HomeMy WebLinkAboutContract 51255 CITY SECRETARY CONTRACT N0. 5 �J DESIGN PROCUREMENT AGREEMENT SEe 12 2p�� FOR CM p VENTANA LIFT STATION This Design Procurement Agreement("Agreement"), entered into the I+ day of 2018 by and between the City of Fort Worth ("City"), a Texas home-rule munici lity ("City"), acting herein by and through, its duly authorized Assistant City Manager, and PB Ventana I,LLC,a Texas limited liability company("Developer")acting by and through E. Peter Pincoffs, II, its duly authorized Manager. City and Developer are referred to herein individually as a party and collectively as the parties. Recitals WHEREAS, the City and Developer each desire to make public infrastructure improvements, including a lift station, required force main and gravity line in the City of Fort Worth, Texas(the "Project")as further described in Attachment"A"; and WHEREAS, City and Developer desire to enter into this Design Procurement Agreement in order to accomplish the goals of the Parties; and WHEREAS, Developer has determined that Jacobs Engineering Group Inc. ("Design Consultant") should provide for the design of the Project based on demonstrated competence and qualifications to perform the Design Consultant services for a fair and reasonable price; and WHEREAS, City staff have reviewed the scope, fee and schedule for the design of the Project and find them to be fair and reasonable; and WHEREAS, Developer will initially fund the costs of Design Consultant and City will reimburse Developer for the City's portion of the design up to a maximum amount of $327,690.00); and WHEREAS, City and Developer intend to execute a Community Facilities Agreement, or other similar agreement, that provides for the Developer to construct the Project and seek reimbursement from the City for the City's share of the easement costs, TXDOT permit costs, Oncor extension costs, construction costs and eligible construction expenses as agreed by the parties; and WHEREAS, Developer shall not earn a fee based upon the City's portion of the design fees paid to Design Consultant. NOW, THEREFORE, for and in consideration of the above recitals and the mutual covenants and agreements herein contained,the City and Developer agree as follows: SECTION 1 GENERAL REQUIREMENTS Design Procurement Agreement for Ventana Lift Station OFFICIAL RECORD Page 1 of 22 PB Ventana I,LLC CITY SECRETARY FT.WORTH,TX 1.1 The Project will generally consist of certain public infrastructure in the form of a lift station and the required force main/gravity line necessary to connect to the existing 30-inch gravity line located at the southeast corner of FM 2871 and Aledo Road as further described on Attached "A". 1.2 Developer will retain Jacobs Engineering Group Inc. as the Design Consultant for the Project pursuant to a written agreement, attached hereto as Exhibit"B". 1.3 The City and Developer intend to use a pro-rata cost sharing formula where the Developer's portion of the Project Costs shall be a percentage of Developer's share of the required peak flow capacity of the overall approximately 5.0 MGD capacity facilities ("Developer's Share"), and the City's portion of the Project Costs shall be the remaining percentage ("City Share"). The pro-rata cost sharing formula shall be referred to herein as ("Cost Sharing"). The required flow capacity of the Ventana property is 1.7 MGD. This required flow capacity was determined by a revised Sewer Study approved by the City that will be solely funded by the Developer to include the revised Ventana boundary in accordance with the City's policies and procedures. 1.4 Design Consultant's estimated fee for the Project is $496,500.00. City agrees to reimburse Developer for the City's Share of the actual cost to design the Project, in an amount not to exceed$327,690.00. The City will process progress payments to reimburse Developer for the City Share of the Project Design Costs. Progress payments shall be made to Developer no more frequently than monthly and shall be subject to a minimum threshold of $50,000.00 before a payment is required to be made by the City to Developer. The Water Department shall process payments as fast as reasonably possible, generally targeting no greater than 30 business days. 1.5 The Project Design Costs shall include engineering design costs shown in Exhibit "B". Real Property Expenses as defined in Section 1.6 below, Oncor charges associated with bringing electrical service to the proposed lift station, and TXDOT permit fees will be incorporated into a future CFA agreement. One construction plan will be generated for the Lift Station and another construction plan will be generated for the Force Main and Gravity Main. Other permit fees (including, but not limited to the City's IPRC fees)and other soft costs will be at Developer's expense and not part of the Cost Sharing. 1.6 The cost for the land where the Lift Station will be located and any easements for the Force Main/Gravity Line necessary to connect the Lift Station to the existing 30" Gravity Line located at the southeast corner of FM 2871 and Aledo Road that are not located in the future ROW dedication shall be part of a future CFA for which City and Developer will be Cost Sharing ("Real Property Expenses"). Developer will not be reimbursed by the City or receive any credit under the Cost Sharing formula for easements that will be dedicated within future ROW. The dollar value attributable to Real Property Expenses in the Cost Sharing formula for land or easements obtained from third parties shall be the cost of acquisition paid to the third parties for the land or easements. The dollar value attributable Design Procurement Agreement for Ventana Lift Station Page 2 of 22 PB Ventana I,LLC to Real Property Expenses in the Cost Sharing formula for land owned by Developer or easements dedicated to the City by Developer shall be$42,000.00 per acre. The Developer shall negotiate any land or easements needed from third parties. 