Loading...
HomeMy WebLinkAboutContract 43806-A4 CITY SECRETARY a RECEIVED AMENDMENT No. 4 CONTRACT NO. LL SEP 12 2018 CRNOFFORTWORTH TO CITY SECRETARY CONTRACT CITY SFCRETARy WHEREAS, the City of Fort Worth (CITY) and EJES, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43806, (the CONTRACT) which was authorized by M&C C-25848 on the 18th day of September, 2012 in the amount of $193,110. 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $119,387 .00 which was authorized on July 22, 2014 (M&C-C-26877) , Amendment No. 2 in the amount of $48,942 .00 which was administratively authorized on October 9, 2015 and Amendment No. 3 in the amount of $57,248 . 00 which was authorized on August 29, 2017 (M&C C-28354) ; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 91; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 23, 2018 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $53,328 . 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $472, 015 . 00 . All other provisions of the Contract, which are not expressly OFFICIAL RECORD CITY SECRETARY Page -I- FT.WORTH,TX amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth EJES, Inc. , Jesus J. Chapa Edwin B. Jones, P.E. Assistant Citv Manager President DATE: ` DATE: APPROVAL RECOMMENDED: �2 11L Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Name of Employee moi---- —zz- lx� &uc64;L Titl Project Manage APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A �Q�' Douglas W. Black Senior Assistant City Attorn FORTS ATTE T: A. Q Mary J. kayL4V City Secretary XAS FOFFICIALECORD ETARY FT.WORTH,TX Page -2- CORPORATE OFFICE •Architectural 12655 N.Central Expy.Suite 500 •Engineering Dallas,Texas 75243 •Planning Phone:214 343-1210 'Construction Management 41b ■Environmental Services I N c o R P o R A T E D Fax:214 343-3885 ■IT Services Service With Excellence August 23, 2018 Rakesh Chaubey, P.E. City of Fort Worth Water Department Engineering & Fiscal Services Division 1000 Throckmorton Street Fort Worth, TX 76102-6311 817-392-6051 RE: Amendment No. 4 Sanitary Sewer Rehabilitation, Contract 91 City Project No. 01957 Additional Design and construction Services Dear Mr. Chaubey: Per your request we are pleased to submit this Amendment No. 4 for additional design services required to complete the above referenced project. The requested modifications will be outside of our scope of services as set forth in City Secretary Contract No. 43806, therefore this Amendment No. 4 is being developed to further identify these services and summarize the associated costs. The additional services required to prepare final construction documents and construction services will include the following: • Project Coordination for Sanitary Sewer improvements CPN-01957, Westcliff Drainage improvements CPN- 01669 and Asphalt Rehabilitation CPN-0157 • Construction Services • Additional Prints of construction plans and specifications We are requesting your assistance in the execution of this Amendment No. 4 in order for us to expeditiously perform these services. The attached EXHIBIT I, outlines the additional tasks, personnel and man-hours we anticipate will be required to make the requested revisions. The total fee for these additional services will be an amount not to exceed $53,328.00. Fort Worth Houston Shreveport 7524 Mosier View Court,Suite 104 525 N.Sam Houston Pkwy. Suite 440 6007 Financial Plaza,Suite 511 Fort Worth,TX 76118 Shreveport, LA 71129 (817) 284-2640 Houston,TX 77060 (318)670-7275 (281) 272-1612 Page 2 The total contract amount to date, including amendments, is as follows: Original Contract Amount = $193,110.00 Amendment No. 1 = $119,387.00 Amendment No. 2 = $ 48.942.00 Amendment No. 3 = $ 57,248.00 Amendment No. 4 = $ 53,328.00 New Contract Amount = $472,015..00 The City MWBE goal for this contract is 22%. The total amount paid to MIWBE (Arredondo, Zepeda, & Brunz, LLC) on total contract amount of$472,015.00 is $119,762.00, which is 25.37%; therefore meeting the City MWBE goal of 22%. If you have any questions or require additional information, please contact me at 214-343-1210, Ext. 133. Sincerely, Edwin B. Jones, P.E., President EJES, Inc. 12655 N. Central Expressway, Suite 500 Dallas, TX 75243 Tel: 214-343-1210 ejones@ejesinc.com Attachment j) G ; : 2 ■ ) § ( \� \ \ /L L � \ \ ) i 0 2 - § § i - S( 0 0 0 0 - - )6) L — Ua« \Lu / z LZ § } \{ \ \ } \ \� § j\ \ \/}{ ea23a ,2� A 2 \ § It a 0 Fat a� u� g� N U 5� U K W O� Q� f a 0 r� N F Fa- U 6 E K 'a z p z N rc O i � F U n m O <0m U F 5 J Q O t N V O Q N = K c U J F o W m U JW O O 2 Q O W LL S z w a o u h - °W �_ W ❑W U U a ❑N ¢> m a K O Fm r r � if i z N w Q �- m W� o E H z U W O b Y Q r vi w