Loading...
HomeMy WebLinkAboutContract 51380 Received Date: 10/10/2018 Received Time: 4:05 p.m. Developer and Project Information Cover Sheet: Developer Company Name: D.R. Horton—Texas,LTD Address, State,Zip Code: 6751 North Freeway,Fort Worth,TX,76131 Phone&Email: 817-230-0800, Authorized Signatory,Title: Benjamin M.Clark,Assistant Vice President Project Name: Revelstoke Section 1B Brief Description: Water, Sewer,Paving, Storm Drain Project Location: Eastern corner of U.S.287 and F.M. 156 Plat Case Number: FP-17-151 Plat Name: Mapsco: Council District: 7 CFA Number: 2018-013 City Project Number: 101388 KFFTF-IIAL RECORD sEcR—TARY a ryQ TX City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 113 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51380 WHEREAS, D.R. Horton—Texas, LTD , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Revelstoke Section 1B ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement;and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas I Standard Community Facilities Agreement-Revelstoke Section 113 OFFICIAL a. CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECR1 UP-1'f FT.WORTJI,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and-that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) Z_ Paving(B) N_ Storm Drain(B-1) Z_ Street Lights & Signs (C) ®, E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (21/o) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS is Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date: 02.20.2017 Page 6of11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Revelstoke Section 1B CFA No.: 2018-013 City Project No.: 101388 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 233,663.89 2.Sewer Construction $ 281,723.52 Water and Sewer Construction Total $ 515,387.41 B. TPW Construction 1.Street $ 693,438.08 2.Storm Drain $ 352,555.39 3.Street Lights Installed by Developer $ 215,752.98 4. Signals $ - TPW Construction Cost Total $ 1,261,746.45 Total Construction Cost(excluding the fees): $ 1,777,133.86 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 10,307.75 D. Water/Sewer Material Testing Fee(2%) $ 10,307.75 Sub-Total for Water Construction Fees $ 20,615.50 E. TPW Inspection Fee(4%) $ 41,839.74 F. TPW Material Testing(2%) $ 20,919.87 G. Street Light Inspsection Cost $ 8,630.12 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 71,389.73 Total Construction Fees: $ 92,005.23 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,777,133.86 x Completion Agreement=100%/Holds Plat $ 1,777,133.86 Cash Escrow Water/Sanitary Sewer-125% $ 644,234.26 Cash Escrow Paving/Storm Drain=125% $ 1,577,183.06 Letter of Credit= 125%w/2yr expiration period $ 2,221,417.33 City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1 B CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER D.R.Horton—Texas,LTD -�,,,.,,, -� i+�,,, a Texas