COMMUNITY FACILITIES AGREEMENT
WITH CITY PARTICIPATION
Developer Company Name: Northbrook 820,LLC
Address,State,Zip Code: P O BOX 93898,Southlake,Texas,76092
Phone&Email: 817-791-7301,wes(&,wilson-stonaker.com
Authorized Signatory,Title: William Stonaker,Manager
Project Name: Northbrook Water/Sewer
Brief Description: Water, Sewer
Project Location: NEC of Loop 820 and Blue Mound Rd.
Plat Case Number: FS-17-098 Plat Name: Russell L.Lee Addition
Mapsco: Council District: 2 City Project Number: 101344
CFA Number: 2017-203
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 1 of 13
COMMUNITY FACILITIES AGREEMENT
WITH CITY PARTICIPATION
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51362
WHEREAS, Northbrook 820, LLC , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Northbrook Water/Sewer("Project") within the City
of Fort Worth, Texas("City"); and
WHEREAS, the City has reviewed the proposed Improvements and desires to have
the Developer oversize the proposed Improvements to provide capacity for future
development in the area("Oversized Improvements"); and
WHEREAS,the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or"Agreement") in connection with the collective Improvements for the
Project; and
WHEREAS,the City has reviewed the Project and desires to participate in the Project
in accordance with this Agreement as presented by the Cost Summary Table and Exhibits
attached hereto; and
WHEREAS, The City's cost participation shall be in an amount not to exceed
$96,703.32 ("Participation"); and
WHEREAS,the City has requested the Developer to cause,and the Developer agrees
to cause,the design,permitting and construction of the Project for which the City will,subject
to City Council approval, reimburse the Developer for the City's portion of those costs after
City's final acceptance of the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim.Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/ ICiIAL RECORD
CFA Official Release Date:01.22.2017
Page 2 of 13 CITY SECRETARY
FT.WORTH,TX
B. Developer shall provide financial security in conformance with paragraph 6, Section II,of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's
contractor(s) to submit a signed affidavit of bills paid signed by its contractor and
consent of surety signed by its surety to ensure the contractor has paid any sub-
contractor(s)and suppliers in full. Additionally,the contractor will provide in writing
that the contractor has been paid in full by Developer for all the services provided
under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans,specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) E. Sewer (A-1) Z, Paving (B) El- Storm Drain (B-1) E1, Street Lights &
Signs (C) ❑.
E. The Developer shall award all contracts for the construction of community facilities in
accordance with Section II,paragraph 7 of the Policy and the contracts for the construction
of the public infrastructure shall be administered in conformance with paragraph 8,
Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current
City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s),Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To.require its contractor to furnish to the City a payment and performance bond
in the names of the City and the Developer for one hundred percent(100%)of
the contract price of the infrastructure, and a maintenance bond in the name of
the City for one hundred percent (100%) of the contract price of the
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 3 of 13
infrastructure for a period of two (2) years from the date of final acceptance
insuring the maintenance and repair of the constructed infrastructure during the
term of the maintenance bond. All bonds to be furnished before work- is
commenced and to meet the requirements of Chapter 2253,Texas Government
Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance(ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in
the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction
to be subject to inspection at any and all times by City inspection forces,to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the
City.
V. To require its contractor to have fully executed contract documents submitted
to the City to schedule a Pre-Construction Meeting. The submittal should occur
no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide,at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the Improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 4 of 13
I. City shall not be responsible for payment of any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereundt-r. City will be responsible for the costs of utility relocation
necessitated by the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,fully
indemnify,hold harmless and defend the City,its officers,agents and employees from all
suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries(including death)or damages sustained by any persons or to any
property, resulting from or in connection with the construction, design,performance or
completion of any work to be performed by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any failure to
properly safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said Developer, its contractors, sub-contractors, officers, agents or
employees.
M. The Developer will further require its contractors to indemnify, defend and hold
harmless the City,its officers,agents and employees from and against any and all claims,
suits or causes of action of any nature whatsoever, whether real or asserted, brought for
or on account of any injuries or damages to persons or property, including death,
resulting from or in any way connected with the construction of the infrastructure
contemplated herein, whether or not such iniuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further,Developer will require its contractors to indemnify and
hold harmless the City for any losses, damages, costs or expenses suffered by the City or
caused as a result of said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner,free from defects, in conformance
with the Policy, and in accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 5of13
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by
the contractor, whether express or implied. Further, Developer agrees that all contracts
with any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further apportioned in the
Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%)for a total of 4%of the Developer's share
of the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent(4%)and material testing fees equal to two percent(2%)for a total
of 6% of the Developer's share of the total construction cost as stated in the
construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in this
Agreement shall terminate if the Improvements are not completed within two
(2) years; provided, however, if construction of the Improvements has started
within the two year period,the Developer may request that the CFA be extended
for one (1) additional year. If the Improvements are not completed within such
extension period, there will be no further obligation of the City to participate.
