Loading...
HomeMy WebLinkAboutContract 47570-A1 CITY SECRETARY CONTRACTNO. 4-S-10 AMENDMENT No.1 COV�F 0qJ TO CITY SECRETARY CONTRACT No. 47570 WHEREAS, the City of Fort Worth (CITY) and 360 Clarus, LLC, (ENGINEER) made and entered into City Secretary Contract No. 47570, (the CONTRACT) which was authorized by M&C C-27633 on the 1St day of March, 2016 in the amount of $250, 000; and WHEREAS, the CONTRACT involves engineering services for the following project: Hydraulic Modeling Assistance Contract; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and .ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 16 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $150,000. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $400,000. 3. Article III of the contract is amended to provide for an addition of time to the term. The following statement shall control the expiration of this agreement: Unless otherwise terminated pursuant to the terms of the original Agreement, this agreement shall continue for an additional 24 months from the original effective date unless approved funds are exhausted prior to that date. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth EOFFICIALECORDProfessional Services Agreement Amendment Template CFW Official Release 9/19/2017 ETARYPage 1 of 3 H,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER --� 360 Claru/s, LLC �+ Su n A anis Michael Crenshaw Assis ant City Manager Manager DATE : DATE: 9/14/2018 AP VA RECOMMENDED: w Douglas RO Wiersig, P.J1. Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. V�44'' --- Kiran Konduru, P.E. Sr. Professional Engineer APPROVED AS TO FORM AND LEGALITY: M&C: C-28816 Date: August 28th, 2018 1295# :�,� K- 3 S'166; Douglas W. Black Assistant City Attorney ATTEST: a y M ryr OFFICIAL RECORD City sec et 7E?t�' CITY SECRETARY City of Fort Worth Professional Services Agreement Amendment Template FT.WORTH,TX CFW Official Release 9/19/2017 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. Amendment No. Department Fund-Account-Center Amount 0200431 52002-5330500-100091 $150, 000 . 00 Total : 150, 000 . 00 City of Fort Worth Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 Page 3 of 3 3"' 0 kj Li4 July 16, 2018 Mr. Kiran Konduru, P.E., CFM Senior Professional Engineer Transportation and Public Works Stormwater Management Division Fort Worth, Texas 76102 Reference: CS#47570— Hydraulic Modeling Assistance Mr. Konduru: Per our recent discussions, it is our understanding that the City would like to amend the current Hydraulic Modeling Assistance contract to continue the current work efforts. The scope of services will remain the same as described in Attachment A of the existing contract. The additional costs to continue the efforts is anticipated to be $150,000. As discussed in the existing scope of services, separate task orders will be issued to define the specific scope of work for the additional efforts. Therefore, we respectfully request a contract amendment in the amount of $150,000. With approval of this amendment, the total amended contract amount would total $400,000. We are available at your convenience to discuss the proposed contract amendment should you have any questions. We appreciate the opportunity to work with you on this important effort, and we are grateful that you consider us a partner in aiding on these matters. Sincerely, Michael Crenshaw, PE, CFM (TX PE # 87675) 360 Clarus, LLC (TBPE Firm # F- 8431) Manager, Primary Point-of-Contact Phone: 817-300-9960 Email: mwcrenshawa-360clarus.com 11 Page 4660 Cedarview Drive,Suite 200, Fort Worth,Texas 76123 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/28/2018 DATE: Tuesday, August 28, 2018 REFERENCE NO.: **C-28816 LOG NAME: 20SWM HYDRAULIC MODELING ASSISTANCE AMENDMENT NO. 1 SUBJECT: Authorize Execution of Amendment No. 1 to the Professional Services Agreement with 360 Clarus, LLC, (City Secretary Contract No. 47570) in an Amount Up to $150,000.00 and Additional Time for Hydraulic Modeling Assistance Contract(ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 1 to the Professional Services Agreement with 360 Clarus, LLC, (City Secretary Contract No. 47570) in an amount up to $150,000.00 and the addition of up to 24 months for Hydraulic Modeling Assistance Contract. DISCUSSION: The purpose of this Mayor and Council Communication is to authorize Amendment No. 1 to the Professional Services Agreement with 360 Clarus, LLC (M&C), for additional funding and time to continue services to ensure the quality and consistency of drainage models produced by engineering consultants working on City projects. The original agreement was approved by City Council on March 1, 2016, (M&C C-27633) in the amount of$250,000.00 and had a 36 month completion timeframe. There are multiple drainage modeling projects ongoing and in queue, thus,this addition of funds and extension of time is necessary. Drainage modelling is a very specialized field that has seen rapid advancement in technology and capability in the past 10 years and these models are often a vital part of the development