Loading...
HomeMy WebLinkAboutContract 51322 Received Date: 10/03/2018 Received Time:7:50 a.m. Developer and Project Information Cover Sheet: Developer Company Name: Forestar(USA)Real Estate Group,Inc Address, State,Zip Code: 14755 Preston Rd., Ste 130 Phone&Email: 972-341-2906,mattjohnson@forestargroup.com Authorized Signatory, Title: Thomas H.Burleson,Executive Vice President Project Name: Trails of Elizabeth Creek Phase 1 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: 42.482 acres out of the Charles Ty dings Survey,Abstract No. 1276 Plat Case Number: FP-17-028 Plat Name: Trails of Elizabeth Creek Mapsco: 641R Council District: 7 CFA Number: 2017-107 City Project Number: 101126 It# City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51322 WHEREAS,Forestar(USA)Real Estate Group,Inc.,("Developer"),desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Trails of Elizabeth Creek Phase 1 ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement;and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas -- Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase I CFA Official Release Date:02.20.2017 OFFICIAL RECORD Page 2 of 11 CITY SECRETARY FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) Lia_ Sewer(A-1) ®_ Paving(B) El. Storm Drain(B-1) ®, Street Lights & Signs (C) , E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s),Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (1001/o) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Trails of Elizabeth Creek Phase I CFA No.: 2017-107 City Project No.: 101 126 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 902,768.70 2.Sewer Construction $ 1,108,918.38 Water and Sewer Construction Total $ 2,011,687.08 B. TPW Construction 1.Street $ 1,660,939.50 2.Storm Drain $ 1,017,692.50 3.Street Lights Installed by Developer $ 162,264.90 4. Signals $ - TPW Construction Cost Total $ 2,840,896.90 Total Construction Cost(excluding the fees): $ 4,852,583.98 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 40,233.74 D. Water/Sewer Material Testing Fee(2%) $ 40,233.74 Sub-Total for Water Construction Fees $ 80,467.48 E. TPW Inspection Fee(4%) $ 107,145.28 F. TPW Material Testing(2%) $ 53,572.64 G. Street Light Inspsection Cost $ 6,490.60 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 167,208.52 Total Construction Fees: $ 247,676.00 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 4,852,583.98 x Completion Agreement=100%/Holds Plat $ 4,852,583.98 Cash Escrow Water/Sanitary Sewer-125% $ 2,514,608.85 Cash Escrow Paving/Storm Drain=125% $ 3,551,121.13 Letter of Credit=125%w/2yr expiration peri2d $ 6,065,729.98 City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Forestar(USA)Real