Loading...
HomeMy WebLinkAboutContract 5144810/29/2018 2:47 p.m. COMWffy CITYFACILITIES PARTICIPATION ENT Developer Company Name: Uplift Education Address, State, Zip Code: 1825 Market Center Blvd. Ste. 500, Dallas, TX 75207 Phone & Email: YBhatia(a,unlifteducation.or¢ Authorized Signatory, Title: Yasmin Bhatia, President CEO Project Name: Uplift Charter School Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights Project Location: West of the 10590 Chapin Rd. Plat Case Number: Plat Name: Mapsco: CMaAsco> Council District: 3 City Project Number: 101548 CFA Number: 2018-080 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 1 of 12 ESR COMln[JITCI Y PARTICIPATION ENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51448 WHEREAS, Uplift Education , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Uplift Charter School ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has reviewed the proposed Improvements and desires to have the Developer oversize the proposed Improvements to provide capacity for future development in the area ("Oversized Improvements"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CIA" or "Agreement") in connection with the collective Improvements for the Project; and WHEREAS, the City has reviewed the Project and desires to participate in the Project in accordance with this Agreement as presented by the Cost Summary Table and Exhibits attached hereto and authorized by City Council via M&C 28841 on September 11, 2018_; and WHEREAS, The- City's cost participation shall be in an amount not to exceed $353,603.66 ("Participation"); and WHEREAS, the City has requested the Developer to cause, and the Developer agrees to cause, the design, permitting and construction of the Project for which the City will, subject to City Council approval, reimburse the Developer for the City's portion of those costs after City's final acceptance of the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder City of Fort Worth, Texas OFFICIAL RECORD Standard Community Facilities Agreement with City Participation - Uplift Charter School CjTY SECRETARY CFA Official Release Date: 01.22.2017 Page 2 of 12 FT. WORTH, TX and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub- contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) VJ. Sewer (A-1) ®_ Paving (B) M. Storm Drain (B-1) E). Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section H, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section H, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 3 of 12 the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 4 of 12 H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City will be responsible for the costs of utility relocation necessitated by the City's participation in this Agreement. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries (including death) or damages sustained by any persons or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees. M. The Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any way connected with the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or emplovees. Further, Developer will require its contractors to indemnify and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of Said contractor's failure to complete the work and construct the City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 5 of 12 improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows and further apportioned in the Cost Summary Table below i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the City is not installing the streetlights, inspection fees equal to four percent (4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs necessary for Developer's portion of the Project. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in this Agreement shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period, the Developer may request that the CFA be extended for one (1) additional year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in this CFA shall be subject to the annual availability of City funds as approved by the City Council. City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 6of12 ii. Subject to paragraph i, above, the City shall reimburse Developer for the City's costs upon presentation of proper documentation of completion of installation of the Oversized Improvements. iii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iv. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. V. The City may utilize the Developer's financial guarantee to cause the payment of costs for construction of the Improvements before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 7of12 Project Name: Uplift Charter School CFA No.: 2018-080 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2% Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Signals Inspection Cost TPW Construction Fees Subtotal Total Construction Fees TOTAL PROJECT COST Financial Guarantee Options, choose one Bond = 100% Cost Summary Sheet City Project No.: 101548 Developer's Cost City's Cost Total Cost $ 64,125.95 $ 75,018.05 $ $ 279,602.69 $ 199,093.31 $ $ 343,728.64 $ 274,111.36 $ $ 379,188.70 $ - $ $ 497,865.00 $ - $ $ 48,525.00 $ $ $ 925,578.70 $ $ $ 1,269,307.34 $ 274,111.36 $ $ 6,874.57 $ 5,482.23 $ $ 6,874.57 $ 5,482.23 $ $ 13,749.14 $ 10,964.46 $ $ 35,082.15 $ - $ $ 17,541.07 $ $ $ 1,941.00 $ $ $ 54,564.22 $ - $ $ 68,313.36 $ 10,964.46 $ $ 1,337,620.70 $ 285,075.82 $ Amount Choice (Mark one) $ 1,543,418.70 x 139,144.00 478,696.00 617, 840.00 379,188.70 497,865.00 48,525.00 925,578.70 1,543,418.70 12,356.80 12,356.80 24,713.60 35,082.15 17,541.07 1,941.00 54,564.22 79,277.82 1,622,696.52 The costs stated herein may be based upon construction estimates rather than actual costs. The City's portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Water Inspection and Material Testing Fees to the Developer. The City's participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No. 19192-06-2010, as amended, ("Unit Price Ordinance") or as determined by public competitive bid. The City's cost participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 8 of 12 depending upon actual quantities as shown on the Notice of Final Completion package (`Green sheet') and based on unit prices from the construction contract documents. In no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public competitive bid. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 9 of 12 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, effective as of the date subscribed by the City's designated City Manager. CITY OF FORT WORTH Jesus Chapa (Oct 26, 2018) Jesus J. Chapa Assistant City Manager Date: Recommended by: yj Evelyn Roberts Contract Compliance Specialist Planning and Development Approved as to Form & Legality: Richard A. McCracken (Oct 26, 2018) Richard A. McCracken Assistant City Attorney M&C N C-28841 o. Date: 9/11/18 Form 1295:-)C)MIgF;mA ATTEST: (�(g�N Mary J. KKayser (Oct 29, 2018) Mary J. Kayser City Secretary ,X7 .XAS DEVELOPER Uplift Education rk"Wi-t� 8&4a 11 Vasmin Bhatia (Oct 26, 2018) Name: Yasmin Bhatia Title: President CEO Date: Oct.26, 2018 ATTEST: (Only if required by Developer) Signature Name: <Name> Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tonle Searle* f Morales Janie Scarlett Morales (& - c 20181 Name: Janie Morales Title: Development Manager r)j-Fj0At WORD, rr-7 City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 10 of 12 Check items associated with the project,being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement with City Participation Location Map ® Exhibit A: Water Improvements ® Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 11 of 12 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No.101548 None City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation - Uplift Charter School CFA Official Release Date: 01.22.2017 Page 12 of 12 8 PROJECT LOCATION 7 TH C, �? P j SEMINARY DR 0 w 0 ry U Drawing: 0:\PROJFCTS\UPL18028\cud\CFA Exhibits\CFA-0 Vicinity Map.dwg of Jun 07, 2018-3:Ohpm by Chris -0 Layout: Loyoutl Xrefs: /✓121 a M\ / —J-D EATHER, ORD Y o w w TRINITY ` �� Amz OLD WEATHERFORD ICHAPIN Rp 30 CHAPIN 75 RICHLAND 2ICHIA41) QM O)D ?� �80 N FA U NO U 3 0 C.F.A. Exhibit for ... Uplift Charter School Vicinity Map Water Project No. 56008-0600430-101548-001580 Sewer Project No. 56008-0700430-101548-001380 File No. X-xxxx & W-xxxx Sheet No. 1 of 1 JmJ7 fc 7/' I \\ I II I I � \\ I PM 31-73L4 21 2 3 4 5 6 7 6 9 141R1 6 7 8 9 10 TI ----I 4 3 — — _ I I 4 / 5 2 I 34 ' 1 30 - 6 33 2 20 19 18 17 16 15 14 1 t 29 13 12 I 7 3 32 3 g i 4 I 31 4 28 11 21 22 23 24 25 26 27 I g 5 30 5 27 28 I 10 2 6 29 6 1 29 30 7 28 ; 7 26 _ 12 8 I 27 8 25 / 13 9 26 y F38 37 36�35 34 / 141 E 10 ; 25 10 24 ; 33 32 - 1 ' 11 I 24 ; 11 23 1 39 40 41 31 16 12 I 23 12 22 42 43 44 17 � 13 I 22 � 13 21 f8 14 I ,21 14 45 is 15 I 2n is 20 1 LEGEND — EXIST. WATER PROP. GA TE VAL VE PROP. WATER PROP. F.H. ASSEMBLY Drawing: 0 \PROJECTS\UPL18028\cad\CFA Exhibits\CFA—A Water.dwg at Jun 15, 2018-1:56pm by Som " Layout: Layoutt Xrefs: x3d—water,dwg — x3d—base.dwg — x3d—paAng.dwg — x3d—base.dwg is 24 ]e I I I s c nnc II I I : to m ,e ,e r 13 1 I I 1e1�I I STREET J I' UPUFT CHARIER I# r I w I e II ��I I I PROP 6' IV� I I I ee I , P 6' W I PROP 8' W PRQP 2' W 3 — 1 ` C HIGH RIDGE. LN 1 1 ~22 I... 2 ' 1 AW 16' W 21 I IiL. tom_` 3 ( 1 3 20 I I e I II 9 a 19 1 I N,� ,• 5 5 18 I I I t / • , ygA�ti I III I2 6 6 17 / // 1 1 � ev.