HomeMy WebLinkAboutContract 51310 Received Date: 9/26/2018
Received Time: 10:55 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: Harmon 38 Investments LP
Address, State,Zip Code: 275 Main Street, Suite 211,Edwards,CO, 81632
Phone&Email: 970-926-2913, steve@mckeever.us
Authorized Signatory,Title: Steve McKeever,Manager
Project Name: The Presidio at Sonoma Creek
Brief Description: Sewer
Project Location: NEC of Harmon Road and Sonoma Creek Lane
Plat Case Number: FP-18-056 Plat Name: Presidio Addition
Mapsco: Council District: 7
CFA Number: 2018-067 City Project Number: 101564
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
.THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51310
WHEREAS, Harmon 38 Investments LP, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related to
a project generally described as The Presidio at Sonoma Creek ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth,Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement;and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that once the Project has been completed and the City has
officially accepted the Improvements City must release the collateral or Developer's
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 8 of 11 CITY SECRETARY
FT. WORTH,TX
financial guarantee. Developer further acknowledges that said acceptance process
requires the Developer's contractor(s) to submit a signed affidavit of bills paid and
consent of Surety signed by its surety to ensure the contractor has paid any sub-
contractor(s) and suppliers in full. Additionally, the contractor will provide in writing
that the contractor has been paid in full by Developer for all the services provided under
this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) El. Sewer(A-1) 0. Paving(B) ❑. Storm Drain (B-1) Street Lights & Signs
(C) ❑
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section Il,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s),Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (1001/6) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 9 of 11
requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the City.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the Improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
Project or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 10 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees. Further, Developer will indemnify and hold harmless
the City for any losses, damages, costs or expenses suffered by the City or caused as a
result of said Developer's or his contractor's failure to complete the work and
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy,and in accordance with all plans and specifications.
M. Developer will further require its contractors to fully indemnify, defend and hold
harmless the City, its officers, agents and employees from all suits, actions or claims of
any character, whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property, resulting from
or in connection with the construction, design, performance or completion of any work,
or on account of any act, intentional or otherwise, neglect or misconduct of said
contractors, or their sub-contractors, officers, agents or employees. Further, Developer
will require its contractors to fully indemnify, and hold harmless the City for any
losses, damages, costs or expenses suffered by the City or caused as a result of said
contractor's, or their sub-contractors', officers' agents', or employees', failure to
complete the work and construct the improvements in a good and workmanlike
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 11 of 11
manner, free from defects, in conformance with the Policy, and in accordance with all
plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the Developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the Developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is not installing
the streetlights, inspection fees equal to four percent (4%) of the Developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 1 YEAR
i. Developer shall complete the Improvements within one (1) year, provided,
however, if construction of the Improvements has started within the one year
period,the Developer may request that the CFA be extended for one additional year
("Extension Period").
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 12 of 11
the end of one(1) year from the date of this Agreement(and any Extension Period)
the Improvements have not been completed.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same if before the expiration of one (1) year, and any Extension
Period, the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction.
Q. PROHIBITION ON BOYCOTTING ISRAEL
Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this Agreement, Developer certifies
that Developer's signature provides written verification to the City that Developer: (1) does
not boycott Israel; and(2)will not boycott Israel during the term of the Agreement.
R. IMMIGRATION AND NATIONALITY ACT
Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 13 of 11
Cost Summary Sheet
Project Name: The Presidio at Sonoma Creek
CFA No.: 2018-067 City Project No.: 101564
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developet's Cost
A. Water and Sewer Construction
1. Water Construction
2.Sewer Construction $ 49,764.40
Water and Sewer Construction Total $ 49,764.40
B. TPW Construction
1.Street $ -
2.Storm Drain $
3.Street Lights Installed by Developer $
4. Signals $
TPW Construction Cost Total $ -
Total Construction Cost (excluding the fees): $ 1
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 995.29
D. Water/Sewer Material Testing Fee (2%) $ 995.29
Sub-Total for Water Construction Fees $ 1,990.58
E. TPW Inspection Fee (4%) $ -
F. TPW Material Testing (2%) $ -
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 1.990.58
Choice
Financial Guarantee Options, choose one Amount "mark one'
Bond = 100% $ 49,764.40
Completion Agreement= 100% /Holds Plat $ 49,764.40
Cash Escrow Water/Sanitary Sewer= 125% $ 62,205.50
Cash Escrow Paving/Storm Drain =125% $ -
Letter of Credit = 125% w/2yr expiration period $ 62,205.50 1 X
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 14 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
47eHARMON 38 INVESTMENTS LP,
Jesus J.Chapa(Sep 25,,x.
a Texas limited partnership
Jesus J. Chapa
Assistant City Manager By: Harmon 38 GP LLC
Date: Sep 25,2018 Its: General Partner
Steve-MGK'e�
Recommended by: By:Steve M`K-.—, Sep 25,2018'
Name: Steve McKeever
Title: Manager
Date: Sep 25,2018
C. I.:- (Sep 25,2018)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
requirements.
