Developer Company Name: Uplift Education
Address, State, Zip Code: 1825 Market Center Blvd. Ste. 500, Dallas, TX 75207
Phone & Email: YBhatia(a,unlifteducation.or¢
Authorized Signatory, Title: Yasmin Bhatia, President CEO
Project Name: Uplift Charter School
Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights
Project Location: West of the 10590 Chapin Rd.
Plat Case Number: Plat Name:
Mapsco: CMaAsco> Council District: 3 City Project Number: 101548
CFA Number: 2018-080
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 1 of 12
ESR
COMln[JITCI Y PARTICIPATION ENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT §
Contract No. 51448
WHEREAS, Uplift Education , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Uplift Charter School ("Project") within the City of
Fort Worth, Texas ("City"); and
WHEREAS, the City has reviewed the proposed Improvements and desires to have
the Developer oversize the proposed Improvements to provide capacity for future
development in the area ("Oversized Improvements"); and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CIA" or "Agreement") in connection with the collective Improvements for the
Project; and
WHEREAS, the City has reviewed the Project and desires to participate in the Project
in accordance with this Agreement as presented by the Cost Summary Table and Exhibits
attached hereto and authorized by City Council via M&C 28841 on September 11, 2018_;
and
WHEREAS, The- City's cost participation shall be in an amount not to exceed
$353,603.66 ("Participation"); and
WHEREAS, the City has requested the Developer to cause, and the Developer agrees
to cause, the design, permitting and construction of the Project for which the City will, subject
to City Council approval, reimburse the Developer for the City's portion of those costs after
City's final acceptance of the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
City of Fort Worth, Texas OFFICIAL RECORD
Standard Community Facilities Agreement with City Participation - Uplift Charter School CjTY SECRETARY
CFA Official Release Date: 01.22.2017
Page 2 of 12 FT. WORTH, TX
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's
contractor(s) to submit a signed affidavit of bills paid signed by its contractor and
consent of surety signed by its surety to ensure the contractor has paid any sub-
contractor(s) and suppliers in full. Additionally, the contractor will provide in writing
that the contractor has been paid in full by Developer for all the services provided
under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City -approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) VJ. Sewer (A-1) ®_ Paving (B) M. Storm Drain (B-1) E). Street Lights &
Signs (C) ®.
E. The Developer shall award all contracts for the construction of community facilities in
accordance with Section H, paragraph 7 of the Policy and the contracts for the construction
of the public infrastructure shall be administered in conformance with paragraph 8,
Section H, of the Policy. Developer shall ensure its contractor(s) pays the then -current
City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond
in the names of the City and the Developer for one hundred percent (100%) of
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 3 of 12
the contract price of the infrastructure, and a maintenance bond in the name of
the City for one hundred percent (100%) of the contract price of the
infrastructure for a period of two (2) years from the date of final acceptance
insuring the maintenance and repair of the constructed infrastructure during the
term of the maintenance bond. All bonds to be furnished before work is
commenced and to meet the requirements of Chapter 2253, Texas Government
Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state -
approved form) supplied by the contractor's insurance provider and bound in
the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction
to be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the
City.
V. To require its contractor to have fully executed contract documents submitted
to the City to schedule a Pre -Construction Meeting. The submittal should occur
no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide, at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the Improvements under this Agreement.
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 4 of 12
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder. City will be responsible for the costs of utility relocation
necessitated by the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby, fully
indemnify, hold harmless and defend the City, its officers, agents and employees from all
suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries (including death) or damages sustained by any persons or to any
property, resulting from or in connection with the construction, design, performance or
completion of any work to be performed by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any failure to
properly safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said Developer, its contractors, sub -contractors, officers, agents or
employees.