Estate Group,Inc !? Jesus J.Chapa(Ju123,2 Jesus J. Chapa Thomas H.Burleson. Assistant Ci Manager Name: Thomas H.Burleson Date: 07/23/018 Title: Executive Vice President Date: 07/20/2018 Recommended by: Tennifer L. EzernacK Jennifer L.Ezernack(Jul 20,2018) ATTEST: (Only if required by Developer) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Department Signature Name: Approved as to Form &Legality: Richard A.McCracken(Jul 23,2J_- Contract Compliance Manager: Richard A. McCracken Assistant City Attorney By signing, I acknowledge that I am the M&C No. person responsible for the monitoring and Date: 07/23/2018 administration of this contract, including ensuring all performance and reporting Form 1295: ORT requirements. ATTEST: ►�—; 2 ' Mary J. Kayser ♦c ' Name: Janie Morales Mary J�KaMr(Aug27,2018) Title: Development Manager Mary J. Kayser/Ronald City Secretary/Assistant CitySecretary OFFICIAL RiECOR® CITY SECRETARY City of Fort Worth,Texas FT.WORTH,TX Standard Community Facilities Agreement-Trails of Elizabeth Creek 6se CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements Exhibit B: Paving Improvements Exhibit B-1: Storm Drain Improvements Exhibit C: Street Lights and Signs Improvements Final Construction Costs (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 101126 None City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 Page 11 of 11 x CN 0 N wv,to n xV) oz� O W uwm as �3z -- V ^�_ o(L F� o 0 Z o Ki II y w U Z OQO CL J� a a Q � Z WU Q (D � _) 00 Z UC) � Z QZ) O U •6 1�. � z (-) o W F--- 0c) 0� O noisser 'Uospino0 'Ad 6L:l LIOZ/Ol/Ol '6Mp•;iq!gx3 VJO\y3:)\l esc4d\sllgi4x3 9ZL\00V3 00L\0069NXdM\0069NXdM\0lS\:I •r�•0•a•d•a 6106L-*LOZ If•3•3 ILLJ x 'd'l '3100—�1MM13W CN 0 z O ® � ® �/ 0 lIM «9 F v W !-�o U ►- N w!tO.CO l lM Z ® a yI LO N « " r N r r W O NV) �x w N 3 n 3- o �, x0 Zi ZPH N I� O I W V Joao COD Lu 0 0 3 X O I 0 p• \ + �--� (, n o O LaJ i J 0 p N n o �d z LLI IL it F- L) U \ • O� o W o z LL �� ro zOvi ♦ \ O ,`W e \ ® \ W WW F '�l► FO U I n mss \ o s2 FJWa Z o jZ z L)w� 0DI d6y �zitcn FJOLU I " I ti�yJ z it aLU�a a. 0 N N ® �by * �O Q O ~ Cl SS02i 9NILI`dH0 9-1M U «g + Q o ® e ~ ZI + e o n (n W m 0 ^ 0 Y O Q> + F > X w Z W 0 r< y� VI g N N i O^ 2 W SS`dd NOGIV 8 O cy) O V_ n e J Do o y 3 e O J n 00 3 n I I I I IOC) n � ROD e N e I o f .e z E)::E):: I I o z N " Z O „ N I w n m Q Q w w �' a z N e 3 J J Q F z J wpp a' > = W J < r h " N N� �(y30NbH0 £�M a a z 0 U- a- 0 a Q w w W U- 3 (9 !i 0 O O O 000 c9 a a a f2 F != F X X X a a a w w W oolsser 'uospiAo0 'Md Wt 9lOZ/6/Z '6MP'llgl4x3 Vd3\V30\l -o4d\sllQ!4x3 9ZL\OOVO 00L\0069NXAM\0069NXdM\61S\:l x O W N w CO o Nto wn I I X X W I� N r- >.06,�!