City participation in this CFA shall be subject to the annual availability of City
funds as approved by the City Council.
ii. Subject to paragraph i,above,the City shall reimburse Developer for the City's
costs upon presentation of proper documentation of completion of installation
of the Oversized Improvements.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 6of13
iii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement
with its contractor or other related agreements.
iv. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if
at the end of two (2)years from the date of this Agreement(and any extension
period)the Improvements have not been completed and accepted.
V. The City may utilize the Developer's financial guarantee to cause the payment
of costs for construction of the Improvements before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails to
pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of supplies
and/or construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1)
does not boycott Israel; and (2) will not boycott Israel during the term of the contract.
The terms "boycott Israel" and "company" shall have the meanings ascribed to those
terms in Section 808.001 of the Texas Government Code. By signing this contract,
Developer certifies that Developer's signature provides written verification to the City
that Developer: (1)does not boycott Israel;and(2)will not boycott Israel during the term
of the contract.
R. IMMIGRATION AND NATIONALITY ACT
Developer shall verify the identity and employment eligibility of its employees who
perform work under this Agreement, including completing the Employment Eligibility
Verification Form(I-9). Upon request by City, Developer shall provide City with copies
of all I-9 forms and supporting eligibility documentation for each employee who
performs work under this Agreement. Developer shall adhere to all Federal and State
laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such
services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 7 of 13
FROM ANY PENALTIES,LIABILITIES,OR LOSSES DUE TO VIOLATIONS OF
THIS PARAGRAPH BY DEVELOPER,DEVELOPER'S EMPLOYEES,
SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to
Developer, shall have the right to immediately terminate this Agreement for violations of
this provision by Developer.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 8 of 13
Cost Summary Sheet
Project Name: Northbrook Water/Sewer
CFA No.: 2017-203 City Project No.: 101344
Items Developer's Cost City's Cost Total Cost
A. Water and Sewer Construction
1. Water Construction $ 205,936.06 $ 79,601.44 $ 285,537.50
2.Sewer Construction $ 248,795.00 $ - $ 248,795.00
Contingency 15% $ 11,940.22 $ 11,940.22
Water and Sewer Construction Total $ 454,731.06 $ 91,541.66 $ 546,272.72
B. TPW Construction
1.Street $ - $ - $ -
2.Storm Drain $ - $ - $
3.Street Lights Installed by Developer $ - $ - $
4. Signals $ - $ - $
TPW Construction Cost Total $ - $ - $ -
Total Construction Cost(excluding the fees): $ 454,731.06 $ 91,541.66 $ 546,272.72
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 9,094.62 $ 1,830.83 $ 10,925.45
D. Water/Sewer Material Testing Fee(2%) $ 9,094.62 $ 1,830.83 $ 10,925.45
Sub-Total for Water Construction Fees $ 18,189.24 $ 3,661.66 $ 21,850.90
E. TPW Inspection Fee(4%) $ - $ - $ -
F. TPW Material Testing(2%) $ $ - $
G. Street Light Inspsection Cost $ $ $
H. Signals Inspection Cost $ $ $ -
J.Engineering Fee $ $ 1,500.00 $ 1,500.00
TPW Construction Fees Subtotal $ $ 1,500.00 $ 1,500.00
Total Construction Fees $ 18,189.24 $ 5,161.66 $ 23,350.90
TOTAL PROJECT COST $ 472,920.30 $ 96,703.32 $ 569,623.62
Financial Guarantee Options,choose one Amount Choice
(Mark one)
Bond=100% $ 454,731.06 x
Completion Agreement=100%/Holds Plat $ 454,731.06
Cash Escrow Water/Sanitary Sewer=125% $ 568,413.83
Cash Escrow Paving/Storm Drain=125% $ -
The costs stated herein may be based upon construction estimates rather than actual costs. The
City's portion of inspection and material testing fees are directly allocated to the City's
accounts for charges and does not reimburse the Water Inspection and Material Testing Fees
to the Developer. The City's participation estimate shall be limited to the unit prices contained
in City of Fort Worth Ordinance No. 19192=06-2010,as amended, ("Unit Price Ordinance")or
as determined by public competitive bid. The City's cost participation (excluding inspection
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 9of13
and material testing fees) is not a lump sum amount and may be less than stated above
depending upon actual quantities as shown on the Notice of Final Completion package(`Green
sheet') and based on unit prices from the construction contract documents. In no event shall
the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 10 of 13
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, effective as of the date subscribed by the
City's designated City Manager.
