HomeMy WebLinkAboutContract 49258-A5 AMENDMENT NO. 5 TO AGREEMENT
X22018 STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
av iinmply E�
COMO COMMUNITY CENTER, PHASE I
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. qq@1\5-
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and HKS, Inc. (Consultant) made and entered into
City Secretary Contract No. (The Contract) which was authorized by the City Council by
M&C C-28294, the 20th day of June, 2017, to provide architectural design and
construction administration services for the New Como Community Center located at
Chamberlin Park and;
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services for additional Civil design services, see Attachment "J".
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional MEP design services for the design and detailing of
additional concepts. The cost of this additional service is $8,160.00 plus $0.00
in reimbursable expenses. The scope of services is described more fully in HKS,
Inc.'s Letter dated August 30, 2018 labeled Attachment "J".
2.
Article II — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "A". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "A". However the total fee paid by the City shall not
exceed a total of $899,301.74 unless the City and the Consultant mutually agree
upon a fee amount for additional services and amend this Agreement
accordingly."
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect.
ti
City of Fort Worth,Texas ,
Standard Agreement for Professional Services AMENDMENT + a
Revision Date:8/16/2016
Page 1 of 2 ---
24
EXECUTED this Jjj�-d oif 2018, in Fort Worth, Tarrant County,
Texas.
HKS, Inc. APPROVED:
By: By:
Mic el Pa son, AIA, NCAR Jesus J. Chaps
Vice President Assistant City Manager
APPROVAL', RECOMMENDED: RECORDED:
By: By:
Ste a Cooke, (rector Q ary J. r !� '
Property Management Department City Secretary A.
APPROVED AS TO FORM AND LEGALITY: M&C Not Required i •
Contract Authorization
By:
Jon tfong
Assistant City Attorney
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that 1 am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
By: &u, a- 9&6C,, _
Brian R. Glass,AIA
Architectural Services Manager
CITY SE"C ieTARY
TX
City of Fort worth,Texas
standard Agreerneni.for Professional Services AMENDMENT
Revtslon Date:8/16/2016
Page 2 of 2
HKS/S Brent Sparks,AIA
PRINCIPAL
August 30th, 2018
Ms. Susan Alanis
Assistant City Manager
City of Fort Worth
401 West 13th Street
Fort Worth,Texas 76102
Re: Como Community Center Phase I- Fort Worth,Texas
Revision to Civil Engineering Fee for Parkland Conversions
HKS, Project Number 20660.000
Dear Ms. Alanis:
HKS, Inc., ("HKS') is requesting a revised fee for the Civil Engineer for the Como Community Center
project.
Dunaway will prepare exhibits for Parkland Conversions for the floodplain easement, drainage
easement, AT&T line, ONCOR overhead electrical lines and Right-of-Way clips on the northwest and
northeast corners of the property. Dunaway will address up to one round of comments from the City.
Dunaway will attend up to two Park Advisory Board meetings and one City Council meeting for the
Parkland Conversions. If additional meetings or exhibit revisions to address additional comments are
necessary,the time required to prepare the exhibits or attend the meetings will be tracked and billed
on an hourly basis and is not part of this proposed scope of work. It should also be noted that
Dunaway cannot and does not guarantee that the request for parkland conversions will ultimately be
approved by the Par Board and/or City Council.
The fee requested is Eight Thousand One Hundred Sixty Dollars. ($8,160.00). Including the 2%
administration fee.
Best Regards,
ilk
full
Brent Sparks, AIA
Principal
1000 MACON STREET,STE 150,FORT WORTH,TX 76102 1 +1817 348 0330(main)+1817 348 8522(fax) I www.hksinc.com
Como Community Center Phase I-Fort Worth
August 3011,2018
Page 2
The undersigned authorized agent of the owner and Client represents and warrants to HKS that all
required approvals for authorization of the foregoing services have been obtained in writing.
AGREED AND AUTHORIZED:
This day of ,2018
By Client:
Signature Title
CC: Mr. Norman Morgan
Ms. Kim Cooper
1' D N A AUTHOROIRATION
U Aw y
CONTRACT AMENDMENT
Dunaway
Date: August 28, 2018 Amendment No.: 3 Project No.: B002926.005
Project
Name: Como Community Center in Fort Worth, Texas
Attn: Mr. Michael Parkinson
Client: HKS, Inc.
Address: 1000 Macon Street, Suite 150, Fort Worth, TX 76102
Services covered by this authorization shall be performed in accordance with the Dunaway
"Standard Terms & Conditions," under the original Agreement dated May 10, 2017.
LUMP SUM HOURLY 2% ADMIN
SERVICES SERVICES FEE TOTAL
ORIGINAL CONTRACT AMOUNT: $162,800 $12,000 $3,496 $178,296
CONTRACT AMENDMENT#1 AMOUNT: $12,500 $0 $250 $12,750
CONTRACT AMENDMENT#2 AMOUNT: $2,500 $0 $50 $2,550
CONTRACT AMENDMENT#3 AMOUNT: $0 $4,000 $80 $4,080
CONTRACT AMENDMENT#4 AMOUNT: $8,000 $0 $160 $8,160
TOTAL REVISED CONTRACT AMOUNT: $185,800 $16,000 $4,036 $205,836
Client hereby requests and authorizes Dunaway Associates, L.P. (Dunaway) to perform the
following additional services:
DETAILED SCOPE OF WORK
1. Parkland Conversion ..............................................................................................$8,000
Dunaway will prepare exhibits for Parkland Conversions for the floodplain easement,
drainage easement, AT&T line, ONCOR overhead electric lines, and Right-of-Way clips
on the northwest and north east corners of the property. Dunaway will address up to one
round of comments from the City. We will also attend up two Park Advisory Board
meetings and one City Council Meeting for the Parkland Conversions. If additional
meetings or exhibit revisions to address additional comments are necessary, the time
required to prepare the exhibits or attend the meetings will be tracked and billed on an
hourly basis and is not part of this proposed scope of work. It should also be noted that
G.1Producbon500\00290009261Cor r espondence10051Prn_posa!19002926.005-ComoCommun;rycenrer-raua-18-0828.docx
Corporate: 550 Bailey Avenue,Suite 400 g Fort Worth,Texas 76107 c Tel:817.335.1 121 r Fax:817.335.7437 c dunawayassociates.com
Fort Worth - Austin g Midland s San Antonio
Authorization for Contract Amendment
Page 2
Dunaway cannot and does not guarantee that the request for the parkland conversions
will ultimately be approved by the Park Board and/or City Council.
If the proposed scope of this amendment meets with your approval, please sign below and return
one copy to our office as our notice to proceed.
Respectfully submitted,
DUNAWAY ASSOCIATES, L.P., Agreed & Accepted
a Texas limited partnership
HKS, INC.
By:
Jlu rn Wells, PE
Discipline Lead II Name:
Title:
Date:
JTW/lau