Loading...
HomeMy WebLinkAboutContract 51438 Received Date: 10/26/2018 Received Time: 7:59 a.m. Developer and Project Information Cover Sheet: Developer Company Name: Camillo Properties,LTD Address, State,Zip Code: 10410 Windermere Lakes,Houston,TX,77065 Phone &Email: 281-671-900,broberts@legendhomecorp.com Authorized Signatory,Title: Blake Roberts ,Vice President Project Name: Carol Oaks North Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: Northeast Corner of Sandy Lane and Ederville Rd. Plat Case Number: FP-17-018 Plat Name: Carol Oaks North Mapsco: Council District: 5 CFA Number: 2018-019 City Project Number: 101146 OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51438 WHEREAS, Camillo Properties, LTD, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Carol Oaks North ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires t tors) City of Fort Worth,Texas OFFICIAL.RECORD Standard Community Facilities Agreement-Carol Oaks North CITY SECRETARY CFA Official Release Date:02.20.2017 Page 2 of 11 FT. WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) N. Sewer(A-1) N. Paving(B) Z. Storm Drain(B-1) N. Street Lights & Signs (C) —Xi. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 4ofIt J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damaPes are caused, in whole or in part, by the alleged nePliQence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damaPes are caused, in whole or in part, by the allePed nePliQence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: L Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS L Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 6of11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and (2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Carol Oaks North CFA No.: 2018-019 City Project No.: 101 146 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 251,765.00 2.Sewer Construction $ 314,205.50 Water and Sewer Construction Total $ 565,970.50 B. TPW Construction 1.Street $ 553,823.00 2.Storm Drain $ 185,876.00 3.Street Lights Installed by Developer $ 89,450.00 4. Signals $ - TPW Construction Cost Total $ 829,149.00 Total Construction Cost(excluding the fees): $ 1,395,119.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 11,319.41 D. Water/Sewer Material Testing Fee(2%) $ 11,319.41 Sub-Total for Water Construction Fees $ 22,638.82 E. TPW Inspection Fee(4%) $ 29,587.96 F. TPW Material Testing(2%) $ 14,793.98 G. Street Light Inspsection Cost $ 3,578.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 47,959.94 Total Construction Fees: $ 70,598.76 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,395,119.50 Completion Agreement=100%/Holds Plat $ 1,395,119.50 x Cash Escrow Water/Sanitary Sewer-125% $ 707,463.13 Cash Escrow Paving/Storm Drain=125% $ 1,036,436.25 Letter of Credit=125%w/2yr expiration period $ 1,743,899.38 City of Fort Worth, Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Camillo Properties,LTD Jesus J.Chapa(Oct 2S,2018) Jesus J. Chapa Assistant City Mana Manager a a&Ry1 r6_ Date: Oct 25,2018 Blake Roberts(Oct 24,2018) Name: Blake Roberts Recommended by: Title: Vice President c I-e kJ Date: Oct 24,2018 Evelyn Robe s(Oct 24,20181 Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting ,_1z�,A -7,,4' 1,12 Richard A.McCracken(Oct 25,2f)1 Richard A. McCracken Janis scan&-hf I iorala Assistant City Attorney Janie Scarlett Morales(Oct 25,2018) M&C No. N/A Name: Janie Morales Date: Title: Development Manager Form 1295: N/A ATTEST: �res- J.Kayser(Od 25, 018) Mary J. Kayser/Ronald Gonzales City Secretary/Assistant City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map ® Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements Water and Sewer Cost Estimates }� Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements l� Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101 146 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Carol Oaks North CFA Official Release Date: 02.20.2017 Page 11 of 11 Summit Oaks of Fort Worth.Texas 3 NORTH w Q JOHN T WHITE 0 SANQI %4 U _m d' W So Sj JAM T WNu tM ® S A F �o- / PROJECT SITE r O YF Q O O U i -OAK 0 fX .11 ri 0 LOCATION MAP C3 N.T.S. Y r. C1 N 2 d N FH�COVER SHEET CAROL OAKS 0 March 5.2018 0 ]ITT MMRS I _ --------M ? o W Ell. Q ~ LU LU Cl) .._ Go ca W Q cl) i= W pN HNld 77U, .L{�dl n + J O Ln z J Q v LV LLJ LU U CN I .. 