Loading...
HomeMy WebLinkAboutContract 50018-A1 CITY SECRETARY CONTRACT N0. JrOC� - AMENDMENT No.1 RECENED SEP -62018 TO CITY SECRETARY CONTRACT No. 50018 CITY OF FORT WORTH CITYSECRETnR , the City of Fort Worth (CITY) and CH2M HILL ENGINEERS, INC, (ENGINEERI made and entered into City Secretary Contract No. 50018, (the RACT) which was authorized by M&C C-28475 on the 14th day of November, 2017 in the amount of $282, 822. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Biosolids Master Plan Update; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 22, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $77,296. 00. (See Attached Letter Proposal, Page 5) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $360,118. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth OFFICIAL RECORD Services Agreement Amendment Template CFW Official Release 9/19/2017 CITY SECRETARY Page 1 of 2 FT.WORTH,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER CH2M HILL ENGINEERS, INC. Jesus J. Chapa 'TE&ifer Kassa, P.E. Assistant City Manager Vice President DATE: (/� `! DATE: Z4 Z 2-ol8 APPROVAL RECOMMENDED: ( l-IeL Chris Harder Interim Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . Chris Harder Interim Water Director APPROVED AS TO FORM AND LEGALITY: M&C:929� Date: Douglas W. Black Assistant City Attorney AT WORD Ma y J. Kayser �. City Secretary r J_ City of Fort Worth Professional Services Agreement Amendment Template K ' ;' OFFICIAL RECORD CFW Official Release 9/19/2017 Page 2 of 2 it CITY SECRETARY FT.WORTH,TX JACOBS JACOBS' Ch24U• 777 Main St Fort Worth,Texas 76102 O+1817 735 6000 F +1817 735 6148 www.jacobs.com August 22,2018 Mr.Christopher Harder, P.E. Director Fort Worth Water Department City of Fort Worth,Texas 200 Texas Street Fort Worth,Texas 76102 Subject:Village Creek Water Reclamation Facility,Final Biosolids Master Plan and Implementation Support,Amendment No.l(City Secretary Contract No.50018,M&C C-28475) Dear Mr.Harder: Please find enclosed CH2M's proposal for Amendment No.1 to the Subject project.Should you have any questions, please do not hesitate to contact me at 512-314-3180. Regards, CI-12M A4�6-z— /, /J7� Matthew Berg, P.E. Project Manager ATTACHMENT A ENGINEERING SERVICES FOR VCWRF BIOSOLIDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT NO.:<XXXX, ATTACHMENT A SCOPE OF SERVICES FOR VILLAGE CREEK WATER RECLAMATION FACILITY FINAL BIOSOLIDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT NO.: <XXXX> AMENDMENT1 The scope set forth herein defines the work to be performed by the ENGINEER in completing Amendment 1 related to the Village Creek Water Reclamation Facility (VCWRF) Final Biosolids Master Plan and Implementation Support Project (Project). Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED Contract Number 50018 was executed by the CITY and ENGINEER on November 27, 2017. ENGINEER has performed services in support of the Biosolids Master Plan in accordance with the contract including the scope of services. Task 4, Additional Services, provides that the ENGINEER may perform additional services with specific direction from the CITY Project Manager on a task by task, time and materials basis. Based on a request from the CITY Project Manager, CI-12M prepared this Amendment for performance of additional services for modeling and preparation of a Wastewater Preliminary Engineering Report in accordance with Texas Water Development Board requirements identified in TWDB-0556. TASK 4.1. ADDITIONAL PROJECT MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. Managing the Consultant Project Team • Two additional meetings between CITY and ENGINEER to 1) Discuss key sections of the Draft Engineering Feasibility Report and 2) Obtain CITY feedback on the submitted Draft Engineering Feasiblity Report. • Task and allocate team resources to manage services related to this Amendment. Communications and Reporting • Update the Project Schedule to rebase the project