HomeMy WebLinkAboutContract 51449Received Date: 10/29/2018
Received Time: 2:58 p.m.
Developer and Project Information Cover Sheet:
Developer Company Name: Double Eagle All Storage, LLC
Address, State, Zip Code: 82 Armstrong Drive, Mustang, Oklahoma 73064
Phone & Email: 405-376-4509, regionalmgmt@aol.com
Authorized Signatory, Title: Mark McDowell, Manager
Project Name: All Storage Double Eagle Water & SS
Brief Description: Water, Sewer
Project Location: Northeast corner of Double Eagle Boulevard and SH114
Plat Case Number: FP-17-120 Plat Name: I Speedway
Mapsco: [Mapsco] Council District: [CD #]
CFA Number: 2017-182 City Project Number: 101187
.,:::.., -" .. .- -
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51449
WHEREAS, Double Eagle All Storage, LLC, ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as All Storage Double Eagle Water & SS ("Project") within
the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Deveiooer's conVAU"s)
City of Fort Worth, Texas OFFICIAL RECORD
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS CITY SECRETARY i
CFA Official Release Date: 02.20.2017
Page 2 of 11 Ft: WORTH, TA
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City -approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) E. Sewer (A-1) 0, Paving (B) El . Storm Drain (B-1) El - Street Lights & Signs
(C) u .
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its
contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate.of Insurance (ACORD or other state -approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the Citv of Fort Worth, its
officers, servants, or emplovees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the ON of Fort Worth, its officers, servants, or employees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 5 of 11
3
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: All Storage Double Eagle Water & SS
CFA No.: 2017-182 City Project No.: 101187
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 64,513.10
2. Sewer Construction $ 42,128.01
Water and Sewer Construction Total $ 106,641.11
B. TPW Construction
1. Street $
2. Storm Drain $
3. Street Lights Installed by Developer $
4. Signals $
TPW Construction Cost Total $ -
Total Construction Cost (excluding the fees):
$
106,641.11
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
$
2,132.82
D. Water/Sewer Material Testing Fee (2%)
$
2,132.82
Sub -Total for Water Construction Fees
$
4,265.64
E. TPW Inspection Fee (4%)
$
-
F. TPW Material Testing (2%)
$
G. Street Light Inspsection Cost
$
H. Signals Inspection Cost
$
H. Street Signs Installation Cost
$
Sub -Total for TPW Construction Fees
$
-
Total Construction Fees:
$
4,265.64
Choice
Financial Guarantee Options, choose one
Amount (Mark one)
(Bond = 100%
$
106,641.11 x
Completion Agreement = 100% / Holds Plat
$
106,641.11
Cash Escrow Water/Sanitary Sewer- 125%
$
133,301.39
Cash Escrow Paving/Storm Drain = 125%
$
-
Letter of Credit = 125% w/2yr expiration period
$
133,301.39
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
Jesus J.Chapaa29, 2018)
Jesus J. Chapa
Assistant City Manager
Date: Oct 29, 2018
Recommended by:
�Robet1 / .lrEvelyc`tv29'F2`0+1✓8)'y
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Approved as to Form & Legality:
Richard A. McCracken
Richard A. McCracken (Oct 29, 2018)
Richard A. McCracken
Assistant City Attorney
M&C No. N/A
Date:
Form 1295: N/A
ATTEST:
l-
Mary J. Payser (Oct 29, 18)
Mary J. Kayser/ Ronald Gonzal(
City Secretary / Assistant City S
DEVELOPER
Double Eagle All Storage, LLC
Mann M�o�CG
Mark McDowell (Oct 29, 2018)
Name: Mark McDowell
Title: Manager
Date: Oct 29, 2018
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Jennifer L. Ezernack for (Oct 29, 2018)
Name: Janie Morales
Title: Development Manager
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvements
Water Cost Estimate
® Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Cost Estimate
❑ Exhibit 13-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
�7 Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101187
None
City of Fort Worth, Texas
Standard Community Facilities Agreement - All Storage Double Eagle Water & SS
CFA Official Release Date: 02.20.2017
Page 11 of 11
ORTWORT
THE CITY OF FORT WORTH
COST EXHIBITS
PUBLIC IMPROVEMENTS TO SERVE
ALL STORAGE DOUBLE EAGLE
SITE LOCATION MAP
Kimley)))Horn
LEGEND:
PROPERTY LINE — —
EASEMENT LINE
PROPOSED WATER
LINE
PROPOSED SEWER
FORCE MAIN
LOT 3, BLOCK 1
OF
LOT 2R AND LOT 3, BLOCK 1
ONE 14 SUBDIVISION
C4RINFT HCLIDE 177
rracT
2
H
ry
0
Z
GRAPHIC SCALE IN FEET
0- 75 150 300
/ LOT 9, BLOCK A
OF
LOT 1, BLOCK 2 _
LOTS B, 9, 8 LOCK A
SPEEDWAY DISTRIBUTION
BTRIBUTION LOT 12, BLOCK A
CENTER 9.0948 ACRES
INSTRUMENT NO.2016-139 ;
PRDCT
fs 0 o$
a
CONNECT TO EX. i:565 LF OF
PROPOSED 12'
12'WATER LINE
(K-23231 WATER LINE — - � JJ / LLI
,.•:, Y
s. :.[ '7:2:Z�\ _ ..