3 kW Iw Z � AVA 31009 IMP I w o0 U M L) - - - - - 05LO a i - Ln w - - �- ��' Z3 < J e L) m I — :' Ln AVA NO"Y,9 9SVHO �. r o _ o V, o z �ILLJ Lu W, ' N 1�L J cL Z L o J L) c ~ ~ J O I x � _ AVA SAO9D Sns0v0 O --------- — _.. � � � q µ ` Li CL LFL L 0 iVdO N M JAd .9l £'L£'lO -NdO m M 3N/7 831VM „91 'X3 N \ N O 0 o 2 rss SS 9eO61—X 37-4 W� r 3N/7 SS ,9 W3 � F- W W cn j r 5C m 4xitJ'i LOX Q QQ' Qc .„ --_....._ W r-.. --—---- ---...-....-- 00 .. -dLLJ O n p F• J W: WCr- --......---...-.—...._.._—_—._. —--- _....__....-- W EDf / 2 ti r24L�lQ Q T tai y s J 0 LO � • A O L 11 0 x LO O - Lo z(v W U U z io 1 � N Wcr— • - _ - - LLJ lil __...___......__...._ _.......-....___ _..__.__..._._.__.__.% i" x JO Cn A � � 2 ._...__._._........_....__..-..._._._—._------...—------- .......-- m D IL .� J 1' P r � U) • U m ra x � r a 0 LR N m O SS SSfi'0 L-X #3713 z 3N/7 SS „8 'X3 0 � I m = Q o J -- - x Z v W Qa. Q � M I W_ { .sz • � N A O Cl) li I. / a E ~ M.0 1 m 9 )5 mto o u a mN z o Ul ~ �. n m O Z Q N'VOW U Do `' i Ad F AVAl NOANVa SSVHD U Z � 1 LLJ J ~N LJ I., o AVAI HAO90 S!]. Jno m a W W LU U � W ZZ x I W O O V) C7 U C) a o N ' 2 J / nQAn� CL a n N m N N h O Z O J_ 2 � bolo-A Wdo - 3NII OS ,e-P 'X3 I n ^ m I WH rY � � GO = a cN AVAI iWNId d I ~ ---- — ----- _ - t t CL ��� Wwo . 3 � I ^ y I � AVA XOOM J,9HSffaO 4 i I I U I o a z a LO � A VA NOANVO HSVHO w n o __..-..................... Vl a rn O O J E aQ \ � I j c Q J Z I ...- ...... __._....__.....- ------------i �' a AVA SAO90 SILEOVO / I02 Z OZ � � �i x Q O Z Z 4 a n lU �I W � � � P K IL w J ftft ` o o p d 0 N m n. Ky Z O J_ S W W 2 NN Z S2 .....� UC9QNw. — O uj w Z ---r N l W u Cl) W Zo W F _ - w .' '. FQ- _ - o� w N W � � � �Q w z -----......._..._._. t CAVA X309LSCS-yQ V W o o d 1 _ LD - LO o Q- .3 s e C) Llj LLII Z (: <id U In LOo A VA NO, NY.? SSVHO U 0C) n 2 LrL U Ia � 2 0 0 O a \ O D Y OO O O LLJ U)z 00 I m .�� 41 VA U / � -AIi_57T O- a7 ✓ 0 m N Q � � d uj � Q a — I o Uu 01 J d N N m O N Lo M O i O J_ Q� 2 W � 2W J J� V Zo i _...__..-- - Q W p H U' p a AVA HMa 7W-L '- m -jJ oW w WLOIC Q g U) _. 934 F cn _W 3 W Via^ r IL _....._......-.... _-...____._...-..__... Z p I j/ AVAL M009 J,99S-VQ �a W �CL0 o0 . . - -... U. co �Wo � L Zp� iLO � n - LO O J ' x Z(: Q r LO N �LVA ATO.LIITVO HSVHO n � A O O o Zan ZQ o 0 I 0 � ! x z N Y 0 " ^ -------._..-.... -- ------..... ...... ---- x W AVAL 9AO90 SMOVO W Q 2 W JC.L J A W� Z o W W �.I � F— `d� a_ 'n {* ■ N OD w � I z O F J CO 42 43 DAP-BID PROPOSAL Peg.1 00 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT I.,WATER IMPROVEMENTS 1 3312.0117 Connection to Existin 4"-12"Water Main 33 12 25 EA 2 $3,500.00 $7 000 00 -2— -- . ---- o_Connection —..�_._9_.__. __ _ - —__ -1 �_ __ _ - ._-_-- -__�_____ 2 _3311.0261 8"PVC Water Pipe 33 11 12 _E_A _ 2985 538.00 .$113,430.00 —3 3312.2033 1"Water Service 33 12 10 EA 79 $950.00 $75,050.00 4 3312.3003 8"Gate Valve 33 12 30 EA 12 $1,250,00 $15,000.00 5 3312.0001 Fire Hydrant 33 12 40 EA 6 $3,800.00 $22,800.00 6 3305.0109 Trench Safety _ — _ _33 0510 LF 296.5 $1.00 $2,985.00 7� 3311.0001 Ductile Iron Water Fittings w/Restraint- 331111 TON 1 $5,000.00 $5,000.00 8 9999.0003 Concrete Cap over Existing Water Line 00 00 00 CY 42 $230-00 $10,500.00 9 10 11 - 12 - -- -- 13 16 17 18 19 20 _ 21 - � 22 23— 24 25 26- 30 31 32 33 _34 35 36 — 38 _ -- 39 _ 40 41 — — 42 43 44 45 — TOTAL UNIT I:WATER IMPROVEMENTS1 $251,765.