� • � �9F 10 13 / / / I • e INGS 11 12 / / I� I ISI P�l • A a • e / C. F. A. Exhibit for... Chapin Village, Phase 1 Water Exhibit 'A' 0 125 250 Water Project No. 56008-0600430-101548-001580 ` I Sewer Project No. 56008-0700430-101548-001380 File No. X-XXXXX & W-XXXX Sheet No. 1 of 1 LEGEND C. F. A. Exhibit for... no comments Uplift Charter School MH 10/8018 — EXiSr. SS Wastewater PROP. SS Exhibit'Al' EXIST SWH Water Project No. 56008-0600430-101548-001580 Sewer Project No. 56008-0700430-101548-001380 PRO? SSMH File No. X-25450 & W-2566 Sheet No. 1 of 1 Id = Swffi J"dC, itr segy0Cxait�teOt1lsisbY �.., — 0 200 400 it a w + Nil piE .+ Si(«-� Y t:v�o13- SS l/IE�Grty I 1 e f s It s M j y TH, rl_ a: 1 u I• w /i-------`-- —~ B ti 9 17 6 l # tl 4V5wlt is 1 `\ __k ._' i_ * I / / �y (I // liessw t\ y 19 to `}t5'SSUIE I -, O 9V FAW AP Drow,r,T tt\PRMCTS\UPL1807E\cad\CFA Egdbks\CFA-At Saw.dwg at Aug 05, 2018-3:15pm by cadres Layout: oyoutt . Xrets; x3d-SEWER.dwg - x3d-base.dwg - x3d-Doving.dwg - x3d-base.dwg 31,I as rs � ao ra � s v �� .. I I II 1 II f- tl 7017 , 1. +6 1 1 1 7i7T't a �' 01.3 S1Rf£1' J n . 7 � � 1 1 1 I 1 a 1 I FAW MY Si61:1W 1 1 � tt \�\1 H ROX LN 1 III _ __ •� � - - 1 r 14 1a t _[4T] 1.3� 8 7 ja 9 10�1, p' 1 2 4 S 6 x 9 I10 1 2 22 17 + 2 21 i n I 5 II I I I I 33 y- --�1I I�II i1jI I ,\• , 1\ s\ \ w1 211 3p 14 4 32 20 19 18 17 18 i3 19 —1 29 12 \ 3 —1-3Y—� 1-1 5 5 1844 27 300 27 28 6 6 17 29 F�— --I 2_6_ 7 �! 1!67 28 ' 27 8 �24 38 37 ! 15 9251 1031 36S 33 i g 14_ I I 0 32 23 111124 39 40 41 31 12 23 4243 13 12 21 14 21 14 l ,.. II1 \C • a %�!� `\7 �s C.F.A. Exhibit for ... LEGEND Uplift Charter School Q CONCRETE PWT. Paving ASPHALT PWT. Exhibit 'B' Water Proect No. 56008-00430-101548-001580 CONCRETE SIDEWALK N 0 125 250 Sewer Prolject No. 56008-0700430-101548-001380 I I File No. X-25450 & W-2566 Crawnq: 0.:PP()fC?"\UPLI802F,\cad,G A Dhibih\CFA-B PaNnq.dwg of Aug 13, 2018-4:21pm by oodles Sheet No. 1 of 1 Laywt: Layoutt fret:,: x3d-existing.dwg - x3d-base.dwq - dd-po�nq,dwq - r-site IuynuLdwq II I I II III II Il� I I \ \ 4x4 MW \ \\ 16Ad '"MIT \ ILj " I M XP \ CHAP/N HUAI) -- --,-- - _ _ 21 RCP ?1 A 2 1 2 3 4 5 S 7 8 9} l ARLP Mi T'� 2 (3L114 56 3 — 4 — 6 2 ( 33 1 2 30 20 19 18 T 15 7 —I 3 I 32 I I 3 —j 29 g 44_ 31 1 4��, 28 21 22 23 24 25 26 1� I 29 27 — 11 r7 28 I 7`,1 6� / 26 i — 12 1 8 27 , 2251 I� 38 37 �1I 36 35 I, 34 33 �24 I 1 210 CO 1 2—y 1 123 39 140 1 42 43 1— 6 12 23 12 22 3 22 1317 4 18 14 21 14 20 1 20 I 16 _1_19 i 1 16 1 19 2 42 LEGEND 7 t�-9- 14 13 \ 12 V29 32 31 45 46 PROP, INLET PROP. SD o 125 250 Drawing: 0:\PR0LECTS\UPL18028\cad\CFA Exhibits\CFA-81 Storm Drain,dwg at Oct 09, 2018-8:56am by sknight Layout: Layoutl Xrefs; x3d—bose.dwg — x3d—drainage.dwg — x—site layout.dwg — x3d—paving.dwg