M. The Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all claims,
suits or causes of action of any nature whatsoever, whether real or asserted, brought for
or on account of any injuries or damages to persons or property, including death,
resulting from or in any way connected with the construction of the infrastructure
contemplated herein, whether or not such iniuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or emplovees. Further, Developer will require its contractors to indemnify and
hold harmless the City for any losses, damages, costs or expenses suffered by the City or
caused as a result of Said contractor's failure to complete the work and construct the
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 5 of 12
improvements in a good and workmanlike manner, free from defects, in conformance
with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by
the contractor, whether express or implied. Further, Developer agrees that all contracts
with any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further apportioned in the
Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the Developer's share
of the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a total
of 6% of the Developer's share of the total construction cost as stated in the
construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in this
Agreement shall terminate if the Improvements are not completed within two
(2) years; provided, however, if construction of the Improvements has started
within the two year period, the Developer may request that the CFA be extended
for one (1) additional year. If the Improvements are not completed within such
extension period, there will be no further obligation of the City to participate.
City participation in this CFA shall be subject to the annual availability of City
funds as approved by the City Council.
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 6of12
ii. Subject to paragraph i, above, the City shall reimburse Developer for the City's
costs upon presentation of proper documentation of completion of installation
of the Oversized Improvements.
iii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement
with its contractor or other related agreements.
iv. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if
at the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
V. The City may utilize the Developer's financial guarantee to cause the payment
of costs for construction of the Improvements before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails to
pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of supplies
and/or construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or
services unless the contract contains a written verification from the company that it: (1)
does not boycott Israel; and (2) will not boycott Israel during the term of the contract.
The terms "boycott Israel" and "company" shall have the meanings ascribed to those
terms in Section 808.001 of the Texas Government Code. By signing this contract,
Developer certifies that Developer's signature provides written verification to the City
that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 7of12
Project Name: Uplift Charter School
CFA No.: 2018-080
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
TPW Construction Fees Subtotal
Total Construction Fees
TOTAL PROJECT COST
Financial Guarantee Options, choose one
Bond = 100%
Cost Summary Sheet
City Project No.: 101548
Developer's Cost City's Cost Total Cost
$
64,125.95
$
75,018.05 $
$
279,602.69
$
199,093.31 $
$
343,728.64
$
274,111.36 $
$
379,188.70
$
- $
$
497,865.00
$
- $
$
48,525.00
$
$
$
925,578.70
$
$
$
1,269,307.34
$
274,111.36 $
$
6,874.57
$
5,482.23 $
$
6,874.57
$
5,482.23 $
$
13,749.14
$
10,964.46 $
$
35,082.15
$
- $
$
17,541.07
$
$
$
1,941.00
$
$
$
54,564.22
$
- $
$
68,313.36
$
10,964.46 $
$
1,337,620.70
$
285,075.82 $
Amount
Choice
(Mark one)
$
1,543,418.70
x
139,144.00
478,696.00
617, 840.00
379,188.70
497,865.00
48,525.00
925,578.70
1,543,418.70
12,356.80
12,356.80
24,713.60
35,082.15
17,541.07
1,941.00
54,564.22
79,277.82
1,622,696.52
The costs stated herein may be based upon construction estimates rather than actual costs. The
City's portion of inspection and material testing fees are directly allocated to the City's
accounts for charges and does not reimburse the Water Inspection and Material Testing Fees
to the Developer. The City's participation estimate shall be limited to the unit prices contained
in City of Fort Worth Ordinance No. 19192-06-2010, as amended, ("Unit Price Ordinance") or
as determined by public competitive bid. The City's cost participation (excluding inspection
and material testing fees) is not a lump sum amount and may be less than stated above
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 8 of 12
depending upon actual quantities as shown on the Notice of Final Completion package (`Green
sheet') and based on unit prices from the construction contract documents. In no event shall
the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 9 of 12
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, effective as of the date subscribed by the
City's designated City Manager.