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farm Version September 1.2(115 004243_Bid Propm I DAPCm IOeka-Co 13u.rl3 00 42 43 OAP-BID PROPOSAL Page 2 or 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No Description' Section No, Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 331110,33 31 LF 12.333120 3233 $42.00 $135,786.00 2 - 3331.4116 8"Sewer Pipe,CSS Backfill 33 31 20LF 1_05 _ $52,00 -__ $5,-460.00 3 3331.3101 4"Sewer Service - - _ 333 50 EA - 77 $750.00_ X57,750 00 4 3339.1001 4'Manhole -� 33 39 10 EA i 18 $4,200.00 $75,600.00 5 9999.0001 Connection to Existing Manhole _ 000000 EA _ 1 _$1,500.00 .-_$1,500.00 -^6 3339.0001 Warren Manhole Liner 33 39 60_ VF_ ry 17 _—$215.00 $3,655.00 7 3301.0101 Manhole Vacuum Testing 33 01 30 _ EA_ _ 1_8__$150.00 $.21700.00 02 8 3301.00Post-CCTV'Inspection 33 01 31 LF 3233 $3.00 $9,699.00 9 33_05.0109 Trench Safety _ - 330510 LF_ 3233 $1.00 _ $3,233.•..00 10 3305.0112 Concrete Collar - 33 05 17 EA i -3 $500.00 $1,500.00 11 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 VF - 20 40.7, $175.00 $7. 122.50 12 0241.2013 Remove 8"Sewer Line 0241 14 LF -510 $20.00 $10 1.,200.00 13 14 15 16 17 18 - 19 20 22 23 - -_ -25 - - - 26 27 28 -- 30 34 35 --- -- 37 38 40 41 - --- . .- ---- -- _42 _ 43 44r45--- - - -- TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $314,205.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form vmaion September 1,2015 00 42 43 Bid Proposal—DAP-Carol OakaConaisef As 004243 DAP-BW PROPOSAL Pap 3 or7 SECTION 00 42 43 Davaloper Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Ilan Information Bidder's Proposal Bidlist Item Dascription specification Unit of Bid Unit Price Bid Value No. Section No. I Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 _ $341.0201 21"RCP,Class III 33 41 10 LF 1485,00 $9,620.00 2 3341.0205 24"RCP,Class III 33 4110 LF _1086 $70.00 _ $76,020.00 33 3 3349.0001 4'Storm Junction Box 491FA 0 3— S4.500.00 $13,500.00 4 _9999.0004 Connection to Existing Junction Box _- 00 00 00 FA_ _- 1 ;2,000.00 12,000.00 334 5 _ 9.5001 10'Curb Inlet - - -'JS-49 20 _ EA 5 $3,400.00 $17,000.00 6 9999.0002 Concrete Drainage Flume 00 00 00_ SY_ 1570 $40.00 $62,800.00 7— 3301.6002 POstLbCTV Inspection 33 01 31 LF 1234 $360 $3,702.00 8 3305.0109 Trench Safety 330516 LF 1234 51.00 $1,234.00 8 _ 10 11 12- -13 i 16 18 20 21 24 _ 25 26 27 28 29 30 _ 31 32 13 34 35 36 _ 37- 38 39 40 4i- W" 1_ - -._ 44 4,- - - TOTAL UNIT 111:DRAINAGE IMPROVEMENTS $185,876.00 CITY OF FORT WORTH STANDARD CONSTRUCTMN SPEC71CATION DOCUMENTS-DEVELOPER AWARDED PROIECiS PmmVOW=Sepbmber1,2013 004243_BWPmp0uL DAP-C=101B-CooWr.3dB 00 42 43 DAP-BID PROPOSAL Pepe 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification I Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 3213.0101 6"Cone Pvmt _ 321313 SY 10275 $3__5.50 $34,762.50 .6. 2 3211,0501 6"Lime Treatment 32 11 33 SY _ 11375 _ $3.00 $34,125.00 3 3211.0400 Hydrated Lime 64 @(32 Ibs/sy) 321129 TN 182 $180.00 $32760:00 4 3213.0506 Barrier Free Ramp.Type R-1 32 13 20 EA 14 $1,200.00 $16,800.00 _5 3213.0504 Bawler Free Ramp,Type M-2 321320 EA_ 2 $1,200.00 __$2,400.00 3213.0302 4"Cone Sidewalk 32 13 20 -SF 32595 $2.90 - $94_,525.50 7 3441.4003 Fumish/Install Alum Sign Ground Mount 3.44130 EA 13^ $650.00 $8,450.00 City Std. 8_ _ 9 — - - 10 12 11 13 16 17 _A- 20 22 21 23 24 25 --276-- 27 2627 2830 _ - 29 31 32 33 34 35 36 37 - - 38 39 40 41- _ 4i- 43 2- 45 TOTAL UNIT IV:PAVING IMPROVEMENTS $553,823.00 CITYOP FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Pamf Version Sepbunber I,20t5 00 42 43 Bid Pmposal_DAP-C wl OA3-Conaber.da 004243 DAP-BID PROPOSAL Page 5 er7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Biddees Proposal Bidlist Item DescriptiSpecification Unit of Bid No. Section No, Measure Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS _1 2805.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF _ 2530 $12.00 $30,380.00 2! 