WHEREAS, One Prairie Meadows, Ltd. , hereinafter called "Developer",
desires to make certain improvements to The Villages of Woodland Springs West,
Phase V Section 6 , an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Mehrdad Moayedi , its
duly authorized General Partner , and the City, acting herein by and through Marc
Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants
and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
06-02-06 PO4 :46 IN vFF]�;�yj�
��1
CFA TPW5-6.doc 1 ; �`I►�°
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA TPW5-6 2 r1 a )
Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $316,894.96.
Developer
Item Cost City Cost Total Cost
A. Construction $ -
1. Streets $240,193.52 240,193.52
2. Storm Drainage $62,340.10 62,340.10
3. Street Lights Tri-Count $1,560.00 1,560.00
4. Street Name Signs $700.00 700.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
(4%) 12,101.34 12,101.34
TOTALS 316,894.96 $ - 316,894.96
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA TPW5-6.doc 3
4. Street Lights to be installed by Tri-County Electric Co-operative
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, said D veloper
has executed is instrument in triplicate, at Fort Worth,Texas this the May of
920040
Approval Recommended:
Transportation and Public Works
Department
NO M&C REQUIRED
Robert Goode, P. E.
Director
ATTEST: City Of Fort Worth
By
arc t
City Secretary Assistant City Manager
7Appro2dto Form:
01
�Agistant Vy Aeforriey
ATTEST: DEVELOPER
By: One Prairie Meadows, Ltd.,
Corporate Secretary a Texas limited partnership
By: Centamtar Terras, L.L.C.,
A Texas limited liability company,
Its General Partner /
By:
Mehrdad Moayedi, .:Tanager
RECEIVED
CFA TPW5-6 4 c4irf_M144H I PY
Y
PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: ONE PRAIRIE MEADOWS, LTD AND .
DEVELOPER
c/o CARTER & BURGESS, INC.
:FOR: STREET IMPROVEMENTS FOR
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V, SECTION 6
DEPARTMENT OF ENGINEERING No. 4763
Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and
labor for the installation of street improvement and all necessary appurtenances and incidental work to provide
a complete and serviceable project designated as:
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the
Contract Documents, including plans, special contract documents, and the General Contract Documents and
General Specifications for Water Department Projects, the site of the project and understanding the amount of
work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment
and material except as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the
City Engineering Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this
Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance
Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and
completing of the said work. Contractor proposes to do the work within the time stated and for the following
sums:
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
STREET IMPROVEMENTS
1. 11,410 S.Y. 6" Lime Stabilized Subgrade
(Includes Preparation of Subgrade), -
complete in place for the sum of
One Dollar&
_Fifty Five Cents per Square Yard $ 1.55 $ 17,685.50
2. 171 Tons Lime for Subgrade (30#/S.Y.)
complete in place for the sum of
Eighty Dollars &
Zero Cents per Ton $ 80.00 $ 13,680.00
N AJOB\013889\Spec\013889.010c.doc
P
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
3. 11,029 S.Y. 6" Reinforced Concrete Pavement
with 7" Curb, complete in place for
the sum of
Eighteen Dollars &
Thi Ei ht Cents per Square Yard $ 18.38 $ 202,713.02
4. 87 L.F. Removal of End of Road Barricade,
complete in place for the sum of
Five Dollars &
Zero Cents per Linear Foot $ 5.00 $ 435.00
5. 585 S.Y. Remove Existing Asphalt Pavement,
complete in place for the sum of
is
Eight Dollars &
Zero Cents per S uare Yard $8.00 $4,680.00
6. 1 L.S. Storm Water Management
One Thousand Dollars &
Zero Cents per Lump Sum
$ 1,000.00 $ 1,000.00
TOTAL STREET IMPROVEMENTS --- $ 240,193.52
ity.of Fort Worth.requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the
,;ity of Fort Worth Construction Inspection Department.
SUMMARY
Total Street Improvements $ 240,193.52
Payment, Performance & Maintenance Bond $ 2,301.00
Total Amount of Contract $ 242,494.52
N:\JOB\013889\Spec\013889.010c.doc M 5i5 `�jq �n �
�� .i NV�i N, UK.
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20.04(F)of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject
to State sales taxes under House Bill 11, enacted August 15, 1991.
The successful Bidder shall be required to complete the attached Statement of Materials and Other charges at
the time of executing the contract.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City
Code Sections 13-A-21 through 13-A-29), prohibiting discrimination:in, employment practices.