T 13, BLOCK F- .•+'•i!'.
POSED
FIR ': _ .3598 ACRES s' •
f
'•"•' 1 .. ."'j'�".•• - 1(J. LOT 10, BLOCK A OF LOT 1, BLOCK 2 RO WPPOSED FIRE
... ,., ,� i•'r',' :'X .;T;.:.' 7 ;.,x ::{..i ` >�ijt OF TEXAS
HYDRANT
�;� ` ;.' 'i:-••i:,,� LOTS 8, 9, & 10, BLOCK A ,:.:ray }�•`' �{FYUMENT NO,
•• i?,•I[�„.»/.•..�+ SPEEDWAY DISTRIBUTION CENTER AMT PROPERTY DEVELOPMENT, LLC • I 4.r;,� :"� .2-54722
't•�' .: i INSTRUMENT NO. 2016-139 VOLUME 5137, PAGE 1358 :. w'!;;.t•
'=?- S:r` i.. ... •.�.,•... / PRDCT DRDCT ''y .'A ry-v ' p.•...:o-Q{'.-ONROCT
5't:• t I / / : CALLED 8.795 ACRE TRACT '! - • e.'1Y:�:r ;
'.+•�:.I,y- / i SPEEDWAY DISTRIBUTION CENTER : ,'•;i,;, f,
OWNERS ASSOCIATION, INC.`-
_ Q INSTRUMENT NO.2009.92705
_ �I INSTRUMENT NO.20154595 I •'k.
U) — — OPRDCT
KlmlejlHom
EXHIBIT A: WATER IMPROVEMENTS ALL STORAGE DOUBLE EAGLE
LEGEND
2
PROPERTY LINE - - �-
EASEMENT LINE O
Z
PROPOSED WATER
LINE
PROPOSED SEWER GRAPHIC SCALE IN FEET
FORCE MAIN I 0�75-150 300
LOT 3, BLOCK 1 I 1
OF
LOT 2R AND LOT 3, BLOCK 1
ONE 14 SUBDIVISION .
CABINT H. SLIDE 177
/ LOT 9, BLOCK A +
OF —
LOT 1, BLOCK 2 I ?J
LOTS 8, 9, A 10, BLOCK A —
SPEEDWAY DISTRIBUTION LOT 12, BLOCK A —
CENTER 9.0948 ACRES _ �" ,`•
INSTRUMENT NO. 2016-139 '
PRDCT
cj
4` HDPE FORCE MAIN
4' HDPE FOCE MAIN
CONNECT TO EX.
4' MANHOLE (X-22703)
..fro• ���: �:t.,+�� ,.:.•..�:':7 r-'t. i:.�t"•w••,.'�._:.-t':':•yri '
_a;•+ ,� . '�P N +�--•+1"',•:;.' :�. !i _. •'�1 -� _ / T 13. BLOCK r 1116 .3598A wI CRES .�,..r
r .... '�."1�1i�• +...,ram— .Law/— � :•., .. _�.:
��•t .•^ .•,y,..- ...; li�.�-F — S!�r..: • 'riqjE OF TEXAS
LOT 10, BLOCK A OF LOT 1, BLOCK 2
: V;? "''::', ",: .. i;•,��.'r,"' LOTS B, 9, 310, BLOCK • r .. IiUMENT NO,
.: }'.�?� y,.�,.�Y.F: M+r••;�;r.r+• SPEEDWAY DISTRIBUTION CENTER AMT PROPERTY DEVELOPMENT, LLC '^'' %';
?: ' ,t 4�•:� t_.... ,2-54722
ri �'!: ,'' ='f•• ;�� i
+"'i.•i.;'•^YT ,•'• / INSTRUMENT NO. 201f139 VOLUME 5137, PAGE 135E :. rr ?,',�•. ffvr OPRDCT
PRDCT DRDCT t =. �Y;'lT•. ,�"`• A
CALLED 6.795 ACRE TRACT ''•% ' :r +_
!.%••hj i SPEEDWAY DISTRIBUTION CENTER
►;'-i� ,� OWNERS ASSOCIATION, INC. :y
Q NSTRUMENT NO. 2009-92705 r'�.., •.'y
= INSTRUMENT NO. 2015d595
Ie..