1.7 The Lift Station property will initially be provided within an exclusive sanitary sewer easement. The Developer will be required to get approval of the City's Planning Commission to defer platting of the site until the adjoining property is platted and to request approval for issuance of the building permit for construction of the Lift Station in the easement. 1.8 City shall have the ultimate right to approve or disapprove the Construction Documents. SECTION 2 TERMINATION 2.1 Termination. This Agreement may not be terminated without cause by either party without the prior written consent of the other party. A party receiving a written request for consent to terminate this Agreement must respond in writing to the party delivering the request, within thirty days of receiving the request. 2.2 Fiscal Funding Out. Notwithstanding anything to the contrary, if, for any reason, at any time during the term of the Agreement, the Fort Worth City Council fails to appropriate funds sufficient for the City to fulfill its obligations under this Agreement, the City may terminate the portion of the Agreement regarding such obligations to be effective on the later of: (i) delivery by the City to Developer of written notice of the City's intention to terminate or (ii) the last date for which funding has been appropriated by the Fort Worth City Council for the purposes set forth in this Agreement. SECTION 3 FORCE MAJEURE 3.1 If either Party is unable, either in whole or part, to fulfill its obligations under this Agreement due to acts of God; strikes, lockouts, or other industrial disturbances; acts of public enemies; wars; blockades; insurrections; riots; epidemics; public health crises; earthquakes; fires; floods; restraints or prohibitions by any court, board, department, commission,or agency of the United States or of any state;declaration of a state of disaster or of emergency by the federal, state, county, or City government in accordance with applicable law; issuance of a Level Orange or Level Red Alert by the United States Department of Homeland Security; any arrests and restraints; civil disturbances; or explosions; or some other reason beyond the Party's reasonable control (collectively, "Force Majeure Event"), the obligations so affected by such Force Majeure Event will be suspended only during the continuance of such event. SECTION 4 Design Procurement Agreement for Ventana Lift Station Page 3 of 22 PB Ventana I,LLC LIABILITY AND INDEMNIFICATION 4.1 DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL PROPERTY LOSS, PROPERTY DAMAGE AND/OR PERSONAL INJURY, INCL UDING DEATH, TO ANYAND ALL PERSONS,OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED, TO THE EXTENT CAUSED BY THE NEGLIGENT ACT(S) OR OMISSION(S), MALFEASANCE OR INTENTIONAL MISCONDUCT OF DEVELOPER,ITS OFFICERS,AGENTS,SERVANTS OR EMPLOYEES. 4.2 DEVELOPER AGREES TO DEFEND, INDEMNIFY, AND HOLD THE CITY, ITS OFFICERS, AGENTS, SERVANTS, AND EMPLOYEES HARMLESS AGAINST ANY AND ALL CLAIMS,LAWSUITS,ACTIONS, COSTS,AND EXPENSES OFANY KIND, INCLUDING, BUT NOT LIMITED TO, THOSE FOR PROPERTYDAMAGE OR LOSS (INCLUDING ALLEGED DAMAGE OR LOSS TO OWNER'S BUSINESS AND ANY RESULTING LOST PROFITS)AND/OR PERSONAL INJURY(INCLUDING DEATH) THAT MAY RELATE TO, ARISE OUT OF, OR BE OCCASIONED BY (I) DEVELOPER'S BREACH OF ANY OF THE TERMS OR PROVISIONS OF THIS AGREEMENT OR (H) ANY NEGLIGENT ACT OR OMISSION OR INTENTIONAL MISCONDUCT OF DEVELOPER, ITS OFFICERS, AGENTS, ASSOCIATES, EMPLOYEES, CONTRACTORS(OTHER THAN THE CITY), OR SUBCONTRACTORS RELATED TO THE PERFORMANCE OF THIS AGREEMENT, EXCEPT THAT THE INDEMNITY PROVIDED FOR IN THIS SECTION SHALL NOT APPLY TO ANY LIABILITY RESULTING FROM THE SOLE NEGLIGENCE OF THE CITY OR ITS OFFICERS,AGENTS, EMPLOYEES, OR SEPARATE CONTRACTORS,AND IN THE EVENT OF JOINT AND CONCURRENT NEGLIGENCE OF BOTH DEVELOPER AND CITY, RESPONSIBILITY, IF ANY, SHALL BE APPORTIONED COMPARATIVEL YINACCORDANCE WITH THE LA WS OF THE STATE OF TEXAS. NOTHING HEREIN SHALL BE CONSTRUED AS A WAIVER OF THE CITY'S GOVERNMENTAL IMMUNITY AS FURTHER PROVIDED BY THE LAWS OF TEXAS. 4.3 Developer shall require all of its subcontractors to include in their subcontracts a release and indemnity in favor of City in substantially the same form as above. This section shall survive the expiration or termination of this Agreement. SECTION 5 INSURANCE 5.1 Developer shall maintain the insurance requirements set forth in Exhibit C, which is attached hereto and incorporated herein for all purposes. SECTION 6 NONDISCRIMINATION 6.1 Developer shall not engage in any unlawful discrimination based on race, creed, color, national origin, sex, age, religion, disability, marital status, citizenship status, sexual orientation or any other prohibited criteria in performing the services under this Agreement. Design Procurement Agreement for Ventana Lift Station Page 4 of 22 PB Ventana I,LLC SECTION 7 VENUE AND CHOICE OF LAW 7.1 Developer and City agree that this Agreement shall be construed in accordance with the laws of the State of Texas. If any action,whether real or asserted, at law or in equity,arises on the basis of any provision of this Agreement, venue for such action shall lie in state courts located in Tarrant County,Texas or the United States District Court for the Northern District of Texas—Fort Worth Division. SECTION 8 THIRD-PARTY RIGHTS AND ASSIGNMENTS 8.1 The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. 8.2 Developer agrees that it will not subcontract or assign all or any part of its rights,privileges or duties hereunder without the prior written consent of the City, and any attempted subcontract or assignment of same without such prior consent of the City shall be void. SECTION 9 BINDING COVENANTS 9.1 Subject to the limitations contained herein,the covenants,conditions and agreements made and entered into by the parties hereunder are declared to be for the benefit of and binding on their respective successors, representatives and permitted assigns, if any. SECTION 10 INDEPENDENT CONTRACTOR 10.1 Developer shall perform all work and services hereunder as an independent contractor,and not as an officer, agent, servant or employee of the City. Developer shall have exclusive control of, and the exclusive right to control the details of the work performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, employees and subconsultants (or subcontractors). Nothing herein shall be construed as creating a partnership or joint venture between the City and Developer, its officers, agents, employees and subconsultants (or subcontractors), and doctrine of respondent superior has no application as between the City and Developer SECTION 11 AMENDMENTS, CAPTIONS,AND INTERPRETATION 11.1 Except as otherwise provided in this Agreement, the terms and provisions of this Agreement may not be modified or amended except upon the written consent of both the City and Developer. 