to include this additional task; monthly updates are included in the original authorization. Task 4.1 ASSUMPTIONS • Two additional 2-hour team meetings with the CITY attended by up to 2 ENGINEERING team members. City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 1 of 6 ATTACHMENT A ENGINEERING SERVICES FOR VCWRF BIOSOLIDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT NO.:<XXXX>-CHANGE ORDER • The rebased project schedule will be prepared in Microsoft Project and submitted with the monthly report. Task 4.1 DELIVERABLES • The updated schedule will be submitted with the typical monthly status report TASK 4.2. ADDITIONAL BIOSOLIDS MASTER PLAN SERVICES. ENGINEER will finalize the existing Draft Long-term Biosolids Master Plan (BMP) and perform additional work for the CITY as follows: 4.2.1 Additional Biosolids Projections/Modeling ENGINEER will provide Additional Engineering Services to update the existing GPS-X process model and biosolids projections for the Village Creek WRF. This is an extension of existing Task 2.4, Update Biosolids Projections, and it includes work and effort that was not intended in the original scope of work. Additional tasks include: 1) Review and analysis of historical plant influent parameters to update projected service population, flow projections, influent loads, and per capita influent to VCWRF. ENGINEER to analyze the data to select a representative time period for use in model calibration. The original scope intent was to use the 2014 BMP's annual average flow and load projections rather than update them for model development. 2) Review and analysis of historical data provided by the City to determine typical wastewater quality characteristics, changes to operating condition, and water quality parameters throughout the treatment process including primary clarification, aeration, secondary clarification, thickening, digestion, dewatering and other processes. The original scope intent was to update the model based only changes to operating conditions as provided by City staff without extensive analysis of historical data. 3) Develop up to three model calibration iterations for annual average conditions. ENGINEER to work with City staff to review and fine tune the calibration to increase its accuracy, and to better reflect anticipated future operating conditions. 4) Develop up three sets of model validation results, testing the calibrated model against historical data for different time periods including annual average and monthly average conditions. This will test the accuracy of the model calibration for various time periods and operating conditions as a QA/QC step with City staff. Identify refinements to the model and calibration to more accurately reflect anticipated operating parameters, and establish more confidence in the model's projection of solids quantities for future operating conditions. 5) Comparison of GPS-X modelled max-month flow and load projections with those projections developed using peaking factors. This will be a QA/QC step to establish confidence that the model reasonably agrees with historically observed peaks. Because the model is not accurate for Max-Week conditions, this verification will give more confidence in the reliability of Max-Week projections based solely on peaking factors. City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 2 of 6 ATTACHMENT A ENGINEERING SERVICES FOR VCWRF BIOSOLIDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT NO.:<XXXX>-CHANGE ORDER Task 4.2.1 ASSUMPTIONS • No additional assumptions. Task 4.2.1 DELIVERABLES • The original project scope Task 2.4 includes a Technical Memorandum (TM) that describes the results of the modeling effort. As part of that TM, with this Amendment the TM will also describe the results of the historical data analyses, revised influent flow and load projections, selection of peaking factors, model validation results, and additional model assumptions made. Results will also be described in the Task 2.8 deliverable, Final Biosolids Master Plan Report, and in the Engineering Feasibility Report described below in Task 4.3. 