Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 51399
Received Date: 10/16/2018 Received Time: 11:24 a.m. Developer and Project Information Cover Sheet: Developer Company Name: Crystal Lake Development,LLC Address, State,Zip Code: 3825 Camp Bowie Blvd,Fort Worth,TX,76107 Phone&Email: 817-655-2321,jcna,haydncutler.com Authorized Signatory,Title: John Cockerham,Manager Project Name: Marine Creek Ranch Section 13 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: South of Cromwell Marine Creek Rd of Huffines Blvd. Plat Case Number: FP-15-110 Plat Name: Marine Creek Ranch FP-16-022 Mapsco: Council District: 2 CFA Number: 2018-078 City Project Number: 101620 EOFFICIALRECORDRETARYTH, TX City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51399 WHEREAS, Crystal Lake Development, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Marine Creek Ranch Section 13 ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 OFFICIAL RECORD CFA Official Release Date:02.20.2017 CITY SECRETARY Page 2 of 11 FT.�9ORTH!TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) LTJ- Sewer(A-1) ®- Paving (B) ®, Storm Drain(B-1) ©, Street Lights & Signs (C) z- E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not installor relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers,agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction,the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Marine Creek Ranch Section 13 CFA No.: 2018-078 CityProject No.: 101620 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 317,777.90 2.Sewer Construction $ 321,016.00 Water and Sewer Construction Total $ 638,793.90 B. TPW Construction 1.Street $ 1,161,670.00 2.Storm Drain $ 358,256.00 3.Street Lights Installed by Developer $ 143,404.00 4. Signals $ - TPW Construction Cost Total $ 1,663,330.00 Total Construction Cost(excluding the fees): $ 2,302,123.90 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 12,775.88 D. Water/Sewer Material Testing Fee(2%) $ 12,775.88 Sub-Total for Water Construction Fees $ 25,551.76 E. TPW Inspection Fee(4%) $ 60,797.04 F. TPW Material Testing(2%) $ 30,398.52 G. Street Light Inspsection Cost $ 5,736.16 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 96,931.72 Total Construction Fees: $ 122,483.48 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,302,123.90 Completion Agreement=100%/Holds Plat $ 21302,123.90 x Cash Escrow Water/Sanitary Sewer—125% $ 798,492.38 Cash Escrow Paving/Storm Drain=125% $ 2,079,162.50 Letter of Credit=125%w/2yr expiration period $ 2,877,654.88 City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Crystal Lake Development,LLC Jesus J. Chapa Assistant City Manager CoCe�ju� Date: Oct 15,2018 John 0ockerham(Oct 9,2018) Name: John Cockerham Recommended by: Title: Manager r y Date: Oct 9,2018 Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting requirements. , Richard A.McCracken(Oct 9,2018( Richard A.McCracken Tanle Scarlett Morales Assistant City Attorney Dave Scarlett Morales(Oct 9,2018) M&C No. N/A Name: Janie Morales Date: Title: Development Manager Form 1295: NSA FOR ATTEST: ; Mary J. Kg sY er *`• Mary J Kayser(Oct 15,20181 Mary J. Kayser/Ronald Gonzal City Secretary/Assistant City Sec ' OFFICIAL,RECORD CITY SECRETARY FT.WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement Location Map ® Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101620 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Marine Creek Ranch Section 13 CFA Official Release Date:02.20.2017 Page 11 of 11 no comments MH 7/13/18 EX. 48" EX. 24" WATER LINE WATER LINE FREALTY. ,r. ,�fc w 1YM vwv nCROMWELL MARINE CREEK ROAD p y� un,n E_o, .Hx G row IrW,"ft"'MARNE CREEK RANCHEEK RANfJI cuar-C 1! I3 /1 /O 9-1 rAn9nr+ AND DR. rcr II. 1r, L EAL n.ETDa.Pa•« CQ ler I I Ia W I ® Z p 1 I 3 4a W 2! �y JO' DRAINACE 22 77�0 r4 EASEMENT �,OPRTCT I II Q zr 2s 19n !a !9 !e s 1 20 9 E TEMPORARY ORAINACC SURRY MOUNTAIN TRL. VO.9/19.PPi 1040 1 26DRTCT W ` ` 1 27 ® W 1 2a ��21 20 19 19 17 16 15 14 I! 12 II w WATER I1NE EASEMENT O CC#DD204i12 094 S \ 29 O -- Pusuc Unu T \\ W CCI EASEMENT �\ \\ 9 22 v EX. 8"4 E v U 29 !D �Rrri N �z WATER LINE Q O \\ J1 L EX. 16 ® SALT SPRINGS DR. WATER LINE \ \\ 0 M CC/D21729!o� \ 19 17 CPRTCT 4 13 f4 I1 GTY PROs Na 100227 \ EX. FIRE © fEE No.121, \ HYDRANT `\ \ n NOTE ALL WATER LINES ARE 8" UNLESS OTHERWISE NOTED LEGEND WATER LINE zoo 0 100 zoo aoo FIRE HYDRANT ►� GATE VALVE SERVICES 1 inch = 200 ft. DATE: 05/29/2018 m m MARINE` CREH`K PROJECT #: 2652-09-01 RANCH �f aN«lao9«9w wrv9ykg 19nd99•p•9fdlbdl9�p�+^e .�`EC TI DN 1 3 Dlpa rt%l'u m^umbo• (. 208 DRAWN BY. R. DEGAN mpg ra¢9lrotlon/liems9 nanbr. 10088006 WATER 519 9°•1 bora.r CHECKED BY: A. TAYLOR arll^yt°^. '••°° 7601^ EXHIBIT "A„ 817-459-1871 SHEET NO: 2 OF 1,3 SHEET 1 OF 2 °_� 617-274-6757 •••.mm9le■9•.eom r u tt N 8" WL L 511-0—,— �WL-B" Y` BORE EX. 24" i _WATER LINE ,,,,,,,r es11r EX. 48 o CROMWELL MARINE CREEK ROAD PRR' Pc a/s WATER LINE 17X 2 6 3 / ! I tV 1 I ! / 5 9 7 O � e MOUNTAIN ISLAND DR. a E- 6 7 8 8 f0 11 17 1-114 Is IB I7 1H 18 ZO IO w w it xrp 0 17 11 55 J4 J5 32 JI JO Z8 Ze 27 26 Zs Z/ 2J ZZ 71 O d SURRY MOUNTAIN TRL. o 'J r7x IES 1+ m X W s e 7 6 s / J s t 1e ® Js - W s 17x z ® I J1 rH x J7 v >. 