HomeMy WebLinkAboutContract 33651 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
�
WHEREAS, Jabez Development, L.P., hereinafter called "Developer", desires to
make certain improvements to Chapel Springs, an addition to the City of Fort Worth,
Texas; and
WHEREAS,the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City",to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section 11, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section 11, paragra MN
Policy. �'t3� %+ i5� �
Chapel Springs CFA—03 22 06 1 �7T ��I:�**I"` '��iH► 4
06-19-06 A09 :36 IN
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
Chapel Springs CFA—03 22 06 2
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1)Attached; Street Lights and Signs(C)Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B,B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to$240,395.94.
Chapel Springs CFA—03 22 06 3
SUMMARY OF
COST
Chapel Springs
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $177,528.20 $177,528.20
2. Storm Drainage $35,642.50 $35,642.50
3. Street Lights $13,700.00 $13,700.00
4. Street Name Signs $735.00 $735.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE
4% $8,526.83 $8,526.83
D. Materials Testing by DOE
2% $4,263.41 $4,263.41
TOTALS $240,395.94 $ - $240,395.94
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2.Developer's column for Item C represents four percent(4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent(2%)of paving and storm drain
costs for materials testing.
Chapel Springs CFA—03 22 06 4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate, at Fort Worth,Texas this the day of
2006.
RECEIVED
Approval Recommended: MAY I a 2006
Transportation and Public Works
Department
IR 51
Robert Goode, P. E.
Director
City of Fort Worth
NO M&C REQUIR1CD j Marc Ott
Assistant City Manager
A TEST:
Marty Hendrix
City Secretary
Appr ed s to Form:
sista C' y Attorney 's
5 eh ercl CarK1,e v-
ATTEST: DE OPER
Corporate Secretary
0FFICIA 1 RECORD
Chapel Springs CFA—03 22 06 5 CITY a �'R /UR
CONSTRUCTION COST ESTIMATE PEI #145600100
EXHIBIT "B"
PROJECT NAME: Chapel Springs ACREAGE: 10.00 BY: EAE
P H A S E: 1 D A T E: 8-May-06 ;,NECKED: EAE
FILE NAME: 144600400 )ATE P R E P D: 8-May-06 REVISED: RLP
A P P R 0 X I M A T I UNIT TOTAL
DESCRIPTION UNIT QUANTITY PRICE AMOUNT
D. STREET PAVING
6"REINFORCED W1 T'CURB SY 5,640 $26.20 $147,768.00
6"LIME STABILIZED SUBGRADE @ 30psy SY 6,029 $2.30 $13,866.70
LIME TONS 91 $88.50 $8,053.50
STREET BARRICADE LF 29 $20.00 $580.00
SAWCUT&REMOVE EXISTING PAVEMENT LF 140 $6.50 $910.00
BARRIER FREE RAMP EA 10 $635.00 $6,350.00
SUB - TOTAL STREET PAVING $177,528.20
PATE ENGINEERS, INC. CFA.xIs
Austin
Austin Bridge & Road
An Austin Industries Company
100%
ElmOwned Austin Bridge&Road,L.P.
February 16, 6 6330 Commerce Drive,Suite 150
Irving,Texas 75063
214/596-7300
Jabez Development, LP
Attn.: Michael Ducote
6815 Manhattan Drive, Suite 400
Fort Worth, Texas 76120
Gentlemen: PROPOSAL
We propose to furnish all labor, materials and equipment to construct, as an independent contractor,
the following described work:
DESCRIPTION AND LOCATION: Chapel Springs
Fort Worth,Texas
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
6"3000 PSI CONCRETE STREET PAVING 5,660.00 SY $26.20 $148,292.00
6"LIME STABILIZED SUBGRADE 6,050.00 SY $2.30 $13,915.00
HYDRATED LIME(32 LB/SY) - 97.00 TN $88.50 $8,584.50'
SAWCUT,REMOVE&DISPOSE EXISTING C&G 140.00 LF $6.50 $910.00
STREET BARRICADE 29.00 LF $20.00 $580.00
TOTAL.......... $172,281.50
This Proposal is subject to the "Bid Qualifications" attached.
Your acceptance of this proposal by signing and returning the original copy to us within (10) ten days
and the approval by us of credit arrangements will constitute a contract.
ACCEPTED: AUSTIN RIDGE & ROAD; LP
BY: BY:
Michael Fowler
TITLE: Estimator
Austin Bridge & Road, L.P.