Limited Partnership /gjg � (�fLGL[ Jesus J Cha pa(Oct 1�o� By:D•R Horton,Inc., Jesus J. Chapa a Delaware Corporation, Assistant City Manager Its Authorized Agent Date: Oct 10,2018 Recommended by: ' Benjamin M Clark(Oct 10,2018) EveIVn Robe %(Oct l�� Name: Benjamin M. Clark Evelyn Roberts/Jennifer Ezernack Title: Assistant Vice President Project Assistant Oct 10,2018 Planning and Development Date: Approved as to Form &Legality: Contract Compliance Manager: n � Z By signing, I acknowledge that I am the person responsible for the monitoring and Richard A.McCracken(Oct 30,2018) Richard A. McCracken administration of this contract, including Assistant City Attorney ensuring all performance and reporting M&C No. N/A requirements. Date: 7enni�erezernacg for R b Jennifer Ezernack for(Oct 10,2018) Form 1295: N/A O T O Name: Janie Morales ATTEST: ' `;i Title: Development Manager �_. V• � I��GIrYJ'• KGS SY Br f Mary J.Kayser(Oct 10,2018) t Mary J. Kayser/Ronald1 City Secretary/Assistant City ecretary C�FICIAL RECORD CITY SECRETARY FT.ViORTI•I,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 113 CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included .Attachment . Attachment 1 -Changes to Standard Community Facilities Agreement Location Map . ! Exhibit A:Water Improvements .X Exhibit A-1: Sewer Improvements I Water and Sewer Cost Estimates Exhibit B: Paving Improvements Paving Cost Estimate l Exhibit 13-1: Storm Drain Improvements I Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101388 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Revelstoke Section 1B CFA Official Release Date:02.20.2017 Page 11 of 11 a_ NO C O_ G HF,O w�� V) I :oFo U W W r-3z a nw= o(L LJ J n U 0s N O Z ~ U p z 3 < � O ~ � J O D N � CD C) O � z � � Oo n U LLQ U � 5 O U NMLONrUM �� smom 'Jewog 'rid £O:Z 9LOZ/9Z/£ '6MP•sl!9!4x3 V30 81 uo!;oes\8l uo!}oes\V30\s}!914x3 BZL\OOV'J OOL\199ZWX3M\009ZWX4M\Ons\:! a 0 M II \ •_ C14 O W W UJ F, J ri w n U W F- O Z K?5LO m � 0 I Q 2 W U Joao X w ^3w o U- 3 w� —OU —oaNr N K O as s�> a N 3n1a0 N3AVHd330 w =o r _ a Q a i-• N m —ffl L� W Z Z F w o X e X3 — — — — 3N1l0 3NM18 w a ry z0_F Ir Ix zF U N I Q f-lM �-lM o X w N —�Z 3NY1 Mltld SH11WS m U w o aL / JW aZa JFF= V' W W J N Y W O O z i �1 / / U z W Ln oLLI J U W I z 00 L / I Q H Z w z ~ N w Q w Lli z Z z J Q ZJ ' w 'o ~ J 2 J Q U w wUj o a w w w 3 0 w w w V) to to c9 c9 c9 O N / z z z � O O O N N N ~ Cl. w w w X X X '-JP ADMOIW 'J•wo9 'Ad ZO:Z BLOZ/9Z/£ '6MP'aLgL4x3 V.33 8t UOFPOS\8L uoIWS\Y3o\sqIq•4x3 8ZL\000"J OOL\L99ZWXdM\009ZWXdM\ms\=1 a 0 rgi \ N O LF— �O W xrx N O NF-M W m a O Q�� W O` 3 00 Q W n it > oCL 3 w F-:- -0 '_ –DU pD V1~ N � O aD 9 N �� — I li....._ a ai 3 x o yl M=L1L\ - - - - - - - - - -- - - - - - - - - - - - - - - - - _ - - — — — �� aNN-n ILLUEttL ms— ' as 3MVle J a w Q J .Y w J WN –�Z 0 3Nn 8► IY 3Nn m -�O W I'wls / Z Z 2� N d i ff It n 1 / I 10 . xx OFJ W Do' Z w Li oz / W U) w UZ >' W to / J ~ z0 % J W a z ~ = o !n m w Li Z z / o o N N 0_ 0_ X X CL d W W J ,jr AemDIW 'JeWD9 'rid OO:Z SIOZ/9Z/£ '6MP'eV 4x3 VAD 81 UQ!