Loading...
HomeMy WebLinkAboutContract 49848-A1 o AMENDMENT NO. 1 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES � A.D. Marshall Public Safety & Municipal Courts Building — Courtrooms Remodel STATE OF TEXAS CITY SECRETARY CONTRACT NO. - t COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Arthur Weinman Architect (Consultant) made and entered into City Secretary Contract No. 49848 (The Contract) which was authorized administratively, the 27th day of October, 2017, for A.D. Marshall Public Safety & Municipal Courts Building - Courtrooms Remodel; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for/to breakdown the existing Probable Estimated Cost of the Project to reallocate funding and include any revisions to the Construction Documents. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the detailing and breakdown of existing Probable Estimated Cost of the Project to reallocate funding and include any revisions to the Construction Documents. The cost of this additional service is $6,780.00 including $500.00 in reimbursable expenses. The scope of services is described more fully in Arthur Weinman, Architect Letter dated August 24, 2018 and revised August 29, 2018, subject: "Municipal Courts Building, Fort Worth, Texas, Projects A & B, AWA Projects# 17-009". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However the total fee paid by the City shall not exceed a total of $35,142.00 including $1,000.00 in reimbursable expenses unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX CFW Std.Agreement for Prof. Services AMENDMENT(Rev. 16 Aug 2016) Page 1 of 2 A.D. Marshall PS&Municipal Crts. Bldg.—Courtrooms Remodel—Amendment No. 1 September 2018 EXECUTED this the ;7,Say of 2018, in Fort Worth, Tarrant County, Texas. Arthur Weinman Architect APPROVED: By: By: Arthur W. Weinman Jesus J. Chapa Principal Assistant City Manager APP L COMMENDS RECORDED: By: � By: teve oke, Director Mary J. K s Property Management Department City Secretary FORT U � APPROVED AS TO FORM AND LEGALITY: M&C Not Re u L Contract Authorizatio 1f`r By: j �mv —�; �XAS, J&A. 9trofig Assistant City Attorn Form1295 Certification: N/A CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring alll performance and reporting requirements. By: &_aAA__ `�' nn Brian R. Glass, AIA Architectural Services Manager OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX CFW Std.Agreement for Prof. Services AMENDMENT(Rev. 16 Aug 2016) Page 2 of 2 A.D. Marshall PS&Municipal Crts. Bldg.—Courtrooms Remodel—Amendment No. 1 September 2018 A-f-tA"M6--M-f I l it ARTHURWEINMAN A R C H I T E C T August 24, 2018 (Rev. August 29, 2018) Mr. Alfonso Meza Municipal Courts Building City of Fort Worth Fort Worth, Texas 401 West 13"' Street Projects A & B Fort Worth, Texas 76102 AWA Project# 17-009 Dear Alfonso, Thank you for the opportunity to present you with our proposal for Architectural services for the Accessible Remodel of the Public Safety and Municipal Court Building at 1000 Throckmorton Street, Fort Worth, Texas. As we discussed services for this proposal will include conferences and revisions to Part A- Building Access and Part B - First and Second Floor Access of the existing document sets previously prepared by our office. Both document sets will be prepared to be issued as separate contracts with separate funding sources, but each with two alternates that may individually accompany either funding source. Services include revisions to both drawing sets and written specifications for this division of work. No additional work is required for the following project: Part A- Building entry access ramp to 1s`floor, new lobby and foyer on north side of building for ramp access, two new Parking Violations offices, remodel to Courtroom #2 to create a lobby for Parking Violations accessible entry door Construction cost estimates for the services covered by this proposal will be included. Davis / Bacon requirements for Federal funding will be included as a cost factor by the City We will have cost estimates broken down as follows: Part B - Remodel of 1st floor Courtrooms#2 thru#5 and 15'floor toilet rooms#8 and #9 to meet Texas Accessibility requirements_ Alternate#1 - Remodel 2nd floor Courtroom #1 and new Court Clerks Room #2 on the second floor to meet Texas Accessibility requirements Alternate#2 - Remodei existing 2nd floor Women's toilet room #3 and adding two new single fixture toilet rooms #4 and#5 to meet Texas Accessibility requirements Architectural services for this proposal shall include a professional construction cost estimator. Architectural services for this proposal shall not include Structural Engineering, M.E.P. Engineering, or a Registered Accessibility consultant. Architectural services shall include coordination of all required professional services. 