Loading...
HomeMy WebLinkAboutContract 49216-CO2 CITY SECRETARY . FORT WORTH City of Fort Worth CONTRACT NO. ` J Change Order Request Breakdown Project Namel Concrete Restoration(2017-3)At Heritage Trace Parkway City Sec#_ 49216 Client Project#(s)l 100835 Contractorl C.Green Soaping,L.P. PM Tariqul Islam Inspectorl Habte Taezaz Change Order Submittal# 0 Date 8/31/2018 Contract Time Dept. TPW Totals CD Original Contract Amount $683,055.00 $683,055.00 120 Extras to Date $38,393.40 $38,393.40 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $721,448.40 $721,448.40 120 Amount of Proposed Change Order -$20.00 -$20.00 Revised Contract Amount 721,428.40 $721,428.40 120 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0-00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.62% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $853,818.75 The purpose of this change order is to add the samples and striping that we did at 200 E.2nd St.in Downtown Fort Worth.For a small stamped concrete job in Downtown and dealing with closing lane for a week for each lane traffic control was necessary.After completing work at Heritage Trace Pkwy and per schedule requested by Sundance Square Authority contractor asked to move to Downtown to complete this small job.To compensate a remobilization cost is added to this contract.To cover all these work $16,360.00 is added to contract while 28CY of extra depth concrete($16,380.00 worth of work)is deleted to contract as it is not required.As a reasult a net change order of- $20.00($16,360-$16,380)is necessary. 0 ti 0MCIAL RE-CORD CITY SECRETARY FT.WORM,TX City of Fort worth Change Order Additions Project Name Concrete Restoration(2017-3)At Heritage Trace Parkway City Sec# 49216 Client Project# 100835 Contractor C.Green Scaping,L.P, PM Tariqul Islam Inspector Habte Taezaz Change Order Submittal# 0 Date 8/31/2018 ADDITIONS HEM DESCRIPTION DEPT ty !EA nit os oto Non e e r Buttons "Refl Ty II R O Mrkr TPW 5 .0 00 0 0 1New 4"White of Thermo tripe TPW 0 10. 0 24 New Traffic Control TP 0 DAY 0.00 5 New Concrete TPW 5.000 000 Y 5 26 New Colored concrete TPW 5.00000000 CY $400.00 7 New Multiple Remobilization TPW 1. LS $5,000.00 TPW $16,360.00 Sub Total Additions16, 6 70 Change Order Additions Page 1 of 1 FORrrH City of Fort worth Change Order Deletions Project Name Concrete Restoration(2017-3)At Heritage Trace Parkway City Sec# 49216 Client Project# 100835 Contractor C.Green Scalping,L.P. PM Tariqul Islam Inspector Habte Taezaz Change Order Submittal# 0 Date 8/31/2018 DELETIONS ITEM --- DESCRIPTION DEPT Qty Unit Unit Cost I ota Concrete HES Extra ep TPW $16,380.00 Sub Total Deletions 6, Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval 02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Projects/100835 - Concrete Restoration 2017- 3/Contractor/100835CO1ConcreteRestorationAtHeritageTraceParkwayChange Order 2d Breakdown.xlsm Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 9/25/2018 CFW Change Order Approval 02 Page 2 of 3 FORT WORTH® city ofFort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: CO-SUb02 Change Order No.: 02 Date Started: 2018-09-11 City Sec. No.: 49216 Date Due: 2018-09-21 Project Name: 100835 - Concrete Restoration 2017-3 100835 DOE Numbers: Project Numbers: Project Stamped Concrete to replace bricks along Heritage Trace Pkwy Description: Project Manager: Tariqul Islam City Inspector: Habte Taezaz Contractor: C. Green Scaping L.P. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ -20.00 Total Cost: $ -20.00 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FonnPrint.aspx?Siteld=51500&ProcessI... 9/25/2018 CFW Change Order Approval 02 Page 3 of 3 Approved: Yes Comments: User: Dana Loucks Date: 2018-09-12 7:13 AM Approved: Yes Comments: User: Tariqul Islam Date: 2018-09-12 8:54 AM Approved: Yes Comments: User: Riad Nusrallah Date: 2018-09-13 1:58 PM Approved: Yes Comments: User: Lauren Prieur Date: 2018-09-13 8:06 PM Approved: Yes Comments: FORT User: Doug Wiersig Date: 2018-09-18 6:27 PM rAOT: 0. .0IA ►—. : Approved: Yes U Comments: mafy , j{ay ei ecretary User: Doug Black Cj Date: 2018-09-19 12:18 AM AXP Approved: Yes �I1 Q c p f a� Comments: �V�Oc User: Susan Alanis Date: 2018-09-25 1:57 PM 1295.x.. A Action Required: OffiCIAL RECORD VTY SECRETARY ' WORM TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 9/25/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tariqul Islam Graduate Engineer+ Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature OFFICIAL R,=X IRD