HomeMy WebLinkAboutContract 49848-A1 o
AMENDMENT NO. 1 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
� A.D. Marshall Public Safety & Municipal Courts Building — Courtrooms Remodel
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. - t
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Arthur Weinman Architect (Consultant) made
and entered into City Secretary Contract No. 49848 (The Contract) which was
authorized administratively, the 27th day of October, 2017, for A.D. Marshall Public
Safety & Municipal Courts Building - Courtrooms Remodel; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services for/to breakdown the existing
Probable Estimated Cost of the Project to reallocate funding and include any revisions
to the Construction Documents.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional design services for the detailing and breakdown of existing
Probable Estimated Cost of the Project to reallocate funding and include any
revisions to the Construction Documents. The cost of this additional service is
$6,780.00 including $500.00 in reimbursable expenses. The scope of services is
described more fully in Arthur Weinman, Architect Letter dated August 24, 2018
and revised August 29, 2018, subject: "Municipal Courts Building, Fort Worth,
Texas, Projects A & B, AWA Projects# 17-009".
2.
Article II — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "A". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "A". However the total fee paid by the City shall not
exceed a total of $35,142.00 including $1,000.00 in reimbursable expenses
unless the City and the Consultant mutually agree upon a fee amount for
additional services and amend this Agreement accordingly."
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
CFW Std.Agreement for Prof. Services AMENDMENT(Rev. 16 Aug 2016) Page 1 of 2
A.D. Marshall PS&Municipal Crts. Bldg.—Courtrooms Remodel—Amendment No. 1 September 2018
EXECUTED this the ;7,Say of 2018,
in Fort Worth, Tarrant County, Texas.
Arthur Weinman Architect APPROVED:
By: By:
Arthur W. Weinman Jesus J. Chapa
Principal Assistant City Manager
APP L COMMENDS RECORDED:
By: � By:
teve oke, Director Mary J. K s
Property Management Department City Secretary FORT
U �
APPROVED AS TO FORM AND LEGALITY: M&C Not Re u
L Contract Authorizatio 1f`r
By: j �mv
—�; �XAS,
J&A. 9trofig
Assistant City Attorn Form1295 Certification: N/A
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring alll performance and reporting requirements.
By: &_aAA__ `�' nn
Brian R. Glass, AIA
Architectural Services Manager
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
CFW Std.Agreement for Prof. Services AMENDMENT(Rev. 16 Aug 2016) Page 2 of 2
A.D. Marshall PS&Municipal Crts. Bldg.—Courtrooms Remodel—Amendment No. 1 September 2018
A-f-tA"M6--M-f I l it
ARTHURWEINMAN
A R C H I T E C T
August 24, 2018 (Rev. August 29, 2018)
Mr. Alfonso Meza Municipal Courts Building
City of Fort Worth Fort Worth, Texas
401 West 13"' Street Projects A & B
Fort Worth, Texas 76102 AWA Project# 17-009
Dear Alfonso,
Thank you for the opportunity to present you with our proposal for Architectural services for the
Accessible Remodel of the Public Safety and Municipal Court Building at 1000 Throckmorton
Street, Fort Worth, Texas.
As we discussed services for this proposal will include conferences and revisions to Part A-
Building Access and Part B - First and Second Floor Access of the existing document sets
previously prepared by our office. Both document sets will be prepared to be issued as
separate contracts with separate funding sources, but each with two alternates that may
individually accompany either funding source. Services include revisions to both drawing sets
and written specifications for this division of work.
No additional work is required for the following project:
Part A- Building entry access ramp to 1s`floor, new lobby and foyer on north side of
building for ramp access, two new Parking Violations offices, remodel to
Courtroom #2 to create a lobby for Parking Violations accessible entry door
Construction cost estimates for the services covered by this proposal will be included. Davis /
Bacon requirements for Federal funding will be included as a cost factor by the City We will
have cost estimates broken down as follows:
Part B - Remodel of 1st floor Courtrooms#2 thru#5 and 15'floor toilet rooms#8 and #9
to meet Texas Accessibility requirements_
Alternate#1 - Remodel 2nd floor Courtroom #1 and new Court Clerks Room #2 on the
second floor to meet Texas Accessibility requirements
Alternate#2 - Remodei existing 2nd floor Women's toilet room #3 and adding two new
single fixture toilet rooms #4 and#5 to meet Texas Accessibility requirements
Architectural services for this proposal shall include a professional construction cost estimator.
