Loading...
HomeMy WebLinkAboutContract 50411-CO2 CITY SECRETARY CONTRACT N0.form 214" n1) CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 2 Faye t or t 1.CONTRACTOR: The Fain Group,Inc. CCSJ: 0902 48 827 2_Change Order Work Unit Sts. 23+21.97 to Ste.40+46.37 Project: DMO 2007(2007) 3.Type of Change(on federahald non-exempt projects): Minor (Major/Wor) Highway: VA 4.Describe the clwVe and the reason for the change order.When necessnry,Include County: Tarrant exceptions to this agreement. District: 02-Fort Worth See attachment W Justification(Reasons)for Change Order. Contract 50411 Number: S.New or revised pian sheetW aro attached and numbered: N/A Each signatory hambywarrants that each has the authority to execute d*Otarge order. ayd9ningO*duet'.w*4Onam*acserapautovalve vW&daa The foilatvingInformation must boprovided calms reradad"comtpentadon due eo uq and d othweapeesm .ddnlamlcha lferfmOmaerethwdaedyreat:orla„orwnynn axon Time Ext.S. 0 Days added on this C.O.: 0 ass muhofth6dmnya.Furth%themamactoraam stttattiltsateament bmade InoomdanowkhItem4andfireCarrottftvq WwsbmMbe neW An Ow mspowfwntah.w. Amt.added by this change order. $66,466.79 For TxDOT use only: THE T �4 Days participating: It Amount participating: J/p,dolled' Ame LarryFraxier Signature Typed/Printed i11M1 Pfe Wou Namelfitle RE9910IMENDED FOR EXECUTION: am /Tit Dae ame/rit Date P(APPROVED REQta APPROVAL k-4W Ivy NarkIna []APPROVED ❑REQUESTAPPROVAL AW A/1.3/10 -s(t� - ame/rit a fifite am tie Date ROVED ❑REQl1E5TAPPROVAL Dustin Blaylock/Project Engineer 05/3 1:.O.k.. J`,7-%J10 Name a ���\�\ D in Date OF 0J �.::: Engineers Seal: P� .••••••.F-r1��L •.• ly/CVT * OFFICIAL RECORD .......................* * ' • CITY SECRETARY 00 DUSTIN BLAYLOCK •••.......••• ....115500... •�� P FT.WORTH,TX 0CIO' e D Form 0/11) CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 2 Page t of t 1.CONTRACTOR The Fain Group,Inc. CCSJ: 0902 48 827 2.Change Order Work Limits:Sta. 23+21.97 to Sta.40+4637 DMO 2007(2001) Project: 3.Type of Change(on federal-aid non-exempt projects): Minor (Major/Minor) Highway: VA 4.Describe the change and the reason for the change order.When necessary,include County: Tarrant exceptions to this agreement. 02-Fort Worth District: See attachment'A"Justification(Reasons)for Change Order. Contract 50411 Number: 5.New or revised plan sheet(s)are attached and numbered: N/A Each signatory hereby warrants that each has the authority to execute this Change Order. Bysigning this change order,the contractor agrees towalveany and all The following Information must be provided claims for additional compensation due to any and all otherexpenses: additional changesfwtime,overhead and prolihorloss ofmmpensadon Time Ext.#: 0 Days added on this C.O.: R as a result of this change.Further,the contractor agrees thatthis agreement Is made in accordance with Item 4 and the Contract Exceptions should be noted in the response for 15 above. Amt.added by this change order. $66,466.79 5For TxDOT use only: THE C TRACTOR Date a I Days participating: 6y ` Amount participating: pedP inted Ame7Larry Frazier Signature Date Typed/Printed Title President Name/Title REG MMENDED FOIR-EXECUTION: am /Tit *D.,�',, Name/Title Date APPROVED REQUEST APPROVAL Name/Title Date Name/Title Date APPROVED REQUEST APPROVAL L ame/Title .Name/Ti t Date APPROVE REQUEST APPROVAL Dustin Blaylock/Project Engineer 05/30/18 Name/Title Date Name/Title Date E APPROVED Engineer's Seal: O o 0 0 0 0 0 am 0 n v m o 0 0 0 0 0 0 Z W Z v v o Ln vi o 0 w o lo rn Ln m N o o Ln �D a Z V Q ry Orn ol Zn o o t; Q' N b rh � M L V N J Ir 5 W Lu } > > Z 0 � � d V p 0 0 0 0 0 0 0 m O C Q m O O O O O O O Clo V Q O V1 In O O W O m V1 w N O O Ln ry LA OV Q N a Qi to O 10 •p V N Vi ro [T M N N N p co W W F rq C) O I1J z O o O o o O O O O vi v � o Ln 'o 'o o N rrn V C � Q V F N Z Q z a 1,1 rq a 0 0 0 0 0 0 0 0 0 0 0 L!t w F 0 0 0 0 0 0 0 0 0 lo 0 N I� J O In Ln Ln = W Z O ~ a x� LU a i J W O O O O O O O O O Qcc �• O O O O O O O O CD 0 z r LU F N O Z o () Q V B A b V1 O O O O O m O U E W m It O V1 0 0 0 0 0 U o � ton N m Ln o Ln N V IK o% co N h V1 to Q r J lL F Z = O 0 V Y V F LLO z 1-- U E W W NJ W W W MC C u a) a) y A E E L < N H m y v F o y u v v y m m 0 N d N u .J 0. 