The undersigned agrees to complete all work covered by these Contract Documents within 20 working days
from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner,
and to pay not less than the"Prevailing Wage Rates for Streets, Drainage and Utility Construction," as
established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached
deposit check in the sum of 5% GAB Dollars Bid Bond) is to become the property of One Prairie Meadows,
Ltd and . or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed
within the time set forth as liquidated damages for delay and additional work caused thereby.
Respectfully sub tted,
MARIO SI & ONS CAVATING, INC.
By:
Title: chae Si ola, Vice President
Address: 0950 Research Road
Frisco, Texas 75034
(S E A Q If Bidder is Corporation
Date June 22, 2005
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
n G� 1, 0• N r^ i 1
N:1JOB10138891Spec1013889.010c.doc
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
SECTION C - STORM DRAIN SYSTEM
1. 28 L.F. 36" Class III R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Seventy Three Dollars &
Fifteen Cents per Linear Foot
$ 73.15 $2,048.20
2. 108 L.F. 33" Class III R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Sixty One Dollars &
Twenty Cents per Linear Foot
$ 61.20 $ 6,609.60
3. 248 L.F. 30" Class III R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Fifty Four Dollars &
Ten Cents per Linear Foot $ 54.10 $ 13,416.80
4. 110 L.F. 27" Class Ill R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Dollars &
Cents per Linear Foot $52.00 $5,720.00
5. 18 L.F. 24" Class III R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Forty One Dollars &
Eighty Five Cents per Linear Foot $ 41.85 $ 753.30
NAJOB\013889\Spec\013889.0100.doc 'kit
P-9 FT. uOiiTHI T�i�
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
6. 133 L.F. 21" Class III R.C. Pipe, including trench
excavation and backfill, complete in
place for the sum of
Thirty Six Dollars &
Ninety Cents per Linear Foot $ 36.90 $ 4,907.70
7. 645 L.F. Trench Safety
Zero Dollar&
Ten Cents per Linear Foot
$ 0.10 $ 64.50
8. 2 Ea. 4' Square Manhole, complete in place for
the sum of
Two Thousand Seven Hundred Dollars &
Zero Cents per Each $ 2,700.00 $ 5,400.00
9. 1 Ea. 5' Square Manhole, complete in place for
the sum of
Three Thousand Two Hundred Dollars &
Zero Cents per Each
$ 3,200.00 $3,200.00
10. 8 Ea. 10' Standard Curb Inlet, complete in
place for the sum of
Two Thousand
Four Hundred Fifteen Dollars &
Zero Cents per Each $ 2,415.00 $ 19,320.00
11. 1 L.S. Remove existing 48" headwall, complete
in place for the sum of
Two Hundred Dollar&
Zero Cents per Lump Sum $ 200.0 1
N:\JOB\013889\Spec\013889.010D.doc � Cl �ap +
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
12. 1 Ea. Connect to existing 48" RCP,
complete in place for the sum of
Two Hundred Dollars &
Zero Cents per Each
$200.00 $ 200.00
13. 1 L.S. Storm Water Management, complete
in place for the sum of
Five Hundred Dollars &
Zero Cents per Lump Sum $ 500.00 $ 500.00
SECTION C - - - STORM DRAIN SYSTEM: $ 62,340.10
SUMMARY
Section A Water System $ 151.858.40
Section B Sanitary Sewer System $ 138.297.25
Section C Storm Drain System $ 62,340.10
Payment, Performance & Maintenance $ 8.500.00
Total Amount of Bid $ 360,995.75
NAJOB\013889\Spec\013889.0100.doc
P-11
PART B - PROPOSAL (cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid security in the amount of 5% is to become the property of the
City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within
the time above set forth, as liquidated damages for delay and additional work caused thereby.
The undersigned bidder certifies that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has
read and thoroughly understands all the requirements and conditions of those General Documents and these
specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants to the
undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended
by City.Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order by the Owner,
and to complete the contract within 45 working days after beginning construction asset forth in the written
work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
[ ] A. The principal place of business of our company is in the State of
[] Nonresident bidders in the State of , our principal place of business are
required to be_percent lower than resident bidders by state law. A copy of the statute is
attached.
[] Nonresident bidders in the State of , our principal place of business, are not
required to underbid resident bidders.
[x] B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.
NAJOB\013889\Spec\013889.0100.doc
mlua
Y O �vr'a N Y' H •4r'L
Receipt is acknowledged of the following addenda:
Addendum No. 1
Respectfully submitted,
Four Cons ct' n Inc.