4.2.2 Additional Alternative: MAD Followed by THP then MAD At the City's request, ENGINEER will provide Additional Engineering Services to evaluate one more technology alternative for comparison with those already included in the scope of work: Mesopilic Anaerobic Digestion (MAD) followed by Thermal Hydrolysis Pretreatment (THP) then Post-MAD, potentially followed by air drying. This is an extension of existing Task 2.6, Alternatives Evaluation, and it includes work and effort that was not in the original scope of work. Task 4.2.2 DELIVERABLES • Results of this analysis will be incorporated as an additional section into the existing Task 2.6 deliverable: TM 2. This will include a description of the technology, conceptual sizing, cost estimate, evaluation using the established non-cost scores, and comparison to other Alternatives. Results will also be described in the Task 2.8 deliverable, Final Biosolids Master Plan Report, and in the Engineering Feasibility Report described below in Task 4.3. TASK 4.3. ENGINEERING FEASIBILITY REPORT(EFR) The CITY desires to seek Texas Water Development Board (TWDB)funding for facility construction. TWDB requires that engineering analysis be documented and formatted in a prescribed manner as set forth in TWDB-0556, Guidance for the Preparation of Wastewater Engineering Feasibility Reports. ENGINEER will develop an Engineering Feasibility Report as set forth in TWDB-0556 based on the technical content contained in the initially scoped TM and "VCWRF Biosolids Master Plan Report"deliverables. Wastewater Engineering Feasibility Reports include some information in addition to that included in the scope of services for the Biosolids Management Plan Report. Effort over and above that originally anticipated include: • Additional details, maps and figures regarding facility siting • Broadened discussion of existing and forecast needs and operational issues • Integration into the report of water sources, ownership, and adequacy of water supply for the planning period which will be provided by the CITY City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 3 of 6 ATTACHMENT A ENGINEERING SERVICES FOR VCWRF BIOSOLIDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT NO.:<XXXX>-CHANGE ORDER • Additional information related to the Intended Use Plan (IUP) which will be provided by the CITY • Identification of industrial discharges and characterization of wastewater discharges from industrial pretreatment dischargers which will be provided by the CITY • Certifications • Project Budget Form (TWDB-1201) Task 4.3 ASSUMPTIONS • The ENGINEER will conduct no additional engineering analysis to prepare the Engineering Feasibility Report beyond the original scope and this Amendment. • No alternative will be recommended in the Engineering Feasibility Report • The Engineering Feasibility Report will be in ADDITION to the deliverable ("VCWRF Biosolids Master Plan Report,") identified in Task 2.8 of the original scope of services. • The CITY will provide water sources, ownership, and adequacy of water supply and similar CITY-generated data required in the Engineering Feasibility Report. • The draft and final reports will be provided in .pdf format via file transfer site. • EFR will be prepared according to our best interpretation of existing TWDB requirements, and estimated level of effort does not include any additional requirements that may be imposed by TWDB review of Draft EFR • The Report is expected to have the following sections as established in TWDB- 0556: o Executive Summary o General Description o Alternatives ■ Flow/load projections ■ Cost Estimates ■ Non-Cost Score Evaluations ■ Benefit-Cost Comparison of Alternatives o Project Specific Requirements ■ Required TWDB content ■ Regulatory Review