#DeS\81 upRDeS\Y33\8 14!4x3 8ZL\00dJ OOL\189ZWXdM\009ZWXdM\OlS\I 0 r9i \ II \ o04 C) J pa Wno vii z O z V) m a z�n Q = W U Mom X W r-3c n I w LL.EL0 N I _W 3 wF-: —0U —0 2 J H � �aaa ° oV>� li..... a W m 3AWa N3AVHd33a it 3 aI i i t IL LU o LLL. u - - - - --- - - - - - - - - - - - - - - - - - - -- - -- w z rlll 3N 8 J_ J _ K 0F I FW LZ+12N r1 — w W w_ W Im J � �Z W O 3 d S MIS FY PF(n O O X W.M W = U LJ K / V L Z II / CD H N w W Y J LL / J w a o 10 -,�na ffiink ao m w �QU w om Nw O MOO ao 0= o� >- oa o W'oair>- 'Wm irm airco am Q- � J �r xonolw •Jaurca 'Wd 99:1 91oZ/9Z/C '6MP•831g14x3 d33 81 uolloeS\al uolioaS\tld3\sqlgl4x3 8ZL\am ooi\199zrwiM\0a9znxdm\aisV 0 II \ 7 N e z r w OO Q Wn`n N \ O Nin 0-4 0 zpfr uC)OD w u �3w Z O W U noo �a 3 w�7 —O—DU 2JF- d DaN� O N �� Qa O NN LO a- I' .... —a 3Maa N3AVNd33(3a 3 a o o T . = j W W 2 _ - 3Naa 3Nme J r J _ 0 W W=� Y WV) �Wa N W —�z W 3NV1 AHVd SHAHS . p F �N C-4 {a / Ir W I Z O � Z FN O m z W /W M / � n N � N Q' ., ppol M � LLJ N \ Sr oZ _jW Z LLI z cn J / W w z_ J oQ J J O O o U 0 L~ Z Z LLI O MOOMM~ W W W W / z o oa as as as F F_ o o o o m w w w 0_' X Q_ (L a_ a_ W J ,jr Asmolw '.,awua 'rid 99:L 9 LOZ/sz/£ 'BMP*ngl4x3 Vd3 8L uo."S\e j aWnoaS\Vj3\E4!Q14x3 azL\aad3 OOL\199ZWX-4M\009ZWX4M\Q1S\:I a 0 u (� e � O Z J 2 CU W WnED g i ami \ J m O V) naw W ncr= oa 3 w F' -�U oavt� o N w ¢a o 0t-j I N� I I�._...- W U3AI80 N3AVHd330 3 a o N _IIL II��1II— ZW pJp W L t L L m00 i Q 0 -Y � LLI ZOO I N w Ir a m 2- w WN _j Z Z MiN SHLWS o Z� 5 / Z W Y o J� r ~ IL Z � W w / W En J _ v w z o Fn cr w 0 0 o 0 5 d J 'JP XOMOIN 'TO-DO 'Nd LVI VWZ/6ZI8 '6MP'sl914x3 V33 SL uo;poS\9l u0.AoaS\Vdo\gi!914x3 SZAOM OOL\199ZWXiM\009LWXm\OlS\-.I a o U) \ Z II \ 0 - N o CCw LO U W to N \ G O N~r- / Z m W mo°D � WW Vn3W X z _ W W a n a�o C) 3 W� —0U '^ J!- d' (JJ a-(n U N w ad ® of 5 I T V) —aa a 3Naa N3AVHd33a w 3( L o U 0_ I r — — — — — — — — — — — — — — - W W W Z _ 3N21a 3NM19 J } J —le W W W �UV) r j— J U) Z m W Z W 3NV1 MIVd SNLWS 2 rc N o v U /_ Z Z \ 5 r L / z W � a z J w F- U W W O 0_ / 0 N O O r i D_ 0_ J 3P Asmom 'JeWD9 'rid i94 9lOZ/9Z/£ '6MP'elQl4x3 WAD 8l aO4-S\8l ao.4-S\VdJ\%!914x3 9ZL\aav3 00L\199ZMCAM\009ZWX:IM\(nS\:I 0042 43(WATER) DAP-BID PROPOSAL Page l oft SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal BidlNItem No. Description Specification Section No. Unit of Measure Bid Quentity Unit Price Bid Value 1 3305.0109 Trench Safety 3305 10 LF 4,261.00 E 0.15 E 639.15 2 3311.0001 Ductile Imn Water Fittings w/Restraint 33 1111 TON 1.41 E 6,500.00 E 9,165.00 3 3311.0241 8"Water Pipe 33 11 10,33 11 12 LF 4,183.00 E 21.34 E 89,265.22 4 3311.0242 8"Water Pipe,CSS Backfill 33 11 10,33 11 12 