( SEAL )
BY:
TvaP5.
on J. D is
If Bidder is Corporation. TITLE: of Operations
ADDRESS: 1 0 Old Seagoville Road
Balch Springs, TX 75180
NAJOB\013889\Spec\013889.0100.doc
P-13
7 Ue L����✓'���Uti9 ��b e
i
III. STREET LIGHTS:
1 . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 6 EA $ 01000 $00, 000. 00
MID-BLOCK RESIDENTIAL 2 EA $ 01000 $00, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 2 EA $ 0, 000 $00, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 01000 $ --0--
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 0, 000 $ --0-
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 01000 $ __0__
RELOCATE EXISTING LIGHT 0 EA $ 01000 $ --0--
0 (200 watt lights) x $7 . 05 (per light) x 24 months = $00, 000. 00
10 (100 watt lights) x $6.50 (per light) x 24 months = $1,560.00
Total: $1,560.00
The Street Lights will be installed by TRI County Electric Cooperative
the developers initial 24- month power charge will be $1,560.00
After the initial 24-month power charge the City of Fort Worth, WILL
ASSUME THE POWER COST.
CFA CODE #2005021
THE VILLAGES OF WIOODLAND SPRINGS WEST, PHASE V - SECTION VI
February 12, 2005
Fort Worth, Texas February 16, 2005
PAGE I OF EXHIBIT C
U Inti$
2. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of THE Director.
3. Streetlights on arterial streets shall be installed with underground
conduit and conductors .
4 . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities".
5. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational .
6. A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points.
7 . The developer shall pay the initial two year power cost to TRI-
COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the
City of Fort Worth, will assume the power cost.
8 . The developer or their contractor shall contact City' s street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-6596 to insure proper inspection of
work.
TOTAL DEVELOPER' S COST $1,560.00
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V - SECTION VI
February 12, 2005
Fort Worth, Texas February 12, 2005
PAGE II OF EXHIBIT C
CFA CODE #2005021
"STREET LIGHTS"
INTERSECTIONS
MOUNTAIN LION DR & WALDEN WOOD DR 1
WALDEN WOOD DR & RED WOLF DR 1
WALDEN WOOD DR & RING TAIL DR 1
WALDEN WOOD DR & FRISCO WOOD DR 1
FRISCO WOOD DR & BRETTON WOOD DR 1
FRISCO WOOD DR & N. RIVERSIDE DR 1
MID BLOCK
BRETTON WOOD DR 2
CHANGE OF DIRECTIONS
BRETTON WOOD DR 2
THE VILLAGES OF WOODLAND SPRINGS WEST, PHASE V - SECTION VI
PAGE III OF EXHIBIT C
ME
F0 179, Yalo
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following seven (7) intersections at a
cost to the Developer of$700.00:
N Riverside Dr & Frisco Wood Dr
Bretton Wood Dr & Frisco Wood Dr
Walden Wood Dr & Frisco Wood Dr
Walden Wood Dr & Ringtail Dr
Walden Wood Dr & Red Wolf Dr
Walden Wood Dr & Mountain Lion Dr
Walden Wood Dr & Bretton Wood Dr
Villages of Woodland Springs West, Phase V, Section 6
CFA code: 2005021 February 12, 2005
O
E E -H A Q ID. "
WESTPO T Q-
J�
PKW .
0
SN KELLER- SLET RD.
= Lo
Z
2 Z
_ o
PROJECF U
LOCATE N m CAYLOR RD.W
1-
0
z W 1
o F
J L
LL
ILn
zKELLER H CKS
1 2
a GOLDEN S
.. J
a TRIANGLE BLV
FM 1-)09
N'
NOT TO SCALE
LOCATION MAP RECEIVED
THE VILLAGES OF
WOODLAND SPRINGS WEST
PHASE V — SECTION 6
Carter Burgess
CARTER & BURGESS,INC.
777 AWN STREET
FORT WORTH,T%76102
JM7)735-6000
PROJECT NO. 013889.010. 1.630
4
3 5
I 6 f ``
7 7 /
J B \\
3 7 6 ' `G 5� • •. • 9
e
7
5 4e 3
9 6
6
\a4' IG '7
7 O
ry .6
4
O !z 9 44 45 J
.!