11.2 Captions and headings used in this Agreement are for reference purposes only and shall not be deemed a part of this Agreement. Design Procurement Agreement for Ventana Lift Station Page 5 of 22 PB Ventana I,LLC 11.3 In the event of any dispute over the meaning or application of any provision of this Agreement, this Agreement shall be interpreted fairly and reasonably, and neither more strongly for or against any party, regardless of the actual drafter of this Agreement. SECTION 12 GOVERNMENTAL POWERS AND IMMUNITIES 12.1 It is understood that by execution of this Agreement,the City does not waive or surrender any of its governmental powers or immunities. SECTION 13 AUTHORIZATION AND COUNTERPARTS 13.1 By executing this Agreement on behalf of Developer,the person signing below affirms that he or she is authorized to execute this Agreement and that all representations made herein with regard to the signer's identity,address, and legal status are true and correct. 13.2 This Agreement may be executed in several counterparts,each of which will be deemed an original, but all of which together will constitute one and the same instrument. SECTION 14 SEVERABILITY AND NO WAIVER 14.1 It is agreed that in the event any covenant, condition or provision herein contained is held to be invalid by any court of competent jurisdiction, the invalidity of such covenant, condition or provision shall in no way affect any other covenant, condition or provision, and does not materially prejudice either Developer or City in connection with the rights and obligations contained in the valid covenants, conditions or provisions of this Agreement. 14.2 The failure of either party to insist upon the performance of any term or provision of this Agreement or to exercise any right granted hereunder shall not constitute a waiver of that party's right to insist upon appropriate performance or to assert any such right on any future occasion. SECTION 15 COMPLIANCE WITH LAWS 15.1 This Agreement is subject to all applicable federal, state and local laws, ordinances, rules and regulations, including, but not limited to, all provisions of the City's Charter and ordinances, as amended. 15.2 If City notifies Developer or any of its officers, agents, employees, contractors, subcontractors, licensees,volunteers,or invitees of any violation of such laws,ordinances, rules or regulations, Developer shall immediately desist from and correct the violation. SECTION 16 NOTICES Design Procurement Agreement for Ventana Lift Station Page 6 of 22 PB Ventana I,LLC 16.1 Notices to be provided hereunder shall be sufficient if forwarded to the other party by hand- delivery or via U.S. Postal Service certified mail,postage prepaid,to the address of the other party shown below: To the City: To Developer: Fort Worth Water Department PB Ventana I, LLC Attn: Attn: Taylor Baird& Peter Pincoffs 200 Texas Street 4145 Travis Street, Suite 202 Fort Worth, Texas 76102 Dallas, TX 75209 with copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 SECTION 17 HEADINGS 17.1 The headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. SECTION 18 RIGHT TO AUDIT 18.1 Developer agrees that the City shall, until the expiration of three (3) years after final payment under this Agreement, have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all its subcontracts hereunder a provision to the effect that the subconsultant agrees that the City shall, until the expiration of three(3)years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and records of such subconsultant, involving Design Procurement Agreement for Ventana Lift Station Page 7 of 22 PB Ventana I,LLC transactions to the subcontract, and further, that City shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subconsultant reasonable advance notice of intended audits. SECTION 19 PROHIBITION ON BOYCOTTING ISRAEL 19.1 Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel, and(2) will not boycott Israel during the term of the contract. SECTION 20 SOLE AGREEMENT 20.1 This Agreement, including any exhibits attached hereto and any documents incorporated herein, contains the entire understanding and agreement between the City and Developer, and any lawful assign and successor of Developer, as to the matters contained herein. Any prior or contemporaneous oral or written agreement is hereby declared null and void to the extent in conflict with any provision of this Agreement. (Remainder of Page Intentionally Left Blank) Design Procurement Agreement for Ventana Lift Station Page 8 of 22 PB Ventana I,LLC IN WITNESS THEREOF,the parties have made and executed this Agreement in multiple originals to be effective on the date signed by the Assistant City Manager, in Fort Worth, Tarrant County,Texas. CITY OF FORT WORTH: DEVELOPER Jesus J. Chapa E Peter Pincoffs III Assistant City Manager Manager PB Ventana I,LLC Date: �.� 'G�3 Date: RECOMMENDED BY: cfle ISL APPROVED AS TO FORM AND LEGALITY: Richard A. McCracken Assistant City Attorney ATTEST: Contract Compliance Manager i y S ary U :_ By signing I acknowledge that I am the person responsible for the monitoring and Date ............... administration of this contract, including ensuring all performance and reporting ' requments AGREEMENT AUTHORIZATION: M&C: C-28780 Name: Title: � , Ax" Date approved: 8/7/18 Form 1295: 2018-380562 Design Procurement Agreement for Ventana Lift Station Page 9 of 22 PB Ventana I,LLC OFFICIAL RECORD CITY SICRIr'T'ARY I�"�'.