• 1 1 1 W a O Z I I I Q � �I 0 0 v �pd I _ Hwy 3w Y, n W0 U neo Z LY LL.a � I I I I I n T .� U- 71 T7ri O 1 3 i // N Z i N = J i 3 QD W N U 17 00 r co i M100 i�15' -'OD i N I co � Op e r, W \ 3 J oo00 w _ LLJ 00 ' _ = U O I �i N N W _m cylX 00 co r /�'; z w l 3 l i I I =o0 II I'I I i m ri �I I /I Wn I it I I I NDi�i� WNd wH I 'U � Imhwli CL C3 - Q U d' Was to WLa�N Z w I I I Ngo I I I V' mNm� ��/I G W LLQ Z h/ - 0402ll II O�Q p Z W < ~ C�>9 RII d W=� J J Q U J Q f Z�cn W W W w > UJH Q Q C'_ �O W 2 r i i Z vi 3 cD !� a Q Q CE 3 c5 !� r— L-1 w w w �` ;�i • �� i QwWa 0 0 0 cn z z z cn H H F zlz m w w - x x x k \� l I I I d d d J W W W no!eeer 'uoeP1Ao0 'Wd 9*4 9!OZ/6/Z '6MP'3lQ14x3 tld0\tld0\l 9eo4d\ei!4!4X3 9ZL\CM COL\U069NXAM\0069NXdM\cns\:l •r�•a•a•d•a 6Lo6t—*LOZ �f•3•3 Z dl '3100—.13A13H0W 7 _ z-_ _ - J wO� CIJ N 3 a `'' tI ® n 00 a n a a r M N N N wa Y o p OZF L� W <o co I ZL`3L.' LLI 6 tb m � o, � o a z J E" y n LD G� n `\ J `"Y \kF- o n cn z Ix ZI I LU v- J W Li Q Q • U Q F- U) DD N a a d O W m 5IX W (n X 0 ~o a w Z n n � X0 40 qq qq pp o O S d 0 IV -/ t U o a W ^ n W H ODW I Z I } O I Z o I o 3 N 3 I J �� � n® a = Z�W I °' pplJ I � � I�O n® W NOO d IZ a LY n Z W O a o w d IN n J O Q Z 3 W Ex a G �v� W w r w W vi C' >- UJ o•. I Z=� W � � rW —�� Z~w J -= a o w I n f q N U !� Q Q Z Z x Z U) N Q Q d 0 C', OCH p p z W a fU) LL% C9 U' O 00 Z z N *Z Z 0 0 D V) F- OC OC X X !E CL d W W J uo!eeer 'uosp!nu0 '►Nd 1't:l LLOZ/OL/OL '6Mp•;!q!4x3 Vd0\YA0\L eso4d\s;!q!4x3 BZL\00VO OOL\0069NX3M\0069NXdM\OlS\:! I 1 1 r~ II ;� z_ F"' o S i J d vj wfOCO Ld 0 I 11 i i N r r-a x V) d+ I I I r N r c9 z ��rri). � �I �1 W _Z�cd O W Q�i $%4 pd. / I Z � U�900 ZN i` Ld �wd, it it U w U X V �3�o 0 a 1 I I / 1 F I l I I / LL J — O r / N W / / Q U W I _ �R Z / Q J I Z m J f`. Z = U 0 i V) ' J N I LLI co W W W / Z i Q N Z Win / J Z W Li / d J W J Z % L Z m // �-it / J 02 J 1 = co r w T 1 co � /// J F- Q Q' z Z Z W N- Q-Q / i ;/i ¢ Q w m < J J LJ J _Z W_ W. Q m I /%�/ Z ~ F- m m m ! J- J% ZW 1 Q l�� J O W m O!N .J Z_ Z � Z R OD W c ! / Z / U) _j / r / 1 // I 1 W� ao W 0 1 Z N'= WV on,no Na. ci voc�io '�'i W O a °rNC4,2 O Q Z 3 UJ /W-J-i / F- Z cu 3 JWJJJ W v) W 00� (' N �o» W=� W J W ZHN Jam = � � w \ / OJH z z ~ = O 1 j I V H cn M Z Z CC Z N Q a 0. 1OJH 0 p (n M \ l 1 l Z W W WLL- C� C7 O I 1 N fn V) U z N a s F F 0 0 N fn It xx a s W W J o0198ep 'uoepino0 'Wd Z£.Z 81OZ/8/l '6Mp•;lgl4x3 yd3\VJO\L aeo4d\iqlgl4x3 8ZL\(Icwi COL\0089N)UM\0089NX4M\cnsV .. 0 \.. r e - •II�.�%0.'iiio�=�`5,,• is��sl • 14 "AIN -��`` ,•`��.� 'iii \1` :. , 16••12��, i • ` \ 4 vtpFr �:RiNii a����ii�i�1 i i�i�i�1 ����y��� �!�1.�.��1■iC.