and Market Analysis (from original scope of services) o Alternative Methods for Project Delivery Alternatives Evaluation City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 4 of 6 ATTACHMENT A ENGINEERING SERVICES FOR VCWRF BIOSOLIDS MASTER PLAN AND REPLEMEN iATION SUPPORT CITY PROJECT No.:<XXXX>-CHANGE ORDER o Cost of the Project o Project Schedule Task 4 DELIVERABLES SUMMARY 4.2.1 Additional content in TM describing the historical plant inflows, future flow and load projections, model calibration and validation, and updated model assumptions (additional content beyond originally scoped TM). Will also be incorporated into the Task 2.8 and Task 4.3 deliverables. 4.2.2 Evaluation of an additional biosolids technology alternative shall be incorporated into the Task 2.6 deliverable, TM 2, and into the Task 2.8 and Task 4.3 deliverables. 4.3 Draft and Final Engineering Feasibility Reports conforming with TWDB-0556. Draft will be reviewed by City, and TWDB if desired by City. TASK 4.4. CONTRACT SUPPORT Federally funded financial programs administered by TWDB include requirements such as complying with federal American/U.S. and prevailing wage monitoring and reporting. Standard City procurement and contracting documents will need to be modified to conform to TWDB funding requirements. Additional administration of both the contract between the CITY and the CONTRACTOR and the CITY and TWDB may be required. ENGINEER anticipates that additional effort will be required above that originally estimated in the scope of services approved on date. This Amendment does not include additional effort for such bid document modifications or contract administration services; an additional Amendment may be required. Budget Summary Task Cost 4.1 -Additional Project Management $10,210 4.2.1 -Biosolids Projections/Modeling $27,035 4.2.2-Additional Alternative: MAD Followed by THP then MAD $17,177 4.3-Engineering Feasibility Report $22,385 Expenses $ 489 Total $77,296 City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 5 of 6 ATTACHMENT ENGINEERING SERVICES FOR VCWRF BIOSOUDS MASTER PLAN AND IMPLEMENTATION SUPPORT CITY PROJECT Ill eXXM Draft Schedule of Upcoming Tasks D TaskName 01"lion 61■rt Fish P1WspssM6 July 18 2818 2818 Dapbc 2016 16 1 5 7 3 1 7 1 5 91 1 2 61 7 Finalize Long-Term Master Plan- 212 days Mon 1/6118 Tue 18!70.118 I I Ii 1 I 1 I 2 2.1-xldlo8 meeting and woMshop !day M.1/&18 Mon V8116 II 1 1 1 I 11 1 1 I 1 7 22-Data Ga8lenrg 60 days Tue 115118 Mon 6'2118 2 I I 1 1 1 I II 1 1 1 { 2.1-Bioeolids Projections 715 tlays Tue 1/5118 Fri 6122/18 2 I I I tl 1 t 1 5 2 6-ARemaN-Ev ahan 291.). Men 62511E Thu 82181 1 I I I 1 1 I I I I 8 TM 2-Akemaeres Evaluation 1 day Fn&118 Fri&7178 5 I 1 II I I 1 1 7 TM 1-Bwands Prgectiass 15 days Mon 8/6118 Fn U2Y18 6 11 I 1 1 & Altematr:es Evaluation'W dkYwp Appmannate Daae 1 daY Thu 8/2116 Thu 82118 6FSN7 my II I I I 9 2.J-RequWtory Re— 15 days Mon&&IB Fd 821/18 6 I I I 1 I II I I 1 10 2.5-Mark.Analyers 15 days Mon 816118 Fri W4118 6 1 I 1 11 Crty board updaW 12 days Mon&6116 Tue 621118 6 I I I 1 I I 1 12 4.3-Enpneenng Feasbdny Repon 20 days Mon 816118 Fd 837118 6 I I I 1 I 1 I 1 I 1 17 Cey Subnsesion b T'WDB 1 D days Man WY18 F6 WI V 18 12 1 1 I I 11 I 1 I 1 1 71 2.7-Irrlpkmenrason PWn l5tlaYs 'fled 8!'`x'18 Tue 5111118 71 1 I I 1 I 1 1 15 2.8-BMP Report 75 days Wed 9/171'18 Tae la'SW18 1 1 r I 1 1 I I I I I 1 18 Draft Report 15 Wys Wed 9!7378 Tue 102718/1,10,97 II I I I I I i I 1 77 Cny Review 1D days Wed 16'118 Tue 13116118 16 1 1 I 1 18 Final Repp't 10 Jaya`h'ed 10/77/16 Tue 103U'18 17 I 1 19 1 I I 28 ■lpkmenM[ion Buppon 60 days Wed&'22118 7-11M1,16111 I 1 I I I 1 I I 21 Contract Strategy Wakalwp,Approximate Date lday, Wed9fUJ18 Wed 9/12/1814 II I e112 1 I I I I i I I I 22 Draft RFP 60 oays Wed 822118 Tue 11/17118 I II I b DMR Agreemenl 60 days Wed 622118 Tue 77!13718 I I I 1 I I City of Fort Worth,Texas Attachment A PMO Release Date:04.09.2012 Page 6 of 6