Richard A.McCracken(Sep 25,2018)
Richard A. McCracken
Q Tania Searle-f f Morwles
City` ity Attorney Scarlett Morales(Sep 25,2018)
M&C No. N/A Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A F F0RT�
ATTEST: (j
—1
Jr Kc�vser
MaryJ.Kay— S`ep 26,2018) ................ LOFFICIALMary J. Kayser/Ronald AS RECORD SECRETARYCity Secretary/Assistant City Secretary WORTIi, TX
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 15 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
❑ Exhibit A:Water Improvements
CE3 Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
❑ Exhibit B: Paving Improvements
3 Paving Cost Estimate
❑ Exhibit 13-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 16 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101564
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-The Presidio at Sonoma Creek
CFA Official Release Date:02.20.2017
Page 17 of 11
f �
0
PROJECT SITE
of r'J 1
SHIER
1
N
® NARMGN .
1.5
THONPSON
C
MM ELDS
\ NAN IN
t TULIP TREE C VANLOW
1
STAGHO Ill
Q ( 4HU
I� o PERIWI
SIR
R
CLEH
V � RIMER BR 7HR ER
UCKLEBERR RAC BROOK
r P ENDER T 11M A z
/1 WA%WING f m SPINDLE TR
f IL BER PREWETT
r STAGHOR RABAPP _
3 AMPIO
FLINTWO SHAGBARK ROCK
p< DBIG LEAF J
i
UNI I MCµ A MAN INI MAN '�.BIRCH WO
BRACK
0
s
CITY PROJECT NO. 101564
SEWER PROJECT NO. 56008-0700430-101564-001380
X-25438
0
a
f
a
�i
v
a
m
0
N
m
O
t'n
O�
Q
3 VICINITY MAP
0
MAPSCO-TAR--035A
C
DUNAWAy COUNCIL DISTRICT #7
550 Bailey Avenue•Suite 400•Fort Worth,Texas 76107 THE PRESIDIO AT SONOMA CREEK &
Tel:817.335.1121
1TXREG.F-1114) HARMON ROAD
0
J
a
0 I Ill
EX-IS"SS--- --
I
hLot 1R3,Block I
I I 13.58 ACRES
(591,513 SQ.Fr.) \\ \ X
Lot 1R2,Block PROPOSED
1.15ACREs 8" SS MANN \
(50,035.94 SQ.Fi.) cc1
Z V /
PROPOSED
a 4' SSMH Lot 1R3,BlockA RES
\l
o0 �\ I (e5,e35.51 sQ.Fr.)
509 0�� PROPOSED
4' SSMH PROPOSED 4' SSMH
a a I \ CONNECT TO EXISTING
x I \ PROPOSED
g 4' SSMH SS MAIN
X PROPOSED
a 8" SS MAIN 5s
S �
o I I PROPOSED NOMA CREEK LA E LLJ •
4' SSMH
CONGRElE5N1F�CE (i�
31'weuc�u FwsE"Frrt x .
I �aFun �
, I
(�
LEGEND
1 1
a —— PROPERTY LINE 0 200 400
a,
a — — PROPOSED LOT LINES
a — — — — — PROPOSED EASEMENTS
m
8"SS PROPOSED SANITARY SCALE: 1"=200 ft.
a SEWER LINE
PROPOSED SANITARY
SEWER MANHOLE
51 EXISTING SANITARY
$� SEWER MANHOLE
3
z
EXHIBIT Al - SEWER EXHIBIT
DUNAWAY THE PRESIDIO AT
= 550 Bailey Avenue•Suite •Port Worth,Texas 76107
Tel:817.33.335.1121 S O N O M A CREEK & H A R M O N ROAD
is
Q (TX REG.F-1114) 81812018
J
d
00 42 43
DAP-BID PROPOSAL
Page 1 of 1
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value
No. No. Measure Quantity
SANITARY SEWER IMPROVEMENTS
1 0170.0100 Mobilization 01 7000 LS 1 $1,000.00 $1,000.00
2 3301.0002 Post-CCN Inspection 3301 31 LF 870 $2.00 $1,740.00
3 3301.0101 Manhole Vacuum Testing 3301 30 EA 5 $200.00 $1,000.00
4 3305.0109 Trench Safety 33 05 10 LF 870 $1.00 $870.00
5 3305.0113 Trench Water Stops 33 05 15 EA 4 $200.00 $800.00
3331.4115 8"Sewer Pipe 33 11 10,33 31 12,
6 3331 20 LF 870 $29.00 $25,230.00
7 13339.1001 4'Manhole 33 39 10,33 39 20 EA 5 $3,200.00 $16,000.00
8 3339.1003 4'Extra Depth Manhole 33 39 10 33 39 20 VF 16.6 $134.00 $2,224.40
9 19999.0001 Connect to Existing Sewer Line 00 00 00 EA 1 $900.00 $900.00
10
TOTAL $49,764.40
Bid Summary
SANITARY SEWER IMPROVEMENTS $49,764.40
Total Construction Bid $49,764.40
Contractor agrees to complete WORK for FINAL ACCEPTANCE within #days 'calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
Dunaj ay Associates, LP C17f
08/10/2018
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal DAP.xls