��♦�` \� 's .i � •ro•a•a•d•a 6Lo6L—*Loz #•o•o x d� '3103-AM-13How 0 0 Wpm 3 ® ul _ n O z ODM oz W p-1 s. �W •r w �,v0iw C W u<mwaro - Goa N '� a n�O U a z it JZ W0 i,�, M . .,i C7 W F- a !• _j \\\ `l Y a WI0 F- F- ~ a inz "\ � Z �coW \ ~ _ = Y \ > m rn ' Z W X ' W i ' W I � \ / \\ N W 0 \\ \ LL o Z Z \\ \\ h /JaQ zZ\ / fn F- a W W I I o \\ I =Wm Z \ \\ o 3 Q W `�S I �a W I I Z J W 0LLJ o- I 0 m i— \\ i 0 Z i I ZI W LLI Q I J i ~ W o m ,r I W W�' Z Z zI 3> , , gg ao 1 0 1 a `•\ =Y a v~i +IaI 3a Y m W II II i' 0mi— O� ♦♦♦ W I Z. ♦� 00 W \� Q N I I ,� > \\ a I � — \\ o ` 210 SS0210 ONINVHO -' ---- i✓ O N ^ I p y I � i Z oo!ssor 'uosp!noo 'Wd GM MZAA '15MP'3!Q!4x3 dd0\tld0\l 8804d\sl!Q!4x3 BZL\am ooL\00 \Q1S\:i 'r0•a•a•d'a 6 106L—i l0a #'3.3 'd'l '3100—AMB)IOW CN ® � ® � Nl MNONG - rA Iuinto 0 � ~ N w 3 a En N L` wa I �o� m O w V aD I n W ;;�o? dO dJ A n z A tb +1s�,d� N © U n 0 a 0 L` IN \ o N Y N n O' 0 01 IK o p o W Z_ -_ U Q m n HOZ =m 0 dao O N + �G0 J N X J LSI J 80 M O Z +`�� "� ?W 0 X ,A o O xi 808 XX.9 as SSONO DNR n � I 0 0 r N p � G x pt o n ik p m n 0 r N N N N N RCf I d NOdI`dW p X p tkl I I - an o o I I = co M pb p n n o o Q z ui p Z X 01 "® W z J I J n �j I • L� (' Q Z z 3 n cn I J m 0 C-) n Ir r N 0 W Z m 7 m F- J Q m O N N Z F- a I h J W W W N LL. N N N N ' a a a F V ) M Z O O O N ~ © N n o n m m m w Z ooleeep 'uoswoa 'WV SL:L 9LOZ/9Z/L '6MP'3!gl4x3 V30\VAO\L eso4d\83!4!4x3 9LL\aw 00/\0069NXdM\06.69NXdM\d1S\t1 'r3'a'a'd'a 6LOBL—*LOZ f'0'0 xi 'd'1 '3100—,k3A 13H3W N O ® NI RNONG W o ® U N w LO i COca o ° W Vn3 O N o A ® o o a U nom= Z © 0_ 3 O \ n = I N �(v o \• 0 \ N ti in m o \ 0 n © y LLI \ o L �m w w n q ® N N n ® 10J 80 SS080 ON18VHO P N J I0 0 N n • '° �° H x � n O � O O R o N p a o SSVd N00I`d aChI o LLIJ n o 0 N O p o 0 0 U J J n N r • n® w N H J I • J N w U 3 n Q n Z O n N Z N W- m o N N OLL.o O N O O N 0_ !— ♦ n N N X w x w 0_ J O N Z O 0 "� • n o n ~ O Z oo!eeer 'uoePlAoO 'Mid 9L:L LLOZ/O!/OL '6MP•3!9!4x3 Vd0\Vd3\L eeo4d\93!414X3 9ZL\CIM OOL\0069NXdM\0069NXAM\OlS\:! •r�•0•a•d•a 6106L-*LOZ #•3'3 x d'1 '3103—kiAlNom [� N O e ® � NI 31NO88 v � � w W o N W ® w M rWr� � O 0 F� FT•jZ m O W0- - Q�tn r� \ e o W ^3w o DCD " W r'�.�0 LJ z W CLit 0 Owl • \ O C O Q n \ O O Z r o o L) H m moo- w= w Li a� w X n 25L dm w D r a ® O g W J U) �O 80 SSOHO 0 l8VHO " " LL J ^ 0 W °x' U d � o n / � Z O q � o W � SSdd NOGWN p Z � � o n " " O N ^ Z O O J � ^ W " " 3 0 Q X O ® I o m ~ O I "® g a '� Z C.D U' r� y�j • li m O W O Z Z J W O m N 2 of o a 3 3 Z0 �m w WLn o o a 0 Li 02 W W N� w � o 0 m W Y Yw I " m m z w "' N �(�30NbN0 J C 43 w w Z Z w a a Z �j Q O_ D_ W W Y Fn a �43 Li \ 0_ w WZ = W W �i 3 EE m 3 An 3 oo!sser 'uoep!nD0 'YVd 9L:L LLOZ/OL/OL '6Mp•}!q!4x3 yj0\yj0\L eso4d\$3!q!4x3 9ZL\OM DOL\0069N)UM\0069NXJM\OlS\:I