CITY OF FORT WORTH DEVELOPER
Northbrook 820,LLC
-7 /1 a Texas limited liability company
Jesus J.Chapa(Oct9,201�)� By: 179D GP, LLC
Jesus J. Chapa Its: General Partner
Assistant City Manager By:
Date: Oct 9,2018 YYau C-Stoker
William E Stonaker(Oct 8,2018)
Recommended by: Name: William Stonaker
Title: Manager
Evelyn Robe s(Oct 8,2018) Date: Oct 8,2018
Evelyn Roberts
Contract Compliance Specialist ATTEST: (Only if required by Developer)
Planning and Development
Approved as to Form &Legality: Signature
Name: <Name>
Richard A.McCracken(Oct 9,20187
Richard A. McCracken Contract Compliance Manager:
Assistant City Attorney
M&C No. NSA By signing I acknowledge that I am the person
Date: responsible for the monitoring and
administration of this contract, including
Form 1295: �!/A ensuring all performance and reporting
requirements.
ATTEST: O�.(�ORT
O�f ✓anie Scarlerr N%orales
Mary T.i<ayser :+ Janie Scarlett Morales(Oct 9,2018)
Mary J.Kayser(Oct 9,2018) j�
Mary J. Kayser ;' * Name: Janie S. Morales
City Secretary * Development Manager
OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth,Texas FT.WORTH1 TX
Standard Community Facilities Agreement with City Participation-Northbro
CFA Official Release Date:01.22.2017
Page 11 of 13
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
with City Participation
® Location Map
Exhibit A:Water Improvements
® Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
:J Exhibit B: Paving Improvements
❑ Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
El Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 12 of 13
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101344
None
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation-Northbrook Water/Sewer
CFA Official Release Date:01.22.2017
Page 13 of 13
W
r
C
m
K
O
c
z
0
0
E INDUSTRIAL AVE
PROJECT SITE
LAWSON RD.
4d
rY
d
S
a
b
g 820 820
3
0
N
O
O
t+1
8�
C
PROJECT# 101344
WATER PROJECT#56008-0600430-101344-001580
SEWER PROJECT#56008-0700430-101344-001380
0
N
n
O
V,
Q
VICINITY MAP
D NWA NORTHBRQOK
U A Y MA TAR-48H COUNCIL DISTRICT#2
550 BaOey Avenue TeluB 335.1121 Worth,Texas 76107 SEC OF BLUE MOUND RD & NORTH WAY DR
o (TX RM.F-11141 FORT WORTH,TX
J
d
it ppri —
F
5+,b0-15 4' e -
1 -- - -
I � Ex--SS
—I r----`, ---I
+1 I 1
I 1 ,
--
I —
I I I \ \ I ��1 — / ! / Q py Lw
13
--�-jI—•� I I 1 I �1 I I � f i \` \ 1 \
4
I ' \
I I / q \ •`-ISI I ��\ � \� \\ i 1
\
t7 el. \ \
^3 >
!
/ k•PERMANENT whER EASAJI T
e LEGEND
---------- PROPERTY LINE
Q ---------- PROPOSED LOT LINES
----------- PROPOSED EASEMENTS 0 200 400
-12'W- PROPOSED WATERLINE
H PROPOSED GATE VALVE
m u PROPOSED PLUG
SCALE: 1"=200 ft.
0
N
n
O
O,
Q
A
D NAWA EXHIBIT A - WATER EXHIBIT
V y NORTHBROOK
f 550 Bailey Avenue•Suite •Fort Worth,Texas 76107
Tel:817.33.335.1121 BLUE MOUND RD & NORTH WAY DR
r
(TX REG.F-1114) 51712018 0
O pF U
J
d
l =4145'U.F
VBt 184,PG.187I. l
T.C.T. l
l a
Maw.
II II
Ll
p ..
-
--------
---- i -----_I®- ---- rrrr I I I I I I I I I I I I I I I I I I I I I
` -
I
I I
ex s II e \ I
I II A ® l
r I I I
'BjNER urwe
r
I
I
\ I
VOL
.DRrc PC.i1�
—
�
l 5'U.E.
D.R.T.C.T. \�
N.,991 70.5 \ E. \\ smr4as
PGW
- - -
D _T_
cx�w ' \ I
I
I
n1 / V4 NEC +2r canes ACc=EAse4Blr
DY THS PIAT
C 30'PEN71Z WATER EASEMENT
72 �� - ��� CCFNO D?0401519A I I
LEGEND
0 200 400
PROPERTY LINE
LOT LITS
°p --------EASE6VT LITS
a —PROPOSED PUBLIC SANITARY SEWER SCALE: 1"=200 ft.