3441.3001 Rdwy Ilium Assmbly TY 1,4,and 6 34 41 20 EA - 14 $2800.00 $39,200000 3 T 3441.1410 NO 10 Insulated Eltac Condr w 34 41 14 LF 2530 1 $3.00 $7e5g0.00 4 — 3441.3301 Rdwy Blum Foundation TY 1.2,and 4 34 41 10 EA 11 $1,000_.00 $11,000.00 37 3441.1501 Ground Box Type B 34 41 10 `EA 2 $650.00 $1,300.00 8 7 — 8 10 11 _ 12 13 14 � — 15 '^ — 18 17 18 _ 19 — 20 —_ 21 _22 23 — 24 26 26 _ 27 29 30 31 32 -Y3 - -- - 34 - -- - 35 _ 3639 _ 37 38 - _40 _ _ - 41 _ - �- 42 _43 - 46 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $89,450.00 CRY OF FORT WORTH STAMARD cowmuclwN sff=tCAnoK DOCUMEN79•DBVELOFEtt AWARDED PRD5Em Form Veedoo September 1,2013 00 42 43 Bid Propmel DAP-Crml OeWCa becx6 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Bidde>'s Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL.IMPROVEMENTS 1 NOT APPLICABLE FOR THIS PROJECT _ 2-, 4 - - 6 8 10 13 _ 1417 16 8 1 -- -.. - _ 1 j9"7 _._ - - -- - — - --- — 20 21 22 23 - 24 -- 25 27 28 29 30 31 - 32- - 33 34- - 35 — —-- 3739 38 _ 40_ 44 -- - 45 TOTAL UNIT VI:TRAFFIC SIGNAL.IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1.2015 00 42 43 Bid Proposal_DAP-Carol Oaks-Coomeer..h 004243 DAP-Bm PROPOSAL F*V 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM CAROL OAKS NORTH UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlisl Item Description Specification Unit of Bid Bid Value No. Section No, Measure Quantity Bid sampan UNIT I:WATER IMPROVEMENTS $251,765.00 UNIT II;SANITARY SEWER IMPROVEMENTS $314,205.50 UNIT III:DRAINAGE IMPROVEMENTS $185,876.00 UNIT IV;PAVING IMPROVEMENTS $553,823.00 UNIT V.STREET LIGHTING IMPROVEMENTS $89.450.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $1,395,119.50 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 110 calendar days after the date when the CONTRACT commences to run as provided In the General Conditions. TITLE: Brock Huggins,President COMPANY: Conatser Construction TX,LLP ADDRESS: 5327 Wichita St I.Worth TX 76119 SIGNATURE: END OF SECTION MY OF PORT WORTH STANDARD CONSTRUMON SPBC MCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Porro V.euan 1,4015 00 42 43Bid Propoul DAPCuoI Ofikl-C aiwrxlr COMPLETION AGREEMENT—SELF FUNDED This Completion Agreement("Agreement"), is made and entered into by and between the City of Fort Worth, ("City") and Camillo Properties, LTD, a Texas General Corporation, authorized to do business in Texas,("Developer"), effective as of the last date executed by a Party hereto. The City and the Developer may collectively be called the"Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 13.7751 acres of land located in the City,the legal description of which tract of real property is marked Exhibit "A"—Legal Description, attached hereto and incorporated herein for all purposes, ("Property"); and WHEREAS, the Developer intends to develop the Property as an addition to the City through plat FP 17-018 or I and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development, Carol Oaks North for Water, Sanitary Sewer, Storm Drainage, Street Paving, and Street Lighting Improvements("Improvements"); and WHEREAS, the City has required certain assurances that the Developer will cause to be constructed to City standards the Improvements pursuant to the Community Facilities Agreement; and WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter set forth, it is hereby agreed by and between City and Developer as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs(as shown on Exhibit`B")required to complete the Community Facilities in the aggregate should not exceed the sum of One Million Three Hundred Muety,Five Thousand One Hundred Nineteen and 50/100 Dollars hereinafter called the "Completion Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 1 of 11 completion of the Community Facilities may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. City hereby waives the requirement for developer to deposit a financial guarantee of 100%of the Hard Costs under the CFA Policy. 