3717 Stoney Creek Road. Fort Worth.Texas 76116 817-737-0977 cell-817-319-9081 w•ww.weinmanarchitecis.com Prior signed City of Fort Worth Contracts for this project covering consultant services including Accessibility inspection services, Construction Administration Services and so forth shall remain in effect The value of this proposal is based on a flat fee, excluding reimbursable expenses, for Architectutat services as itemized above: Modification of prepared design documents for 1'`floor exterior building access, Traffic offices, Courtroom #2-5 and Toilet Room accessibility; and for 2"d floor Courtroom #1 accessibility, Court Clerks #2 accessibility and three Toilet Room accessibility design services; and for preparation of professional cost estimation services: Architectural $ 3,880.00 Estimated Reimbursable Expenses 500.00 $ 4,380.00 Professional Cost Estimator $ 2,400.00 Total Professional Services $ 6,780.00 This proposal is good for 60 days from the above date. If you decide to proceed after that date we reserve the right to review our fees at that time. Time will be billed on a monthly basis or at the completion of the drawings. Payment of all invoices will be due upon receipt of invoice. Payment not received within thirty days of invoice date shall bear interest at the rate prevailing at the principal place of business of the Architect. Our Hourly rates for additional services beyond those contracted would include the following personnel rates: Principal $180.00 per hour Project Architect $140.00 per hour Senior Project Manager $105.00 per hour Project Manager $ 90.00 per hour Senior Draftsman $ 70.00 per hour Draftsman $ 55.00 per hour Reimbursable expenses, reimbursable with fifteen percent (15%) handling and carrying charges, shall include the following items: Professional consultants not included above. Printing Rendering or model production costs 1_ong distance travel, meats, hotel, auto rental Auto travel at $0.55 per mile Express Mail, Federal Express, or other local and long distance courier services Please review the attached General Conditions of the Proposal for further information regarding this proposal. I appreciate the opportunity to assist you with this project. If this proposal is acceptable it may be regarded as an Addendum to the contracts already signed for this project. Please prepare your suitable contract or addendum form for this addition to the 2 contract for our examination and signature to allow requested services in this proposal to proceed immediately. If you have any questions please do not hesitate to contact me. Sincerely, fA Arthur W, Weinman, A.I.A. AWW:ew attachment 3 Riddle & Goodnight Inc. Construction Cost Estimates/Construction Specifications + ,� PROPOSAL V Date: August 23, 2018 Z Attn: Arthur Weinman Architect 61 3717 Stoney Creek Road Fort Worth, Texas 76116 Project: City of Fort Worth Municipal Courtroom Remodel, Project Breakdown and Separation for Funding Service Description: Provide opinion of probable cost Estimate 20 hrs $120/hr $2,400 We base our work on the previous*estimate, and your revised Drawings for the purposes of reallocating funding for the project from various sources. (three separate estimates). The terms and conditions set forth in this quote and attached terms and conditions(if any)for professional services constitute the agreement between Riddle&Goodnight Inc. and the undersigned party requesting service. We also understand time is of the essence on this project, and will strive to meet your deadlines. Payment Terms:Within 30 days foftowing date of invoice. 1 tJ 4f��- — Signature: Riddle&Goodnight Date: August 23, 2018 Date: Signature: Purchaser of Professional Service Printed Name and Title 1155 Mary Drive www.ddd"oodnight.com Phone 817.946.7825 Weatherford,TX 76085