: $ 3,215.00 $ 14,490.00 $ 17,705.00 3.0 Preliminary Plans & $ 15,770.00 $ 51.00 $ 15,821.00 Specifications 4.0 Final Plans &Specifications $ 16,445.00 $ 51.00 $ 16,496.00 5.0 Bid Phase: $ 5,769.00 $ 1,475.00 $ 7,244.00 6.0 Construction Phase Services $ 12,905.00 $ 535.00 $ 13,440.00 7.0 ROW/Easement Services $ 2,119.00 $ 0.00 $ 2,119.00 8.0 Survey $ 2,122.00 $ 10,400.00 $ 12,537.00 9.0 Permitting $ 18,358.00 $ 70.00 $ 18,428.00 10.0 City Directed Services $ 5,800.00 $ 0.00 $ 5,800.00 AMENDMENT No. 2 TOTALS: $ 102,793.00 $ 27,147.00 $ 129,940.00 There are supplemental services required to be performed by existing certified SBE firms associated with this amendment request. More specifically, $20,700.00 of the total request will be performed by the following certified SBE firms listed in the table below: Task Firm Amount Percent r%) Survey Spooner&Assoc., Inc. $ 10,400.00 8.00% SUE Services Rios Group, Inc. $ 14,450.00 11.12% TOTAL: $ 24,850.00 19.12% The $24,450.00 in certified SBE services noted above represents approximately a nineteen percent (19.12%) commitment level to the project costs associated with Amendment No. 2. Contract Amendment No. 2 represents slightly more than a twenty- nine percent(29.18%) increase in the total contract value of this project. 6701Brentwood Road,Sufte 1 11W-Fort Worth, 76112-3363 817.451.3500 817.451.3506 r i n mroun www.rjn.com JL Excellence through Ownership Therefore, we are requesting Contract Amendment No. 2 to the Main 34, 100 and D100, Drainage Area Sanitary Sewer System Evaluation Study and Improvements Project Agreement in the amount of$129,940.00. For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 740,698.02 Amendment No. 1 (approved March 5, 2015) $ 18,600.00 Amendment No. 2 $ 129,940.00 Amended Contract Value $ 889,238.02 Please do not hesitate to contact us should you have questions or need any background information concerning this matter. Thank you for your time and consideration. Sincerely, Chris Brooks, P.E., Senior Project Manager ATTACHMENTS CC: Tony Sholola, P.E., FWWD, City of Fort Worth Daniel Jackson, Regional Manager-Vice President, RJN Group Seth Cooksey, Design Manager, RJN Group o1 1. 1.8 1. sm - E Y a �» ww O m Yui O ~ O y o 0 0 n " w CL � g« E`V o� � e co C 0 - at La C o at Oi n E m rc o� o m A m „ mt ecc m m M r O n � m � yy « O my a =_ 3 C Y O > e � YI dt oo n m o 0 m O e 4 CC. c m C • > 'm w 3 y m U L � H y ya w W Q O Ci m Q C C O N c N d Q Ir0 q C .E LLtr m n -10 •o 0 w "' of a �ry > N a » (� W O ad E @ « e ❑ U s'o o m« � �m y o c N o w` N J O L m -N n O Z d u o m» H YI O m c a` Z `O u LU Q N NN NN C m d m m ❑ d C 0 m� Z W ZW` u r r a a d y $ r y E c ry�ry O U zi U m m m m aj t��m c n- an d a.�y.j �' ~c �� -• � c 3fdy E g Y3 fn ;a ; AW m mmm am ary `'' O �ry rv_m:a ov -- ' 4y G ;' `o,Env om`^WnN o,a�aEumm m2'E m°'Na 2� r NE camp 9i3 �¢ 3� " ma`mn� a`c`Emmm m,nm�°u°' `�LLEmmNN - mmo 2 N .Ncoa y 'm -wm Q3 F rn= of g ^.a °ymavimN mmtt��m° " m"c? m� .��E E N � 3 m o and^E�3c��LL oy eo n`.f mo a`f.—So"`m a« may«m�'a`o`m a` �cWu E.EmmE��' _ O - a oNiv c ry aE z E E " rvNry a'E o O r n_ r¢o" w-� a Y: U¢F \\\\ \`� �\\\ ���� / / \\ \�/\ 22!! � ; \ \\\ } :2 \\J;q2- \ cr % )§ § TF TIT [T— T[ —To o o T 7E Z o _ / - /\ && |k!/ 0k7 ] . IS _,\|f2 +| !002\/ k \ <J MQ.` ; ,ee � , ; Q; �- 21� IT = a 2: T -i_ Z;:_ 1'1,2! \�( |�}| k}!\ !�!! o EO {k�\ M&C Review Page I of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Folic %RTH COUNCIL ACTION: Approved on 8/14/2018 -Ordinance No. 23317-08-2018 DATE: 8/14/2018 REFERENCE NO.: "C-28795 LOG NAME: 60M34SA2-RJN CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 29961 with RJN Group, Inc., in the Amount of$129,940.00, for Main 34, 100, D100 Drainage Areas Sanitary Sewer System Evaluation Study and Improvements for a Revised Contract Amount of$889,238.02 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Fund in the amount of$146,941.00 from available funds; and 2. Authorize the execution of Amendment No. 2 to City