Loading...
HomeMy WebLinkAboutContract 47803-A1 TOP�� AMENDMENT NO. 1 TO AGREEMENT C ,�F,;p PSTANDARD AGREEMENT FOR PROFESSIONAL SERVICES COWTOWN COLISEUM HVAC REPLACEMENT STATE OF TEXAS pp CITY SECRETARY CONTRACT NO. 4- p O3- At COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Summit Consultants, Inc. (Consultant) made and entered into City Secretary Contract No. 47803 (The Contract) which was authorized by the City Council by M&C C-27697, the 3rd day of May, 2016, for existing Cowtown Coliseum to replace the HVAC Systems; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for providing an air handler air filter study to enhance the current HVAC filtering system. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the design and study of an Air Filtering System. The cost of this additional service is $3,260.00 with no additional reimbursable expenses. The scope of services is described more fully in Summit Consultants, Inc.'s Letter dated August 29, 2018, subject: "Cowtown Coliseum Air Handler Filter Study". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "B". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "B". However the total fee paid by the City shall not exceed a total of $90,860.00 including up to $600.00, unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX CFW Std.Agreement for Pro.Srvs AMENDMENT(Rev.8/16/2016) Page 1 of 2 Cowtown Coliseum HVAC Replacement—Amendment No. 1 September 2018 EXECUTED this the day of , 2018, in Fort Worth, Tarrant County, Texas. Summit Consultants, Inc. APPROVED: By: By: Mrincipal wn, P.1E. Jesus J. Chapa AssistantCity Manager APPROVAL RECOMMENDED: RECORDED: By: By: �N. C Steve Cooke, Director MaryJ. Kays �C)4 Property Management Department City Secretary 0 APPROVED AS TO FORM AND LEGALITY: M&C Not Required , . .......... . Contract Authorization By: joKn B. Str ng Assistant City Attorney CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: 1:(M, P" 06jy) Brian R. Glass, AIA Architectural Services Manager OFFICIAL RECORD CITY SECRETARY FT wORTH,TX CFW Std.Agreement for Pro.Srvs AMENDMENT(Rev.8/16/2016) Page 2 of 2 Cowtown Coliseum HVAC Replacement—Amendment No. 1 September 2018 Attachment "B" Asummit 3_v e F 1.8741 Suite 500 Facsimile 817 8788 4L Fort Worth,Texas 76102 �%wmsummitme,).ca n August 29, 2018 Alfonso Meza Registered Architect City of Fort Worth Property Management Department 401 W. 13th Street Fort Worth,Texas 76102 Attn.: Alfonso Meza Re: Cowtown Coliseum Air Handler Filter Study Summit Consultants, Inc. (Summit) is pleased to offer the following proposal.for providing an air handler air filter study for the referenced project. SCOPE OF SERVICES: BASIC SERVICES Summit will conduct an air handler air filter study to review/present several different air filter options to the City of Fort Worth in order to possibly reduce the maintenance costs of the air handler air filters at Cowtown Coliseum. The main concern is the premature clogging of the. existing air filters due to the high amount of dirt/dust present in Cowtown Coliseum that is causing the filters to be changed every week (large amount of labor and materials). The basic services excludes design/rework to the existing systems or possible future systems. Also, the basic services excludes electrical or plumbing engineering. Summit will review the existing conditions, as required, to complete the study. ADDITIONAL SERVICES(IF REQUESTED) MEP engineering design work for altering the existing system. THE CITY OF FORT WORTH WILL: Provide building and site base plans in AutoCAD 2008 or higher for use by Summit in preparation of engineering feasibility study. Provide all known existing architectural, structural, civil, and MEP drawings required in the review of the existing mechanical systems. Advise Summit of the applicable standards/requirements. Furnish copies of MEP plans of adjacentlapplicable work that was performed by other engineers. Such documents will be used only for reference. COMPENSATION FOR ENGINEERING SERVICES: Summit Consultants will be paid for Basic Services the stipulated sum of $3,260.00. design+engineering+consulting City of Fort Worth August 29, 2018 Page 2 Compensation for other Additional Services will be on the basis of direct salary cost times 2.9 plus reimbursable expenses times 1.2. Please see Exhibit A Hourly Billing Ranges for current total billing ranges for Summit personnel. The Basic Services fee payment schedule will be based upon a monthly estimate of completion of the work, not to exceed the following amounts at the specified phases of the project: PHASE AMT. DUE Air Filter Stud $3,260.00 Additional Services fees will be billed monthly based on the percentage of completion of the Additional Service. FORM OF CONTRACT: If this proposal meets with your approval, please sign where indicated and return an executed copy for our files. We deeply appreciate this opportunity to be of service and look forward to working with you on this project. Sincerely, SUMMIT CONSULTANTS, INC. 0r ` Keay MM�c44..,V21-- Leroy, P.E. Accepter) CITY OF FORT WORTH By: Title Date: Exhibit A SUMMIT CONSULTANTS, INC. Hourly Billing Ranges EMPLOYEE CLASSIFICATION BILLING RANGE LOW HIGH Principal $130.50 $182.70 Mechanical Engineer $69.60 $124.70 Electrical Engineer $72.50 $124.70 Fire Protection Engineer $110.20 $130.50 Mechanical Designer $58.00 $89.90 Electrical Designer $52.20 $98.60 Plumbing Designer $49.30 $101.50 CADD Technician $43.50 $63.80 Word Processor $39.59 $52.20