of affordable and effective solutions to flooding problems. This amendment, in the amount of$150,000.00, is expected to provide for the review of models produced over the next 24 months. Staff considers this fee to be fair and reasonable for the services to be performed. There is no anticipated annual operating cost to the Transportation and Public Works (TPW) Stormwater Management Division. M/WBE Office - The consultant, 360 Clarus, LLC, is in compliance with the City's BDE Ordinance for the Amendment No. 1. A waiver of goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE office, in accordance with M/WBE or BDE ordinance,because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible. This stormwater contract area is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION/ CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation, funds will available as appropriated in the Capital Budget of the Stormwater Capital Projects Fund. Prior to an expenditure being incurred, the participating department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department Account Project ProgramActivity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project ProgramActivity Budget Reference# Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Susan Alanis (8180) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Kiran Konduru (7598) ATTACHMENTS 1. 20SWM HYDRAULIC MODELING ASSISTANCE AMENDMENT No. 1 FID Table.xlsx (CFW Internal) 2. 20SWM HYDRAULIC MODELING ASSISTANCE AMENDMENT No. 1 Requisition.pdf (CFW Internal) 3. SAM Search Results.pdf (CFW Internal) 4. Signed Form 1295 Certificate.pdf (Public) 5. S WS-077_SIGNED Departmental Waiver .pd (CFW Internal) SAM Search Results List of records matching your search for Search Term : 360* clarus* Record Status: Active No Search Results July 20,2018 3:11 PM https://www.sam.gov/ Page 1 of 1 City of Fort Worth Departmental Request for Waiver Of MBE/SBE Subcontracting/Supplier Goal TPW Stormwater $150,000.00 DEPARTMENT NAME: ESTIMATED COST / PROPOSAL DATE Hydraulic Modeling Assistance SWS-077 NAME OF PROJECT/BID: DOE/PROJECT NO. kirankonduru ,,... .,,m a.�R L'° 7598 05/09/2018 SIGNATURE OF /PROJECT MANAGER EXTENSION DATE NIGP CODE Prior to advertisement, the contracting/managing department shall determine whether the bid/proposal is one which MBE/SBE requirements should not be applied. MBE/SBE requirements may be waived upon written approval of the MWBE Manager. If one of the conditions listed below exists,the contracting/managing department shall notify the Manager via this form, stating the specific reason(s)for requesting a waiver. If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either may appeal to the City Manager, or designee, and his/her decision is final. Please Check Applicable Reason: QA. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE Ordinance, because the public or administrative emergency exists which requires the goods or services to be provided with unusual immediacy; or =B. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE Ordinance, because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible; or QC. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE Ordinance, because the application of the provisions of this ordinance will impose an economic risk on the City or unduly delay acquisition of the goods or services; or =D. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE Ordinance, because the MWBE Waiver is solicited based on the sole source information provided to the MWBE Office by the managing department's project manager. Justify Commodity or Service Waiver Request: The amendment#1 to the contract has professional services where the subcontracting or supplier opportunities are negligible.TPW Stormwater would like to request a waiver to the MWBE goal requirement. Please use additional sheets,if needed M WBE OFFICE USE ONLY: Melani Valle Date: 018.0 .ned 8yMe6:00-0e 05/18/18 Date:2018.05.18 13:56:00-05'00' Approved Signature of M/WBE Authorized Personnel Date Not Approved Signature of M/WBE Authorized Personnel Date Rev.2-20-13 P'- 0�m ( t'� CERTIFICATE OF INTERESTED PARTIES FORM 2295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.i,2,3.5.and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2018-351667 360 Clarus,LLC FORT WORTH,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 05/10/2018 being filed. City of Fort Worth DatZACI ed:/og 3 Provide the identification number used by the govemmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contracL SWS-077 Engineering Consulting 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Crenshaw,Michael Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Y 't 1 t-� Cr��.s . and my date of birth is 3" Z a ' 1 O My address is �6�'Q GQ�atU',a••.' pf. �p�}water -7(p%z 3 (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct Executed in / R-rrA—3 County, State of fi't K4N, 5 .on the--Ldsy of ,26 /$ . (month) (year) fD�221-z'� Sowwre of authorized agent of contracting business e" (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.lx.us Version V1.0.5523