33 ,. ., �, 30 /oJa z U EX. FIRE E-1HYDRANT ? ' 29 dlvX -- IV% SALT SPRINGS DR. e J ® g e I 28 ®OTTER IRL.Jo WATER LINE s • 7 a s � J a 1 � 27 U_ 76 = e J m 25 EX. 8" 8s/ ---1-/ 027 WATER LINE ,d z s x :.1 o o- �a LEGEND tt I ss e WA TER LINE 1: W 7 FIRE HYDRANT :1 m 74 ►� GA TE VALVE " v 20 SERVICES TAP AND SLEEVE f4 I 19 9 to ro le EX. FIRE ,e I, 1 HYDRANT ® ® „ 00 0 100 zoo 400 T�xe�,gy 12 1 2 J EX. FIRE POND OR / HYDRANT EX. 8" 1 inch = 200 ft. WATER LINE FORAM 0512912018 m 1 m a MARINE CREEK I 2652-09-01 RANCH a.9.rIpYI..16q....wp blrld...p.ud1l.abin pinldlo R. DEGAN ,S`ECTION 1 27�WATER Y.• A. TAYLOR arItayla., ,•_.• 76010 EXHIBIT "A" 817-469-1671 fa.: 517-274-8757 SHEET NO. 3 of 13 SHEET 2 OF 2 ....mIII a1.7:a..aam comments 7/13/18 MN 1.list clear comments// no Ion r apply 9/10 _ J._ ,,W7 EWT. S r¢r7AN,nc ru tancr CROMWELL MARINE CREEK ROAD ;.r4,'L ti rwa I mar.NG w mmr x cr tar L amt 1 MARINE CREEK RANCH Iaaacvur IlpwlegAp t4°rrnlma TwnrKr ® u t2 n ID 9 e MARINE CREEK FANp/ owlcr °nlowar II C 4 star r� I I '.'SWIARY a1ER l9rT. 1 "mr I e wr "" —� MOUNTAIN ISLAND DR, tiler � L '3 RArCO REALTY,LID I , E 1O. 1419L NL IM I w I19L w I ® 16 rr-r Z O I 2 J 1 3 µy 23 JO'DRAINAGE 71 17 i Q EAgYENT CC/D2161489 I 11 Q .--I OPR7CT 21 D J9 m 37 JQ II 25 p /9 7FMPORARY DRAINAGE SORRY MOUNTAIN TRL. E-1 EASEMENT a� KLL 9119,PG IOM 26 DRTCT \ \ \\ 27 ® X w 26 021 20 19 18 17 16 13 14 /5 12 11 NATER LINE \ \ '3 [t] C1 D2wM26 �= \\ z O1R1CT G 29 O a� \\ a PU61JG U1ILITY CCJ D2 r179 m\ \\ m '� u 2) 24 23 26 27 26 26 JD V LwFr'T \ N �Z X. 8� N/ RY E- \o 31 SE R INE c `c�L \ J2 SS SS v \ ®\ Y SALT SPRINGS DR.O \\ ® E RAA(Jr CC/0217293760 \\ \ 17 O°RiCT 1 13 12 I1 18 OTY PROL NO '00227 \\\ © NO. -23301 w LEGEND • SANITARY SEWER MANHOLE 200 0 100 200 400 8" SANITARY SEWER SANITARY SEWER SERVICE • EX. SANITARY SEWER MANHOLE —SS— EX. SANITARY SEWER LINE 1 inch = 200 ft. DATE: 05/29/2018 m�m a MARINE CREEK PROJECT # 2652-09-01 RANCH r* un gw6rq DRAWN BY.• R. DEGAN SECTION 13 L ragt!an' nuff 1. 008 lbple reg446tim/Ikome number, 10088000 WASTEWATER 619 e°et berIer CHECKED BY.• A. TAYLOR arlingten, t.aa. 7,010 EXHIBIT "A-1" 517-469-1671 SHEET NO: 4 OF 13 SHEET 1 OF 2 1aa: 617-274-6757 •r e.m m e t a a 6 8.e 0 m Unum _ EWT CROMWELL MARINE CREEK ROAD KX f7J9f, 0 PC 743 17X CwRTcr - ® Q 6 5 4 J S IU I X J 1 3W67 0 MOUNTAIN ISLAND DRbw �a w 6 7 6 9 )0 1I 17 IJ II /3 16 17 I6 19 20 20 O to w d : n - � gil W l .-a ~ m12 dJs JI u J7 Jr JD 29 7e n 26 Zs 21 7J 27 71 O E— SURRY MOUNTAIN TRL. 1J 17X u W ® m 15 1 W 7 9 e 6 s 1 J 7 I 1 32 6 ® 7 17X ® it IB a U y ae JAS a6 a7 ae 39 40 1 s a E f0 f9 � ) 8" SANITARY ? 79 1 OTTER TRL WER LINE �—SALT SPRINGS DR. a d 78 X 8 ANI AR 6 ® I MARINE CREEK ANCH SEWER LIN ® )- 9 CC/D21729CVRTCTJ760 a 4 J = f 17 CITY PROA NO. 160777 Y 7 X m FIE 0.X-2 _U zs = t J 20b 23 9 Z 1 O 27 71 --j— LEGEND JLEGEND to z s 26 7J ° n • SANITARY SEWER MANHOLE 11 77 8" SANITARY SEWER 12 m 7 x SANITARY SEWER SERVICE 77 0 �, • EX. SANITARY SEWER MANHOLE 13 70 0 6 —SS— EX. SANITARY SEWER LINE 14 9 � /9 is f0 ' X. 8" SANITARY 16 SEWER LINE 200 0 100 200 400 to ® n ® I7 TUXBI/RY PAHO OR. 17® 1 2 a 4 1 inch = 200 ft. EX 8" SA ITA Y SE LI E DATE: 05/29/2018 PROJECT 1. 2652-09-01 m I m a MARINE CREEK I RANCHC1 -••p.I.Irp. DRAWN BY.• R. DEGAN SECTION 1 �"regbtrocbn Ie><flbar f-2755 1ep6 r.gev6eoll/uean.9 nunbar: 100AEOOD WASTEWATER ° '°'` b°r6'r Y. CHECKED B • A. TAYLOR erlim glo°, 1.:°. 760,0 1f EXHIBIT A-111 817-469-1671 f ea: 617-274-6757 SHEET NO: 5 OF 13 SHEET 2 OF 2 •..,mm6le.°e.°om 1 PROPOSED 10' SEEDING OR F SIDEWALK SODDING /N MEDIANP NS1RAN¢o0�G IBI°lIBT 1.BLMYARNE p3EK RANCH LT4mmom EE iJ12IOEEK RANCH BiRIR 1 149fAC UM SANTNIT 4vE1P E911:vn:r II wi. ft IJIT iorvlNrYRaI«a�o MOUNTAIN ISLAND DR. V u NA YCO REALTY,LTD .......... W_IIIA=x H+ mRr I _ E' 16 I i W EE ? / 2 J 4 S O JO'ORAAVACE ( Y a 25 27 I71Q—O _ ul CCEA /Oltg646892 Z OPRrCr24 11 ry� 1 TYPE R— 4o J9 Je n J6 77 20 RAMP 9 E" TEMPORARY ORAWACE SORRY MOUNTAIN TRL. EASEMENT 10L 9149.P6 1040 1 26 ~ °R>r1 x 27 1 FF ' 1 28 �21 10 iB 18 17 16 Is 14 1-1 /2 /I [� WATER LINE 28 CCI 0104116094 29 x PUBLIC UMJFY Z\` EASEMENT N \ Z ( J0 E- CC/02/6/70178 22 Ze 20 Jo OPRICr FF 1 C J2 � EE -- Ao \ O SAL T SPRINGS DR. � GG INE K RAACN 21 CC/ J760 \ 16 17 NO. 4 tJ /1 11 ptt O'R C' PROO.L(N0.100227 HH TYPE R-1 IF NO. -2Jso4 4'a RAMP TTT LEGEND 29' B—B PAVEMENT, 6" CONC., 50' ROW 110' B—B PAVEMENT, 200 0 100 zoo aoo ® 10" CONC., 77' ROW Q 4" CONC. SIDEWALK 1 inch = 200 ft. (DEVELOPER) DATE: 07/31/2018 MA RIME CREEK m 1 m a PROJECT #• 2652-09-01 RANCH 6MrpYwrYlp AA811yY1Q WW.6.p.6rofVbrA"phom DRAWN BY.• R. DEGAN SECTION 13 rtrot /ik =nu r. 2759 008 tbpa reyiAlT6tbn/lianse manber. loose000 CHECKED BY.- A. TAYLOR PAVING I n 0 6 6 A t bore 7 r EXHIBIT "B" Brlingt6n, tAA6A 76010 e17-464-1e71 SHEET NO: 7 OF 16 SHEET 1 OF 2 `°A: 4-°'s7 m.ataI rrr. AOA.eBIII PROPOSED 10' — TYPE P— SEEDING OR — SIDEWALK 1 RAMP SODDING IN MEDIAN�� y ' unurr esur lic 14WE 17391. a 2(3 cw9rcr PROPOSED 5'— > ROPOSED 5' RQPOSED 10' SIDEWALK EES AA SIDEWALK SIDEWALK 7 6 6 I ! I 3 IV 1 2 ! 1 6 6 7 AA TYPE R— o RAMP B w .......................................................:.:::7G10"N.TAIN::ISLAND:DR....................:::::::.. ............................................... ............. ..... ....... E 9 W � W ' 6 7 B 9 10 11 12 I! 14 16 iB 17 to 19 20 x TYPE R— 2 m RAMP m !4 of m !1 w 29 28 27 26 2 24 2! 1 22 I 2 E SORRY MOUNTAIN TRL. a -' +� Ll � 17x x .�,�. X m W cc 5 „ mp1A11 9 B 7 6 ! � ! 2 I MI6 z FF 3 _ a 2 17X ROPOSED 5' U ! I !' �� SIDEWALK E- !? !! 34 m M n x !9 a uwmi w 1 2 ! 2 4 CC J I 29 SALT SPRINGS DR. TYPE R— = RAMP 3° OTTER TRL.!o to 9 B 7 B B 4 ! 