N I coo OOM a y ��0 5-109r6' M 2f 10 a - ROgp fO q E - - 21 I �J I 3 I 20 --4 f o'C I 4 19 5 18 1 • 6 6 17 7 16 1--- \ 14 � •/ � I \' � j' 10 13 (/ 11 12 7 ' 1 8 9 C.F.A. Exhibit for ... Uplift Charter School Storm brain Exhibit 'B1' Water Project No. 56008-0600430-101548-001580 Sewer Project No. 56008-0700430-101548-001380 File No. X-25450 & W-2566 Sheet No. 1 of 1 I I I I II I SmT tatT ar) I W SMEET Ught 11I 111111 1 22 — ` _2 1 2 3 [4F 6 7 h I9 11al11 r 2 1 2 t-3 4 5 8 7 9 10 /� 1 -- _� 4 .1 I ~-- 21 -_ ---__6 ---I -- 3�3- 30 ~ t3 I� II I 9 1919•3 1 1 3 1 20F 20 19 1817 18 14 4 7 F- 29 12 3� I I1I II - - - --� h------i 11 I 5 5 — t8 I — _9 y — — M 5 28 21 22 23 24 25 26 27 IIII------�-_— EL 27 28 � I g 6 17 31 a g 29 e — 29 -- B —1— 17 4 i 15 12 8 /159928 p1l 24 138 1 37 36 35 34 331 ,p 25' I I 1 0 32 l �9� 14 15 -I �� —I— 24 —1 F 1t —I 23 31 10 ~ —J t I 1 39 40 41 42 - / 13 16 12 23 12 22 43 1B 14 21 14 :1: 22tj 21 ��f \ 44 I 12 / r F--a 13 17 13 20 45 F 1 . Is C.F.A. Exhibit for ... LEGEND Uplift Charter School 9-0 DOT. STREET UGHr � Street Lights 9-0 PROP.STREET UGHT 0 125 250 Exhibit 'C' NWater Project No. 56008-0600430-101548-001580 I Sewer Project No. 56008-0700430-101548-001380 File No. X-25450 & W-2566 Drrnvng: 0:\PROX(,,M\UPL18028\cad\CFA E.hbib\CFA-C Street L'xjht.dwg at Aug 13, 201"..21pn by 000ke. Sheet No. 1 of 1 Layout: Loputt Xrers. x3d-base-dwg - x3d-bose.dwq - x3d-paving.dwq upon Charter sawol ITEM I DESCRIPTION I UNIT I A WATER IMPROVEMENTS 1 3305.0109 Trench Safety 2 3311.0001 Ductile Iron Water Fillings M Restraint 3 3311.0261 8" PVC Water Pipe 4 3312.0001 Fire Hydrant Assembly 5 3312.0106 Connection to E1dsting 16' Water Main 6 3312.3003 8' Gale Valve 7 3312,3005 12" Gate Valve 8 3311.0461 12' PVC Water Pi 9 3305.2004 afar Cry er Aipe I0 3305.1004 24' CV� 6y�en Cut 11 3311.0581 16' PV water pe 12 3312.2801 3' Water Metro and Vault 13 3312.3006 16" Gate Valve w/ Vault 14 3312.2203 2' Water Service w/ rpeter IS 3305.1005 30' CasI By O n Cut 16 3305.2005 16' Wate�arr4orr 17 3312.6W2 6' Blow Off Valve AI SEWER IMPROVEMENTS 1 3301.0002 Post -CCTV Inspection 2 3305.0109 Trends Safety 3 3331.4208 12" Sewer Pipe 4 3331 A215 15" Sewer Pipe 5 3331.4216 15' Sewer Pipe, CSS Back611 6 3331A222 18' DIP Sewer 7 3339.1001 4' Manhole 8 3339.1002 4' Drop Manhole 9 3301.0101 Manhole Vacuum Testing 10 3339.1003 4'Extra Depth Manhole 11 3137.0107 Block Rlpr dry 12 3331.4115 8' Sewer Pip 13 9999.0001 Connect to E sting Sewer Manhole 14 9999.0002 4" Sewer Vent sr.NA a Sheet Uuerw m SHEETS 7 8 LF 435 708 TON 0.41 0.49 LF 83 0 EA 0 1 EA 1 0 FA 1 0 FA 0 0 LF 0 0 LF 0 0 LF 0 0 LF 270 708 FA 1 0 EA I 1 EA 2 0 LF 80 0 LF so 0 EA 1 0 10 II 12 1.1 14 15 16 LF 736 600 850 714 630 770 536 LF 736 600 850 714 630 770 536 LF 0 0 0 0 0 0 536 LF 697 50 850 660 630 519 0 LF 6 0 0 40 0 6 0 LF 39 556 6 6 0 251 0 FA 2 2 3 1 4 2 EA 0 0 6 1 0 0 0 EA 2 1 2 4 f 4 2 VF 14 20 21 49 II 45 20 SY 0 276 137 22 0 646 0 LF 0 0 0 14 0 0 6 EA 1 0 0 0 0 6 0 EA 1 0 1 6 it 6 6 1013 I I I I I I I QTY.L I UNITCOST I TOTAL 