Q fl,
13
7 n
i
is '
17 11 42
41 • ✓1
•• 13
40
17
/4 39
/9 7
r9 15 3e 'Y
16 37 • ' 'hC`+
70
/7
21 39 J6 ' dpny1�0
Is Js23
♦ 1� q
70 33 76
75 74 7/ J7 75 �
76 77 it
/ 7J 70 74
77 d
N 7J
79
75
7e \,
n .J
29
76 47 �r„ ♦'
Q
41 91y
3r 40
5z d
JJ Je
J4 37
is 36 e SCALEe 1" = 200'
�oR 33
A tir
Alk
4\yrJ�Q�,1�F
STREETS
EXHIBIT 'B'
THE VILLAGES OF
LEGEND WOODLAND SPRINGS WEST
PROP. 4' S I DEWALK ............•• PHASE V — SECTION 6
OP. 29 B/B ( BY HOMEBU I LDER)
ADWAY/50' ROW � AI'f@I :'Burgess
PROP. 4 SIDEWALK
( BY DEVELOPER) �Rc'1' HEIB
R & BURGESS,INC.
Y �:• �` WORTH,T%76102
LIMITS OF PROJECT • . �. IU' I1 73s..e0M
9 9e :.UU:�IIU' �C 1 e P JECT NO. 013889.010.1.630
0-\Job\ 013889\cIv\Phase V, Section 6\88961cfa.dgn PAGE 4 OF 6
\ z
'1 \� 10,
1l J
10' 13 5
6
z 10' f 7
4 9 .
Ai!
2
j 6 9
J 50 B
7 /
4 49 7
B , 5
48 6
47 s
40' r0
I ,SSS'; � 7 f 6 4 �`�`•
1�w� r l pQq H 45 J Sa
44 40'
.��Q•• 'J �O{ l0 h'
a /dt' 47 I O •1rG
4Y
it
/6 1 J 40
I 17 W
II �"
H 2 Ir/
IS JH Vf)• -
19
20 16 J7
71 17 39 J6 0, 10• ,
e J5 21• '44,
414
YP /9
34 O 1 0' \\\ ♦ �4,4;;�ynt�F\
zJ 21" Fw
z0 JJ 26 \•f'/S�
24 21"
I .23 zl J2 25
2z J1 10• 21• \Rcp ga4 c 'ts
/` 2J JO 10'
27 24 YJ `• ,
?9
P 20 ♦ tt�
29
3026 4z 't7G ♦,
�d 41
J1
40
32
ff�
Je o
�• JJ
l 34 37
35 J6
ew�t•��'.
4lat. `0
y.' SCALE= 1" = 200'
STORM DRAIN
LEGEND EXHIBIT 'B-l'
PROP. STORM DRAIN LINE THE VILLAGES OF
PROP. INLET r WOODLAND SPRINGS WEST
PROP. MANHOLE w ;�,� ,� �o �'� E V - SECTION 6
PROP. HEADWALL --� ���� �( �J�J
0
� ��`U��� arter Burgess
EXIST. STORM DRAIN LINE ___ �___ "a.Un' �; ��� 77 RTE n EFBURGESS,INC.
LIMITS OF PROJECT • ! 17RT73S6W0TX 7610'1
PROJECT NO. 013889.010.1.630
E
p
O 4`ye(;;�C,
Of
? 4'
O J
O 36 3
6
2J� 7
' 3 � B tF.
O d .
5
z
3 69
S 50
B
7 �
49
B 7
9
O�� / 5 ,B 13
6
6 47
40P 7 46 4
e
Q�i�• /z - ,S
R{Q 13 10 9 44 s � p
IO
0 14 45 40
I6
12, 41
13 ,0
17
' 1, 39
O IB - IS
38
qq
O !6 37
s0 17 W 4
sI ' 39
36
to 33 3
zz
9 34
23 - 4\ 6.
Ozo 33 zb \ `y .
zr 52
O zs z5 qJ �Qy9�a�•
zb zz it hG b
!�
/ YJ z+ p
JO
77 14 zJ � A
� e
13 zB � •�
zB
27 ,3
30 �•pU� 26 41
r7r�
0
31
d ,0 r�r
3s �
krt.
33 36
4
J4 37
�[[• ,1'r ` J5 J6
10N
45tiW\�� SCALEl 1" = 200'
• y 4 c �,'
STREET LIGHTS
LEGEND EXHIBIT 'C'
ROP. SINGLE STREET LIGHT THE VILLAGES OF
(IST. SINGLE STREET LIGHT WOODLAND SPRINGS WEST
)N STEEL POLE WITH STREET PHASE V — SECTION 6
Q STOP SIGNS ATTACHED)
IOP. STREET SIGN �► Carter Burgess
(IST. STREET SIGN 0 CARTER & BURGESS,INC.
IMITS OF PROJECT — 7n WO STREET,Tx
FORT 35-600 l7(76102
X817)7]5-8000
PROJECT NO. 013889.010.1.630