2 1 0 37 V 26 = s ! tB LEGEND I 36 9 z 4 ID 27 24 J 29' B-B PAVEMENT, 6" 1B z ° 2° CONC., 50' ROW 11 23 a 6 0 I22 ® 110' B-B PAVEMENT, 77 m 24 10" CONC., 77' ROW +! B :, 20 4" CONC. SIDEWALK '� 9 ® I 19 (DEVELOPER) '° '° ro CC 17 200 0 100 200 400 12 T(/XBU yBe1 2 ! PONp pR 4 TYPE R- 1 inch = 200 ft. 7 RAMP F91 DATE: 07/31/2018 NE CREHKIm m I m a, RANC PROJECT ! 2652-09-01 MARINE I a99 q.w.rry w,a.B.�..1a,lwou..a.■+n DRAWN BY.• R. DEGAN SECTION 13m°°mgWmtW 1 wbw. I-27M u1p1.ro*tmUon/Ikwm numbr. 10068000 PAVING 1 1° '°'` "°r 1;r CHECKED BY. A. TAYLOR o r 1 1 n g t o n, 1!16. 6 010 EXHIBIT "B" 617-469-1671 SHEET NO. 8 of 16 SHEET 2 OF 2 ' 81-27-877 °...mmola:o..eom 4' WHITE SKIP LANE LINE WITH TYPE II-CR , F DOUBLE WHITE 4" DOUBLE YELLOW 4' MARKERS W WITH 8" WHITE LINE WITH 8" YELLOW n n 20 I �� HATCH LINE HATCH LINE J W m 1e /e is U1 V] ururr rwr. rr prrcr FCROMWELL MARINE CREEK4" SOLID WH1TE LANEr..AI rryyr,ac]41 LINE WI IH TYPE 11-CR4" DOUBLE 4' MARKERSEVEMENT YELLOW LINE et a 12 11 10 9 e U MARKERS i I 1 14 I E"" I 1r swxvr snw orr. Q' I p-�•"�lx? MOUNTAIN ISLAND DR.arn;r ,�xaxwaoxo w asrurea 1s 8" SOLID WHITE a r/ 14 ro 11 r9 SOLID MVE NE W TURN BAY LANE LINE KITH W WITH TYPE I—C 4" J L TYPE II—CR a RAISED MARKERS rs 12 15 11 12 11 4" MARKERS _ Unum _ F - - - - - - - - - • - • - - - - - - Ewr CROMWE MARINE 'X 17391 PG 245 �. � w 17X CVRrcr - EE= AA Ycnc V 7 6 5 4 ] 2 tO 1 2 ] 4 5 6 7 kA Gd.E0UNrA''-' � 6Q4 r.RY SO'M NaAW1 rx A.ser I'm F E a a•ner 4" SOLID WHITE LANE MOUNTAIN ISLAND DR. LINE WI TH --�r-T--rTT 9 TYPE II-CR 4" MARKERS 200 0 100 200 400 1 inch = 200 ft. DA TE: 0713112018 PROJECT F 2652-09-01 CROMWELL mmea MARINE CREEK oM« 9«m.yho t.rxdee.p.sloteoem,le am•+v DRAWN BY. R. DEGAN ROAD tape batkotlon number f. 2759 tbple regislmtlan/Iiaenx number. 10688000 PAVING 519 east Darder CHECKED BY.• A. TAYLOR arlington. texas 76010 EXHIBIT "B" 8 1 7 -1 6 71 SHEET NO. 16 OF 16 SHEET I OF 1 `°_F 817-27+-8757 •tt.mmolexae.com JUJVCTION BOX WMT3R Prp 1" R CROMWELL MARINE CREEK ROAD �' r � UIUTY E91i. m'1.ARO 1n Ismer,x w 1¢n4R cc IIq J.I wRr a"r'�r r vs.e EX 36" R °r'x0a (20' RECESSED 1 MARINE(REEK RANCH cc#mmCURB INLET EE 13 /2 n fo 9 e MARINE(REEK RANCHGnlm 1 14 G16 A 9 Imtl 1!•511ITARr,4 k91r, wrrcr w.am x rn7 MOUNTAIN ISLAND DR. uacr rolw.a.IIwI.MAIi° W mr�wrT I5 NA1LD REALTY,LID 10.14192/G 444 E-' YlICT f_l X. " HDPE 16 W EE Zc / 2 3 4 s x 23 22 Q 3D'DRAINAGE 171— EASEMENT Z CCI D216148992 11 Q —4DPRTcr 21 180�N 25 21" RC 39 20 TEMPDIPARY DRAMA 24" RC SUR) MOUNTAIN TRL. E-4 EASEMENT JUNCT/O 1-+ WL 9149.PG 1040 219OX DRTCT 1--r v 0 CUB 5 CUR X 30" RC FF /N ETS /NL TS 1 W 26 11 20 19 16 17 I 15 /4 13 12 1I UNE W cci nia T6'ws = oo JUN TIO BO Z r 29 a G EAsEfury T 10 c TS LL/D2I617D179 m 0 2D m FM DPamr N rZ 22 F. E"' 0 31 36 RCP E 3 RC � EE EX. 20• CURB INLET SALT SPRINGS DR. GG M CCI D21729 RANCH EX. 5(x5• DROP INLET fs 17 OPRICT 4 13 fa n am PRW NO.11.227 LE ND.X—I EX. 20' CURB INLET HHw LEGEND EXISTING STORM SEWER LINE 200 0 100 200 400 PROPOSED STORM SEWER LINE STORM MANHOLE 1 inch = 200 ft. o CURB INLET DA TE: 07/31/2018 MARINE' CREEK M 111'1 Ia PROJECT # 2652-09-01 RANCH 9M■,aR.�,lw wrr�yrlp MI�(lI N11C1�h11I vl.,lrra DRAWN BY. R. DEGAN SECT-101V 13 thea r�td 1�: t- o1pEa raglstraum/uca+w N4lfllbf: loo mm STORM DRAIN b:r der CHECKED BY.• A. TAYLOR 9riln9t to:9. 76ol0 EXHIBIT "B-1" 1117-469-1671 SHEET NO. 9 OF 16SHEET 1 OF 2 1 917-274-8757 Erg.mel o l 6 a o 8.e 0 R. unurY LE ESIYr o CROMWELL MARINE CREEK ROAD la 17J91, PG 245 17X I opR,Cr EQ AA 21 Z 4 8 6 7 AA p NCT/O 0r B H MOUNTAIN ISLAND DR. W15' CU �•-°�• x LE oo ' 6 7 8 9 )o II 12 /3 14 I3 16 17 18 19 20 33" RC U ` 10 CUR Z J CTI N OX / LE 04 o 55 34 M 32 JI M 29 28 27 76 25 24 23 22 21 N Z W E- SURRY MOUNTAIN TRL. Q.�� • 24' RCP W•r" 20 DRAINAGE W cc c� m r,!,5k� EASEMENT u p X.DROP INLET 9 8 7 6 5 / 3 2 i JL/NCTi X V - W 10 CU FF J2 36a RCP z NLE S 2 a FF 1 RC -21",PCP 36 RCP 32 M 34 35 38 37 38 -V 40 , J0 ,9 /R /N ET C /NJETS DONVERTED 4 cc 0' CUR -M�` J CTI ON BOX PrP SALT SPRINGS DR. N 4s JU 710 " —I BOX 21' RCP e Z 6 OTTER TRL. w 4ACCJ 02211J 0CH 21" �' 27 to 9 OPR,Ci 5 4 3 2 1 MY PR01 N0. 100227 X 7 26 D' URB 29 Fl1F o.x- V t 6 /NLEJS « 25 3 LEGEND ° z + ©s7 21 J to Z 5 20 EXISTING STORM 2' pa 26 SEWER LINE " 17 6 is LU on ' b 24 PROPOSED STORM 7113 23 0 �� SEWER LINE 20 " H a f4 g1 22 ❑ STORM MANHOLE 19 R f5 /N4ETS Io o CURB INLET 16 11 , cx cc 17 200 o 100 200 400 -21 7 00217 RCP I2 TUXgUR y BB ' s 3 4 RC 1 inch = 200 ft. 7 1 "" x 24" RCP rDRAWV 07/31/2018 MARINE CREEK 11'11 m a 2652-09-01 I RANCID � ,1�,.1�°°1�f.,t>� R. DEGAN SECTION Z '�wgietratim nmeaer: f-2759 thps regbtroti6n/Ikena numbr. 10088000 STORM DRAIN 519 east border A. TAYLOR arIIngt6o, :6e760 EXHIBIT 'IB-1" 817-469-1671 10 of 16 SHEET 2 OF 2 16 : 6I70-274-6757 •��.m m l o•a e.c o m NAVW FEALTY,VZ) �— KL 14192 PQ 944 a 5 DRTCr DRW INLET O O 2 �. a �� i n Iv Iv N) Nj, to W o z 0 O) V I Go to O A � RQLD y 47X4'SQ W saw rT I cn -RIG ? I I N � I I� �o LEGEND - - - — — i EXISTING STORM SEWER LINE 6; v Q Rq PROPOSED STORM SEWER LINE I TEMPORAR e CO rCTION ANci� 4g p TURN— ROU EMENT �e STORM MANHOLE �" cc OP CT 2a '3 _ _ I o CURB INLET PIIWANENT I D.E CC/DZ $DUH wp. 100 0 50 100 200 DRNZ ' 1 inch = 100 ft. — rDRAM 0713112018 m I m a MARINE CREEK I 2759 • 2652-02-02 RANCH dull enpineerinp eurvalAnp lendecepe eniJEecture plenninp W. L4RDAS SECTION 13 �mo-nAl number t. 008tbpb repletratbn/Iieenx number: 10088000 STORM DRAINAGE 519 b o r d e r Y A. CASCO orilnpten, toxo@ ]solo EXHIBIT "B—l's 817-489-1871 SHEET N0: 11 of 16 SHEET 3 OF 3 le., 8,7—z74-8757 rrr.mmetexae.eom f +- UnLnr L I WF 920 CROMWELL MARINE CREEK ROAFoUpwrD Mmw cuff.fl e�oo>t7 unm Barr. VOL aua ra/oa ,y lm.rm tm 0= am= :.ear 717S!rA:lrV -GREEK °rfff4Yaria s aha, awl o,c serer +m AMTn,,rw ,,a,,a,o MOUNTAIN ISLAND DR. 0 mr cqr 1e NAlo0 REAI.rY,Lm ra ,a1a.a aw MMIT 4 W EE 23 -24: f ! a s r^ F.14]E11r pm ffi 17CCj 2 V` pD21gpTcr z 24 =Q ! 21 is � U ! 19 z as n .s m 99 f9 TAY arrAau SORRY MOUNTAIN TRL �maarr +a 9149.PO 1010 se y + 9R7cr T n 'm 2f 20 19 fa 17 to 10 r4 /! 17 11 WA7MEw9awr AO cr{0204120094 = �G CPRTcr G 20 PLH10U7VTVEASEWENT �Z30 7� U VFR7CTV CC.4 M1170t79 73 Yf 25 26 Y/ m 29 .>0 '1 r2 27 FF L EE 9jDcGG M E IST SPRINGS DR. to n CV a�Pn�r� • u u n atY PROs t1a 109147 HH w 200 0 100 200 400 LEGEND X` STREET LIGHTS 1 inch = 200 ft. # EX. STREET LIGHTS PATE; 07/31/2016 MARINE CR-E-EK m 1 m a PROJECT 1t 2652-09-01 RAATC.F3� I aMa"ai+r»ere�a rrid.aaPa.,aduaa9s w.r.irp DRAWN BY R. DEGAN SECTION 13 �" "" '-z>� tbpa ra0iebaam/Ilo�raa mmbr. 10099000 CHECKED BY A. TAYLOR STREET LIGHT s 1 a a a a t b o r d e r ITMC� arllntaa77t010 O10- 1 -1a1 SHEET NO. 12 OF 16 SHEET 1 OF 2 to x: 817-274—a 757 •e e.mmatasaa.eam u7urr �1r o CROMWELL MARINE CREEK ROAD 1OL791• PG ars 172 cPR1Cr EE Q AAAA 2 7 e 5 4 J 2 1V 1 2 J 4 5 6 74 O I MOUNTAIN ISLAND DR. E- W I w DD ' 6 7 e 9 10 11 12 15 14 /5 IB 17 IB I° 20 ��Aar 1 U Z J 55 .74 JJ 32 51 30 29 2e 27 25 25 24 2J 22 SORRY MOUNTAIN TRL. 172 W cc JJ —15 W 1 U 9 d 7 e 5 I ! 2 1 rrA" z Fr J2 /6 a2 17X U FJt to a ., E ` d9 u 34 m m 57 Je 50 40 t a J Q JD ID Z 4 CC rr.na� J 20 SALT SPRINGS DR. 5 J 2e = 0 OTTER TRL. Io 9 e 7 e 5 4 7 2 1 27 O 7 2 20 Y U 26 = a J 28 25 Z 4 ©2' LEGEND 24 --j— to Jt0 2 5 26 X STREET LIGHTS 23 a 25 # EX. STREET LIGHTS 22 6 12 W 7 21m 24 iJ 0 e 23 20 14 9 19 22 t5 10 to 1e11 I CC cc 17 200 p 100 200 400 U T(�XB 12 1 2 Y!'pH0 DR Be a 4 1 inch = 200 ft. DATE: 07/31/2018 MARINE CREEK m 1 m a PROJECT # 2s52-09-01 RANCH I d.591g1n99tbp��W109e9y9ndi19ch1n yWnrnp DRAWN BY.• R. DEGAN SECTION 13 '°r°`°m.mt�° '. 2759 008 tbpb r.grb0tb0/Ika6r 096bs: to055o00 STREET LIGHT s 1 9 .9 9 t b 0 r d 9 r CHECKED BY.• A. TAYLOR art I°q t 9 t.:9. 7 5 010 EXHIBIT "C" 5 1 7-4 5 9-15 71 SHEET NO: 13 of is SHEET 2 OF 2 `°' °"-274-57s7 www. mm0tea09.°om 1 urun cslr. 1Q I7.f9t ra>•ra aam CROMWELL MARINE CREEK ROAD Ivalvrr � L.--?J-W.—ft, 691 r.(I.mO$17I 916 W.IILL M IOIa .A1 aRRr OIrRr J PSt MARINE CREEK RANCH a4 on 'w" EE IJ 12 11 10 9 6 MARINE CREEK RANCH WNW R S 1 14 CAO A 9 I] IY Mh,YlR EWE g10r p am Irl MOUNTAIN ISLAND DR. a¢r IElsorrNn rusawXn cgr97A I�ioeiera 13 .--1 "AQ'laREALTY. 1-1L & W13-1P SIGNS E. WVCT W 16 rWrr EE Z, / 2 .! 4 S r4 2J 22 ¢ 1-1 & 13- P SI NS JO'DRAINAGE J vst I71�O EASEMENT Z .. CCI D216148992 24 OPRTCT 21 16 40 39 J6 J7 J6' U 23 20 19 TEMPORARY DRAINA SORRY MOUNTAIN TRL. VOL -I L 9149..PCEASEMENT 26 DRTCT STREET NAME & STOP SIGN 17 STREETTOP /NAME & x (Ri-1) FF G] W 21 20 I9 16 17 16 13 is /J 12 11 WATER UNE 26 G W EA3EMENr 0 CCI z 0204126094 y z apRTCr G 29 Tar PUBLIC UTILITY Tr1 fly EASEMENT2 T� y 2 28 29 JO U CCI D216170179 a-RTcr N STOP SIG ry 22 FF EI (R1-1) JI o d X. STOP SIGN 32 (RI-1) L EE v SALT SPRINGS OR. O ® GG MA NE CR 1,RAACH ' CCI D217293760 re 17 OPRICT 4 Ta u n CITY PROJ.Na 100227 � LE N0.X-2J504 N X. STOP SIGN LEGEND 200 0 100 200 400 STREET SIGNS EX. STREET SIGNS 1 inch = 200 ft. DA TE. 0713112018 MARINE CREEK m m�a PROJECT ! 2652-09-01 RANCH CIM«brlwra.Rr.rtp rrmp..ra+x.mM.p.rrlrp -2759 DRAWN BY. R. DEGAN SECTION 13 t6ro registration se nu 1. 008 tbple regielratlan/Ilanae number. 10088000 STREET SIGNS 519 .a 6 t b o r d e r CHECKED BY: A. TAYLOR arIIngtaa, t9:a9 76010 EXHIBIT "C-1" 817-469-1671 fa■: SHEET NO. 14 OF 16 SHEET 1 OF 2 ww.Inmm0ta 4-6757 • 4sa9.eom umnr _ Es9r Q, CROMWELL MARINE CREEK ROAD 1r°r 1739• PG 245 17x arrrcr Ef= kA r vsE 7 e s • ! z 1Y 1 z ! • s s 7 M STREET NAME & e STOP SIGNS > C\2 (R1-1) MOUNTAIN ISLAND DR. 1-1L & E W13-iP SIGNS W oo 6 7 8 9 10 11 17 1! 11 13 to 17r18 19 20ul �1Aya r� W1-1R STREET NAME & �. � 5f r, W13-1P STOP SIGNS SIGNS (RI-1) U !s 34 s 32 if 30 29 28 I 27 26 26 24 23 22 21 2 F, SURRY MOUNTAIN TRL. '— 17X m 4J n.�1a• x - m W cc m mo.../3... 1 U W !z � z 2 17X a FF !1 x 3 U 32 n J4 33 x 37 38 jo 40 !o 1 s 3 d • �...' J oc ?9 SAL T SPRINGS R. Co 3 28 —" oc = e OTTER TRL.]o W wurwE armc ai > _5, CCI 021729!760 n 10 9 OPRTCr 3 4 3 2 1 0 7 2 29 a CfPRaL No. ioo227 FILE r z-2 s U_ 26 y = s ! 2e d z 25 LEGEND Ex STOP SIG 9 �2 • O 27 (R1-i) 24 -1 10 2 s 26 S TREE T SIGNS 11 2.1 u EX. STREET SIGNS 12 m 7 2 21 + o 1! U e e v 20 49 1• 9 4t! 19 O 21 's 10 STREET NAME & 18 STOP SIGNS (R1_1)to 11 I oc ce 17 200 0 100 200 400 T Xg 12 1 2 U Y OR. ee 3 4 ND HH 1 inch = 200 ft. 7 x STOP SIGN DATE: 07/31/2018 m MARINE' CREEK 1 1 , l PROJECT 2652-09-01 1ma RANCHal bin t+•a+v DRAWN BY. R. DEGAN SECTION 13 ' *otm o 1. 00 tbq•reyt>,vauaa/n�..comber: 10QBBOl' STREET SIGNS 5,3 .a a l b o r 0 a r CHECKED BY.• A. TAYLOR art ataa• texas 7G EXHIBIT "C-1" 817--480-1671 1a:: 817--274-8757 SHEET NO. 15 OF 16 SHEET 2 OF 2 •�o.mmate=ae.com UU 12 11 DAP.RR)PROPOSAL. Page I,!r_ SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Marine Creek Ranch Section 13 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Unit of Specification laid Unit Price Bid Value No Measure Section Na Quantity UNIT I:WATER IMPROVEN IENTS 1 3305.0109 'french Safetv LF 93 05 10 4899 $0.10 $489.90 2 3305.1003 20"CasinS By Open Cut LF 33 0522 42 $41000 $17.220.00 3 3311.0001 Ductile Iron Water Fittings w%'Restraint TON 33 11 11 0.9 57.800.00 $7,020.00 4 3311.0251 8"DIP Water LF 33 11 10 162 $83.00 $13,446.00 5 3311.0261 8"PVC Water Pipe LF 33 11 12 4737 $26.00 5123,162.00 6 3312.0001 Fire Hvdrant EA 39 1240 5 $3.640.00 $18,200.00 7 3312.0108 Connection to Existing 24"Water plain EA 33 1225 1 $8.700.00 58,700.00 8 3312.0117 Connection to Existing 4".12"Water Main EA 33 1225 4 $800.00 53,200.00 9 3312.2003 1"Water Service EA 33 1210 145 $790.00 $114.550.00 10 3312.3003 8"Gate Valve EA 33 1220 9 51.310.00 $11.790.00 TOTAL UNIT 1:WATER IMPROVEMENTS $317,777.90 UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection LF 33 01 31 5248 51.50 $7.872.00 2 3301.0101 Manhole Vacuum Testing EA 33 01 30 21 $110.00 $2.310.00 3 3305.0109 Trench Safely LF 33 05 10 5248 SI.00 55.248.00 4 3331.3101 4"Sewer Service EA 33 31 50 149 $620.00 $88.660.00 .33 31 5 3331,4115 8"Sc%wr Pipe LF 12,33 33 11 10 31 20 5048 $29.50 $148.916.00 6 3111.4116 8"Scwcr Pipe.CSS Back-fill33 11 10.33 31 LF 12 ii z 1 20 120 $4(1.110 $4.300.00 7 3339.0001 Epoxy Nianholc Liner VF 33 39 60 26 $210.00 $5.460.00 33 39 10.33 39 8 3339.1001 4'MallhOle E:\ 20 21 $2.500.00 152.500.00 3 39 1 U.33 39 9 3 339.1003 4'Extra Depth Manhole \'F 211 35 5150.00 55,250.00 TOTAL UNIT It:SANITARY SEWER IMPROVEMENTSi $321,016.0 CM 1IF FORT U'ORTit VANDARI)C ON.S I RI'<'TIi t'o-Penia!&[.-ter I,2015 1)(,4241 n,J Prt,D+a,J_U:W Js 104243 DAP-B Ir)PROPOS.-U. SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Marine Creek Ranch Section 13 UNIT PRICE BID Bidder's Application Project Item lnlbrmation Bidders Proposal Bidlist Item Description Unit of Specification Bid Cnit Price Bid l-afue No. Measure I Section No. (luantnp UNIT III:DRAINAGE IMPROVEMENTS 1 3305.0109 'french Safetv LF 33 05 10 3100 $0.50 St.550.00 2 3341.0201 21"RCP,Class III LF 33 41 10 615 562.00 $38,130.00 3 3341.0205 24"RCP,Class III LF 33 41 10 1567 571.00 511 1,25700 4 _341.0208 27"RCP,Class UI LF 33 41 10 33 577.00 52.541.00 5 3341.0302 30"RCP,Class Ill LF 33 41 10 444 588.00 539,072.00 6 3341.0305 33"RCP.Class III LF 33 41 10 135 5106.00 514.310.00 7 3341.0309 36'RCP.Class Ql 1.17 33 41 10 306 5121.00 S37,026.00 8 3349.0001 4'Stam Junction Bos EA 33 49 10 9 53,900.00 535.100.00 9 3349.5001 10'Curb Inlcl FA 33 49 20 13 S3,500.00 545,500.00 10 3349.5002 15'Curb Inlet FA 33 4920 4 S4,900.00 519.600.00 11 3349.6003 20'Recessed Inlet EA 33 49 20 1 S6,800.00 56,800.00 12 9999.0001 Remove Drop Inlet Apron x Lid I EA 1 I $2.550.001 52.550.00 13 9999.0002 Remove 4'Drop Inlet I EA I 1 5800.00 5800.00 14 9999.0003 Construct Concrete Apron I EA I I S4.020.001 S4.020.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $358,256.00_ Bid Summary UNIT I:WATER IMPROVEMENTS $317,777.90 UNIT II:SEWER IMPROVEMENTS $321,016.00 UNIT III:DRAINAGE IMPROVEMENTS $358,256.00 Total Conslructlon Bid $997,049.90 Contractor agrees to complete WORK for FINALACCEPTANCE within calendar days alter the date when the CONTRACT commences to run as provided in the General Conditions. Bumsco Construction, Inc. r),V�� John urns,President ('IT)*,;r FORT\er)RTH 5"1:M)ARLI t'(,]S FRI.CTU 1\WEAFICAIl 5-UL\'LLOPLIt AW ARULI)PPIJL"IS I-1--,< SgxcYnN,1,^_+,1i 4_43 Lpd P1,1-id UAP 11, 00 42 43 DAP-80 PROPOSAL Pep t or i SECTION 00 42 43 Developer Awarded Proietxe-PROPOSAL FORM Marine Creek Ranch Section 13 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of 1 Specification Bid No. I I Messum Section No. Quantity Unit Price Bid Vane U NdIMPROVE WENTS 1 0241.1300 Remove Cone Cu&&Gutter LF 024115 137 520.00 $2,740.00 2 0241.0401 Remove Concrete Drive SF 0241 13 3675 52.50 59,187.50 3 0241.1100 Remove Asphalt Pvmt SY 024115 564 $20.00 S11,280.00 4 3211.0400 Hydrated Lime TN 32 11 29 435 $155.00 $67,425.00 5 3211.0501 6"Lime Treatment SY 321129 17346 $2.85 550,006.10 6 3211.0502 8"Lime Treatment SY 32 1129 6634 $2.95 $19,570.30 7 3213.0101 6"Cane Pvmt SY 32 13 13 16598 533.20 $551,053.60 8 3213.0105 10"Cone Pvmt SY 32 1313 6234 547.65 $297,050.10 9 3213.0301 4"Con;Sidewalk SF 32 1320 17085 $5.25 589,696.25 10 3213.0301 Barrier Free Ramp,Type R-1 EA 32 1320 16 $2,000.00 $32,000.00 III 3213.0306 Barrier Free Type P•1 EA 321320 4 $1,900.00 57,600.00 12 13217.0001 4"SLD Pvmt Marking HAS LF 32 17 23 1559 $1.30 $2,026.7G 13 3217.0002 4"SLD Pvua Marking HAS LF 32 1723 301 $1.30 5391.30 14 3217.0201 8"SLD Pvmt HAS LF 32 17 23 516 52.75 51,419.00 15 3217.0202 8"SLD Pvmt Marking HAS LF 32 17 23 119 52.75 $327.25 16 3217.0501 24"SLD Pvmt Markin HAE LF 32 1723 11 $16.50 S181.56 17 3217.2102 REFL Raised Marker TY I•C EA 32 17 23 12 S4.95 559.40 18 3217.2104 REFL Raised Marker TY II-C-R EA 321723 60 54.95 $297.00 19 3217.4303 Remove 8"Pvmt Morking LF 32 1723 1290 50.95 S1,225,50 20 3441.4006 Install Ahtm sign Ground Mount EA 34 41 30 24 $450.00 510,800.00 21 9999.0001 Remove Type III Barricade EA 3 $500.00 $1,500.00 22 9999.0002 Type III Barricade EA 1 51,500.00 511500.00 23 3292.0400 Seeding,H dromulch SY 1 3292 13 2889 S 1.50 S4,333.50 TOTAL UNIT IV:PAVING IMPROVEMENTS $1,161.670.001 Contractor agrees to complete WORK for FINAL ACCBPTANCI within 100 calendar days alter the date when the CONTRACT commences to ran as provided in the General Coadido" Lela McQulen Operations Manager Gilco Contracting, Inc. CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PR011 CTS Foes t'eaioe SepeaUer 1.2015 00 42 43 91d PrapsW DAP.A> 00 42 43 DAP-BID PROPOSAL Pyr 1 or 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Marine Creek Ranch Section 13 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BidlistItem Description Unit of Specification Bid Unit Price Bid Value No. Measure Section No. Quantity UNIT V:STREET LICHTING IMPROV ME TS 1 2605.3015 2"CONDT PVC SCH 80 T LF 26 05 33 2200 59.45 $20,790.00 2 3441.3002 Rdwy Illum Assmbly TY 8,1 1,D-25,and D-30 EA 34 41 20 15 $2,417.00 $36,255.00 3 3441.3003 Rdwy Illum Assmbly TY 18,18A,19,and D-40 EA 34 41 20 8 $4,433.00 535,464.00 4 3441.3201 LED Lighting Fixture EA 344120 31 5326.00 $10J06.00 5 3441.3301 Rdwy Illum Foundation TY 1,2,and 4 EA 34 41 20 15 $1,287.00 $19,305.00 6 13441.3302 Rdwy Illum Foundation TY 3,5,6,and 8 EA 34 41 20 1 8 $1,767.00 $14,136.00 7 13441.3401 6-6-6 Triplex Alum Elec Conductor I LF 344 20 1 2200 $3.34 $7,348.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $143,404.001 Bid Summary Contractor agrees to complete WORK for FINAL ACCEPTANCE within /Zj� calendar days after the date when the CONTRACT commences to run as provided In the General Conditions. Submitted by: Rich fe President Independent Utility Construction, Inc. CtTy OF FORT WORTH STANDARD CONMUC71ON SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fans Varna Sepr®bw 1,2015 00 42 47 Bid Propaal_DAPAh COMPLETION AGREEMENT—SELF FUNDED This Completion Agreement("Agreement"), is made and entered into by and between the City of Fort Worth, ("City") and Crystal Lake_Development,_LLC, a Texas limited liability corn12M, authorized to do business in Texas, ("Developer"), effective as of the last date executed by a Party hereto. The City and the Developer may collectively be called the"Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 31.317 acres of land located in the City, the legal description of which tract of real property is marked Exhibit "A"—Legal Description, attached hereto and incorporated herein for all purposes, ("Property"); and WHEREAS, the Developer intends to develop the Property as an addition to the City through plat FP -18-013 or I-S : and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development, Marine Creek Ranch, Section 13 for Paving,Drainage, Water, Sewer,Street Lights and Street Signs ("Improvements"); and WHEREAS, the City has required certain assurances that the Developer will cause to be constructed to City standards the Improvements pursuant to the Community Facilities Agreement; and WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter set forth, it is hereby agreed by and between City and Developer as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs (as shown on Exhibit `B") required to complete the Community Facilities in the aggregate should not exceed the sum of Two Million Three Hundred Two Thousand One Hundred Twenty Three and 90/100's Dollars ($2,302,1239Q), hereinafter called the "Completion City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 1 of 13 Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of the Community Facilities may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. City hereby waives the requirement for developer to deposit a financial guarantee of 100%of the Hard Costs under the CFA Policy. 3. Completion by the Developer. The Developer agrees to complete the Community Facilities and pay all Hard Costs in accordance with City standards, the CFA, the Plat, and the Plans as approved by the City. For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Community Facilities pursuant to Section 6,hereof. 4. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to Developer's Financial Guarantee, as described in the CFA Policy, or other requirements for security in connection with the development of the Property and the completion of the Community Facilities that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions of this Agreement shall control. 5. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a) acceptance by the City of the Community Facilities; or (b) mutual written agreement of the Parties. 6. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Community Facilities are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits, the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 2 of 13 the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. 7. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Community Facilities the following: A. A statement that the City is not holding any security to guarantee any payment for work performed on the Community Facilities; B. A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; C. A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property; and D. A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in (a), (b) and (c) above. 8. Miscellaneous. A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. B. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: (i) Notice to the City shall be addressed and delivered as follows: City of Fort Worth Planning& Development Department 200 Texas Street Fort Worth, Texas 76102 Attention: CFA Division Janie Morales, Development Manager Email: Janie.Morales@fortworthtexas.gov Confirmation Number: 817-392-7810 and/or CFA Division Email: CFAnfortworthtexas.gov Confirmation Number: 817-392-2025 City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 3 of 13 With a copy thereof addressed and delivered as follows: City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Attention: Richard A. McCracken Assistant City Attorney Confirmation Number: 817-392-7611 (ii) Notice to the Developer shall be addressed and delivered as follows: Crystal Lake Development,LLC 3825 Camp Bowie Blvd. Fort Worth, Texas 76107 A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. E. Legal Construction. In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof. G. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to this Agreement. City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 4 of 13 H. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 5of13 Executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH: DEVELOPER: Crystal Lake Development, LLC !? Jesus J.Chapa(0ct 15,2 8) /'. 1d�uv ^��ri Jesus J. Chapa John Cockerham(Oct 9,�J18! Assistant City Manager Name® Title: Date: Oct 15,2018 Date: Oct 9,2018 Approved as to Form &Legality: � Contract Compliance Manager: R�,hard A.McCra-en(Oct 9,2018 By.signing, I acknowledge that I am the Richard A. McCracken person responsible for the monitoring and Assistant City Attorney administration of this contract, including ensuring all performance and reporting ATTEST: F o&� requirements. ✓anie Scarlett Morales Navv T. Ka SY erY Janie Scarlett Morales(Oct 9,2018) Mary J.Kayser(Oct lS,2018) Name: Janie S. Morales Mary J.Kayser '* Title: Development Manager City Secretary XAS M&C: Ill A Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH$ TX City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 6 of 13 LIST OF EXHIBITS ATTACHMENT"1"-CHANGES TO STANDARD AGREEMENT EXHIBIT A- LEGAL DESCRIPTION EXHIBIT B - APPROVED BUDGET City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 7of13 ATTACHMENT 66 1" Changes to Standard Agreement Self-Funded Completion Agreement "NoiV' City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 8 of 13 EXHIBIT A LEGAL DESCRIPTION METES &BOUNDS DESCRIPTION 31.317 ACRES OF LAND BEING A 31.317 ACRE TRACT OF LAND LOCATED IN THE JOSEPH BOMAN SURVEY, ABSTRACT NO. 79, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, BEING A PORTION OF A CALLED 964.473 ACRE TRACT OF LAND AS DESCRIBED IN THE SPECIAL WARRANTY DEED TO HAYCO REALTY, LTD.,A TEXAS LIMITED PARTNERSHIP, FILED FOR RECORD IN VOLUME 14192,PAGE 644, DEED RECORDS, TARRANT COUNTY, TEXAS (DRTCT)AND BEING A PORTION OF A CALLED 19.603 ACRE TRACT OF LAND AS DESCRIBED IN THE SPECIAL WARRANTY DEED TO M & C DEVELOPMENT, LTD.,A TEXAS LIMITED PARTNERSHIP, FILED FOR RECORD IN COUNTY CLERK'S INSTRUMENT NO. D214158673, OFFICIAL PUBLIC RECORDS, TARRANT COUNTY, TEXAS (OPRTCT), SAID 31.317 ACRE TRACT OF LAND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS" FOR THE SOUTHEAST CORNER OF LOT 1, BLOCK J, MARINE CREEK RANCH,AN ADDITION TO THE CITY OF FORT WORTH,TARRANT COUNTY, TEXAS, ACCORDING TO THE PLAT RECORDED IN COUNTY CLERK'S INSTRUMENT NO. D217119504, OPRTCT, SAID BEGINNING POINT HAVING A NAD83 -TEXAS COORDINATE SYSTEM POSITION(GRID) OF N:6994480.7 E:2303052.1 (BEARINGS & COORDINATE VALUES SHOWN HEREON ARE IN REFERENCE TO THE NAD83 - TEXAS COORDINATE SYSTEM -NORTH CENTRAL ZONE,4202, BASED ON GPS OBSERVATIONS UTILIZING THE LEICA GPS REFERENCE NETWORK. ALL DISTANCES SHOWN HEREON WERE ADJUSTED TO SURFACE USING A COMBINED SCALE FACTOR OF 1.00015312510, BASE POINT OF 0,0,0); THENCE NORTH 89 DEGREES 41 MINUTES 35 SECONDS EAST, OVER AND ACROSS SAID CALLED 964.473 ACRE TRACT OF LAND, A DISTANCE OF 210.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MMA 817-469-1671"; THENCE NORTH 00 DEGREES 06 MINUTES 53 SECONDS WEST, A DISTANCE OF 210.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MMA 817-469-1671 THENCE SOUTH 89 DEGREES 41 MINUTES 35 SECONDS WEST, A DISTANCE OF 210.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS" FOR THE SOUTHEAST CORNER OF A RIGHT-OF-WAY DEDICATION, SAME BEING THE NORTHEAST CORNER OF SAID LOT 1, BLOCK J, MARINE CREEK RANCH(CC#D217119504); City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 9 of 13 THENCE NORTH 00 DEGREES 06 MINUTES 53 SECONDS WEST,ALONG THE EAST LINE OF SAID MARINE CREEK RANCH(CC#D217119504),A DISTANCE OF 59.23 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", FROM WHICH AN"X" CUT FOUND IN CONCRETE FOR THE NORTHERNMOST NORTHEAST CORNER OF MARINE CREEK RANCH,AN ADDITION TO THE CITY OF FORT WORTH,TARRANT COUNTY, TEXAS,ACCORDING TO THE PLAT RECORDED IN CABINET A, SLIDE 12800, PLAT RECORDS, TARRANT COUNTY, TEXAS (PRTCT) BEARS SOUTH 89 DEGREES 37 MINUTES 03 SECONDS WEST,A DISTANCE OF 212.00 FEET; THENCE NORTH 89 DEGREES 37 MINUTES 03 SECONDS EAST, ALONG THE SOUTH RIGHT-OF-WAY LINE OF SAID CROMWELL MARINE CREEK ROAD,A DISTANCE OF 1610.80 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE SOUTH 00 DEGREES 05 MINUTES 53 SECONDS EAST, DEPARTING SAID SOUTH RIGHT-OF-WAY LINE,AT A DISTANCE OF 61.9 FEET, PASSING THE NORTHWEST CORNER OF LOT 1, BLOCK 1, EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL NO. 13 ADDITION,AN ADDITION TO THE CITY OF FORT WORTH,TARRANT COUNTY, TEXAS,ACCORDING TO THE PLAT RECORDED IN CABINET A, SLIDE 11779, PRTCT,AT A DISTANCE OF 660.1 FEET, PASSING THE SOUTHWEST CORNER OF SAID LOT 1, BLOCK 1, EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL NO. 13 ADDITION, SAME BEING ON THE NORTH LINE OF SAID CALLED 19.603 ACRE TRACT OF LAND,AND CONTINUING IN ALL A TOTAL DISTANCE OF 775.09 FEET,TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE SOUTH 89 DEGREES 33 MINUTES 57 SECONDS WEST,A DISTANCE OF 11.03 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING ON THE WEST LINE OF SAID CALLED 19.603 ACRE TRACT OF LAND; THENCE SOUTH 00 DEGREES 23 MINUTES 42 SECONDS EAST,ALONG SAID WEST LINE,A DISTANCE OF 507.27 FEET,TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING THE SOUTHWEST CORNER OF LOT 23, BLOCK 1, MARINE CREEK RANCH,AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS,ACCORDING TO THE PLAT RECORDED IN COUNTY CLERK'S INSTRUMENT NO. D216024776, OPRTCT; THENCE SOUTH 10 DEGREES 49 MINUTES 40 SECONDS WEST, CONTINUING ALONG THE WEST LINE OF SAID CALLED 19.603 ACRE TRACT OF LAND,A DISTANCE OF 184.