CITY OF FORT WORTH
Jesus Chapa (Oct 26, 2018)
Jesus J. Chapa
Assistant City Manager
Date:
Recommended by:
yj
Evelyn Roberts
Contract Compliance Specialist
Planning and Development
Approved as to Form & Legality:
Richard A. McCracken (Oct 26, 2018)
Richard A. McCracken
Assistant City Attorney
M&C N C-28841
o.
Date: 9/11/18
Form 1295:-)C)MIgF;mA
ATTEST:
(�(g�N
Mary J. KKayser (Oct 29, 2018)
Mary J. Kayser
City Secretary
,X7 .XAS
DEVELOPER
Uplift Education
rk"Wi-t� 8&4a 11
Vasmin Bhatia (Oct 26, 2018)
Name: Yasmin Bhatia
Title: President CEO
Date: Oct.26, 2018
ATTEST: (Only if required by Developer)
Signature
Name: <Name>
Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Tonle Searle* f Morales
Janie Scarlett Morales (& - c 20181
Name: Janie Morales
Title: Development Manager
r)j-Fj0At WORD,
rr-7
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 10 of 12
Check items associated with the project,being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
with City Participation
Location Map
® Exhibit A: Water Improvements
® Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 11 of 12
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No.101548
None
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation - Uplift Charter School
CFA Official Release Date: 01.22.2017
Page 12 of 12
8
PROJECT LOCATION
7 TH
C, �?
P j SEMINARY DR
0
w
0
ry
U
Drawing: 0:\PROJFCTS\UPL18028\cud\CFA Exhibits\CFA-0 Vicinity Map.dwg of Jun 07, 2018-3:Ohpm by Chris -0
Layout: Loyoutl Xrefs:
/✓121
a
M\
/ —J-D EATHER, ORD
Y
o w
w
TRINITY ` �� Amz
OLD WEATHERFORD
ICHAPIN Rp
30
CHAPIN 75
RICHLAND 2ICHIA41)
QM O)D
?� �80 N FA U NO U
3
0
C.F.A. Exhibit for ...
Uplift Charter School
Vicinity Map
Water Project No. 56008-0600430-101548-001580
Sewer Project No. 56008-0700430-101548-001380
File No. X-xxxx & W-xxxx
Sheet No. 1 of 1
JmJ7 fc 7/'
I \\
I
II
I
I �
\\ I PM
31-73L4
21 2 3 4 5 6 7 6 9 141R1 6 7 8 9 10 TI
----I
4
3 — — _ I
I
4 /
5 2 I 34 ' 1 30 -
6 33 2 20 19 18 17 16 15 14
1 t 29 13 12 I
7 3 32 3 g i 4 I 31 4 28 11 21 22 23 24 25 26 27 I
g 5 30 5 27 28 I
10 2 6 29 6 1 29 30
7 28 ; 7 26 _
12 8 I 27 8 25 /
13 9 26 y F38 37 36�35 34 /
141 E 10 ; 25 10 24 ; 33
32 -
1 ' 11 I 24 ; 11 23 1 39 40 41 31
16 12 I 23 12 22 42 43
44
17 � 13 I 22 � 13 21
f8 14 I ,21 14 45
is 15 I 2n is 20 1
LEGEND
— EXIST. WATER PROP. GA TE VAL VE
PROP. WATER
PROP. F.H. ASSEMBLY
Drawing: 0 \PROJECTS\UPL18028\cad\CFA Exhibits\CFA—A Water.dwg at Jun 15, 2018-1:56pm by Som "
Layout: Layoutt Xrefs: x3d—water,dwg — x3d—base.dwg — x3d—paAng.dwg — x3d—base.dwg
is 24 ]e
I I I s c nnc
II I I : to m ,e ,e r
13
1
I I 1e1�I I STREET J
I'
UPUFT CHARIER I# r I w I e
II ��I I
I PROP 6' IV� I I I ee I ,
P 6' W
I PROP 8' W PRQP 2' W 3 —
1 ` C HIGH RIDGE. LN
1 1 ~22 I...
