HomeMy WebLinkAboutContract 49291-CO4CFW Change Order Approval St-COApp04
Page 2 of 3
FORT WORTH. city of Fort Worth ����iNNifff,
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 04
Change Order No.: St-COApp04 Date Started: 2018-10-18
City Sec. No.: 49291 Date Due: 2018-12-07
Project Name: CO2014 - Old Decatur Rd Reconstruction, Phase 2
CO2014
Project Numbers:
CPN:CO2014
DOE Numbers:
Project Reconstruction of Old Decatur Road from IH-820 to Angle Avenue.
Description:
Project Manager: JT Auldridge
Contractor: Jackson Construction, Ltd.
COUNCIL ACTION (If Required):
M&C Log Name: NA
M&C Number: NA
COST AND DAYS SUMMARY:
City Inspector: Weyman Oden
M&C Date:
Department: Cost($) Fund Account Center:
TPW $-99,827.17 34014-0200431-5740010--
Total Cost: $-99,827.17
Approval Status:
Approved: Yes
Comments:
User: Carmen Estep
Date: 2018-10-18 2:59 PM
0O2014-CO2380-9999-14010199
Requested
Days:
0
Total Requested Days: 0
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
https://projectpoint.buzzsaw.coml bz_web/FormsIFonuPrint.aspx?SiteId=51500&Proces... 10/18/2018
Approved:
roved:
Comments:
User: JT Auldridge,
Project Manager, TPW
Date: �0/12/ 19
Approved:
Comments:
User: Lissette Acevedo,
Program Manager, TPW
Date:
Approved:
Comments:
User: Ricardo Matute,
Sr. Capital Projects Officer, TPW
Date:
Approved:
Comments:
4 User: Greg Simmons,
Director, TPW
9k
Approved:
Comments:
User: Doug Black,
Sr. Assistant City Attorney, LEGAL
Date:
Approved:
Comments:
User: Susan Alanis,
Assistant City Manager, CMO
Date:
Approved:
Comments:
User: Mary Kayser,
City Secretary, CSO
Date:
M&C:
1295:--Nfi
c, 4-9 -a-9 I
j, �bjl'
Signa re
Signature
Signature
S' ature
-1-1�* C 171
...........
0
gnat&
OFFICIAL RECORD
MY SECRE-7,ARY
CPN: CO2014
Change Order #4
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Lissette Acevedo, PE, PTOE, PMP°
Program Manager
OFFICIAL RECORD;
CITY SECRETARY
FT WORTH, TX
FORT WORTH. City of Fort Worth
~r Change Order Request Breakdown
Project Name Old Decatur Rd Reconstruction, Ph 2 Limits from IH 820 to N. of Angle Ave. City Sec # 1 49291
Client Project #(s)l 3180
Contractor Jackson Construction, Ltd PMI Lissette Acevedo Inspector Weyman Oden
Change Order Submittal # 1 4 1 Date 1 10/15/2018
Dept.
TPW
WATER
SEWER
Contract Time
Totals
(CD)
Original Contract Amount
$4,298,923.00
$12,705.00
$8,000.00
$4,319,628.00
300
Extras to Date
$117,646.33
$42,092.99
$0.00
$159,739.32
61
Credits to Date
$0.00
$0.00
$0.00
Pending Change Orders (in M&C Process)
$0.00
$0.00
$0.00
Contract Cost to Date
$4,416,569.33
$54,797.99
$8,000.00
$4,479,367.32
361
Amount of Proposed Change Order
-$99,827.17
$0.00
$0.00
-$99,827.17
0
Revised Contract Amount
$4,316,742.16
$54,797.99
$8,000.00
$4,379,540.15
361
Original Funds Available for Change Orders
$0.00
Remaining Funds Available for this CO
$0.00
$0.00
$0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE)
AS % OF ORIGINAL CONTRACT
1.39%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$5,399,535.00
.JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is needed to reconcile the final project quantities. Item quantities are being increased/decreased accordingly to match the
final, in -place quantities.