ao ax a1 OM-Bm PROWSAL Ap 1�3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek Phase 1 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No. Description specification Unit of Measure Bid Quantity Unit Price Bid Value Section No. 1 3305.0109 Trench Safety 330510 LF 15,630 $0.10 $1,563.00 2 3311.0141 6'Water Pipe 3211 10,33 11 12 LF 5 $30.00 $150.00 3 3311.0241 8"Water Pipe 3311 10,3311 12 LF 9,049 $23.10 $209,031.90 4 3311.0441 17'Water Pipe 3311 10,33 11 12 LF 5,918 $40.00 $236,720.00 5 3311.0541 16'Water Pipe 3311 10,33 11 12 LF 663 $58.00 $38,454.00 6 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 9.302 $6,150.00 $57,207.30 7 3312.0001 Fire Hydrant 331240 EA 21 $3,530.00 $74,130.00 8 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 2 $700.00 $1,400.00 9 3312.2003 1"Water Service 331210 EA 156 $780.00 $121,680.00 - 10 3312.2103 112"Water Service 331210 EA 3 $1,220.00 $3,660.00 11 3312.3002 6"Gate Valve 32 12 20 EA 1 $900.00 $900.00 12 3312.3003 8"Gate Valve 331220 EA 49 $1,280.00 $62,720.00 13 3312.3005 12"Geta Valve 331220 E1 14 $2,240.00 $31,360.00 14 3312.3006 16"Gate Valve w/Vault 33 12 20 EA 2 $16,000.00 $32,000.00 15 9999.0001 Air Release Valve(12"Water Line) 000000 EA 2 $8,100.00 $16,200.00 16 9999.0002 7'Irrigation Sleeve 00 00 00 LF 413 $7.50 $3,097.50 17 9999.0003 4"Irrigation Sleeve 00 00 00 LF 1,190 sio.sol $12,495.00 IMP $902,768.7 1 3300.0002 Post-CCN Inspection 33 01 31 LF 14,072 $1.50 $21,108.00 2 3300.0101 Manhole Vacuum Testing 330130 LF 59 $110.00 $6,490.00 3 3305.0109 Trench Safety 330510 LF 14,072 $1.00 $14,072.00 4 3305.0112 Concrete Collar 330517 EA 23 $500.00 $11,500.00 5 3305.0116 Concrete Encasement for Utility Pipes 330510 CV 47.1 $300.00 $14,130.00 6 3331.3101 4"Saxer Service 33 31 50 EA 251 $660.00 $165,660.00 7 3331.4115 8"Sewer Pipe 3331 20 LF 8,661 $35.58 $308,158.38 8 13331.4116 8"Sewer Pipe,CSS Backfill 33 31 20 LF 680 $43.00 $29,240.00 9 3331 4201 10"Sewer Pipe 33 31 20 LF 297 $44.00 $13,068.00 t0 3331.4208 12"Sewer Pipe 33 31 20 LF 971 $52.00 $50,492.00 11 3331.4209 12"Sewer Pipe,CSS Backfill 3331 20 LF 109 $61.00 $6,649.00 12 3331.4215 15"Sewer Pipe 3331 20 LF 2,809 $59.00 $165,731.00 13 3331.4216 15"Sewer Pipe,CSS Backfill 3331 20 LF 146 $71.00 $10,366.00 14 3331.4317 24"Sewer Pipe(PS-115) 3331 20 LF 399 $161.00 $64,239.00 15 3339.0001 Epoxy Manhole Liner(Warren Coating) 333960 VF 85 $220.00 $18,700.00 16 3339.1001 4'Manhole 333910,333920 EA 50 $2,611.50 $130,575.00 17 3339.1002 4'Drop Manhole 33 3910,33 39 20 EA 1 $4,740.00 $4,740.00 19 3339.1003 4'Extra Depth Manhole 33 3910,33 39 20 VF 251 $150.00 $37,650.00 20 3339.1003 5'Extra Depth Manhole 33 39 10,33 39 20 VF 10 $230.00 $2,300.00 21 9999.0005 4'Manhole with Water Tight Hinged Cover for Unimproved Surfaces 35 39 10,33 39 20 EA 7 $3,440.00 $24,080.00 22 9999.0006 5'Drop Manhole with Water Tight Hinged Cover for Unimproved Surfaces 36 39 10,33 39 20 EA 1 $8,940.00 $8,940.00 22 9999.0007 Connect to Existing Stub 000000 EA 1 $690.00 5890.00 23 9999.0008 End&Plug 000000 EA 17 $20.00 $340.00 -- - -- -UNiTt'SANITARYx4EWQC RICNEM $1,108,918.3 CRYOPEORT, M L15 O STNO ANDARD C311 SPECanCAT10N DOCUAff1lr3-DEVF].OPER AwMDFD IR04:CT3 Pam Varim Sqaaa 47a13 lO6C Fiore 1 ao xx La aHRapoW DAP ao ax R DM-Bm PROPOSAL P-2d3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek Phase i UNIT PRICE BID Bidder's Application Project Item Information Bidder.Proposal Bidlist Item No. Description Specification Unit of Measure Bid Ouardiry Un@ Price Bid Velue Seetion No. 1 3125.0101 SWPPP x x acre 31 25 00 LS 1 $500.0 $500.00 2 3305.0109 Trench Safety 33 05 10 LF 4,727 $0.50 $2,363.50 3 3137.0102 Large Stone Riprap,dry 31 3700 SV 103 $44.00 $4,532.00 4 3339.1001 4'Manhole 33 39 10,33 39 20 EA 1 $4.000.00 $4,000.00 5 3349.0104 4'Stacked Manhole 334910 EA 5 $1,300.00- $6,500.00 6 3341.0201 21"RCP,Class III 3341 10 LF 790 $56.00 $44,240.00 7 3341.0205 24"RCP,Class III 3341 10 LF 619 $65.00 $40,235.00 8 13341.0208 2T'RCP,Class III 3341 10 LF 578 $73.00 $42,194.00 9 3341.0309 38'RCP,Class III 3341 10 LF 37 $112.0 $4,144.00 10 3341.0402 42"RCP,Class III 3241 10 LF 400 $145.00 $58,000.00 11 3341.1103 4x4 Box Culvert 3141 10 LF 962 $240.00 $230,880.00 12 3341.1201 5x3 Box Culvert 3241 10 LF 411 $260.00 $106,860.00 13 3341.1202 5x4 Box Culvert 334110 LF 423 $264.00 $120,132.00 14 3341.14027x4 Box Culvert 354110 LF 507 $416.0 $210112.00 15 3349.1002 21"Flared Headwall,i pipe 334940 FA 1 52,200.00 $2,200.00 16 3349.1003 24"Flared Headwall,1 pipe 33 49 40 FA 1 $2,300.00 $2,300.00 17 3349.5001 10'Curb Inlet 334920 EA 9 53,600.00 $32,400.00 18 3349.500215'Curb Inlet 334920 EA 6 54,900.00 $29,400.00 19 3349.500320'Curb Inlet 334920 EA 4 $6,000.00 $24,000.00 20 3349.600110'Recessed Inlet 344920 EA 5 $3,700.00 $18,500.00 21 3349.600215'Recessed Inlet 344920 EA 1 $5,000.00 $5,000.00 22 3349.7001 4'Drop Inlet 1334920 FA 1 $4,100.00 $4,100.00 23 9999.00093'Orop Inlet 334920 EA 2 53,900.0 $7,800.00 24 9999.0010 TX4'CH-FW-OHsadwall 334940 EA 1 $12,500.00 $12,500.00 25 9999.0011 Remove and Dispose Existing of 5'X3'Headwall 00 00 00 EA 1 $1.200.001 $1,200.00 28 9999.0012 Pipe Collar 1000000 EA 7 1 $400.001 $2,800.00 $1.017,692.5 CTTYOF FORT WORTH arANDARDCONSTRUCTIONSPkCTPTCAMONDOCIIIbENPS-DEVF WRAWARDEDPROIECP9 Fvm Vim S�raeEs 1,]DIS TOECFds 1..Rol BiJ FtapoW DAP r alr W srltr011 Per7r1 11ECTWN m 1213 Owakpw