LF 78.00 E 58.84 E 4,589.52 5 3312.0001 Fire Hydrant 33 1240 EA 4.00 E 3,753.75 E 15,015.00 6 3312.0117 Connection to Existing 4"-12"Water Main 33 1225 EA 3.00 E 300.00 E 900.00 7 3312.2003 1"Water Service 33 1210 EA 115.00 E 672.65 E 77,354.75 8 3312.3003 8"Gate Valve 33 1220 EA 12.00 E 1,087.00 E 13,044.00 9 9999.0001 1"Water Service on Existing Line 33 12 10 EA 25.00 E 947.65 E 23,691.25 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farts Venlan Feb—V 16,2019 00 42 43BId Propavl DAP_Rev_02-16-18 00 42 43 TWATER) DAD-81D PROPOSAL P.8.1 of I SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Infomution Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value 1 2412.2013 Rerrove 8"Sewer Line 0241 14 LF I0.00 $ 16.00 $ 160.00 2 3301.0002 Post-CCTV Inspection 33 Ol 31 LF 4,389.00 S 1.75 S 7,680.75 3 330L0101 Manhole Vacuum Testing 33 0130 EA 19.00 $ 100.00 $ 1,900.00 4 3305.0109 Trench Safety 3305 10 LF 4,389.00 S 0.15 f 658.35 5 3331.3101 4"Sewer Service 33 3150 EA 132.00 S 553.00 f 72,996.00 6 3331.4115 8"Sewer Pipe(SDR-26,ASTM D3034) 33 11 10,33 31 12,33 3120 LF 4,176.00 S 29.18 S 121,855.68 7 3331.4116 8"Sewer Pipe(SDR-26,ASTM D3034 w/CSS) 10,33 31 12,33 31 20,33 05 10 Q LF 213.00 $ 63.18 S 13,457.34 8 3339.0001 Epoxy Manhole Liner 33 39 60 VF 11.20 S 165.00 S 1,848.00 9 3339.1001 4'Manhole 33 39 10,33 39 20 EA 19.00 S 2,686.00 $ 51,034.00 10 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 63.80 11 9999.0002 4"Sewer Service on Existing Line 33 31 50 EA 8.00 $ 833.00 $ 6,664.00 12 9999.0003 Manhole Adjustment 33 05 14 EA 3.00 $ 800.00 $ 2,400.00 13 9999.0004 Connection to Existing Pipe 33 11 10,33 3l 12,33 31 20 EA 1.00 S 300.00 S 300.00 14 9999.0005 Connection to Existing Manhole 33 39 10,33 39 20 EA 1.00 S 769.40 S 769.40 $ 281,72352 OTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vallon February 1410te 004243_11M Propoul_DAPR.r D2-1618 004243(STORM) DAP-RID PROPOSAL Peas 1 of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value 1V _� 1 2413.3023 Remove 48"Storm Line 0241 14 LF 8.00 $ 30.00 $ 240.00 2 2414.4202 Remove 5'Drop Inlet 0241 14 EA 1.00 $ 750.00 $ 750.00 3 3305.0109 Trench Safety 33 05 10 LF 1,566.00 S 0.15 $ 234.90 4 3305.0112 Concrete Collar 33 05 17 EA 3.00 S 100.00 $ 300.00 5 3341.0201 21"RCP,Class BI 3341 10 LF 156.00 $ 52.43 $ 8,179.08 6 3341.0205 24"RCP,Class III 3341 10 LF 100.00 $ 60.64 S 6,064.00 7 3341.0208 27"RCP,Class III 3341 10 LF 50.00 $ 67.28 $ 3,364.00 8 3341.0302 30"RCP,Class III 3341 10 LF 67.00 $ 76.07 S 5,096.69 9 3341.0309 36"RCP,Class III 3341 10 LF 32.00 $ 98.62 S 3,155.84 10 3341.0402 42"RCP,Class III 3341 10 LF 578.00 $ 128.97 $ 74,544.66 11 3341.0409 48"RCP,Class BI 3341 10 LF 241.00 $ 151.94 $ 36,617.54 12 3341.1304 6x5 Box Culvert 3341 10 LF 342.00 S 322.54 S 110,308.68 13 3349.0001 4'Storm Junction Box 33 49 10 EA 1.00 $ 41850.00 S 4,850.00 14 