OPRDCT
EXHIBIT A-1: SEWER IMPROVEMENTS ALL STORAGE DOUBLE EAGLE Kimley*Horn
�.� �-
r
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Bidlist
Rem No. I Description
1 0241.1118 4"-12" Pressure Plug
2 3126.0101 SWPPP Z 1 acre
3 3305,D109 Trench Safety
4 3311.0001 Ductile Iron Water Fitting_ s w/ Restraint
5 3311.0261 8" PVC Water Pipe
6 13311.0461 12" PVC Water Pipe
7 13312,0001 Fire Hydrant
8 13312.0117 Connection to Existing 4"-12" Water Main
9 13312.2203 2" Water Service
10 13312.3003 8" Gate Valve
11 13312.3005 12" Gate Valve
12 13471,0001 Traffic Control
00 42 43
DAP- BID PROPOSAL
Page 1 of 2
Bidder's Application
Bidder's Proposal
Specification Section No.
I Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT 1: WATER)MPROVEMENTS
0241 14
EA
1
$500.00
$500.001
312500
LS
1
$2,000.00
$2,000.001
330510
LF
570
$0.33
$188.10
331111
TON
1
$5,000.00
$5,000,00
331112
LF
5
$50.00
$250.001
331112
LF
565
$55.00
$31,075.001
331240
EA
11
$3,500.00
$3,600.001
331225
FA
it
$1,000.001
$1,000.001
331210
EA 1
51
$2,500.001
$12,500.001
331220
EA 1
11
$1,500.00�
$1,500.00I
331220
IEA 1
21
$2,500.001
$6,000.001
347113
IMO 1
11
$2,000,001
$2,000.001
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fonn v—Ion September 1, 2015
TOTAL UNIT I: WATER IMPROVEMENTS $64,513.101
00 4243_BId Proposal.xlan
004243
DAP - BID PROPOSAL
P.g. 2 of 2
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Biddoes Propose[
Bidlist
Item No.
I Description
I SpeeJowicnSection No.
I Uoitof
Measure
I Bid
Quantity
Unit Price
I Bid Value
jjNIT II: SANITARY SEWER JWROVEMENTS
1
3331.3401 Ductile Iron Sewer FI01nas 331111
TON
1
$5.000.00 $5,000.00
2
3331.4104 4" Sewer Force Main 3311 10. 3311 12, 33 31 15
LF
690
$40.00 $27,600.00
3
3339.0001 Epoxy MaNmle Liner 33 39 60
VF
9
$400.00 $3,600.00
4
9999.0001 Trench Safety 330610
LF
797
$0.33 $263.01
5
9999.0002 4" Sewer Force MaIn.CSLM Backfll 03 34 13,33 3115
EA
107
$45.00 $4,815.001
6
9999.0003 Clearft Wye 00 00 00
LS
1
$500.00 $500.001
7
9999.0004 Thrust Blocidna 00 00 00
LS
1
$360.00 $350.001
TOTAL UNIT I): SANITARY SEWER IMPROVEMENTS
$42,128.011
Bid Summary
UNIT I: WATER IMPROVEMENTS
$64,513.10
UNIT il: SANITARY SEWER IMPROVEMENTS
$42,128.01
Totes Construction Bid
$106,641.11
Contractor agrees to eompiete WORK for FINAL ACCEPTANCE within
60
pleader days after the date whoa the
CONTRACT commences to run an provided in the General Coaditimm
END OF SECTION
, -�_
(Signatur
TITLE.: President
DATE: 9/Z1! LD14
crrr of Fowr w014N
STA"MCWXTR11MMMr WCATMDOM2i*M-t1EVBAMMARD®PROMM
F.—valve aVlatlhar J. 2015 00 42 43Bld Aapoaatidan