*OWN,YX EXHIBIT A It1t[ll1C11 !iII i� Mn 5' 1i 'r �A I. ASA03 VENTANA UFT STATION EXHIBIT A VENTANA City of Fort Worth,Tarrant County,Texas Jacobs Project No.WFX008W 0 soo 1.wo 2000 FFFT Design Procurement Agreement for Ventana Lift Station Page 10 of 22 PB Ventana I,LLC EXHIBIT B ,BD9 Bryan S,reel.Suite,300 Unitrtl Stat�a •,314 SA].A300 www israUa com ADDITIONAL SERVICES AUTHORIZATION PROJECT Vantana Mesta,Lift Station,Fore.Main and NAME: Gravity System PROJECT City of Fort Worth,Tarrant County.Texas NUMBER: WFXOO810 CLIENT: PMB Ventana Developer,LLC Art.- Rm Taylor Baird ADDRESS: 4145 Travis Street,Suite 202 Dallas.Texas 75204 Client hereby requests and authonzes Jacobs Engineering Group Inc.(-Jacobs-)to perform the following Additional Services under the Professional Services Agreement executed between Jacobs Engineering Group Inc.and Client dated July 1 O,2017(the-Agreement') The Agreement is incorporated herein and forms an integral part of thio Additional Services Authorization. To lha axtent o/any conflicts between the terms end conditions o!this Additional Services Authorization and the Agreement,the Agreement shall control SERVICES AUTHORIZED: Ghent authorizes Jacobs to perform the Servicas described in Exhibit A attached herato and Incorporated by reference herein. COMPENSATION(Select One): M Time and Materials as per Exhibit A LJ Firm Fixed price of E as par Exhibit A n Other as par Exhibit A Accepted for PMB VENTANA DEVELOPER,LLC Accepted for JACOBS ENGINEERING OROUP INC. BY } __ - —.c.a* BY Name: G ��a� Name S Brad Davis - --- - Title: Title- Vice P -_-_--�--_-�-_---- -- lAClf7a.�aG�Z resident Dale: gel-.�t�j DaleJune 14,2018 XOOA,O.ASAO] Rnlneatl 0)-201] MdlOonai Services AuihorizsUon Design Procurement Agreement for Ventana Lift Station Page 11 of 22 PB Ventana I,LLC EXHIBIT A SCOPE OF SERVICES AND COMPENSATION This Exhibit A is incorporated as a part of the Agreement between the parties and is incorporated by reference therein. The basis of compensation for Jacobs providing the services as described herein. PROJECT IDENTIFICATION Company Name: PMB Ventana Developer,LLC Project Number. WFXO0810 Project Name: Ventana Master Lift Station,Force Main and Gravity System Location: Southwest of Chapin School Road and Atedo Road City. City of Fort Worth County: Tarrant County State: Texas GENERAL PROJECT DESCRIPTION Jacobs Engineering Group Inc. (Jacobs)will provide professional services for the Ventana Master Lift Station,Force Main and Gravity System,as shown on the attached Exhibit B_ The following scope is for the planning,design,bidding and construction administration services for a lift station,force main and gravity system to serve the Ventana development and adjacent areas located in the wastewater service basin. It is anticipated that the lift station will contain submersibEe pumps(three or more)with an approximate capacity of 5 MGD. SCOPE OF SERVICES I. OVERALL SURVEYING AND ENGINEERING SERVICES A. PRELIMINARY DESIGN REPORT Based on previously prepared wastewater master pian by others: • Verify the sanitary sewer flows for the lift station design. • Site Layout — Configure the lift station site according iD Fort Worth guidelines and to facilitate ease of access and incorporate the lift station site into the overall Development Plan. • Calculate Total Dynamic Head (TDH) to prepare system head curves and determine submersible pump capacities. • Provide load summary and layout for utility provided infrastructure_ • Collect pump curves from at least two reputable submersible pump manufadnrers and plot pump curves vs.system curves. • Establish appropriate discharge pipe siting. • Size proposed wet well. • Develop other design parameters, including lift station, water hammer, site electrical requirements (power and instrumentation/control), buoyancy analysis, and required emergency storage volume. • Specify the odor control with detailed design anticipated by manufacturer. • Prepare preliminary lift station site plan (30% Design) with preliminiary force man and gravity line layout Jacobs NWFX00810.ASA03 Exhibit A—Scope of Ser ices and Campensatim June 14,2018 PMB Ventana Developers.LLC—Vertana Master Lift Statim Force Man and Gravity System Pape 1 d 8 Design Procurement Agreement for Ventana Lift Station Page 12 of 22 PB Ventana I,LLC • Submit bound Preliminary Design report including appendices presenting design calculations and equipment performance curves to Client and City for review and approval. • Address comments on the report and resubmit one time for approval_ • Attend one meeting with City staff to review project prior to initiating final lift station design. • Submit bound Final Design report to Client and City. B. TOPOGRAPHIC SURVEY Perform a field topographic survey,tnckiding the lift station site, 100'in width along the proposed alignment and provide topographic mapping with a mininum of one-foot contour intervals and identify positions and elevations of natural ground features and surface visible features. The alignment of the force main is assumed as shown on Exhibit B. C EXISTING UTILITY VERIFICATION Coordinate with the pipeline companies and prepare exhibits depicting the location, horizontal and vertical of oil/gas pipelines and TRWD raw waterlines identified on site. In conjunction with Client and pipeline companies, provide field survey for the `pot hole shots on covered Imes_ Budget estimate fee for this task includes subcontractor service for uncovering pipes via hydro- excavation or`pot hole'process. D. RIGHT-OF-WAY AND EASEMENT LEGAL DESCRIPTION AND EXHIBIT Prepare a metes and bounds legal description and graphic exhibit for the purpose of describing the location of right of way or an easement specified by the Client Each legal description will be prepared based on a field survey of the subject tract or tracts of land affected by the easement. The easement description will meet the current Texas Board of Professional Land Surveying Standards and Procedures of Practice_The descriptions and exhibits will be provided to the Client or Client's agent to be included as part of the easement documents(prepared by others).The fee for this task assumes up to five easements will be needed.Additional easement documents will be billed as an additional service. E. COORDINATION WITH OTHERS Attend and coordinate with franchise utility and electric providers, environmental consultant, geotechnical engineer,TRWD,and others,including sharing of files and coordination meetings as requested by Client. F. GENERAL PROJECT MEETINGS Attend major milestone meetings throughout the course of the design phases to coordinate the project Project meetings include Client,Clty,and other consultants. 