3. Completion by the Developer. The Developer agrees to complete the Community Facilities and pay all Hard Costs in accordance with City standards,the CFA,the Plat,and the Plans as approved by the City. For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Community Facilities pursuant to Section 6,hereof. 4. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to Developer's Financial Guarantee, as described in the CFA Policy, or other requirements for security in connection with the development of the Property and the completion of the Community Facilities that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions of this Agreement shall control. 5. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a)acceptance by the City of the Community Facilities;or(b)mutual written agreement of the Parties. 6. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Community Facilities are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 2 of 11 7. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Community Facilities the following: A. A statement that the City is not holding any security to guarantee any payment for work performed on the Community Facilities; B. A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; C. A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property; and D. A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in (a), (b)and(c) above. 8. Miscellaneous. A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. B. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: (i) Notice to the City shall be addressed and delivered as follows: City of Fort Worth Planning& Development Department 200 Texas Street Fort Worth, Texas 76102 Attention: CFA Division Janie Morales,Development Manager Email: Janie.Morales@fortworthtexas.gov Confirmation Number: 817-392-7810 and/or CFA Division Email: CFA&fortworthtexas.gov Confirmation Number: 817-392-2025 With a copy thereof addressed and delivered as follows: City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 3 of 11 City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Attention: Richard A. McCracken Assistant City Attorney Confirmation Number: 817-392-7611 (ii) Notice to the Developer shall be addressed and delivered as follows: Camillo Properties,LTD. 10410 Windermere Lakes Houston, TX 77065 A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. E. Legal Construction. In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof. G. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to this Agreement. City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 4 of 11 H. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 5of11 Executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH: DEVELOPER: Camillo Properties, LTD Jesus J.Chapa(Oct2,2018 f5G6Z�C2'KPt72f"fS Jesus J. Chapa Blake Roberts(Oct 2 Fi:,. Assistant City Manager Name: Title: Date: Oct 25,2018 Date: Oct 24,2018 Approved as to Form &Legality: Richard A.McCracken(Oct 25,2018) Contract Compliance Manager Richard A. McCracken Assistant City Attorney By signing I acknowledge that I am the person responsible for the monitoring and ATTEST: administration of this contract, including F SRT` ensuring all performance and reporting ��••'" !2 requirements. m ''0 Mary J. ayser(Oct 25, 018) Mary J. Kayser * i = Tame Scarlet f Morales City Secretary * Janie Scarlett Morales(Oct 25,2018) Janie S. Morales M&C: AS Development Manager Date: LOFFICIAL RECORD SECRETARY ORTH,TX City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 6of11 LIST OF EXHIBITS ATTACHMENT"1"-CHANGES TO STANDARD AGREEMENT EXHIBIT A - LEGAL DESCRIPTION EXHIBIT B - APPROVED BUDGET City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 7of11 ATTACHMENT "1" Changes to Standard Agreement Self-Funded Completion Agreement xis City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 8of11 EXHIBIT A LEGAL DESCRIPTION KNOW all men by these presents that Camillo Properties is the Owner of the following described property: A PORTION of Lot 