2 x x O o 3 'op G m a m m .a ✓ m O a Q C y U cn O J W O C C LU w i N c y � -2 `° a v a o o ¢ L O O m u e Q R fV [V C 'F E c C v u C = O w w 7 a O EL c u u u N o � E LL Q 2 m u W W W O m m ~ O F L N m U in n co rn RECEIVED F 1 2018 WOFFORTYMMU CaYSECRETARY h h b � zz v wLU ww >0 OZ rl rr F N N fA N N O 10 10 (J N N N rL O W W F V N a 3 0 w O z v v z O N 12 O P LLI F 10 C n n N U tA D W >> r 0 c� LL! iL Q + J y. _a O z rui z V O � Z i V U V 4 a CC r z � 3 0 0 Z > H q O z n V `o � m O cc N tA ~ N o Z O CL V v a_ i c L) F o v V) v W F Q � � m m � J u � i V C N o E v m w W F J F O m - O ¢ �c f- Approved: Comments: User: Wilma Smith �� Project Manager Signature Da e TPW Approved: Comments: 2 User: Lissette Acevedo Program Manager Signature ate TPW Approved: Comments: /- User. Ricardo Matute Sr. Capital Projects Officer Signature Date TPW Approved: Comments: (,J User: Doug Wiersig Director SignatLU Date TPW Approved: Comments: Q/ User: Doug Black q/zT 18 Sr. Assistant City Attorney Signature Date LEGAL Approved: -! Comments: User: Susan Alanis Assistant City Manager Signa ure Date CMO Approved: �+ Comments: M&C: User: Mary Kayser `Z City Secret4295; Si na ur D CSO p� Approved: U Comments: User: Gerry Powers OFFICIAL RECORD ` Inspector CITY�I:CRETARY Signature Daf x l TPW ' FT.WORTH,TX CFW Change Order Submittal COSub05 Page 1 of 1 Routing Assigned To: Wilma J Smith Due Date: 8/2/2018 Assigned By: Perla Banda Due Time: 3:57 PM Links 2 fortworthgov/Infrastructure Proiects/00705 - Six Points Urban Villages/Contractor- Fain/Change Orders/CO#2/CO#2 00705 Six Points Urban Village Streetscape.pdf fortworthgov/Infrastructure Proiects/00705 - Six Points Urban Villages/Contractor Fain/Change Orders/CO#2/Breakdown-Change Order-2.pdf Attachments(0) No Attachments have been added to this form. ' FORT WORTH. C'ty of Fort Worth -1 �•--..� Change Order Request Submittal (Change Order Breakdown Available in Links) Submittal No.: COSub05 Date Started:,8/1/2018 9111 Date Due: 9/25/2018991 Buyspeed Updated to Pay: Contractor Submitted Invoice: City Project No: 00705 Project Name: 00705 - Six Points Urban Villages Closeout Requirement: O Yes O No MBE/DBE Opportunity Required: Q Yes O No MBE/DBE Documentation Completed or Marked. O Yes O No NA Contractor: Perla Banda Description: (Limit 5000) https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 9/7/2018 FORT WORTH, City of Fort Worth Change Order Request Breakdown ProjectNamel Sic Points Urban Village Streetscape Improvements City Sec# 1 50411 Client Project#(s) 00705 Contractorl The Fain Group,Inc. PM Wilma Smith Inspectorl Gerry Powers Change Order Submittal# 0 Date 512312018 Dept. TPW Contract Time Totals (WD) Original Contract Amount $2,357,709.60 $2,357,709.60 214 Extras to Date $14,714.44 $14,714.44 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,372,424.04 $2,372,424.04 214 Amount of Proposed Change Order $66,466,79 $66,466.79 Revised Contract Amount 2,438,890.83 $2,438,890.83 214 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $66,466.79 $66,466.79 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.44% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591.) $2,947,137.00 The original contract planned for the existing meter boxes to be adjusted to grade.The City water department has requested that all water meters and boxes that need to be adjusted be replaced with new meter boxes. The original contract did not include a bid item for prep row. The majority of the ROW prep items are covered with individual bid items for removal of various existing improvements in conflict with the proposed design. The contractor has requested that the ROW preparation item be added to cover additional items that have be identified for payment such as tree removal,tree planter box removal,providing temporary access to businesses(typically ADA compliant wooden access ramps across construction in front of business entrances),as well as miscellaneous removal items not covered by individual removal items. City of Fort worth Change Order Additions Project Name Six Points Urban Village Streetscape Improvements City Sec# 50411 Client Project# 00705 Contractorl The Fain Group,Inc. PM Wilma Smith Inspector Gerry Powers Change Order Submittal# 0 Date 5/23/2018 ADDITIONS Qty Unit Unit Cost Total Water Meter Box Replacement one 2 177"Water Meter Box Replacement(Plastic) TPW 14.00000000 EA 892.45 3 Prep R W TPW 17.00000000 STA 1,250.00 4 Conic Curb&Gutter(TY II) TPW 2,490.00000000 LF 26.50 5 Remove and Install Meter TPW 5.00000000 EA 785.00 6 Remove Existing Water Meter TPW 6.00000000 EA 750.00 7 Cut and Plug Existing Water Line(2"-12") TPW &00000000 EA $500.00 8 %Bond TPW 1.00000000 LS $658.09 TPW $126,226.79 Sub Total Additions $126,226.79 Change Order Additions Page 2 of 4 Foa'WORTTH City of Fort Worth Change Order Deletions Project Name Six Points Urban Village Streetscape Improvements CitySec# 50411 Client Project# 00705 Contractor The Fain Group,Inc. PM Wiima Smith Inspector Gerry Powers Change Order Submittal# 0 Date 5/2312018 DELETIONS City Unit Unit Cost I ota one Curb(Ty 5 ,7 . TPW $59,760.00 Sub Total Deletions 59,76.00 Change Order Deletions Page 3 of 4 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Wilma Smith / -J'�— Name of Employee/Signature Project Manager Title This form is N/A as No City Funds are associated with this Contract Printed Name Signature