11. ENGINEERING SERVICES A. CONSTRUCTION PLANS 1. Lift Station • Prepare plan and profile sheets, which include but not limited to ail mechanical piping, pumps, valves, controls, ventilation, emergency by-pass pumping and flow metering equipment • Prepare site plans, including yard piping, lighting, perimeter security fencing and all- weather access road. Jacobs a ATX00610ASA03 Exhibit A—Soape of Services and Compensation June%4.20 f8 P16 Ventana Developers.LLC—Ventana MasW Lift Station.Face Mam and Grimly System Page 2 of 8 Design Procurement Agreement for Ventana Lift Station Page 13 of 22 PB Ventana I,LLC • Prepare a grading plan within the faciity footprint • Prepare concrete structural plan and elevation for wet well and a valve vault and metering chamber, including structural details. Design will be based on recommendations in geotechnical report(by others). • Prepare electrical site plan and detail sheet(s),which inckides details for supplying power to pumps, instrumentation and associated equipment.Lift station control panel system will be part of the pump manufacturer package. Plans will include location of SCADA panel (designed by others it required, line of sight study excluded). Provide instrumentation specification for City review and approval_ Specification shall inckide language for the contractor to supply and install instrumentation panels,wiring and associated equipmerd, mono radio tower with reinforced concrete base, and I/O to PLC and associated programming. Determine and coordinate with City to determine VO List to include in the specification. City will provide equipment fist to incorporate in instrumentation specification. City will connect PLC and HMI and is not part of the contractor's scope. City will provide height of the tower required to include in the specification. Power is assumed to be 3 phase and available at the lift station site. Review and coordination of offsite power designed by others is included by separate task this contract • Reserve a location for odor control system with detailed design by manufacturer. • Prepare plans for an intruder resistant security fence wire and double swing access gate with padlock. • Prepare erosion control plans_ • Prepare construction notes and details to supplement any City standards. • Prepare and submit a `Summary Transmittal Letter', in accordance with 30TAC§217,to the TCEQ,if required 2. Force Main and Gravity Line Prepare construction plans for approximately 8,000 linear feet of force main pipe from the Lift Station to the existing City sanitary sewer system_ Prepare construction pians for approximately 1,600 linear feet of gravity sanitary sewer from the existing Ventana Phase 1JPhase 2 connection to the City of Fort Worth and City of Benbrook systems. The plans will include plan and profile design. 3. Access Road Prepare construction plans for an aN-weather access road connecting the proposed lift station site to Jerry Dunn Parkway along the eastern boundary of the City of Fort Worth's City limits_ The plans will include plan and profile design with a single anticipated low-water crossing. Should a low-water crossing not be allowed, Storm Water Management, iSWM Analysis, Floodplain Development Permits or detailed bridge or culvert crossing design will be billed as an additional service. B. COMMUNITY FACILITIES AGREEMENT Prepare and submit a Community Facilities Agreement(CFA),financial guarantee,cost estimates and exhibits in accordance with City of Fort Worth requirements and process through the City for approval. The fee for this task assumes two CFAs will be prepared(one for frft station,one for linear force main and gravity lines). C. CONSTRUCTION BIDDING SERVICES One set of quantities will be obtained upon initial City submittal and upon approval of plans_ Other quantity takeoffs will be prepared on an hourly basis_ Jacobs AAFX0081CASA03 Exhibit A—Scope of Services and Campem alien June 14,21318 PMB Ventana Developers.LLC—Ventana Master Lilt Sumac,Fane Mann and Gravity System Page 3 of 8 Design Procurement Agreement for Ventana Lift Station Page 14 of 22 PB Ventana I,LLC Prepare construction bid packages for lift station improvements and site grading, and one package for force main and gravity utilities. These packages will include quantity estimates, bid forms,and specifications(if required). One set of quantities will be obtained upon approval of the plans. Jacobs will receive bids,review bids,and prepare bid summary. D. SPECIFICATIONS AND CONTRACT DOCUMENTS Prepare specifications and contract document books (one for force main and gravity line improvements and one for lift station improvements). This scope includes coordination with the awarded contractor and Client to obtain items required within the documents (certificates of insurance,bonds,ate.). E. CONSTRUCTION ADMINISTRATION 1. Attend Pre-Construction Conference with the successful Contractors,City,and the Client to discuss the project in detail. Provide one set of final plans for Contractor,City and Client with electronic version for Contractor distibution lo subcontractors,as necessary. 2. Make periodic visits to the site to observe the progress of construction activity and to determine,in general,if the work is proceeding in accordance with the information given and the design concept expressed in the Contract Documents. This review should not be in lieu of work performed by City Inspectors, but will be more general in nature. Jacobs has no respo nsibifities for projects safety,construction means and methods or construction quality, cost or schedule. Periodic site visits will consist of one site visit per month for three hours each for ten months,assuming approximately 30 hours of effort. 