HomeMy WebLinkAboutContract 33662 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. a3LVqZ--1
WHEREAS, Panel Installers, LTD., hereinafter called "Developer", desires to
make certain improvements to Ace Hardware Trucking, addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Wise, and Denton Counties, Texas, hereinafter called "City", to
do certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Andrew L. Ericson, its duly
authorized Vice President, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, subsequently amended and approved by the City Council of
the City of Fort Worth, is hereby incorporated into this Community
Facilities Contract as if copy herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties
and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of
06-26-06 A03 :48 I N `'J�
Ace Hardware Trucking
Page 1 of6
_�'irY,Ci�U o �1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or dama'-es are caused,
in whole or in part, by the alleged ne,-H,ence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
Ace Hardware Trucking
Page 2 of 6
Water (A)attached; Sewer (A-1)attached; Paving (B) Stonn Drain (B-
1) ; Street Lights and Signs (C).
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
IL Water and Sewer Facilities
A. Developer shall install the proposed water line(s), fire line(s) and/or
meters as shown on Exhibit A, the estimated cost of which is $67,218.
The City agrees to record the location of each said service line in respect
to the corner of the lot served, and to retain said records in its possession.
The Developer and the City shall share in the cost of the water
improvements as follows:
WATER FACILTIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within Development $ 45,500 $ 21,718 $ 67,218
Approach $ -0- $ -0- $ -0-
Easements* $ -0- $ -0- $ -0-
Services $ -0- $ -0- $ -0-
Engineering $ -0- $ -0- $ -0-
Sub-Total Water $ 45,500 $ 21,718 $ 67,218
*To be dedicated by the developer
The costs stated herein may be based upon construction estimates rather
than actual cost. The final cost to Developer and City shall be based upon:
1. Unit prices contained in City of Fort Worth Ordinance No. 14552;
Ace Hardware Trucking
Page 3 of 6 P rJ 7(5 f
f
WATER COST SHARE (Developer pays for 12" water pipe, gate valve, and
fittings. The City pays for 16"/12" water pipe, gate valve, and fittings.)
16 /12" water pipe ($40-$26)
744 L.F. x $14 = $ 10,416
16 /12" gate valve ($6,587-$1 ,223)
1 EA. x $5,364 = $ 5,364
Cast Iron fittings ($2,969/ton)
2 Ton x $2,969 = $ 5,938
$ 21,718
WATER
Unit Price from
Pay Item Unit Description Developer's
Projects
1 LF 6"Water Pie $ 15.00
2 LF 8"Water Pie $ 17.00
3 LF 10" Water Pie $ 24.00
4 LF 12"Water Pie $ 26.00
5 LF 16"Water Pie $ 40.00
6 EA 8" Gate Valve w/Cast Iron box & Lid $ 676.00
7 EA 10"Gate Valve w/Cast Iron box & Lid $ 1,182.00
8 EA 12" Gate Valve w/Cast Iron box & Lid $ 1,223.00
9 EA 16" Gate Valve w/Cast Iron box & Lid $ 6,587.00
10 TN Cast Iron/Ductile Iron Fittings $ 2,969.00
11 EA Install 1" Air &Vacuum Release Valve $ 3,534.00
w/Vault
12 EA Install 4" blow-Off w/4" Gate Valve & $ 3,624.00
Sump Manhole
B. Developer shall install sanitary mains as shown on Exhibit A-1, the
estimated cost of which is $3,180. The City agrees to record the location
of each said service line in respect to the corner of the lot served, and to
retain said records in its possession. The Developer shall bear the cost of
the sewer improvements as follows:
AMY
� 1 �l
C'°EA Y
Ace Hardware Trucking tv
Page 4 of b
o L.°v%�i( � ✓11 u
SANITARY SEWER FACILITIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Mains within Development $ 3,180 $ -0- $ 3,180
Approach $ -0- $ -0- $ -0-
Easements* $ -0- $ -0- $ -0-
Services $ -0- $ -0- $ -0-
Engineering $ -0- $ -0- $ -0-
Sub-Total Sewer $ 3,180 $ -0- $ 3,180
*To be dedicated by the developer.
The costs stated herein may be based upon construction estimates rather
than actual cost.
TOTAL WATER AND SANITARY SEWER FACILITIES:
Estimated Estimated City Estimated Total
Developer Cost Cost Cost
Sub-Total Water $ 45,500 $ 21,718 $ 67,218
Sub-Total Sewer $ 3,180 $ -0- $ 3,180
Total Water and Sewer $ 48,680 $ 21,718 $ 70,398
Construction
Construction Inspection $ 974 $ 434 $ 1,408
Grand Total I $ 49,6541 $ 22,1521 $ 71,806
Ace Hardware Trucking
Page 5 of 6
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and saai Developer
has-executed this instrument in quadruplicate, at Fort Worth, Texas this the ay of
2006.
Approval Recommended:
Water Department
^cntr.ac:c :authorization
Date
S. Frank Crumb
Director
ATTEST:
City Of Fort Worth
City Secretary Assistant City Manager
Marty Hendrix Marc A. Ott
Approve to Form:
Assistant ty ttorney
DEVELOPER
Panel Installers, LTD.