Answded P •PROPO/AL POW Tab of MOM 040 Phut t UNIT PRICE BID Bidder's Application Fy.tl....nn.w, rd11wl►r►rd 61dbf M1on 110. D"a"O. lir d L11wne m G-4b "Pelts v V" M 1 0241./005 ow Cane 4115 1113 SY 37 3710M 3211.0501 ru-T."nut 321129 SY .700 7s177tAS 3 3211.0m rLW.7e.W.A t121 SY 117.66 .610 1 ]211 Lia(N" 371129 7ON 3055611.p0M 1 S ]211.0100 tine 331129 7CH 212 AO 11 32/3.0101 t Caao 321313 N t ."11.40 1 mm.00117SCwo P.m1 321313 SY It Olt f127 m 1 32110301 rCam SM-A 321320 3F I7m11 UYS7S t 3213A 04 4.iu F1a1 T Y,2 321320 EA a 1 fl(imA0 to 3313 ►-t 321330 EA m simaiml MOD 115M1,1mi 311130 EA 21 1,"S.m 12 3M1 rW PY, 31!130 EA 22131.05 /3 ]661..0053 Fans11e1n119 AMI Claod Ment SY aft L" 17 7111" U 1 311600 moo 11mom U JIIt. Non YIM W. W, OM1741 311130 EA I f116.m 1S ]669.1"3 fnit1en11rtNun t7rudNow Sr.W I/ 34A1" EA 1 5340.09 is 3M1./OW Nun Ole.d!66411 Slt trar Tun 1.111 311130 EA 1 $m.00 17 3661.1003 F.11WS1.o11 Alun Ormd U." Sm.that Lae Tan •1L 311130 i Mm is 3661./005 Plr11dlhlrlt AAan OIeIPd Neuf Elt tfw14 SP11 117 311130 : tl".40 is 3661 Im3 A1w al..r ldsot Std O r i 31.130 , MOD 20 3661.10531 i1MIY Ah-Sly AWt SkL I.We 7 IRS 321130 EA t 105.05 21 32t7.m01 rtlDP-I 1W 321727 u 1.f" i st.Sm.00 22 3217 t t Pwt IKS 1773 V imsel 31.114.00 23 7. r PIw 1669 32 V23 LF Som S7451]5 21 3217. 11" 321723 EA 2 1300.00 23 mRm1J CalroaT rMe1c�0...0 050000 EA t S 966240-00 28 OMM14 Pwolwtm ft " LF ". OO.m 27 0505.0013 Tw 0b d- Mer 7.71 050000 G 1 f9i "Lm 211 ""WIS Pd. 311130 EA 26 31120.00 29 17 Tun Aar 00" EA I .m FV, 10511.001111 0040 EA 7 s2mm 71 Nm.00f11 M " 2 1 UN 3"0.00 1 2905.36%r CCIID7 RC sm so 05 33 LF 31106 S7.451 MANUS 2 3661.4002 /law TV 11.11.0-23.ud D•70 Al 31 31.605. 1492m.m 3 36613201 LID /00110 311120 EA 31 3313LM 30703.00 ! 36613301 9,.n 7Y u a,d 1 311120 EA 36 $tam. SOMS.m s 3661.139.'Wood Sm ro,S, 3311 tO EA t SIASI00 t w5 Abm Ile,C.,&.W WM0 Q-dw Pah 00, 4000 34011 ,579.116 7 0505.0021 OmAk mm 7 WTSM $ D..bb Pde v- TY111.0.25 wd D-30 mm EA 7 1 313.111.00 t 0566.0003 Pao Lftwmd TolMwnerod Sola Padelld 0500 EA t 54=Wf 11/.1113.40 UNT[WATER IIAMOVEhOWS "02.7110.70 IMT 9SEWER SVRMSAWM 51.109.911L UW 911 UNIT M.►AVM PPROYEL41IIS 1. UNY Y:STIMV LIGHTM MOMOVEMOM Tow Come-rue,ml U V CovaLrr8"mto aa/Nst"Im IN r ML ACcarWICS adrb 1711 OR- Prb/Oesrap+PlrtrtlPta19s41t Ar171111At�WIC9as9r1 105 OWL 11SMIL{r11 Q11maeMrSSwSYaW51est14/IM PSSSL019r1 16 0'V. COMIRAC7 n3M1lI M r as M Peeled 10 Ile 01rlrr O1Pis. WOOF SECT1011 Bu =onstruction, Inc. GlIco Contracting, Inc. Indepe nt Utility Constr c. Jolt urns, President Dale R.Gilreath-President Richard Wolfe,President 4Y v11muWt murir0rlscTtulrtorArultlsttsln swan....rolaaal. a�ti�ePwb Llw I�w�IJIC af11111^LW