Loading...
HomeMy WebLinkAboutContract 33661-A2 AMENDMENT NO.2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. - (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Streamwater Group Inc. , (Engineer) made and entered into City Secretary Contract No. 33661, (the Contract) which was authorized by the City Council by M&C C-21502 on the 13th day of June 2006 and subsequently revised by one amendment; WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2005, WSM-A. WHEREAS, it has become necessary to execute Amendment No. 2 to the said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 14, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $17, 985.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $172, 926.00. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 08-16-11 PO4: 10 I ' 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the _ day of 2011, in Fort Worth, Tarrant County, Texas. ATTEST: ,aa � * O ppOOQ �V p0 OpO�g1`i� 0 Marty Hendrix �.-0 odd City Secretary 10 v o0 0 00000 0000 .C1 APPROVAL RECOMMENDED: � q�� APPROVED: // V., I�<X W - "I'- S . Frank Crumb, P.E. it ctor, Fernando Costa Water Department Assistant City Manager Streamwater Group, Inc. ENGINEER NO M&C REQUIRED By: Name:Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd. ; Ste 230 Fort Worth TX 76112 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX -2- C�unmp June 14,2011 Mr.Rakesh Chaubey,P.E. Project Manager Water Department City of Fort Worth 1000 Throckmorton St. Fort Worth,TX 76102-6311 Reference: Contract Amendment No.2 Water and Sanitary Sewer Replacement Contract 2005,WSM-A DOE No. 5295, City Project No. 00385 Dear Mr.Chaubey: The following is a summary of additional work requested for Amendment No.2 to the above referenced project,per recent design meetings with City of Fort Worth officials. Amendment No.2: Additional design-1,040 linear feet of 12" Water line along Beaumont Street(From Lebow Channel culvert to Grover Avenue Additional Design—840 linear feet of 8"water at various street intersection with Beaumont Street Additional Design—367 linear feet of 8"SS at various street intersection with Beaumont Street Additional Survey at various street intersections with Beaumont Street for sewer line design Update three(3)supporting sheets(Cover Sheets, General Notes, and Location/layout Map) Amendment no.2(See attached Exhibit"]") _ $17,985.00 The current status of the contract between Stream Water Group,Inc and City of Fort Worth for the Water and Sanitary Sewer Replacement Contract 2005,WSM-A is as follows: Original Contract Amount= $ 150,546.00 Amendment No. 1 Amount= $ 4,395.00 Amendment No.2 Amount= $ 17,985.00 Total Contract Amount including Amendment No.2= $ 172,926.00 Please process Amendment No.2,to the Water and Sanitary Sewer Replacement Contract 2005,WSM-A in the amount of$17,985.00. If you require any additional information or have any questions regarding this matter,please give me a call at 817-446- 4171.We appreciate the opportunity to provide Engineering Design Services for the City of Fort Worth. Sincerely, Stream Water Group,Inc. Shamsul Arefin,P.E. President Copy:File,Tony Sholola,P.E.,David Cooper,P.E.(City of Fort Worth) 6 73 7 Brentwood Stair Rd • Suite 230 • Fort Worth, TX 76112 • Phone 317.446.4171 • Fax: 817.446.433 www. streamwatergroup.com e to \ kC k � § co ± � C ¥ 0 60 60 _ W. _ _ \ Ln 2 � kd _ 2 Ln ) Q E 2 / 2E k v � Ln 's NLo m0 o U � @o E Nva a Wo00RC, * 2 k � z rLn /gCD C, c n . & ma. � § u ■ � k ° � k /� n � . aJ - � ■ © 0 d % z - ) 2 0 % 2 0 \ @ ) § k § } ` ] 05 w 7 } / / \ e - fkk0 ; )§ a § 0 � a 2 § c0 7 j CL CO CO c k } ƒ ° a n , m £ & / o £ 2 ; ; ;D ;D » @ ' §m o m 3 . m 0 0 # c o , = o 4 a a � m C k § .0 .0 \ : a ; J CN 0 _