3349.0002 5'Storm Junction Box 33 49 10 EA 2.00 S 5,850.00 S 11,700.00 15 3349.0102 4'Manhole Riser 33 49 10 EA 2.00 $ 3,550.00 $ 7,100.00 16 3349.5001 ]0'Curb Inlet 33 49 20 EA 14.00 S 4,400.00 $ 61,600.00 17 9999.0006 Wet Protection 31 25 00(MOD) EA 14.00 S 150.00 S 2,100.00 18 9999.0007 Connect to Existing 6'x5'RCB 3341 10 EA 1.00 $ 300.00 $ 300.00 19 9999.0008 Bonds for all Utility Improvements 0073 10 LS 1.00 S 16,050.00 $ 16,050.00 $ 352,55539 CITY OF FORT WORTH DO 42 43(STORM) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 004243 Porm version APrR 1,2014 Revelstoke,Sectbn IS w a1 As sNmmsn DAP B4O PROPOSA; Page 1 of l SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM BID SUMMARY TOTAL UNIT 144 kTER IMPROVEMENTS S 233 663 89 TOTAL UMT Il-SEVER I,%fPROVENtE,%"r5 S 281.723 52 TOTAL UNIT 111-STORM IMPROV EMENTS S 352.535 39 Total Constiruction Bid S 667,942.60 This Bid issubmitted b3 theentit3 named below: BIDDER: 131. C.N.1 oung Conslsvcnon,L P 210 S.Sisth 51met TTTILE1•�5 �y Lr Mansfield,1176063 DATE: 91Z V7 Conimclor apses to complete NORK ror FINAL ACCEPTANCE within 400 / working dnte n fler the d.+te when the CONTRACT commences to run as pmNded in the General Conditions END OF SECTION CITY OE FORT WORT. VMDAAOCONSTRUCTIONSVEOFIGTIONp UMENTS DEVEIOYERAWAPOEOPROIERS 00+1 A)el PeoPoe.t oAr ae�O71+:s Farm V,—,Feb—,16,1011 0042 43(WATER) DAP-BID PROPOSAL Page 1 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. = of Measure Bid Quantity Unit Price Bid Value l 2410.0300 Remove Barrier Free Ramp,Type M-2 0241 13 EA 1.00 $ 633.51 $ 633.51 2 3211.0400 Hydrated Lime(32#/SY) 32 11 29 TN 280.00 $ 153.45 $ 42,966.00 3 3211.0501 6"Line Treatment 32 11 29 SY 17,470.00 $ 2.34 $ 40,879.80 4 3213.0101 6"Conc Pvna 32 13 13 SY 16,380.00 $ 33.11 $ 542,341.80 5 3213.0301 4"Conc Sidewalk 32 1320 SF 2,618.00 $ 5.37 $ 14,058.66 6 3213.0501 Barrier Free RarM,Type R-1 32 13 20 EA 12.00 S 1,503.65 $ 18,043.80 7 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 7.00 $ 1,482.39 $ 10,376.73 8 3441.4003 Furnish/Instal]Alum Sign Ground Mount Cay Std.-W IAL&W13-IP on 3441 30 EA 1.00 $ 137.50 S 137.50 Existing Pole 9 3441.4003 Furnish1itst ell Alum.Sign Ground Mount City Std.-Wl-1R&Wl3-1P&Pole 34 41 30 EA 1.00 $ 385.00 $ 385.00 10 9999.0009 Furnish/Install Alum Sign Ground Mount City Std.-R8-3R w/Stickers(Left 3441 30 EA 1.00 S 385.00 S 385.00 Arrow)&Pole 11 9999.0010 Fumishlnstall Alum Sign Ground Mount City Std-R8-3R w/Stickers(Left 3441 30 EA 1.00 $ 137.50 S 137.50 Arrow)on Ex Pole 12 9999.0011 Furnish/Install Alum Sign Ground Mount Cay Std-R8-3R w/Stickers(Right 3441 30 EA 2.00 $ 385.00 $ 770.00 Arrow)&Pole 13 9999.0012 Install EOR Barricade 34 4130(MOD) EA 1.00 $ 1,172.33 S 1,172.33 14 9999.0013 Remove Barricade&Connect to Existing 34 4130(MOD) EA 2.00 $ 620.38 $ 1,240.76 15 9999.0014 Pavement Header 32 13 13 LF 29.00 $ 8.61 5 249.69 16 9999.0015 SWPPP Maintenance 3125 00(MOD) LS 1.00 17 9999.0016 City Bonds for all Paving Improvements 0073 10 LS 1.00 S 16,500.00 S 16,500.00 E 690,278.08 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fonn Version February 16,2018 0042 43 BN Prop- OAP_Rev_02-16.18 00 42 43(WATER) DAP-BID PROPOSAL PFao 1 of 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNITV-STREET NAME SIGNS IMPROVEMENTS 1 3441.4003 Fumish/Install Alum.Sign Ground Mount City Std.-Name Blade(x4)&Pole 34 41 30 EA 8.00 $ 395.00 $ 3,160.00 �O AFT 1����$IS.(t7-�IlH�RO f�fi .N S1F $ 3,160.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS form VRnlpe FehmnY 16,201a 00 42 439Id PmpmI DAP_RPv_01-1619 m 4t 0 sr>wRa j DAF•ND NIOPWAL hglMl SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM BID SUMMARY TOTAL UNIT IV-FAVMRAPROVEMINTS >< Humn TOTAL UNIT VdTREETNAM SettRAFROVWENIS S 3,100.00 TatalCaosstelMaW S summ This Bid Is submitted by the entity named below: 24��k—� BIDDER: BY: L.H.Ley Compaay,Ltd. �9�1♦/ 1880 Crawn Road TITLE; ROH AtiO [{'(1 ALISIL(• I'tc,.s+/• Dat W,TX 75LU DATE: Contmetw agrees to complete WORK far FINAL ACCEPTANCE whhia 'J7J 38 warlda8 days after the date when the CONTRACT cinausences to ma as provided in the General Coodltloas. END OF SECTION crtr OF POW Warr" STANDARD COMTRUMON SP EOFI LAnaS DDCWI@ne-MOAPCR AWrRM Nlal[CTS m Q 41„W Nea-Y-LW-PW-ablFta F-vara..FW.—v le,It" Do 42 43(WATER) [IAF-NIB FAOFOSAL Pap 1011 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Infomraton Bidders Proposal I3ldlm Description Specification Section No Urat of hleasme Bid QuEntity Unit Price Bid Value Item No IMPROVEMENTS 1 2605 3015 2"CONDT PVC SCH 80(T) 2605 33 LF 1.51400 $ 1182 S 17,895 48 2 3441 1410 NO IO Insulated Elm Condr(Copper) 3441 10 LF 4,542 00 S 125 S 5.67750 3 3341 3303 Rdwy Ill m Foundation TY 7 34 4120 EA 3800 S 1.10900 $ 42,142 00 4 9999 0017 Rdwy IBum Assmbly Waslungion A]4/1-034 41 20 EA 38 00 S 3,81600 S 147,288 00 5 9999 0018 City bonds for all Street Light loipro.-ernents 0073 10 LS 100 S 2,75000 S 2,75000 S 215,752.98 CITY OF FORT WORTH STANDANO CONSTRIJaIM YEOFICATiON DOCUMENTS-DEVELOPER AWARDED FRO)ECTS brio Venkn Fehrury 1410U 004241 11d PmpoYLOAF 14V_OZ-1&1A 00.2.1 k...V DAP.B1 rROPOSAL r.p 1 of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM BID SUMMARY TOTAL LWIT VI-STREET LIGHTS WQROVIMENTS S 213.732le Tow Caotraetian Ed S 21MM This Bid is submitted by the ontib'named below: 1 1 BIDDER: BY: l� inlepsdewt Utility Canstmedr,Ie. SIO Son Valley Drive TITLE: Fen Warty.TC 76119 DATE: Camncter a{rem N taBepleN WORK For FINAL ACCEPTANCE within 3 O raleadar days after due date When the CONTRACT rommeam to raw u provided in the Central Conditions. END OF SECTION OT'OF FORT WORTH 00.1.1 Swnmxy STANDARD[ONSTROCTIOM wEORGTOM OONMIMIS•pEVEIOPER AWARDED PAOIECfS 00.1.1 F.I.V.nlon Apra;2014