HomeMy WebLinkAboutContract 50779-CO1CFW Change Order Approval COAppr-01 Page 2 of 3 CONTRACT NOD. FORT WORTHe C'ty of Fort Worth �..�....-- Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: COAppr-01 Date Started: 2018-10-23 City Sec. No.: 50779 Date Due: 2018-12-12 Project Name: 100637 - Sidewalks 2017 Gas Well Funds 100637 Project Numbers: DOE Numbers: Project To install sidewalk and curb ramp improvements to fill gaps in Description: high pedestrian activity corridors to improve use, safety and comfort in and around - Seminary Dr. From Hemphill St. To Campus DR. And Campus Dr. From Joe B Rushing Rd. To Mansfield HWY Project/Contract Compliance Maged Zaki Manager: Contractor: Arreguin Group,INC COUNCIL ACTION (If Required): M&C Log Name: M&C Number: City Inspector: Adilda Cazorla M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 17,394.12 33005-0200431-5740010-100637-0 0 Total Cost: $ 17,394.12 Approval Status: Total Requested Days: 0 OFFICIAL RECORD CITY SECRETARY FT WORTH, TX https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 10/29/2018 CFW Change Order Approval COAppr-01 Page 3 of 3 Approved: Yes Comments: User: Veronica Arreguin Date: 2018-10-23 1:25 PM Approved: Yes Comments: User: Maged Zaki Date: 2018-10-23 2:01 PM Approved: Yes Comments: User: Lane Zarate Date: 2018-10-25 6:45 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-10-26 1:43 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-10-26 4:10 PM Approved: Yes Comments: User: Doug Black Date: 2018-10-26 9:24 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-10-27 8:14 AM Action Required: Please review and approve Z M&C: 1295: N � Atte by ' ��. ..... .: �•;�y May J, s City Secretary https://projectpoint.buzzsaw.com/ bz_web/Fonns/FonnPrint.aspx?Site1d=515 OFFICIAL RECORD CITY SECRETARY FT WORTH, TX cec 18 Fox. City of Fort Worth Change Order Request Breakdown Project Namel PEDESTRIAN SW SEMINARY & CAMPUS DRIVE City Sec # 1 50779 Client Project #(s) 100637 Contractorl ARREGUIN GROUP PM MAGED ZAKI Inspectorl ADILDA CAZORLA Change Order Submittal # Date 1 1012312018 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW Contract Time Totals CD $559,878.25 $559,878.25 $0.00 $0.00 $559,878.25 $559,878.25 $17,394.12 $17,394.12 77,272.37 $577,272.37 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 3.11% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $699,847.81 This change order is needed to add quantities to bid items no 43 and 44 which exceed the original quatities in the contract.. And also to remove some quantities from bid items no : 2,18,20 and 30 due to cancelation of improvement on Hamphill St. and from bid item no 14 since it has been claimed under bid item 44 in this change order. Aslo deletion of Bid items no 36 and 37 since we can't relocate the light poles due to the 16" gas pipe in these area. City of Fort worth Change Order Additions Project Name PEDESTRIAN SW SEMINARY & CAMPUS DRIVE City Sec # 50779 Client Project # 100637 Contractor ARREGUIN GROUP PM IMAGED ZAKI Inspector ADILDA CAZORLA Change Order Submittal # 0 Date 10/23/2018 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 43 9999.UOU5 4" Concrete Sidewalk with ono ur a ; lacent to Curb; Curt 44 Concrete Sidewalk with MonoCurb aAdjacent o Curb; TPW 1,741.66500000 SF 5 TPW $58,373.28 Sub Total Additions 58,373.28 Change Order Additions Page 2 of 4 FoR_1 TH City of Fort Worth Change Order Deletions Project Name PEDESTRIAN SW SEMINARY & CAMPUS DRIVE CitySec # 50779 Client Project# 1 100637 Contractor ARREGUIN GROUP PM MAGED ZAKI Inspector ADILDA CAZORLA Change Order Submittal # = Date 10/23/2018 DELETIONS HLM I UESCRIPIION DEPT Qty Unit I Unit Cost Total 2 0241.0300 Remove ADA Ramp 14 3213.03114" Conic Sidewalk, Adjacent to Curb TPW -1,741.66500000 F5.5 1 321. 04 Barrier Free Ramp, Type M-2 TPW 2.00000000-----A1,8 0.00 20 3213.05 Barrier Free Ramp, Type P-1 TPW 2.000 00 EA 1,5 30 3441.4 03 Furnish/Install Alum Sign Ground Mount City Std. TPW 4.00000000A 350.00 6 3441.3502 Relocate TY1 Embedded Street Light Pole TPW 3.00000000 EA 6,5 . 0 37 3441.3051 FURNI H/Install LED Lighting Fixture (137 WattATB2 Cobra Head) TPW 3.00000 EA --$-900.00 TPW $40,979.16 Sub Total Deletions 40,97 .16 Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Chanae Order M/SBE Sub I Type of Service I Amount for this CO Total 1 $0.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requiremen s. Ma Maged Zaki Graduate Engineer CFW Change Order Approval COAppr-01 Routing Assigned To: Assigned By: Links 1 fortworthgov/Infrastructure Proiects/100637 - Sidewalks 2017 Gas Well Funds - Seminary and Campus/Contractor/Change Orders/C0#1 v3/Change Order #1 v3 (CONTRACT 100637).xlsm I No Attachments have been added to this form. Page 1 of 3 Due Date: Due Time: 8 SC�T1y0G18 �,;r https://projectpoint.buzzsaw.coml bz web/FormsIFormPrint.aspx?SiteId=51500&Proces... 10/29/2018