HomeMy WebLinkAboutContract 49932-A1 UTY SECRETARY
RECEIVED AMENDMENT No.1 CONTRACT NO. a
09122018
2018
CITY0FrORTWORTH TO CITY SECRETARY CONTRACT No. 49932
CITYSECRET4ny
WHEREAS, the City of Fort Worth (CITY) and DUNAWAY ASSOCIATES, L.P . ,
(ENGINEER) made and entered into City Secretary Contract No . 49932, (the
CONTRACT) which was authorized on the 14 day of November, 2017 in the
amount of $58, 825 . 00; and
WHEREAS, the CONTRACT involves engineering services for the
following project :
Hammond Street Drainage Improvements - Final Design and Construction
Phase Services; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT :
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated September 10, 2018, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $21, 700 . (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $80, 525 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
City of Fort Worth
Professional Services Agreement Amendment Template � `� �'"'R EML!pj)
CFW Official Release 9/19/2017
krn y
Page 1 of 4
FT. F,,,T 1 TX
APPROVED :
City of Fort Worth ENGINEER
�i DUNAWAY ASSOCIATES, L.P .
Susan Alanis
Assistant City Manager bisci 1i e Lead
DATE : ( g DATE: q./8.fj/
APPROVAL RECOMMENDED :
�),4
W. 1...�
Douglas iersig, P .E .
Director, Transportation & Public Works Department
Contract Compliance Manager :
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Mike B nt, PE, PMP
Proct ager
OFFICIAL f Z CCr1,3
CITY sEc.--i TA,,,,f
C 3
1��4MENT � 1
City of Fort Worth
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY: M&C:n6v-j
Date:
Douglas W. Black
Assistant City Attorney
ATTEST: �Or, FO&T'I
Mary J. Ka se
City Secretary i '*
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
7-
X.,E1r 0 M 6w-t %� 1
City of Fort Worth
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 49932
Amendment No . 1
Department Fund-Account-Center Amount
TPW 52002-0200431-5330500-C00488-CO2830 $21, 700 . 00
Total : $21, 700 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017
Page 4 of 4
O DUNAWA
v
Dunaway No. 2006041.003
1
Septemberg, 2018
Mr. Mike Bennett, P.E., PMP
Capital Delivery Division /TPW
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
Reference: 00488 Hammond Street— Proposed Scope Revision
Dear Mr. Bennett:
At the direction of the City, Dunaway has provided professional services beyond the scope
of our original City Secretary Contract No. 49932. These services have included:
• Preparation of two additional plan/profile drawings for the proposed alternative
storm drain alignment through the car dealership located in the Longhorn Dodge
Addition, Block 1, Lot 1,
• Revision of junction box detail sheets to include a new, larger box associated with
the proposed alternative alignment,
• Updating of plans to include and reference LIM & Associates City Project No.
100421 water and sewer sheets. This includes the addition of associated water
and sewer detail sheets,
• Preparation of two additional plan/profile drawings for requested sewer line
removal and replacement at Timothy St and Pleasant St as well as at the 1-35W
Service Road,
• Updating of the Engineer's Opinion of Probable Construction Cost to reflect the
alternate alignment, additional water and sewer items, and updated POL
quantities,
• Update the Bidders Proposal section of the Bidders Application in the current
specifications,
• and, Preparation of Temporary Construction and Permeant Drainage easement
documents for necessary parcels running through the car dealership lot based on
the alternative culvert alignment.
To accommodate the addition of the scope of work and based on our updated estimate of
effort to complete the project, Dunaway is anticipating that the current time and materials
Corporate: 550 Bailey Avenue,Suite 400 F Fort Worth,Texas 76107 41 Tel:817.335.1 121 Q Fax:817.335.7437 * dunawayassociates.com
Fort Worth * Austin 0 Midland @► San Antonio
00488 Hammond Street— Proposed Scope Revision
September 27, 2018
Page 2
contract of $58,825.00 will be exceeded by a total of $21,700.00. 1 feel that this additional
fee presents a conservative estimate for remaining engineering services effort.
We are available at your convenience should you have any questions.
Sincerely,
DUNAWAY ASSOCIATES, L.P.
a Texas limited partnership
JosiZi t, PE, CFM
Discipline Lead II
G:\Production\Municipal\2006\2006041\Correspondence\Letters\18-0910-Amend1-Contract 3-Hammond St Construction.docx
Fort Worth _ Austin ? Midland - San Antonio
dunawayassociates.com
DUNAWA
Y
Dunaway No. 2006041.003
April 3, 2018
Mr. Mike Bennett, P.E., PMP
Capital Delivery Division /TPW
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
Reference: Hammond Street— Proposed Scope Revision
Dear Mr. Bennett:
Per our recent conversations, it is our understanding that the current owners and/or tenant
of the car dealership located in the Longhorn Dodge Addition, Block 1, Lot 1 have
requested the proposed storm drain improvements to follow the existing drainage
easement across the property, rather than follow a route just inside the west and north
property lines. It is also our understanding that based on the request from the
owner/tenant,the City would like Dunaway Associates, (Dunaway)to prepare an alternate
bid design for a storm drain alignment within the existing easement. We further
understand that the City would like to advertise the Hammond Street storm drain project
in mid/late April in order for construction to take place during the summer of 2018.
To accommodate the addition of the bid alternate, Dunaway requests the scope of the
current contract (City Secretary Contract No. 49932) to include the additional effort of
preparing construction drawings for an alternate alignment of the proposed storm drain
improvements within the existing drainage easement across the car dealership lot. We
anticipate the following effort will be required:
• Prepare two additional plan/profile drawings for the proposed alternative storm
drain alignment,
• Revise the junction box detail sheet to include the new, larger box associated with
the proposed alternative alignment,
• Update the Engineer's Opinion of Probable Construction Cost to reflect the
alternate alignment, and
• Update the Bidders Proposal section of the Bidders Application in the current
specifications.
We understand the previously-approved scope is based on a time and materials budget.
Therefore, for the budgetary purposes, we anticipate the additional effort to be on the
order of$7,100.
Corporate: 550 Bailey Avenue.Suite 400 x Fort Worth,Texas 75107 Tel:81 T335.1121 x Fax;817,335.7437 e dunowayassociates.com
Fort Worth 3 Austin a Midland r San Anronic
Hammond Street— Proposed Scope Revision
April 3, 2018
Page 2
We are available at your convenience should you have any questions.
Sincerely,
DUNAWAY ASSOCIATES, L.P.
a Texas limited partnership
Michael J. Dellies, PE, CFM
Associate
MJD/mjd
G:\Production\Municipal\2006\2006041\Correspondence\Letters\2018-0403-Amends-Contract 3-Hammond St Construction.dom
Fort Worth 3 Austin * Midland 4