ATTEST:
Corporate Secretary By:
Sign, print name and title
Ace Hardware Trucking V` 'IEll I`;
WILBARGER
R` g 820
PIE C 287
FA RLANE LAKE
MARTIN ARLINGTON
w
r
mow =
< J V
_= KEL S MARTIN MARTIN
PECOS
0
820
0
W S ITE 287
w
DAVID STRICKLAND DAVID STRICKLAND
Y VESTA PARLEY
vn VESTA FAR EY
a a LASTER
o LASTER = SUN VALLEY
it w af ZI KALTE NBRUN
_
_KA N
a o itw
MAXEY SAUNDERS
LOCATION MAP
N.T.S.
MAPSCO 93E
ACE TRUCKING
LOCATION' MAP
ur
Cp t, LP.EA,P,,
f
� tog
l AE=DBMS
II
. II
I 1 I
II r
II
SCALE: 1 " = 160'
I I
I o I
a
I
II
FIR
I VAULT
I FH", P4
PRO
MRI I I — —
(DOMErE. I 1
I 1
y1R R
((IRR. 1' 1
1 �
l �
I I PRO ,
I I FH cgJZ O W•
I�I I i a�'•6
I I I
I I I
I I
I I
� I 1
wraw SPRINGS LANE \
I I I
I I
II I
I
to I I I w 1 1 i
I � I
OLD BLUE
I w I
I I
LEGEND
PROPOSED WATER LINE
— — — EXISTING WATER LINE
♦- PROPOSED FIRE HYDRANT
-b- EXISTING FIRE HYDRANT
EXHIBIT 99A» '9�ti� ? �,��
NATER DISTRIBUTION SYSTEM
ACE TRUCIaNG
W —
YllilW DR= EX 12'SS SSMH D(¢ _ 11'SS--
U
SSMH
RIM=600.28
IC= (12' IN V) 588.18
JE= (12' IN N) 588.15 I I 9
E= (12' DUT E) 588.03 I I os
I I I
II p
I
SCALE: 1 " = 160' I I I
i I
I
I
II
I
I
I oFFicE -C.o.
rr..a.n C.O.
II I - -
11
1 1
1 1 C.O.111 1 A I
1 � 1
C.O.
ZIL Ln
11 11 °tR0
1-
II I I I c;
I I 9
I I < C.O.
I I m
I I m
I I C.(
II I m I
1 I I
— — W1uow SPRINGS L4xs \ I i I I
I I c.o. '
I I
I I C.O.
�s
10 I i w l 1 /E7 2
I o l MH
MH
3 i SSMH
OLD BLUE CIRCLE I i z i RIM=592.46
E= (24' IN SV) 573.41
R.= (24' OUT NE) 573.31
I w I �4 Ss
II I �j /X2
SSMH
RIM=592.41 /
FE= (24' IN SV) 578.71
K.= (6' IN S) 580.56 /
iE= (24' OUT NE) 578.31 /
4
/2
LEGEND
PROPOSED SEWER LINE
— — — EXISTING SEWER LINE
• PROPOSED MANHOLE
o EXISTING MANHOLE
EXHIBIT "A- 1 "
SEWER DISTRIBUTION SYSTEM
ACE TRUCKING
Page 1 of 2
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/20/2006
DATE: Tuesday, June 20, 2006
LOG NAME: 60ACE HARDWARE REFERENCE NO.: C-21540
SUBJECT:
Authorize Execution of a Community Facilities Agreement with Panel Installers, LTD., for
Construction of Water and Sewer Services to Serve Ace Hardware Trucking Facility
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with Panel Installers, LTD., for the installation of water and sewer services to serve Ace
Hardware Trucking Facility, a development, located in east Fort Worth.
DISCUSSION:
Panel Installers, LTD., the developer of Ace Hardware Trucking Facility, has executed a proposed contract
for community facilities to serve a development located in the east part of Fort Worth, south of Martin
Street and east of Village Creek Boulevard (see attached map).
The total cost for water and sewer improvements for this development is $71,806. There will be City
participation in water pipe oversizing (16"/12") to increase pipe capacity in the development area. The
Developer and City estimated costs for water and sewer improvements are subject to construction
inspection fees.
ESTIMATED COST:
PROJECT COST DEVELOPER CITY TOTAL
WATER $45,500.00 $21,718.00 $67,218.00
SEWER $3,180.00 $0.00 $3,180.00
INSPECTION $974.00 $434.00 $1,408.00
TOTAL $49,654.00 $22,152.00 $71,806.00
This development is zoned I and located in COUNCIL DISTRICT 5.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Water Capital Projects Fund.
http://www.cfwnet.org/council_packet/Reports/mc_print.asp 10/16/2006
Page 2 of 2
TO Fund/AccountiCenters FROM Fund/Account/Centers
P264 539140 605140042883 $21,718.00
Submitted for City Manager's Office