2 ' 1 AW 16' W 21 I IiL. tom_`
3 ( 1 3 20 I I e
I II
9 a 19 1 I N,� ,•
5 5 18 I I I t / • , ygA�ti
I III I2
6 6 17 /
// 1 1 � ev.� • � �9F
10
13 / / / I • e INGS
11 12 / / I� I ISI P�l • A a • e /
C. F. A. Exhibit for...
Chapin Village, Phase 1
Water
Exhibit 'A'
0 125 250 Water Project No. 56008-0600430-101548-001580
` I Sewer Project No. 56008-0700430-101548-001380
File No. X-XXXXX & W-XXXX
Sheet No. 1 of 1
LEGEND C. F. A. Exhibit for...
no comments Uplift Charter School
MH 10/8018 — EXiSr. SS Wastewater
PROP. SS Exhibit'Al'
EXIST SWH Water Project No. 56008-0600430-101548-001580
Sewer Project No. 56008-0700430-101548-001380
PRO? SSMH File No. X-25450 & W-2566
Sheet No. 1 of 1
Id = Swffi J"dC,
itr
segy0Cxait�teOt1lsisbY �.., — 0 200 400
it
a w + Nil
piE .+ Si(«-� Y t:v�o13- SS l/IE�Grty
I 1
e f
s It s M j y TH, rl_
a: 1 u I• w /i-------`-- —~
B ti 9 17 6 l # tl 4V5wlt is 1 `\ __k ._' i_ * I / /
�y (I //
liessw
t\
y
19
to
`}t5'SSUIE I
-,
O
9V FAW AP
Drow,r,T tt\PRMCTS\UPL1807E\cad\CFA Egdbks\CFA-At Saw.dwg at Aug 05, 2018-3:15pm by cadres
Layout: oyoutt . Xrets; x3d-SEWER.dwg - x3d-base.dwg - x3d-Doving.dwg - x3d-base.dwg
31,I as
rs � ao
ra � s v �� ..
I I II 1 II f- tl 7017
, 1. +6
1 1 1 7i7T't a �'
01.3
S1Rf£1' J
n . 7 � �
1
1
1 I
1 a
1 I
FAW MY Si61:1W 1
1 �
tt
\�\1
H ROX LN
1
III _ __ •� � - -
1 r
14
1a
t _[4T] 1.3�
8 7 ja 9 10�1, p' 1 2 4 S 6 x 9 I10 1 2 22 17 +
2 21 i n
I 5 II I I
I I 33 y- --�1I
I�II i1jI I ,\• , 1\
s\ \
w1 211
3p 14 4 32 20 19 18 17 18 i3 19
—1 29 12 \
3 —1-3Y—�
1-1 5 5 1844 27
300 27 28 6 6 17
29
F�— --I 2_6_ 7 �! 1!67 28 '
27 8 �24
38 37 ! 15
9251 1031
36S 33 i g 14_ I I 0 32
23 111124 39 40 41 31
12 23 4243 13
12
21
14 21 14
l
,..
II1
\C
• a %�!� `\7 �s
C.F.A. Exhibit for ...
LEGEND Uplift Charter School
Q CONCRETE PWT. Paving
ASPHALT PWT. Exhibit 'B'
Water Proect No. 56008-00430-101548-001580
CONCRETE SIDEWALK N 0 125 250 Sewer Prolject No. 56008-0700430-101548-001380
I I File No. X-25450 & W-2566
Crawnq: 0.:PP()fC?"\UPLI802F,\cad,G A Dhibih\CFA-B PaNnq.dwg of Aug 13, 2018-4:21pm by oodles Sheet No. 1 of 1
Laywt: Layoutt fret:,: x3d-existing.dwg - x3d-base.dwq - dd-po�nq,dwq - r-site IuynuLdwq
II
I I II
III
II
Il�
I I \ \
4x4 MW \ \\
16Ad '"MIT \
ILj " I M XP \
CHAP/N HUAI)
-- --,-- -
_ _
21 RCP ?1 A
2 1 2 3 4 5 S 7 8 9} l ARLP Mi T'� 2 (3L114
56
3 —
4 —
6 2 ( 33 1 2 30 20 19 18 T 15
7 —I 3 I 32 I I 3 —j 29
g 44_ 31 1 4��, 28 21 22 23 24 25 26
1� I 29 27 —
11 r7 28 I 7`,1 6� / 26 i —
12 1 8 27 , 2251
I� 38 37 �1I 36 35 I,
34
33
�24 I 1
210 CO
1 2—y 1 123 39 140 1 42 43
1—
6 12
23 12 22
3 22 1317
4
18 14 21 14
20 1
20 I 16 _1_19 i 1 16 1 19 2 42
LEGEND
7 t�-9-
14 13 \
12
V29
32
31
45
46
PROP, INLET
PROP. SD o 125 250
Drawing: 0:\PR0LECTS\UPL18028\cad\CFA Exhibits\CFA-81 Storm Drain,dwg at Oct 09, 2018-8:56am by sknight
Layout: Layoutl Xrefs; x3d—bose.dwg — x3d—drainage.dwg — x—site layout.dwg — x3d—paving.dwg
N
I coo OOM
a
y ��0
5-109r6' M
2f 10 a
- ROgp
fO q E
- - 21 I �J
I 3 I 20
--4
f o'C I 4 19
5 18
1 •
6 6 17
7 16
1---
\ 14 � •/ � I \' � j'
10 13
(/
11 12
7 '
1
8 9
C.F.A. Exhibit for ...
Uplift Charter School
Storm brain
Exhibit 'B1'
Water Project No. 56008-0600430-101548-001580
Sewer Project No. 56008-0700430-101548-001380
File No. X-25450 & W-2566
Sheet No. 1 of 1
I I
I I II
I
SmT tatT ar) I W SMEET Ught
11I 111111 1 22 — `
_2 1 2 3 [4F 6 7 h I9 11al11 r 2 1 2 t-3 4 5 8 7 9 10 /� 1 -- _�
4 .1 I ~-- 21
-_ ---__6 ---I -- 3�3- 30 ~ t3 I� II I 9 1919•3 1 1 3 1 20F 20 19 1817 18 14 4
7 F- 29 12 3� I I1I
II - -
- --� h------i 11 I 5 5 — t8 I
— _9 y — — M 5 28 21 22 23 24 25 26 27
IIII------�-_— EL 27 28 � I g 6 17
31
a g 29 e — 29
-- B —1— 17 4 i 15 12
8 /159928 p1l
24 138 1 37 36 35 34 331 ,p 25' I I 1 0 32 l �9� 14
15 -I �� —I— 24 —1 F 1t —I 23 31 10 ~
—J t I 1 39 40 41 42 - / 13
16 12 23 12 22 43
1B 14 21 14 :1: 22tj 21 ��f \ 44 I 12 / r
F--a 13
17 13
20 45 F 1
.
Is
C.F.A. Exhibit for ...
LEGEND Uplift Charter School
9-0 DOT. STREET UGHr �
Street Lights
9-0 PROP.STREET UGHT 0 125 250 Exhibit 'C'
NWater Project No. 56008-0600430-101548-001580
I Sewer Project No. 56008-0700430-101548-001380
File No. X-25450 & W-2566
Drrnvng: 0:\PROX(,,M\UPL18028\cad\CFA E.hbib\CFA-C Street L'xjht.dwg at Aug 13, 201"..21pn by 000ke. Sheet No. 1 of 1
Layout: Loputt Xrers. x3d-base-dwg - x3d-bose.dwq - x3d-paving.dwq
upon Charter sawol
ITEM I DESCRIPTION I UNIT I
A WATER IMPROVEMENTS
1 3305.0109 Trench Safety
2 3311.0001 Ductile Iron Water Fillings M Restraint
3 3311.0261 8" PVC Water Pipe
4 3312.0001 Fire Hydrant Assembly
5 3312.0106 Connection to E1dsting 16' Water Main
6 3312.3003 8' Gale Valve
7 3312,3005 12" Gate Valve
8 3311.0461 12' PVC Water Pi
9 3305.2004 afar Cry er Aipe
I0 3305.1004 24' CV� 6y�en Cut
11 3311.0581 16' PV water pe
12 3312.2801 3' Water Metro and Vault
13 3312.3006 16" Gate Valve w/ Vault
14 3312.2203 2' Water Service w/ rpeter
IS 3305.1005 30' CasI By O n Cut
16 3305.2005 16' Wate�arr4orr
17 3312.6W2 6' Blow Off Valve
AI SEWER IMPROVEMENTS
1 3301.0002
Post -CCTV Inspection
2 3305.0109
Trends Safety
3 3331.4208
12" Sewer Pipe
4 3331 A215
15" Sewer Pipe
5 3331.4216
15' Sewer Pipe, CSS Back611
6 3331A222
18' DIP Sewer
7 3339.1001
4' Manhole
8 3339.1002
4' Drop Manhole
9 3301.0101
Manhole Vacuum Testing
10 3339.1003
4'Extra Depth Manhole
11 3137.0107
Block Rlpr dry
12 3331.4115
8' Sewer Pip
13 9999.0001
Connect to E sting Sewer Manhole
14 9999.0002
4" Sewer Vent
sr.NA a Sheet Uuerw m
SHEETS
7
8
LF
435
708
TON
0.41
0.49
LF
83
0
EA
0
1
EA
1
0
FA
1
0
FA
0
0
LF
0
0
LF
0
0
LF
0
0
LF
270
708
FA
1
0
EA
I
1
EA
2
0
LF
80
0
LF
so
0
EA
1
0
10
II
12
1.1
14
15
16
LF
736
600
850
714
630
770
536
LF
736
600
850
714
630
770
536
LF
0
0
0
0
0
0
536
LF
697
50
850
660
630
519
0
LF
6
0
0
40
0
6
0
LF
39
556
6
6
0
251
0
FA
2
2
3
1
4
2
EA
0
0
6
1
0
0
0
EA
2
1
2
4
f
4
2
VF
14
20
21
49
II
45
20
SY
0
276
137
22
0
646
0
LF
0
0
0
14
0
0
6
EA
1
0
0
0
0
6
0
EA
1
0
1
6
it
6
6
1013
I I I I I I I QTY.L I UNITCOST I TOTAL
1,143
$1.00
$1,143.00
0.9
$10,030.66
$9,027.00
83
$32.00
$2,656.00
1
$3,850.00
$3,250.00
1
$2100.00
$2,100.00
1
$1,155.00
$1,155.00
0
$2,000.00
$0.00
0
$1,155.00
$0.00
0
$60.00
$0.00
0
$120.00
$0.00
978
$52.00
$50,856.00
1
$19,380.00
$19,380,00
2
$11,072.00
$22,144.00
2
$2.980.00
$5,960.00
80
$128.00
$10,240.00
80
$62.00
$4,960.00
1
$5,673.00
$5,673.00
SUBTOTAL
$139,144.00
4,836
$1.25
$6.045.00
4,836
$1.50
$7,254,00
536
S44.00
$23,594.00
3,406
$54.00
$183,924.00
40
S60.00
$2,400.00
840
$120.00
$100,800.00
16
$4,600.09
$73,6W.00
1
$5,200.00
$5,200.00
17
$265.00
$4,505.00
180
$225.00
$40,500.00
1,075
S24.00
$25,800.00
14
$36.00
$504.00
1
$2,180.00
$2180.00
2
$1.200.06
SN00.00
SUBTOTAL
$478,696.00
UPE ChWer SctgW
Shut by SMM Cmanlilias
2 W 3
L
ITEM
I alusmprim
I LWJT !