FoK_ r_ T WORTH City of Fort Worth
Change Order Additions
Project Name I Old Decatur Rd Reconstruction, Ph 2 Limits from IH 820 to N. of Angle Ave. City Sec # 49291
Client Project# 1 3180 1
Contractorl Jackson Construction, Ltd I PMI Lissette Acevedo I Inspectorl Weyman Oden
Change Order Submittal # ® Date 1 10/15/2018 1
I I EM UESCRIP I IUN
III-9 9999.0004InstallNew IxDOI MBGF
IV-12 3349.0003 6' Storm Junction Box
IV-14 �9999.0011 Connect to Ex. SO Junction Box
V-4 13217.0202 8" SLID Pvmt Marking HAS)
V-5 13441.4006 Install Alum Sign Ground Mount
VII-4 3311.0161 6" PVC Water Pipe
VII-7 13305.0109 Trench Safety
IX-3 13291.0100 Topsoil
IX-4 13292.0200 Seeding, Broadcast Inside R.O.W.
IX-5 13292.0200 Seeding, Broadcast Outside R.O.W.
X-1 I,9999.0014 Portable Message Sign
C01-1 I' COP
PVMT
CO2-2 36" RCP CLASS III
CO2-3 8" FLEXIBLE, TY A, GR-1 WITH LIQUID EMULSION
CO2-6 5-DAYS OF WATER TO BCCC
ADDITIONS
UEPI
Qty
Unit
Unit Cost
total
IPW
'232.0000UUUU
LF
$80.00
$18,560.UUI
TPW
2.00000000
EA
$8,315.68
$16,631.361
jTPW
5.000000001
EA
1 $400.00
$2,000.00I
TPW
F 60.066 000 l
LF
T $1.50
$90.001
TPW
j 5.000000001
EA
$375.00
$1,8/b.001
TPW -
22.000000001
LF
- $100.00
$2,200,001
TPW
1 2 00000001
LF
$1.00
$2LUU1
TPW
1 2,520.000000001
CY
$31.00
$/8,120.1101
T W
I 12,111.000=0001
SY
T- $0.50
$6,055.501
TPW
1 10,489.000000001
SY
$0.50
b,244.5U1
- -]TPW
I 3.M00001
WK
--T- $575.00
:1,/2b.001
TPW
15,133.000000001
SY
$65.75
$994,994./bi
TPW
152,000900001
LF
$138.00
$20,9/6.01JI
TPW
16,520.00000000
SY
$23.59
$388,22U.U01
TPW
5.00000000
LS
$100.00
$buu.Uul
TPW $1,537,214.11
WATER $0.00
SEWER $0.00
Sub Total Additions $1,537,214.11
Change Order Additions Page 1 of 1
FORT WORTH
City of Fort worth
Change Order Deletions
Project Name I Old Decatur Rd Reconstruction, Ph 2
Limits from IH 820 to N. of Angle Ave.
I CitySec # I
49291 I
Client Project# 1 3180
1
Contractorl Jackson Construction, Ltd
I PMI Lissette
Acevedo I
Inspectorl Weyman
Oden
Change Order Submittal # ®
Date 1 10/15/2018
1
DELETIONS
ITEM
UESCRIP I ON
ULP I
Qty
Unit
Unit Gost
I otal I
II-4
3125.011J1 Silt Fence
IPW
1,346.0000000
LF
$1.50
$2,019.001
II-5
3125.0101 Rock Check Dam
TPW
1.00000000
EA
$1,000.UU
$1,000 001
II-6
3125.0101 Construction Entrance
TPW
1.00000000
EA
$1,675.00
$1,675,001
III-9
9999.0004Install New TxDOT MBGF
ITPW
166.000000001
LF
$80.00
$13,28U.001
9999.0009 Demo Temporary Drive for BCCC & Repair/Replace to Pre-
III-16
Construction Conditions
�3341.0309
TPW
1.00000000
LS
$7,000.00
$7,000.001
IV-7
36" RCP, Class III
f PW
26.00000000
LF
$t38.00
$3,588.001
IV-11
13349.0001 4' Storm Junction Box
ITPW
1.000000001
EA
$3,000.00
$3,000.001
IV-14
19999.0011 Connect to Ex. SD Junction Box
ITPW 1
1.000000001
EA
`A400.00
$40U.001
IV-17
19999.0003 Propex ArmorMax Turf Reinforcement
ITPW 1
208.000000001
SY
J _ $39.00
$8,112.001
IV-20
13305.0109 Trench Safety
ITPW 1
171.000000001
LF
1 $1.00
$1Y1.001
V-3
13217.2103 REFL Raised Marker TY II -A -A
ITPW 1
144.000000001
EA
1 $4.00
$578.U01
V-4
8' SLID Pvmt Marking HAS (Y)
48.00000000)
LF
1 $1.50
$/2.UUI
V-5
13217.0202
3441.4006 Install Alum Sign Ground Mount
ITPW
TPW
4.00000000
EA
1 $375.00
$1,500.UUI
VII-4
3311.0161 6" PVC Water Pipe
ITPW
5.00000000
LF
1 $100.00
$SUU.U01
VII-7
13305.0109 Trench Safety
ITPW
5.000000001
LF
1 $1.00
$6.001
IX-3
13291.0100Topsoil
ITPW 1
1,764.000000001
CY
1 $31.00
$54,M4.U01
IX-4
L3292.0200 Seeding, Broadcast Inside R.O.W.