1,143 $1.00 $1,143.00 0.9 $10,030.66 $9,027.00 83 $32.00 $2,656.00 1 $3,850.00 $3,250.00 1 $2100.00 $2,100.00 1 $1,155.00 $1,155.00 0 $2,000.00 $0.00 0 $1,155.00 $0.00 0 $60.00 $0.00 0 $120.00 $0.00 978 $52.00 $50,856.00 1 $19,380.00 $19,380,00 2 $11,072.00 $22,144.00 2 $2.980.00 $5,960.00 80 $128.00 $10,240.00 80 $62.00 $4,960.00 1 $5,673.00 $5,673.00 SUBTOTAL $139,144.00 4,836 $1.25 $6.045.00 4,836 $1.50 $7,254,00 536 S44.00 $23,594.00 3,406 $54.00 $183,924.00 40 S60.00 $2,400.00 840 $120.00 $100,800.00 16 $4,600.09 $73,6W.00 1 $5,200.00 $5,200.00 17 $265.00 $4,505.00 180 $225.00 $40,500.00 1,075 S24.00 $25,800.00 14 $36.00 $504.00 1 $2,180.00 $2180.00 2 $1.200.06 SN00.00 SUBTOTAL $478,696.00 UPE ChWer SctgW Shut by SMM Cmanlilias 2 W 3 L ITEM I alusmprim I LWJT ! I I I I I' I fJNJT COS ' I T07-AL SAWS B PAVING IMPROVEMENTS 21 I 25 1 3211,0400 Hydrated Lime TON 56 75 131 $165.00 $21,615.00 2 3211.0602 8" Lime Treatment (481blSY) SY 2,3 J 3,125 5,465 $4.60 $25,139.00 3 3213.0103 8' Conc Pvml SY 2,2! J6 2\\955 5,171 $38.56 $199,083.50 4 3213,0301 4' Conc Sidewalk SF 10,601f 12,972 23,572 $3.75 $88,395.00 5 3213.0404 8' Concrete Driveway SF 0 265 265 $3.50 $927.50 6 3212.0302 2' Aspftalt Pvmt Type D SY 895 0 895 $10.62 $9,304.90 7 3212.0501 4' As alt Base T Re B SY 895 0 _ 895 $2124 $19,009.80 8 3213.0506 Barrierlyree Ramp, T�y P•1 EA 0 4 4 $400.00 $1,600.00 9 3305.0107 Manhole Adjustment, inor EA 1 0 2 $1,000.00 $2,000.00 10 9999.0003 End of Road Barricade EA 1 1 2 $2,5M.00 $5.000.00 11 9999.0004 Reinforced Concrete Header LF 0 37 37 $25.06 $925.00 12 9999.0005 Pavement Markings/ Signage LS 0.5 0.5 I $4,989.00 $4,989.00 13 9999.UoUb Remove 5ignageniarricade EA 1 1 2 $500.00 $1,000.00 SUBTOTAL $379,198.70 Uplift Charter School Sheet by Sheet Quantities 3 d 3 ITEM DESCRIPTION I UNIT ` B/ STORM DRAIN IMPROVEMENTS 31 31 l 3137.0107 Block MrT, dry SY 0 3,760 2 3305.0109 Trench a ety LF 679 75 3 3341,0201 21" RCP, Class III LF 82 6} 4 3341.0205 24' RCP, Gass III LF 0 1 5 3341.0302 30" RCP, Class III LF 597 0 6 3341.2003 5-104Box CulveR LF 0 82 7 3349.0001 4' Storm Junction Box EA 1 0 a 3349.0002 5' S1arm Junction Box EA 1 0 9 3349.5001 1V Curb Inlet EA 2 4 10 9999.0007 Pedestiran Rail per TxDOT PR1 LF 0 306 11 9999.0008 4' Drop Inlet EA 1 0 12 9999.0008 6' Drop Intel A I 0 13 9999.WIo culvert Headwall �A 0 2 C STREET LIGHT IMPRO✓FMFNTS 34 1 2605.3015 2" COf DT PVC SCH 80IT) LF 1,420 2 3441.1502 Ground Box Type 8, w/Apron EA 1 3 3441.3002 III= Assembly TY 11 EA 8 4 gdwy 3441.3301 dwy Illum Foundation TY 1 EA 8 5 9999.0011 oral ki11-1W LF 4,260 SHEETS jo� TOTAL UNIT COST TOTAL QTY. 3,760 $24.00 $90,240.00 754 $1.50 $1,131.00 147 $70.00 $10.290.00 10 $78.00 $780.00 597 $91.00 $34,327.00 82 $2,900.00 $237,800.00 1 s4,350.06 $4,350.00 1 $5,760.00 $5,760.00 6 $3,450.00 520,760.00 306 $82.00 525,092.00 1 $3,437.00 $3,437.00 1 $5.154.00 $5,154.00 2 $19,372.00 138,744.00 SUBTOTAL $497,865.00 1,420 $12.29 517,451.80 1 $548.20 $548.20 8 $2,100.00 516,8W. 8 $1,050.00 $8,400. 4,260 $1.25 $5,325. SUBTOTAL $48,525.00