c PROPOSED YANNgf
EXISANG SANITARY SENER
PROPOSED PRIVATE SANITARY SENER
t9
o, EUSTM0 WATER LINE
a
g� -
F-
EXHIBIT Al - SEWER EXHIBIT
2 DUNAWAY NORTHBRQaK
X 550 Bailey Avenue•Suite 400•Fort Worth,Texas 76101
Tel:817.335.,121 BLUE MOUND RD & NORTHWAY DR
(TX REG.F-1114) 8/7/2018
J
d
00 42 43
DAP-BID PROPOSAL
Page 1 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
1
Project Item Information Bidder's Proposal
BidlistoItem Description n Section unit Bid Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 0241.1014 Remove 10"Water Line 02 41 14 LF 1120 $24.00 $26,880.00
2 0241.1510 Salvage Fire Hydrant 0241 14 EA 4 $3,500.00 $14,000.00
3 0241.1515 Salvage 3"Water Meter 0241 14 EA 1 $500.00 $500.00
4 3305.0109 Trench Safety 33 05 10 LF 1645 $2.50 $4,112.50
5 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 80 $680.00 $54,400.00
6 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 3.25 $4,500.00 $14,625.00
7 3311.0141 6"Water Pipe 3311 10, LF
331112 10 $30.00 $300.00
8 3311.0341 10"Water Pipe 3311 10, LF
331112 1120 $69.46 $77,795.20
3311.0441 12"Water Pipe 3311 10,
9 331112 LF 1120 $2.54 $2,844.80
10 13311.0461 12"PVC Water Pipe 33 11 12 LF 515 $72.00 $37,080.00
11 3312.0001 Fire Hydrant 33 1240 EA 1 $3,500.00 $3,500.00
12 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 $1,500.00 $1,500.00
13 3312.2001 1"Water Service,Meter Reconnection 33 12 10 EA 1 $1,500.00 $1,500.00
14 3312.2101 1 1/2"Water Service,Meter Reconnection 33 12 10 EA 1 $2,000.00 $2,000.00
15 3312.2201 2"Water Service,Meter Reconnection 33 12 10 EA 5 $2,500.00 $12,500.00
16 3312.3002 6"Gate Valve 33 12 20 EA 4 $1,100.00 $4,400.00
17 3312.3005 12"Gate Valve 33 12 20 EA 3 $3,200.00 $9,600.00
18 3312.4211 24"x 12"Tapping Sleeve&Valve 33 12 25 EA 1 $9,500.00 $9,500.00
19 9999.0002 Traffic Control 3471 13 LS 1 $8,500.00 $8,500.00
20
21
22
23
24
25
26
27
28
29
TOTAL UNIT 1:WATER IMPROVEMENTS $285,537.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Farm Version September 1,2015 00 4243_Bid Proposal DAP.As
00 42 43
DAP-BIDPROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information
id
Mxlud
BidlNtoItem Description 10 n Section Measure QUnit of I uantity Unit Price Bid Value
UNIT fl:SANITARY SEWER IMPROVEMENTS
1 3301.0002 Post-CCTV Inspection .3301 31 LF 1710 $3.00 $5,130.00
2 3301.0101 Manhole Vacuum Testing 3301 30 EA 8 $150.00 $1,200.00
3 3305.0109 Trench Safety 33 05 10 LF 1710 $2.50 $4,275.00
4 3305.0113 Trench Water Stops .330515 EA 5 $500.00 $2,500.00
5 3331.3201 6"Sewer Service 3331 50 EA 5 $3,500.00 $17,500.00
6 3331.3202 6"2-way Cleanout 3331 50 EA 5 $900.00 $4,500.00
3331.4115 8"Sewer Pipe 3311 10,
7 3331 12, LF
3331 20 16151 $78.00 $125,970.00
3331.4116 8"Sewer Pipe,CSS Backfill 3311 10,
8 3331 12, LF
3331 20 95 $88.00 $8,360.00
9 3339.0001 Epoxy Manhole Liner 33 39 60 VF 81.6 $225.00 $18,360.00
10 3339.1001 4'Manhole 33 39 10, EA
33 39 20 8 $5,500.00 $44,000.00
26 9999.0001 Demo Existing Lift Station 00 00 00 LS 1 $4,500.00 $4,500.00
27 19999.0002 Traffic Control 3471 13 LS 1 $7,500.00 $7,500.00
28 9999.0003 Abandon Service 00 00 00 EA 4 $1,250.00 $5,000.00
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT 11:SANITARY SEWER IMPROVEMENTS1 $248,795.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Pmposal_DAP.xls
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item aputalUnit of Bid
No. Description n Section Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS $285,537.50
UNIT II:SANITARY SEWER IMPROVEMENTS $248,795.00
UNIT III:DRAINAGE IMPROVEMENTS
UNIT IV:PAVING IMPROVEMENTS
UNIT V:STREET LIGHTING IMPROVEMENTS
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid $534,332.50
Contractor agrees to complete WORK for FINAL ACCEPTANCE within' #days Icalendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION