HomeMy WebLinkAboutContract 33572 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 3np—
WHEREAS, One Prairie Meadows, Ltd. , hereinafter called "Developer",
desires to make certain improvements to The Villages of Woodland Springs West,
Phase V Section 7 , an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Mehrdad Moayedi , its
duly authorized General Partner , and the City, acting herein by and through Marc
Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants
and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II,paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
OFFI-.'l`_
p�,v r!1
06-02-06 PO4 :43 IN Ci981f 3 Nl-,:12 ,lr2y
CFA TPW5-7.doc 1 QQ U P�
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in Part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA TPW5-7 2
Water(A) None; Sewer(A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $242,601.19.
Developer
Item Cost City Cost Total Cost
A. Construction
1. Streets $162,987.91 162,987.91
2. Storm Drainage $69,094.00 69,094.00
3. Street Lights Tri-Count $936.00 936.00
4. Street Name Signs $300.00 300.00
B. Engineering Design
C. Construction Engineering
and Management by DOE $ $
(4%) 9,283.28 9,283.28
$ $
TOTALS 242,601.19 $ - 242,601.19
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
61
CFA TPW5-7.doc 3 �,
4. Street Lights to be installed by Tri-County Electric Co-operative
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affixed �said ev to er
dhas executed this instrument in triplicate, at Fort Worth,Texas this the ffd y of
,2004
Approval Recommended:
Transportation and Public Works
Department
NO M&C RFQUIRED
Robert Goode, P. E.
Director
ATTEST: City Of ForWorth
Y}(1ar+-then �ri Marc O
City Secretary Assistant City Manager
Appro as to Form:
Assistant ity Attorney
ATTEST: DEVELOPER
By: One Prairie Meadows, Ltd.,
Corporate Secretary a Texas limited partnership
By: Centamtar Terras, L.L.C.,
A Texas limited liability company,
Its General Partner
By:
Mehrdad Moayedi,51anager
RECEIVED
CFA TPW5-7 4
PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: ONE PRAIRIE MEADOWS, LTD.,DEVELOPER
c/o CARTER & BURGESS, INC.
FOR: STREET IMPROVEMENTS FOR
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V, SECTION 7
DEPARTMENT OF ENGINEERING No. 4748
Includes the furnishing of all materials, except materials specified to be furnished by the City,
equipment and labor for the installation of street improvement and all necessary appurtenances
and incidental work to provide a complete and serviceable project designated as:
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidders, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications for Water Department Projects, the
site of the project and understanding the amount of work to be done, and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the City Engineering Department of the City of Fort Worth, Texas; and binds himself
upon acceptance of this Proposal to execute a contract and furnish an approved Performance
Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by
the Contract Documents for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
i
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
STREET IMPROVEMENTS
210 1. 7,883 S.Y. 6" Lime Stabilized Subgrade
(Includes Preparation of Subgrade),
complete in place for the sum of
One Dollar&
Fifty Five Cents per Square Yard $ 1.55 $ 12,218.65
212 2. 118 Tons Lime for Subgrade (30#/S.Y.)*
complete in place for the sum of
Eighty Dollars &
Zero Cents per Ton $ 80.00 $ 9,440.00
N:1JOB10138891Spec1013889.020A.doc
n��
CITY x6ECMIN�`I aIUI
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
314 3. 7,627 S.Y. 6" Reinforced Concrete Pavement
with 7" Curb, complete in place for
the sum of
Eighteen Dollars &
Thi Ei ht Cents per Square Yard $ 18.38 $ 140,184.26
4. 29 L.F. Removal of End of Road Barricade,
complete in place for the sum of
Five Dollars &
k
Zero Cents per Linear Foot $ 5.00 $ 145.00
5. 1 L.S. Storm Water Management
One Thousand Dollars &
Zero Cents per Lump Sum $ 1,000.00 $ 1,000.00
TOTAL STREET IMPROVEMENTS --- $ 162,987.91
City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City
of Fort Worth Construction Inspection Department.
SUMMARY
Total Street Improvements $ 162,987.91
Payment, Performance & Maintenance Bond $ 1,534.00
Total Amount of Contract $ 164,521.91
N:\JOB\013889\Spec\013889.020A.doc l�, a(' TO
' 7
r''�0'1�11� tf 1'
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20.04(F) of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject
to State sales taxes under House Bill 11, enacted August 15, 1991.
The successful Bidder shall be required to complete the attached Statement of Materials and Other charges at
the time of executing the contract.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City
Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices.
The undersigned agrees to complete all work covered by these Contract Documents within 20 working
days from and after the date for commencing work, as set forth in the written Work Order to be issued by the
Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as
established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached
deposit check in the sum of 5% GAB Dollars Bid Bond is to become the property of One Prairie Meadows,
Ltd. or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within
the time set forth as liquidated damages for delay and additional work caused thereby.
pectfully submitted,
MARIO C A SON EXCAVATING, INC.
racola,
:
gce President
e:
Address:
10950 Research Road
Frisco, Texas 75034
(S E A L) If Bidder is Corporation
Date June 22, 2005
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
N:\JOB\013889\Spec\013889.020A.doc ���� 3i,� rz a
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
SECTION C - STORM DRAIN SYSTEM
1. 33 L.F. 39" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Ninety Four Dollars &
Zero Cents per Linear Foot
$ 94.00 $ 3,102.00
2. 615 L.F. 36" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Seventy Three Dollars &
Zero Cents per Linear Foot
$ 73.00 $ 44,895.00
3. 42 L.F. 24" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Forty Four Dollars &
Zero Cents per Linear Foot
$ 44.00 $ 1,848.00
525 4. 690 L.F. Trench Safety
Zero Dollar&
Ten Cents per Linear Foot
$ 0.10 $ 69.00
5. 4 Ea. 4' Square Manhole, complete in
place for the sum of
Three Thousand Dollar&
One Hundred Dollars &
Zero Cents per Each $3,100.00 $ 12,400.00
IAli 11 E�C 0
Ph
N:\10B\013889\Spec\013889.020B.doc P-10
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
6. 2 Ea. 15' Standard Curb Inlet, complete in
place for the sum of
Two Thousand
Nine Hundred Forty Dollars &
Zero Cents per Each $ 2,940.00 $ 5,880.00
7. 1 Ea. Remove existing drop inlet, complete
in place for the sum of
Two Hundred Dollar &
Zero Cents per Each $ 200.00 $ 200.00
8. 1 Ea. Connect to existing 39" RCP,
complete in place for the sum of
Two Hundred Dollars &
Zero Cents per Each
$ 200.00 $ 200.00
9. 1 L.S. Storm Water Management, complete
in place for the sum of
Five Hundred Dollars &
Zero Cents per Lump Sum $ 500.00 $ 500.00
SECTION C - - - STORM DRAIN SYSTEM: $ 69,094.00
SUMMARY
Section A Water System $ 96.522.80
Section B Sanitary Sewer System $ 114,027.05
Section C Storm Drain System $ 69,094.00
Payment, Performance & Maintenance Bond $ 7,684.00
Total Amount of Bid $ 287,327.85
n, C.l
NAJOB\013889\Spec\013889.020B.doc P-11 �'
PART B - PROPOSAL (cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid security in the amount of 5% is to become the property of the
City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within
the time above set forth, as liquidated damages for delay and additional work caused thereby.
The undersigned bidder certifies that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has
read and thoroughly understands all the requirements and conditions of those General Documents and these
specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants to the
undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended
by City Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order by the Owner,
and to complete the contract within 40 working days after beginning construction as set forth in the written.
work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
[ ] A. The principal place of business of our company is in the State of
(] Nonresident bidders in the State of , our principal place of business are
required to be_percent lower than resident bidders by state law. A copy of the statute is
attached.
[] Nonresident bidders in the State of , our principal place of business, are not
required to underbid resident bidders.
[ B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.
N:\JOB\013889\Spec\013889.0208.doc P-12
Receipt is acknowledged of the following addenda:
Addendum No. 1
Respectfully submitted,
FourConst ti� n Inc.
{ SEAL )
BY:
Ja on J. Dan' s
If Bidder is Corporation.
TITLE: .P. oferations
ADDRESS: 11200 Old Seagoville Road
Balch Springs, TX 75180
N:\JOB\013889\Spec\013889.020B.doc P_13
III. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 2 EA $ 01000 $00, 000 . 00
MID-BLOCK RESIDENTIAL 3 EA $ 01000 $00, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 0, 000 $00, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 0, 000 $ --0--
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 01000 $ --0-
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 01000 $ __0__
RELOCATE EXISTING LIGHT 0 EA $ 01000 $ --0--
0 (200 watt lights) x $7 . 05 (per light) x 24 months = $00, 000. 00
6 (100 watt lights) x $6.50 (per light) x 24 months = $936.00
Total: $936.00
The Street Lights will be installed by TRI County Electric Cooperative
the developers initial 24- month power charge will be $936.00
After the initial 24-month power charge the City of Fort Worth, WILL
ASSUME THE POWER COST.
CFA CODE #2005022
(REVISED 07-27-2005)
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V - SECTION VII
February 14, 2005
Fort Worth, Texas July 27, 2005
PAGE I OF EXHIBIT C
2. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of THE Director.
3. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
4 . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less, than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities" .
5. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational.
6. A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points.
7 . The developer shall pay the initial two year power cost to TRI-
COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the
City of Fort Worth, will assume the power cost.
8 . The developer or their contractor shall contact City' s street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-6596 to insure proper inspection of
work.
TOTAL DEVELOPER'S COST $936.00
THE VILLAGES OF WOODLAND SPRINGS, PHASE V - SECTION VII
February 14, 2005
Fort Worth, Texas February 14, 2005
PAGE II OF EXHIBIT C
CFA CODE #2005022
"STREET LIGHTS"
INTERSECTIONS
HOUSTON WOOD DR & WALDEN WOOD DR 1
WALDEN WOOD DR & MILBY OAKS DR 1
MID - BLOCK
HOUSTON WOOD DR 2
WALDEN WOOD DR 1
CHANGE OF DIRECTIONS
HOUSTON WOOD DR 1
WALDEN WOOD DR 2
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V - SECTION VII
PAGE III OF EXHIBIT C
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following three (3) intersections at a cost
to the Developer of $300.00:
Walden Wood Dr & Milby Oaks Dr
Walden Wood Dr & Houston Wood Dr
Walden Wood Dr & Houston Wood Dr
Villages of Woodland Springs, Phase V, Section 7
CFA code: 2005022 February 12, 2005
-KE E -
WESTP0 T Jy
----------
PK
0 0 ����Q
SN KELLER-IlASLET RD.
z �
= ZCi
OJT a2
LOCA ION o `2
�.___
m CAYLOR RD.W
0
z
W
0:
to z KELLER H CKS
_ >
z
a GOLDEN T.
V J
TRIANGLE BLV
FM 1 09
N
NOT TO SCALE
LOCATION MAP
THE VILLAGES OF
WOODLAND SPRINGS WEST
Ca
PHASE V - SECTION 7 1'1'e1' Burgess
CARTER & BURGESS,INC.
777 AWN STREET
FORT WORTH,T%76102
On71 73.5-6000
PROJECT NO. 013889.020.1.630
-GN=qo\Job\ 013889\oly\ Phase V, Section T\8897IoTa.dOn PAGE 1 OF 6
36 37
38
• / /
JJ � 11 j'
/ 1
31
Jz 43 44
30 to
1 29 19 45
o• re •` 20 Is
CCC���
4 p4' z7 . 21
q 14 46
16 a zz 13 47 ,f
i • >rl 11
04 23 12 48
24 11 49
zJ 15 • SO \ ...�
IO • ,
zl ♦• '
27 9 q • 52
' a
20 . re 7 JJ
/ 19 6 51 /
. 30 5 55 � fbv
•• +y
' ,� 36
p
37 J � ♦• • • '
IJ •OG • 1 '• 17
14 3
1J • •• i • l6
lz • l5
- 11 • 1 ♦ II
ID �'
12
- aV 13
q O�� ♦ l D I I � `•
41/4
SCALE1 1" = 200'
i•
STREETS
LEGEND EXHIBIT 'B'
PROP. 29' 13/13r// THE VILLAGES OF
ROADWAY/50' ROW WOODLAND SPRINGS WES'
PROP.t BY HOMEBU I LDER) �����• P o EC"I'ION 7
4' S I DEWALK ............• N� ,
PROP. 4' S I DEWALK JyBYr�SS
( BY DEVELOPER)
R• �^6URGE55,INC.
