Loading...
HomeMy WebLinkAboutContract 33661-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. -0 1 (MSC Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Stream Water Group Inc. , (Engineer) made and entered into City Secretary Contract No. 33661, (the Contract) which was authorized by the City Council by MSC C-21502 on the 13th day of June 2006,and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2005, WSM-A. WHEREAS, it has become necessary to execute Amendment No. 1 to the said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 21 20101 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,395.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $154,941.00. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ,)5 day of2011, in Fort Worth, Tarrant County, Texas. ,A�p^O�tl�� aa�Fo °fir aa� ATTEST: f � 0 0�0��� Ca It ao Y Marty Hendr o 00*'d 0 City Secretary a °00000°°°° ca NO M&C REQUIREIJ4 t�XA�44�.c,� APPROVAL RECOMMENDED: APPROVED: S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager Stream Water Group Inc. ENGINEER By: Name:Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd. ; Ste 230 Fort Worth TX 76112 APPROVED AS TO FORM AND LEGALITY: 9� 2 -;;;; Assistant City Attorney -2- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX December 2,2010 Mr.Rakesh Chaubey,P.E. Project Manager Water Department City of Fort Worth 1000 Throckmorton St. Fort Worth,TX 76102-6311 Reference: Contract Amendment No.1 Water and Sanitary Sewer Replacement Contract 2005,WSM-A DOE No. 5295, City Project No. 00385 Dear Mr.Chaubey: The following is a summary of additional work requested for Amendment No. 1 to the above referenced project,per recent design meetings with City of Fort Worth officials. Amendment No. 1: Redesign 791 linear feet of 12" Water line at Beaumont Street(2 Plan and Profile Sheets)due to a conflict with the proposed 7X5'Storm Drain system along the existing waterline by another consultant. Update the Sewer Plan and Profile sheet to reflect the redesign of waterline. Update three(3)supporting sheets(Cover Sheets, General Notes, Location Map)and Addition of Standard Details(3 sheets) Amendment no. I (See attached Exhibit"]" _ $4,395.00 The current status of the contract between Stream Water Group,Inc and City of Fort Worth for the Water and Sanitary Sewer Replacement Contract 2005,WSM-A is as follows: Original Contract Amount= $ 150,546.00 Amendment No. 1 Amount= $ 4,395.00 Total Contract Amount including Amendment No. 1= $154,941.00 Please process Amendment No. 1,to the Water and Sanitary Sewer Replacement Contract 2005,WSM-A in the amount of$4,395.00. If you require any additional information or have any questions regarding this matter,please give me a call at 817-446- 4171.We appreciate the opportunity to provide Engineering Design Services for the City of Fort Worth. Sincerely, Stream Water Group,Inc. Shamsul Arefin,P.E. President Copy:File,Tony Sholola,P.E.(City of Fort Worth) OFFICIAL RECORD 6737 Brentwood Stair Rd • Suite 230 • Fort Worth, TX 76112 • Phone' 817.446.4171 . 1 www. streamwatergroup.com FT.INORTH,TX