3. Prepare a summary of quantity changes from the Bid Set to the final approved drawings. Contractor and/or Owner to prepare change order. 4. Calculate inspection fees based on final contract amount 5. Coordinate with the contractor and owner regarding plan interpretation and attend meetings and site visits as required_ 6. Consult with and advise the Client,issue instructions to the Contractors on behalf of and as requested by the Client. 7. Review contractor change orders as requested. 8. Accompany Ciernt, City Staff, and utility providers on the final inspection of the project for compliance with the Contract Documents. 9. Prepare record drawings based on data (modifications, adjustments, etc.) from the Contractor.Record drawings will be prepared using contractor issued redlined drawings.This scope assumes minor revisions are required.Furnish a set of prints of these record drawings to the Client 10.Assist the Client in obtaining final acceptance of the project by the City,utility providers,and TCEQ as required. The effort for this task is hourly with a budget estimate assuming approximately 150 hours. Additional effort required or requested beyond the budget estimate will be billed as an additional service. Jacobs#WFX00810ASA03 Exhibit A—Scope of Servkes and Compensation Aare t4,2018 PMB Venom Developers.LLC—Ventana Master lift Station,Fame Main and Gravity System Paye 4 of 8 Design Procurement Agreement for Ventana Lift Station Page 15 of 22 PB Ventana I,LLC Ill. SURVEYING CONSTRUCTION STAKING A. CONSTRUCTION STAKING 1. Lift Station Provide one complete set of alignment and grade stakes to prep and grade site. Including wet well horizontal and vertical offsets and site control for Contractor use during construction. 2. Farce Main and Gravity Line Provide one complete set of alignment and grade stakes on 100'centers on tangents and 50' centers on curves. 3. Access Road Provide one complete set of alignment and grade stakes on 100'centers on tangents and 50' centers on curves. 4. Electrical Service Provide one complete set of alignment stakes on 100'intervals on tangents and 50'interval on curves. Approximate nearest three phase power is anticipated it Benbrook,along Jerry Dunn Parkway,approximately 3,000 feet from lift station site_ ADDFTIONAL SERVICES From time to time, the Client may require additional services to those described above. Jacobs will provide these services and be compensated_ Additional services will be paid for by Client as indicated in Additional Services Authorization or such other document as deemed appropriate by Client and Jacobs. Additional Services shall consist of,but not be limited to,the following items: A. Environmental Delineation or Permitting. B. Storm Water Management Plan and Floodplain Development Permit for Access Road Crossing. C. Geotechnical Engineering for Lit Station site. D_ Project Management,it requiredMMuested solely by Client GENERAL CONDITIONS This Exhibit A is based on the following General Conditions: A. All research for the boundary verification, including easements, adjoining deeds, etc_, will be provided by the Client will be performed by an outside deed research company and billed as a reimbursable expense. B. All negotiations and coordination with adjoining property owners will be by Client C_ Site will be mowed by Client prior to design surveys. D. Site will be cleared prior to grading stakes being set E. Pavement section design will be the responsibility of the Client and is not included in this Scope. City standards will be used unless otherwise directed by Client F. Site will be developed in accordance with City of Fort Worth subdivision ordinance. Jacobs NWFX00815.ASA03 Exhibit A-Soope of Services and Compensation June 14,2018 PMB Vw ana developers.LLC-Veritma Master Lit Station,Face Man and Gravity Syst m Page 5 of 8 Design Procurement Agreement for Ventana Lift Station Page 16 of 22 PB Ventana I,LLC COMPENSATION SCHEDULE WBS Lump Sum Hourly (Budget Estimate) I. OVERALL SURVEYING AND ENGINEERING SERVICES A. Preliminary Design Report 0830 $2900000 B. Topographic Survey 0510 $7,500.00 C. Existing Utility Verification 0511 $20,000.00 D. Right-of-Way and Easement Legal Description and Exhibit 0560 $7,500.00 E_ Coordination with Others D600 $15,000.00 F. General Project Meetings H601 $10.00.00 11. ENGINEERING SERVICES A. Construction Plans 1. Lift Station 0835 $145,000.00 2. Force Main and Gravity Line 0630 $39,000-00 3_ Access Road D631 $4,500.130 B. Community Facilities Agreement 1. Lift Station D608 $5,060-00 2. Force Main and Gravity Line 0509 $4,500-00 C. Construction Bidding Services 1.Lift Station 0840 $5,000.00 2_ Force Main and Gravity Line 0640 $4,500.00 D. Specifications and Contract Documents 1. Lift Station 0641 $S OOD.DD 2. Force Main and Gravity Line 0642 $4,500.00 E. Construction Administration 0845 $35,000.00 Ill. CONSTRUCTION STAKING A, Construction Staking 1. Lift Station 0526 $4 000.00 2. Force Main and Gravity Line 4525 $6 560.00 3. Access Road 0515 $2,500-00 4. Electrical Service 0535 $2,500.00 Sub-Total: $291,500.00 $65,000.00 Reimbursable Expenses Allocation: $15,000.00 TOTAL: $371,500.00 Jacobs#WFX00010ASM3 Exhibit A—Soape of Services and Compensation June 14.2018 PM6 Ventana Developers,LLC—Varna Master LA Station,Force Main and Grarltg System Pape 6 of S Design Procurement Agreement for Ventana Lift Station Page 17 of 22 PB Ventana I,LLC IV.ADDITIONAL SERVICES ITEMS: A. Environmental Delineation or Permitting $25,000.00 B. Storm Water Management Plan or Floodplain Development Permitting for Access Road Crossing $30,000.00 C. Geotechnical Engineering for Lift Station Site $20,000.00 D. Project Management $50,G00.00 GRAND TOTAL: $496,500.00 This fee amount will be valid for 90 days_ REIMBURSABLE EXPENSES In performance of the Scope of Services described above, the follawing types of expenses are not contemplated in the Total Contract Anwunt shown above. These are considered reimbursable expenses and Jacobs will be compensated for providing same in accordance with the following: Reimbursable Expenses include the following items: 1. Out-ofixodret expenses related to employee travel and mileage,courier expenses,and reprographics shall be reimbursed at cost plus ten percent 2. The cost of subcontracted services such as authorized borings,materials testing,and other specialized services by outside consultants shall be reimbursed at cost plus ten percent 3. Cost of permits or fees required by regulatory agencies or departments obtained on behalf of the Client shall be reimbursed at cost plus ten percent. 