DATE: 6330 Commerce Dr., Suite 150
Irving, Texas 75063
214.596.7300 (Main)
214.596.7398 (Fax)
FEB724-06 16:55 FROM-Rodman Paving, Inc. 19723351433 T-095 P.006/008 F-241
\�a UTiUMS.L.P. '
Page 2 of 2
Storm Drain
1 21"CLASS III RCP 43 LF $ 44.00 $ 1,892.00
2 24"CLASS III RCP 292 LF $ 49.00 $ 14,308.00
3 10'CURB INLET 4 EA $ 2,400.00 $ 9,600.
4 15"CURB INLET 1 EA $ 3,250.00 $ 3,250.00
5 24"SLOPED END HEADWALL 2 EA $ 825.00 $ 1,650.00
6 TRENCH SAFETY 335 LF $ 0.50 $ 167.50
7 CONNECT TO EX.STORM 1 EA $ 650.00 $ 650.00
8 SAWCUT,REMOVE&REPLACE EX. PAVEMENT 45 SY $ 80.00 $ 3,600.00
9 CONSTRUCTION SIGNAGE 1 LS $ 525.001 $ 525.00
Subtotal For Storm Drain: $ 35,642.50
Bonds
1 ITWO YEAR 100% 11 LS $ 4,897.25 1 $ 4,897.251
Grand Total: $ 195,463.00
Waiting Days Prior To Paving: 10
Working Days After Paving: 4
_This oroaosal does not include the following Items
-Inspection Fees -Construction Material Testing
-Permits -Geotech Testing
-Impact, Tap Or Connection Fees -Traffic Control Plans
-Construction Staking -Adjustment Of Existing Utilities
-Engineering Control -Removal Or Replacement Of Paving
-Water Meters Or Monitors -Erosion Control
-Electrical Conduit Or Work -Rock Excavation(no geotech)
-Sleeves -Import Of Select Material For Backfill
-Landscaping -Grade to Drain
-Tree Removal Or Replacement -TV Inspection of Storm Drain
-Cathodic Protection -Process Or Compaction Of Spoils
-Final Adjustment In Paving Areas -Locate Of Private Utilities
-Offsite Export Of Spoils -Hydromulch,Seed Or Sod
Sincerely,
BIII Richardson
Rodman Utilities, L.P.
P.O.BOX 957,FRISCO,TX 75034 . PHONE:972.335.4510 - FAX:972.712.0971
RODMAN EXCAVATION,INC. - RODMAN UNDERGROUND,INC. - RODMAN PAVING,INC. - RODMAN UrUM'IES,L.P. -
RODMAN POWER&COMMUNICATIONS,LLC. - WESTERN PLAINS RESOURCES,INC.
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 1 EA $ 2, 600 $2, 600. 00
MID-BLOCK RESIDENTIAL 2 EA $ 2, 600 $5, 200 .00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 600 $2, 600. 00
MID-BLOCK COLLECTOR 0 EA $ 2, 600 $00, 000. 00
MID-BLOCK ARTERIAL 0 EA $ 3, 000 $00, 000 .00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3, 000 $00, 000 . 00
RELOCATE EXISTING LIGHT 2 EA $ 1, 650 $3, 300 . 00
Subtotal $13, 700. 00
City' s Cost $00, 000. 00
Developer' s Subtotal $13, 700. 00
4% Inspection fee $00,000.00
Project Total $13, 700. 00
Adjacent Developer' s Cost $00 . 000. 00
Developer' s Cost $13,700.00
CFA CODE #2006020
DEVELOPERS COST: $13,700.00
CHAPEL SPRINGS, PHASE I
March 7, 2006
Fort Worth, Texas March 7, 2006
PAGE I OF EXHIBIT "C"
it STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of street lights at the
approximate locations shown in exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and/or collector streets can be installed using
overhead or underground conductors with the approval of the director of
transportation and Public Works.