Secretary Contract No. 29961 with RJN Group, Inc. in the amount of$129,940.00 for Main 34, 100, D100 Drainage Areas Sanitary Sewer System Evaluation Study and Improvements for a revised contract amount of $889,238.02. (City Project No. 02397) DISCUSSION: On March 23, 2004, (M&C C-20006)the City Council authorized an engineering agreement in the amount of$740,698.02 with RJN Group, Inc., for Main 34, 100, D100 Drainage Area Sanitary Sewer System Evaluation Study and Improvements. The Main 34, 100 and D100 drainage areas generally consist of the downtown central business district. The agreement was subsequently revised by Amendment No. 1 in the amount of$18,600.00 administratively authorized on March 6, 2015. Amendment No. 2 will provide design services for the upgrade of the existing water and sanitary sewer main on 8th Street (Commerce and Calhoun)to provide adequate conveyance for a proposed downtown multifamily high rise development. In addition to the contract amount, $17,000.00 (Sewer: $13,000.00, Water: $4,000.00) is required for project management and material testing. This project will have no impact on the Water Department's operating budget when completed. Design is expected to be completed by January 2019. Construction is expected to start on August 2019 and be completed by December 2020. The project is located in COUNCIL DISTRICT 9. M/WBE OFFICE: RJN Group, Inc., is in compliance with the City's M/WBE Ordinance by committing to 19 percent M/WBE participation on this Amendment No. 2. The City's goal on this Amendment is 19 percent. FISCAL INFORMATION/CERTIFICATION: http://apps.cfwnet.org/council_packet/mc review.asp?ID=26043&councildate=8/14/2018 9/4/2018 M&C Review Page 2 of 2 The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water and Sewer Capital Fund. The Fiscal Year 2018 Water Operating Budget includes appropriations of$29,069,236.00 for the purpose of providing Pay-As-You-Go Funding for Water Capital Projects. After this transfer for Fiscal Year 2018, the balance will be $8,406,955. The Fiscal Year 2018 Water Operating Budget includes appropriations of$29,022,689.00 for the purpose of providing Pay-As-You-Go Funding for Sewer Capital Projects. After this transfer for Fiscal Year 2018, the balance will be $7007,780. Appropriations for Main 34, 100, D100 Drainage Area Sanitary Sewer System Evaluation Study and Improvements Project as depicted below: FUND Existing Additional Project Appropriations Appropriations Total* Water & Sewer Capital $0.00 $146,941.00 $146,941.00 Fund 56002 Sewer Capital Fund - $160,227.00 $0.00 $160,227.00 Legacy 59607 Project Total $160,227.00 $146,941.00 $307,168.00 * Numbers rounded for presentation purposes. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I I ID I Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder(5020) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 60M34SA2-RJN 1295.pdf 60M34SA2-RJN Map.pdf 60M34SA2-RJN 60 AO 18.docx http://apps.cfwnet.org/council_packet/mc review.asp?ID=26043&councildate=8/14/2018 9/4/2018 0, - D"�q 9(�- CERTIFICATE OF INTERESTED PARTIES FORM 1295 lofl Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2018-355071 RJN Group,Inc. Dallas,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the form is 05/17/2018 being filed. City of Fort Worth Date Acknowl dged: I- 3 < 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 02397 This supersedes certificate 2018-354481-Main 34,100 and D100 Drainage Areas Sanitary Sewer System Evaluation Study and Improvements-Amendment No.2 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Jackson,Daniel Dallas,TX United States X Plymale, Paul Dalla,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Daniel Jackson and my date of birth is Oct. 1, 1976 My address is 12160 Abrams Road,Suite 400 Dallas TX 75243 USA (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in Dallas County, State of Texas on the17 day of May 2018 (month) (year) n Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.5523