I
I
I I
I'
I fJNJT COS ' I
T07-AL
SAWS
B
PAVING IMPROVEMENTS
21 I
25
1
3211,0400 Hydrated Lime
TON
56
75
131
$165.00
$21,615.00
2
3211.0602 8" Lime Treatment (481blSY)
SY
2,3 J
3,125
5,465
$4.60
$25,139.00
3
3213.0103 8' Conc Pvml
SY
2,2! J6
2\\955
5,171
$38.56
$199,083.50
4
3213,0301 4' Conc Sidewalk
SF
10,601f
12,972
23,572
$3.75
$88,395.00
5
3213.0404 8' Concrete Driveway
SF
0
265
265
$3.50
$927.50
6
3212.0302 2' Aspftalt Pvmt Type D
SY
895
0
895
$10.62
$9,304.90
7
3212.0501 4' As alt Base T Re B
SY
895
0
_ 895
$2124
$19,009.80
8
3213.0506 Barrierlyree Ramp, T�y P•1
EA
0
4
4
$400.00
$1,600.00
9
3305.0107 Manhole Adjustment, inor
EA
1
0
2
$1,000.00
$2,000.00
10
9999.0003 End of Road Barricade
EA
1
1
2
$2,5M.00
$5.000.00
11
9999.0004 Reinforced Concrete Header
LF
0
37
37
$25.06
$925.00
12
9999.0005 Pavement Markings/ Signage
LS
0.5
0.5
I
$4,989.00
$4,989.00
13
9999.UoUb Remove 5ignageniarricade
EA
1
1
2
$500.00
$1,000.00
SUBTOTAL
$379,198.70
Uplift Charter School Sheet by Sheet Quantities 3 d 3
ITEM
DESCRIPTION
I UNIT
`
B/
STORM DRAIN IMPROVEMENTS
31
31
l
3137.0107 Block MrT, dry
SY
0
3,760
2
3305.0109 Trench a ety
LF
679
75
3
3341,0201 21" RCP, Class III
LF
82
6}
4
3341.0205 24' RCP, Gass III
LF
0
1
5
3341.0302 30" RCP, Class III
LF
597
0
6
3341.2003 5-104Box CulveR
LF
0
82
7
3349.0001 4' Storm Junction Box
EA
1
0
a
3349.0002 5' S1arm Junction Box
EA
1
0
9
3349.5001 1V Curb Inlet
EA
2
4
10
9999.0007 Pedestiran Rail per TxDOT PR1
LF
0
306
11
9999.0008 4' Drop Inlet
EA
1
0
12
9999.0008 6' Drop Intel
A
I
0
13
9999.WIo culvert Headwall
�A
0
2
C
STREET LIGHT IMPRO✓FMFNTS
34
1
2605.3015 2" COf DT PVC SCH 80IT)
LF
1,420
2
3441.1502 Ground Box Type 8, w/Apron
EA
1
3
3441.3002 III= Assembly TY 11
EA
8
4
gdwy
3441.3301 dwy Illum Foundation TY 1
EA
8
5
9999.0011 oral ki11-1W
LF
4,260
SHEETS
jo�
TOTAL
UNIT COST
TOTAL
QTY.
3,760
$24.00
$90,240.00
754
$1.50
$1,131.00
147
$70.00
$10.290.00
10
$78.00
$780.00
597
$91.00
$34,327.00
82
$2,900.00
$237,800.00
1
s4,350.06
$4,350.00
1
$5,760.00
$5,760.00
6
$3,450.00
520,760.00
306
$82.00
525,092.00
1
$3,437.00
$3,437.00
1
$5.154.00
$5,154.00
2
$19,372.00
138,744.00
SUBTOTAL
$497,865.00
1,420
$12.29
517,451.80
1
$548.20
$548.20
8
$2,100.00
516,8W.
8
$1,050.00
$8,400.
4,260
$1.25
$5,325.
SUBTOTAL
$48,525.00