3. The City of Fort Worth will install all the street lights that use overhead
or underground conductors on residential, and collector streets. The
developer agrees to pay the City of Fort Worth the amount shown below prior
to the City starting its design efforts, at the option of the developer and
at their expense they may purchase the poles, fixtures, and mast arms from
the City in order to assure compliance with city material standards
4 . Street lights on arterial streets shall be installed with underground
conductors
5. The developer agrees to dedicate all easements required for the installation
and maintenance of the street lights and to provide for the installation of
any electrical transformers required for the proper operations of the street
light system
6. The estimated cost of this street light installation is detailed on page (1)
of exhibit "C" and is summarized below. The street lights will remain the
property of, and will be maintained by the City of Fort Worth
March 7, 2006
DEVELOPERS COST: $13,700.00
CHAPEL SPRINGS, PHASE I
CFA CODE #2006020
PAGE II OF EXHIBIT "C"
FYI' WEI
III
"STREET LIGHTS"
INTERSECTIONS
CHRYSTAL SPRINGS DR & CHAPEL CT 1
MID BLOCK
CHRYSTAL SPRINGS DR 1
CHAPEL LANE 1
CHANGE OF DIRECTIONS
CHAPEL CT 1
RELOCATION
CHRYSTAL SPRINGS DR & DEAWILLE DR 1
CHAPEL LANE & DEAWILLE DR 1
CHAPEL SPRINGS, PHASE I
PAGE III OF EXHIBIT "C"
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following three (3) intersections at a cost
to the Developer of $735.00:
Deauville Dr & Chapel Springs Ct
Deauville Dr & Crystal Springs Dr
Chapel Springs Ct & Crystal Springs Dr
Chapel Springs
CFA code: 2006020 March 7, 2006
ORT > BL W
WORTH o o A ♦FSO
> a a <pFATNF ¢o FCACy G� ti
ljv w yCC Aq M RJR ro i
pSA Ck <
glG SRN'RQ/VA/p'RQ/VA/ Ak PACK.. E<pN eqD
CpgpH Hppse S��gRROkeN`��ti KIDWA Q~ a Bp�gF
VERNAA HI E SE T EMEN u
TALL OAK GRAY OAK 9 D, n
SITE LONE PIN GROVE p wn
LOCATION
3 LAINFIE
/1 /V ,tom J AC4d �C� IJ(LEAH a
q � �fTT F� sT0 SJ 3
Z FANDOR w < yCBy MFY RID A
Li
HORNBY v ,1Y BING 6),
F JIVES ¢ �QJ �<v tiFfGFy Fy fPMER R NCH Farmers
CA �ev0 v�Pq CUMfRfq/v9 9?cn Branch
WAY
P MqM oRo Fr
WEST POINT
A ` f Q �FSl
POINT
f
x
u
3
r
£ Ao
ti
Zm 'arZ
OLD WEATHERFORD
L) ASA N
r o �
�
s =
Z
P
OLD WEAT RFOR CHAPIN v
�O
� o
CD 10
CHA PEL SPRINGS
L OCA TION MAP
N. TS.
N.T.S.
F-
D
o
0
a #
1 11
xv\� _
s r
f
Y
PATE ENGINEERS CHAPEL SPRINGS
6000 WESTERN PLACE II OVERALL SMEET LAYOUT
SUITE 730 SHEET
FORT WORTH TEXAS 75107 PRG,lEGT NO.
PH. 817 698-0001 D-o- NO. 52Q
FAX 817# F-698-0320 STREET & ,msµ DRAIN EXHIBIT B
x,ts N0. 145600100 P6a F1LE NO, * laft1
i I
1
N.T.S.
t�
24'R l J 8" RCP
—1
C.I.
� f
( 18•
CP 8
f
T
4 _
PATE ENGINEERS Cl,'r4PEL SPR/NGS
6000 WESTERN PLACE II OWRAf STORY SEWER -OtiT
su730
FORT WORTH, TEXAS 76107 PROJECT NO. SHEET
PH. 817 698-0001 D.O.E. NO. 5240
FAX 8173 698-0320 STREET & STORM DRAIN H181T B—
ioe wa a eomoo PLAN FILE NO. W-1821
t
€I •
1� \
OA 1
1 11 t N.rf:
� N.T.S.
12 c7.3 LL
t ti
- % I f
SS1
14
rr 6
5
S
5 ,b� 2 T
3 ` 4
8 3 r�r
9 2
REMOVE
5 S S$ VaS71NG
_ 1 1 STREET
6 � r 10 /SCO LIGHT
= ✓ 15 L�
/_C
fn /� 14
12 ?J
J0 r
S�
REMOVE
EXISTING
STREET
LIGHT
�f
i
PATES ENGINEERS CHAPEL SPRINGS
6000 WESTERN PLACE II 'STREET LIGKM AND SIGNS LAY09T
SUITE 730 PR�IECT NO
FORT WORTH TEXAS 76107 SHEET
PH. (8173 698-0001 MOM NO. 5240
FAX (817) 698-0320 STREET & STORM DRAIN EXHIBIT C
sue ire. iaxii N FILE N0. —1821