ITPW 1
10,584.000000001
SY
1 $0.50
$5,292.001
IX-b
IJZ92.0200 Seeding, Broadcast Outside R.O.W.
ITPW 1
6,489.000000001
SY
1 $0.50
$3,244.5UI
X-1
19999.0014 Portable Message Sign
TPW 1
1.000000001
WK
I $575.00
$5/5.001
X-3
3'2.31.0113 Install 6' Chain Link, Steel
TPW 1
236.0000000
LF
$31.00
$7,316.UU1
X-7
9999.0017Force Account
TPW 1
74,243.52000000
EA
$1.00
$14,243.521
C01-1
10' GONG PVMT
I PW I
12,147.00000000
SY
$65.75
$/98,865.Z51
C01-2
110' GONG PVMT HES
ITPW 1
2,827.000000001
SY
1 $85.00
$240,295.UU1
C01-12
16' STORM JUNCTION BOX
ITPW 1
1.000000001
EA
1 $8,315.68
$8,315.681
CO2-2
136" RCP CLASS III
ITPW 1125.000000001
LF
1 $138.00
$11,250.001
CO2-3
18' FLEXIBLE, TY A, GR-1 WITH LIQUID EMULSION
TPW 1
12,590.000000001
SY
1 $23,50
$295,885.U01
CO2-6
15-DAYS OF WATER TO BCCC
iPW
1.000000001
LS
$100.00
$1UU.UUI
CO2-14
I8- FLEXIBLE, TY A, GRA WITH LIQUID EMULSION
TPW I
618.000000001
SY
$23.50
$14,523.UUI
CO3-1
18' FLEXIBLE, TY A, GR-1 WITH LIQUID EMULSION
I
I
I
I
I
TPW
I
I
I
I I
I I
I
I
I
I
I
I I
I
I
I
I
I
I I
3,139.333191001
I
I
I
I
I
SY
$23.50
I
I
I
I
I
I
I
I
$13,774.331
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TF W
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$1,637,041.281
WATER
$0.001
SEWER
$0.001
Sub
Total Deletions
$1,637,041.28I
Change Order Deletions Page 1 of 2
M/SBE Breakdown for this Change Order
Type of Service mft ?mount for tls CO
NONE
Previous Change Orders
co # ( DATE _ I
Total
Total
AMOUNT
$0.00 1
$0.00 1
CFW Change Order Approval St-COApp04 Page 1 of 3
Routing
Assigned To: IT Auldridge Due Date: 10/19/2018
Assigned By: IT Auldridge Due Time: 2:59 PM
Links 1
fortworthaov/Infrastructure Proiects/02014 - Old Decatur Rd IH820 South to Angle Ave Roundabout/Contractor/Change
Orders/CHANGE ORDER #4/CHANGE ORDER #4.xlsm
Attachments (01
No Attachments have been added to this form.
https:llprojectpoint.buzzsaw.coml bz webIFormsIFormPrint.aspx?Siteld=51500&Proces... 10/19/2018
CFW Change Order Approval St-COApp04
Page 3 of 3
Please review, approve and submit.
https:Hprojectpoint.buzzsaw.com/ bz web/FormsIFormPrint.aspx?Site1d=51500&Proces... 10/18/2018