4. Safes tax as required by state law for surveying and professional services. STANDARD BILLING RATES(Effective Date:January 1,2018) Cateoory Bill Rate Slliour Clerical/Admin S 50- 80 Designer $ 70- 90 Senior Designer S 90-120 EFT S 70-100 Project Engineer $ 90-120 Project Manager $130-180 Senior Project Manager $190-225 Program Manager $225-275 Survey Instrument Technician(Field) $ 40- 70 Survey Party Chief $ 60- 90 Survey Technician(Office) $ 60- 90 Survey Project Manager $120-170 Construction Inspector $ 75-110 Hydrologist $ 70-100 Environmental Scientist/Engineer $ 60- 90 Landscape Architect $ 80-120 Planner $ 70-120 Sr.Planner $120-190 Notes: This Standard Biting Rate schedule reflects he range of baling rates for perumnel perkrwkg pmbssiwial services under the Agreement for the respective category. The ad"hourly rate billed win be for the speeft employee who provides the service in pertarmanoe of the Work and ni be mhin the ranges shorn above. These rates are valid for one yearfrom he date specified as INFective Dae'above and subject to aditisirnent thereafter. Jaocbs OWFXOg810.AS1 EAU A—Scope of Services and Compensation .lune 14.2018 PMB Ventana Developers.LLC--Ventana Masts Lift Station,Force Man and Cka ity Systan Page 7 of 8 Design Procurement Agreement for Ventana Lift Station Page 18 of 22 PB Ventana I,LLC This Rate Schedule is not an all-inclusive list of categories of personnel employed by Jacobs. Should there be a need to use a category(s)of personnel additional to the categories listed above,they will be discussed with the Client at the tme their service requirements are defined and this Rate Schedule mended accordingly. JACOBS'CONTACT FOR ALL CORRESPONDENCE Please direct all correspondence to: Kevin C.Kessler,P.E. Project Manager (214)920-8106 Kevin.Kessler@Jacobs.com Jacobs Engineering Group Inc. 1999 Bryan Street,Suite 1200 Dallas,Texas 71,201 Jacobs#W FX00810.ASA03 Exhibit A-Scope of Services and Compensation June 14,')018 PM8 Ventana Developers,LLC-Ventana Master Lift Station,Force Main and Gravity System Page 8 0`a Design Procurement Agreement for Ventana Lift Station Page 19 of 22 PB Ventana I,LLC r i� yIFLr� � ff _ r _ k N ASA03 VENTANA UFT STATION EXHIBIT d VENTANA City of Fort WortK Twont County.Te�oos Jocobs Project No.WFX008M a ��oo 1000 Design Procurement Agreement for Ventana Lift Station Page 20 of 22 PB Ventana I,LLC EXHIBIT C 1.01 Duty to Acquire and Maintain. Developer shall ensure that a policy or policies of insurance are procured and maintained at all times, in full force and effect,to provide coverage of the types and amounts specified herein, naming the City as an additional insured as set forth herein, and covering all public risks related to this Agreement. The insurance required hereunder may be met by a combination of self-insurance and primary and excess policies. 1.02 Types and Amounts of Coverage Required a. Commercial General Liability: (1) $1,000,000.00 per occurrence, $2,000,000.00 aggregate, including coverage for the following: (i)Premises Liability;(ii)independent contractors;(iii) products/completed operations; (iv) personal injury; (v) contractual liability; (vi) explosion, collapse, and underground property damage b. Property Damage Liability: (1) $1,000,000.00 per occurrence C. Umbrella Policy (1) $1,000,000.00 d. Automobile Liability: (1) $1,000,000.00 Each accident on a combined single-limit basis e. Worker's Compensation: (1) As required by law f. Employer's Liability: (1) $1,000,000.00 per accident 1.03 Revisions to Required Coverage. At the reasonable recommendation of the City's Risk Manager,the City may at any time revise insurance coverage requirements and limits required by this Agreement. Company agrees that within ten (10) days of receipt of written notice from the City, all such revisions requested by the City will be implemented. The policy or policies of insurance shall be endorsed to provide that no material changes in coverage, including, but not limited to, cancellation, termination, non-renewal, or amendment, shall be made without thirty (30)days' prior written notice to the City. Design Procurement Agreement for Ventana Lift Station Page 21 of 22 PB Ventana I,LLC 1.04 Underwriters and Certificates. The insurers for all policies must be licensed and approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, prior written approval of the City's Risk Management Division is required. Within ten(10)business days following execution of this License,Developer shall ensure that City is furnished with certificates of insurance signed by the respective companies as proof that the types and amounts of insurance coverage required herein have been obtained. In addition, Developer shall, on demand,provide the City with evidence that it has maintained such coverage in full force and effect. 1.05 Deductibles. Deductible or self-insured retention limits on any line of coverage required herein shall not exceed $25,000.00 in the annual aggregate unless the limit per occurrence or per line of coverage, or aggregate is otherwise approved by the City. 1.06 No Limitation of Liability. The insurance requirements set forth in this section and any recovery by the City of any sum by reason of any insurance policy required under this License shall in no way be construed or affected to limit or in any way affect Company's liability to the City or other persons as provided by this Agreement or law. 1.07 Umbrella or Excess Liability. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 1.08 Additional Insured. The City, its officers, employees and volunteers shall be named as an Additional Insured on the Automobile and Commercial General Liability policies. 1.09 Waiver of Subro ag tion. The insurance shall include a waiver of rights of recovery (subrogation) in favor of the City of Fort Worth. 1.10 Copies of Policies and Endorsements. City shall be entitled, upon request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms,conditions,limitations, or exclusions in order to comply with the requirements of this Agreement except where policy provisions are established by law or regulations binding upon either of party or the underwriter on any such policies. 1.11 Certificate of Insurance. Developer shall submit to the City a certificate of insurance evidencing all required insurance coverage and any applicable endorsements. Design Procurement Agreement for Ventana Lift Station Page 22 of 22 PB Ventana I,LLC M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA Forr To- N COUNCIL ACTION: Approved on 8/7/2018 REFERENCE ** 60VENTANA DESIGN DATE: 8/7/2018 NO.: C-28780 LOG NAME: PROCUREMENT AGREEMENT CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Design Procurement Agreement with PB Ventana I, LLC, in the Amount of$496,500.00, with City Participation in the Amount of$327,690.00 for the Engineering Design of a Sanitary Sewer Lift Station, Force Main and Gravity Line Located Southwest of FM 2871 and Aledo Road for Future Growth in Southwest Fort Worth and for the Ventana Development(COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council authorize the execution of a Design Procurement Agreement with PB Ventana I, LLC, in the amount of$496,500.00, with City Participation in the amount of $327,690.00, for the Engineering Design of a Sanitary Sewer Lift Station, Force Main and Gravity Line located southwest of FM 2871 and Aledo Road for future growth in Southwest Fort Worth and for the Ventana Development(CPN 10 1675) DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is for the City to participate with PB Ventana I, LLC (Developer) in the engineering design cost of a sanitary sewer lift station, force main, and gravity main, to be located southwest of FM 2871 and Aledo Road. The Developer is designing and constructing the Ventana Development(Project). The Developer has retained Jacobs Engineering Group, Inc., as the engineering consultant to perform the design of the sanitary sewer lift station, force main, and gravity main needed for the Developer's Project. Staff has asked the Developer to expand the engineering scope to increase the design capacity of the proposed sanitary lift station, force main, and gravity main from 1.7 million gallons per day (MGD)to 5.0 MGD in order to provide for future growth located within the Fort Worth city limits in Southwest Fort Worth. The estimated fee for the City's portion of the engineering design, topographic survey, easement preparation, subsurface utility exploration, construction documents, and bidding services is $327,690.00. The engineering design will be reviewed through the City's Infrastructure Plan Review process. Staff concurs that the fees charged by Jacobs Engineering Group, Inc., are fair and reasonable for the work to be performed and for the expected final work product. Cost Sharing Breakdown PB Ventana I LLC, $168,810.00 Participation City of Fort Worth Participation $327,690.00 Total Engineering Design Cost $496,500.00 In additional to the amount of$327,690.00 needed for the design agreement, $25,000.00 is required for project management and real property staff cost for a total cost of$352,690.00. Upon completion of design, an M&C will be submitted to the City Council for approval of a Community Facilities Agreement with City Participation for the City's share of the construction costs. http://apps.cfwnet.org/council_packet/mc review.asp?ID=26127&councildate=8/7/2018 09/12/2018 M&C Review Page 2 of 2 This project is located in COUNCIL DISTRICT 3, Mapsco 86N, 86S, 86T, 86X, and 86W. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of Water and Sewer 2017A Bond Funds. The Water and Sewer Bond 2017A CFA Programmable Project P00001 includes an appropriation of$7,818,928.00 for the city participation on developer capital projects. After the funding of this M&C, the amount of$7,332,183.00 of the appropriation will be available to fund future individual projects TO Fund Department Account ProjectProgram Activity Budget Reference# Amount ID ID Year Chartfleld 2 FROM Fund Department Account Project Program Activity Budget Reference# ID ID Year Chartfield 2 Amount Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder(5020) Additional Information Contact: Wendy Chi-Babulal (8242) ATTACHMENTS 60Ventana Desgin Procurement Agreement MAP.pdf Ventana Lifts Station DPA Form 1295 Certificate.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=26127&councildate=8/7/2018 09/12/2018 C,-D 1 ge CERTIFICATE OF INTERESTED PARTIES FORM 1295 loft Complete Nos.l-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos_1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 12018-380562 PB Ventana 1, LLC Dallas,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 07/16/2018 being filed. City of Fort Worth Date Acknowl d 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 101675 DPA Lift Station Nature of interest 4 Name of Interested Parry City,State,Country(place of business) (check applicable) Controlling Intermediary Jacobs Engineering Dallas,TX United States X PMB Capital Investments LP Dallas,TX United States X Pincoffs, Peter Dallas,TX United States X Baird,Taylor Dallas,TX United States X 5 Check only if there is NO Interested Parry. ❑ 6 UNSWORN DECLARATION / My name is —F�`�� �.Q t�� and my date of birth is Myaddressis `ms t ,4V(S ST- (street) r(street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in dam` County, State of 7P kP 1 on the 16 11. day of SVL—,2019 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics,state.tx.us Version V1.0.6711