Architectural services for this proposal shall not include Structural Engineering, M.E.P.
Engineering, or a Registered Accessibility consultant. Architectural services shall include
coordination of all required professional services.
3717 Stoney Creek Road. Fort Worth.Texas 76116
817-737-0977 cell-817-319-9081
w•ww.weinmanarchitecis.com
Prior signed City of Fort Worth Contracts for this project covering consultant services including
Accessibility inspection services, Construction Administration Services and so forth shall remain
in effect
The value of this proposal is based on a flat fee, excluding reimbursable expenses, for
Architectutat services as itemized above:
Modification of prepared design documents for 1'`floor exterior building access, Traffic
offices, Courtroom #2-5 and Toilet Room accessibility; and for 2"d floor Courtroom #1
accessibility, Court Clerks #2 accessibility and three Toilet Room accessibility design
services; and for preparation of professional cost estimation services:
Architectural $ 3,880.00
Estimated Reimbursable Expenses 500.00
$ 4,380.00
Professional Cost Estimator $ 2,400.00
Total Professional Services $ 6,780.00
This proposal is good for 60 days from the above date. If you decide to proceed after that
date we reserve the right to review our fees at that time.
Time will be billed on a monthly basis or at the completion of the drawings. Payment of all
invoices will be due upon receipt of invoice. Payment not received within thirty days of invoice
date shall bear interest at the rate prevailing at the principal place of business of the Architect.
Our Hourly rates for additional services beyond those contracted would include the following
personnel rates:
Principal $180.00 per hour
Project Architect $140.00 per hour
Senior Project Manager $105.00 per hour
Project Manager $ 90.00 per hour
Senior Draftsman $ 70.00 per hour
Draftsman $ 55.00 per hour
Reimbursable expenses, reimbursable with fifteen percent (15%) handling and carrying
charges, shall include the following items:
Professional consultants not included above.
Printing
Rendering or model production costs
1_ong distance travel, meats, hotel, auto rental
Auto travel at $0.55 per mile
Express Mail, Federal Express, or other local and
long distance courier services
Please review the attached General Conditions of the Proposal for further information
regarding this proposal. I appreciate the opportunity to assist you with this project. If this
proposal is acceptable it may be regarded as an Addendum to the contracts already signed for
this project. Please prepare your suitable contract or addendum form for this addition to the
2
contract for our examination and signature to allow requested services in this proposal to
proceed immediately.
If you have any questions please do not hesitate to contact me.
Sincerely,
fA
Arthur W, Weinman, A.I.A.
AWW:ew
attachment
3
Riddle & Goodnight Inc.
Construction Cost Estimates/Construction Specifications + ,�
PROPOSAL V
Date: August 23, 2018 Z
Attn: Arthur Weinman Architect 61
3717 Stoney Creek Road
Fort Worth, Texas 76116
Project: City of Fort Worth Municipal Courtroom Remodel, Project Breakdown and Separation
for Funding
Service Description:
Provide opinion of probable cost
Estimate 20 hrs $120/hr $2,400
We base our work on the previous*estimate, and your revised Drawings for the purposes of reallocating
funding for the project from various sources. (three separate estimates).
The terms and conditions set forth in this quote and attached terms and conditions(if any)for
professional services constitute the agreement between Riddle&Goodnight Inc. and the undersigned
party requesting service. We also understand time is of the essence on this project, and will strive to
meet your deadlines.
Payment Terms:Within 30 days foftowing date of invoice.
1 tJ 4f��- —
Signature: Riddle&Goodnight Date: August 23, 2018
Date:
Signature: Purchaser of Professional Service
Printed Name and Title
1155 Mary Drive www.ddd"oodnight.com Phone 817.946.7825
Weatherford,TX 76085