1-R and all of Lot 3,Block 2-R, Carol Oaks North Addition to the City of Fort Worth, Tarrant County, Texas according to the plat recorded in Volume 388-140,Page 75, Plat Records,Tarrant County,Texas as conveyed to A&D Real Estate Holding,LLC by Special Warranty Deed recorded under Clerk's File No.D215225824, of said real property records,and being more particularly described by metes and bounds as follows: BEGINNING at a set 1/2 inch steel rod at the northwest corner of said Lot 1-R, and at the intersection of the south right-of way line of Interstate Highway 30,a 300 feet wide limited access highway,with the east right-of-way line of Sandy Lane, a public strret with a variable width; ITl FN CF South 89 degrees 15 minutes 00 seconds East along the South right-of-way line of said f-30. 852.75 feet to a set 1/2 inch steel rod; THENCE South 89 degrees 49 minutes 00 seconds East, continuing along the south right-of-way line of said I-30, 35.54 feet to a set 1/2 inch steel rod at the northeast corner of said Lot 3, and at the northwest corner of Lot 2-R,Block 2-R, Carol Oaks North Addition to the City of Fort Worth,Tarrant County, Texas, according to the plat recorded in Volume 388-139,Page 56,Plat Records,Tarrant County, Texas; THENCE South 00 degrees 01 minutes 00 seconds East along the East line of said Lot 3 and the West line of said Lot 2-R, 577.01 feet to a found 5/8 inch steel rod at the southeast corner of said Lot 3,the Southwest corner of said Lot 2-R,and in the North right-of-way line of Ederville Road,a public street with a variable width,being 64 feet wide at this point; THENCE South 89 degrees 59 minutes 00 seconds West along the North right-of way line of said Ederville Road, 327.24 feet to a found 3/8 inch steel rod at the beginning of a curve to the led whose radius bears South 00 degrees 01 minutes 00 seconds East; 988.93 feet; THENCE continuing along the North right-of-way of said Ederville Road and along said curve to the left through a central angle of 18 degrees 06 minutes 00 second,an arc length of 312.41 feet(long chord bears South 80 degrees 56 minutes 00 seconds West, 311.11 fee,[)to a set 1 inch steel rod at the end of this curve; THENCE South 71 degrees 53 minutes 00 seconds West, continuing along the North right-of- way line of said Ederville Road, 14.20 feet to a found 1/2 inch steel rod at the beginning of a curve to the right whose radius bears North 18 degrees 07 minutes 00 seconds West?920.93 feet; City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 9 of 11 THENCE continuing along the North right-of-way line of said Ederville Road and along said curve to the right through a central angle of 17 degrees 06 minutes 36 seconds, an arc length of 275.01 feet(long chord bears South 80 degrees 26 minutes 18 seconds West,273.99 feet)to a set 1/2 inch steel rod; ?'HENCF North 44 degrees 21 minutes 09 seconds ka_st, 14.31 feet to a set 1/2 inch steel rod. THENEI` North 00 degrees 01 minutes 21 seconds Fast_230.69 feet to a set 1/2 inch steel ruda THENCE North 89 degrees 58 minutes 39 seconds Wust, 189.59 feet to a set 1/2 inch steel rod in the East right-of-way line of said Sandy Lane. TJ-1 F;N(.:I North 18 degrees 45 minutes 00 seconds East a I o n L-.the East right-0f-way line of said Sandy Lane.214.59 feet to a set 1/2 inch steel rod; THENCE North 29 degrees 59 minutes 00 seconds East, continuuing along the East right-of-way line of Sandy Lane,280.70 feet to the POINT OF BEGINNING,and containing 13.7751 acres, more or less. City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 10 of 11 EXHIBIT B APPROVED BUDGET Section I Water $251,76,5.00 Sewer $314,205 .50 Sub-total $565,970.50 Section II Interior Streets $553,823.00 Storm Drains $185,876.00 Sub-total $739,699.00 Section III Street Lights $89,450.00 Sub-total $89,450.00 TOTAL $1,395,119.50 City of Fort Worth, Texas Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 11 of 11