STRLIMITS OF PROJECT 7J5R000E�
O ORT}1,EE 76102
PROJECT NO. 013889.020.1.630
)CN=ps\Job\ 013889\o1v\ Phase V, Section T\889TIo?a.dgn PACE 4 OF 6
♦ G� 5~
♦ G
a♦ QP♦4
A
36
37 ♦ !
� 6j. f3
35
` 3e `
33 �.p, ,1
t4- 43
31 / 7 4'MH 444'MH
30
n !`
/4##
"`§-lbw' 29 19 is + 45'^
27
41
41 Z3 21 to so
Q" TY 26 9 3 t
Tl Y7 e q 5t r
zo Pe q
Ao 7 � 93 C
/ 19 / 29 6
le ]0 5 /
17 31 , SB
32 3
�`
is 17
3 �'(4
4 4�
13 v0 16 Fj4i
o7p (�
IT 15
gyp' to 13
lb
It
10
q
,SPF a� "oE ti
,Y 5 SCALEa 1 — 200
4P
STORM DRAIN
LEGEND EXHIBIT 'B-1'
PROP. STORM DRAIN LINE THE VILLAGES OF
PROP. INLET r WOODLAND SPRINGS WES'
PROP. MANHOLE PHASE V - SECTION 7
PROP. HEADWALL --{ Carter Burgess
0
EXIST. STORM DRAIN LINE __= CARTER & BURGESS,INC.
777 MNN S"M
LIMITS OF PROJECT —— —' FOU WO 1N'7176102
1e17)77s-6000
PROJECT NO. 013889.020.1.630
OGN=po\Job\ 013889\oly\ Phase V. section T\889TIafa.dgn PAGE 5 OF 6
5
E�ppO�Ph�'
0 36 37 Jy.
JB
0 v0
JS �
34 40 \
' !! 4-� 41
41
!2
O.• 43
JI / l7 `ted 44
30 Is
h' 29 19 16
13 /
2945
20 15 \
0-"1"
17 4 2/ 14 46
01 22 /J 47
15 {a 2! 11 48
\ /.
24 24 /1 49
23 �.� 25 10 50
0 22 26 9 51 \/
0 21 27 B 941 52 _
20 29 7 �9 5!
'
19 19 d' 54
6 rY
' 19
/ 30 5 a 55 l�-i fjU
0C, L�
17 JI 4 56
0 J2 J
ss. O16 O
36 � 2 9
1 A,
15 / 17 G�Q�44
/4 -C!� Yv�.p y¢h4i
/J d 16
12 15
A IJ
q� R•
U9 _6 /0
Ste,
o` N
n
SCALES 1 = 200'
R
e
y~
STREET LIGHTS
LEGEND EXHIBIT 'C'
PROP. SINGLE STREET LIGHT • THE VILLAGES OF
EXIST. SINGLE STREET LIGHT 0 WOODLAND SPRINGS WES'
( ON STEEL POLE WITH STREET PHASE V - SECTION 7
AND STOP SIGNS ATTACHED)
PROP. STREET SIGN Cart" ' Bwg"3
EXIST. STREET SIGN Q CARTER & BURGESS,INC.
VN
LIMITS OF PROJECT STREET FO WO
RT WORTH, X
������ FOTX 76102
(917)7356000
PROJECT NO. 013889.020.1.630
AGN=pi\)ob\ 013889\oiv\ Phase V, Seotion T\8897Icfa.dgn PAGE 6 OF 6