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS" ON THE NORTH RIGHT-OF-WAY LINE OF TUXBURY POND DRIVE, A 50-FOOT PUBLIC RIGHT-OF-WAY, BEING THE SOUTHWEST CORNER OF LOT 1, BLOCK I, OF SAID MARINE CREEK RANCH(D216024776), AND BEING THE City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 10 of 13 EASTERNMOST CORNER OF MARINE CREEK RANCH, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS,ACCORDING TO THE PLAT RECORDED IN COUNTY CLERK'S INSTRUMENT NO. D217293760, OPRTCT; THENCE NORTH 79 DEGREES 10 MINUTES 03 SECONDS WEST,ALONG SAID NORTH RIGHT-OF-WAY LINE, A DISTANCE OF 254.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING THE SOUTHEAST CORNER OF LOT 16, BLOCK CC, OF SAID MARINE CREEK RANCH(D217293760); THENCE NORTH 00 DEGREES 17 MINUTES 53 SECONDS WEST,ALONG THE EAST LINE OF BLOCK CC, A DISTANCE OF 737.78 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING THE NORTHEAST CORNER OF LOT 3, BLOCK CC, OF SAID MARINE CREEK RANCH(D217293760); THENCE SOUTH 89 DEGREES 42 MINUTES 07 SECONDS WEST, ALONG THE NORTH LINE OF SAID LOT 3, BLOCK CC,A DISTANCE OF 115.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING ON THE EAST RIGHT-OF-WAY LINE OF HICKORY HILLS LANE, A 50-FOOT PUBLIC RIGHT-OF- WAY; THENCE NORTH 00 DEGREES 17 MINUTES 53 SECONDS WEST, ALONG SAID EAST RIGHT-OF-WAY LINE, A DISTANCE OF 15.00 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE SOUTH 89 DEGREES 42 MINUTES 07 SECONDS WEST, OVER AND ACROSS SAID HICKORY HILLS LANE,AND ALONG THE NORTH LINE OF BLOCK FF, OF SAID MARINE CREEK RANCH(D217293760),A DISTANCE OF 1010.62 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING THE NORTHWEST CORNER OF LOT 23, BLOCK FF, OF SAID MARINE CREEK RANCH (D217293760); THENCE SOUTH 14 DEGREES 00 MINUTES 23 SECONDS EAST,ALONG THE WEST LINE OF SAID LOT 23, BLOCK FF,A DISTANCE OF 126.14 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING ON THE NORTH RIGHT-OF-WAY LINE OF SALT SPRINGS DRIVE,A 50-FOOT PUBLIC RIGHT-OF-WAY, AND BEING AT THE BEGINNING OF A NON-TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 265.00 FEET; THENCE ALONG SAID CURVE TO THE LEFT,AND SAID NORTH RIGHT-OF-WAY LINE, THROUGH A CENTRAL ANGLE OF 10 DEGREES 55 MINUTES 03 SECONDS, AN ARC LENGTH OF 50.49 FEET, AND HAVING A LONG CHORD WHICH BEARS SOUTH 70 DEGREES 32 MINUTES 04 SECONDS WEST,A CHORD LENGTH OF 50.42 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 11 of 13 THENCE NORTH 73 DEGREES 24 MINUTES 18 SECONDS WEST,A DISTANCE OF 14.75 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE SOUTH 69 DEGREES 06 MINUTES 20 SECONDS WEST,A DISTANCE OF 61.01 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE SOUTH 64 DEGREES 18 MINUTES 42 SECONDS WEST,A DISTANCE OF 126.86 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE NORTH 75 DEGREES 51 MINUTES 26 SECONDS WEST,A DISTANCE OF 14.15 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING ON THE EAST RIGHT-OF-WAY LINE OF HUFFINES BOULEVARD, A VARIABLE WIDTH PUBLIC RIGHT-OF-WAY,AND BEING AT THE BEGINNING OF A NON-TANGENT CURVE TO THE LEFT HAVING A RADIUS OF 1100.00 FEET; THENCE ALONG THE EAST RIGHT-OF-WAY LINE OF SAID HUFFINES BOULEVARD, THE FOLLOWING CALLS: ALONG SAID NON-TANGENT CURVE TO THE LEFT,AND IN A NORTHWESTERLY DIRECTION, THROUGH A CENTRAL ANGLE OF O1 DEGREES 38 MINUTES 08 SECONDS,AN ARC LENGTH OF 31.40 FEET,AND HAVING A LONG CHORD WHICH BEARS NORTH 32 DEGREES 11 MINUTES 46 SECONDS WEST,A CHORD LENGTH OF 31.40 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS", BEING AT THE BEGINNING OF A CURVE TO THE RIGHT HAVING A RADIUS OF 1050.00 FEET; ALONG SAID CURVE TO THE RIGHT,AND IN A NORTHWESTERLY DIRECTION, THROUGH A CENTRAL ANGLE OF 16 DEGREES 35 MINUTES 18 SECONDS,AN ARC LENGTH OF 602.03 FEET,AND HAVING A LONG CHORD WHICH BEARS NORTH 16 DEGREES 35 MINUTES 18 SECONDS WEST,A CHORD LENGTH OF 593.82 FEET, TO A 5/8 INCH CAPPED IRON ROD SET STAMPED "MYCOSKIE MCINNIS"; THENCE NORTH 89 DEGREES 41 MINUTES 35 SECONDS EAST,DEPARTING SAID EAST RIGHT-OF-WAY LINE, AT A DISTANCE OF 12.00 FEET, PASSING THE SOUTHWEST CORNER OF AFOREMENTIONED LOT 1, BLOCK J, MARINE CREEK RANCH(D217119504), AND CONTINUING IN ALL A TOTAL DISTANCE OF 212.00 FEET,TO THE POINT OF BEGINNING,AND CONTAINING 31.317 ACRES (1,364,185 SQUARE FEET) OF LAND, MORE OR LESS. City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 12 of 13 EXHIBIT B APPROVED BUDGET Section I Water $317,777.90 Sewer $321,OI 6.00 Sub-total $638,793.90 Section II Interior Streets $1,161,670.00 Storm Drains $ 358,256.00 Sub-total $1,519,926.00 Section III Street Lights $143,404.00 Sub-total $143,404.00 TOTAL $2,302,123.90 City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 13 of 13