Loading...
HomeMy WebLinkAboutContract 33665 General Contract Documents CITY SECRETARY Swi{icaEions CONTRACT NO. for ,. PLAINS FOR THE CONSTRUCTION OF STORM DRAtIN IMPROVEMENTS ON HOUSTON ST, (14TH ST. TO SOUTH OF 13TH ST.) 14TH[ ST. (THROCKMO[$TON ST. TO HOUSTON ST.) THROCKMORTON ST. (13TH ST. TO 14TH ST.) Project No. 309240013683 i D.O.E. No. 4657 i FILE No. K-1941 . QIVTkAt FoRT WoRTH cONJTr�U( �3t x���'S p MIKE MONCRIEF MAYOR d1% CHARLES R BOSWELL MARC A. OTT CITY MANAGER ASSISTANT CITY MANAGER i A. DOUGLAS RADEMAKER, P.E. DIRECTOR, DEPARTMENT OF ENGINEERING S. FRANK CRUMB, P.E. s� DIRECTOR. WATER DEPARTMENT ROBERT D. GOODE, P.E. DIRECTOR DEPARTMENT OF TRANSPORTATION & PUBLIC WORKS i Pmpaased Br 0 6 LDPEZGARCIA GROUP i*:........ ...........:.. 1ooF.1slnStreet (e17)3e0-l000 i BRENT E. LEWIS Suite 20D (81 n 882-%Q Fax I............................... r i FortWottf4Texas76102 �i+A 92662 wwwloPe:9ar6agroupam (:19-'-4./C E NSF- V+��•:� �e ��;° i"yo, FBI. %,t ONAL i 06-26-06 A08:48 IN 2006 ORIGINAL FORT WORTH WWVW4. q Home t Coun(,O Agenda � M&C I Employee Directory I Morning Report I Ads I PRS I IT Online t Departrnenv% I Sit,Map Print M&C COUNCIL ACTION: Approved on 6/13/2006 -Ordinance No. 16978-06-2006 & 16979-06-2006 DATE: 6/13/2006 REFERENCE NO.: **C-21501 LOG NAME: 303014TH CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinances and Authorize Execution of Contract with Tri-Tech Construction, Inc., for Storm Drain, Improvements on 14th Street, Throckmorton Street and Houston Street (City Project No. 00136) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing appropriations in the Culture and Tourism Fund by $455,146.00 , and decreasing the unreserved, undesignated fund balance by the same amount; 2. Authorize the transfer of$455,146.00 from the Culture and Tourism Fund to the Specially Funded Capital Projects Fund; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Specially Funded Capital Projects Fund in the amount of$455,146.00, from available funds; and 4. Authorize the City Manager to execute a contract with Tri-Tech Construction, Inc. in the amount of $395,425.00 for Storm Drain Improvements on 14th Street, Throckmorton Street and Houston Street. DISCUSSION: On January 24, 2006, (M&C C-21263) the City Council authorized the City Manager to execute an engineering agreement with LopezGarcia Group, to prepare plans and specifications for storm drain, paving and traffic signal improvements on 12th Street, 13th Street, 14th Street, Throckmorton Street and Houston Street. In order to expedite and to closely coordinate the relocation of all existing public and private underground utilities located on the identified streets, the project was divided into two portions (storm drain and paving and traffic signal improvements) for construction purposes. Council approval is being sought for construction of the storm drain improvements via this M&C and the paving and traffic signal improvements will be advertised for bid at a future date. This project consists of the installation of a storm drain system on the following streets and will facilitate the construction of the Omni Hotel and the City parking garage, both of which are proposed west of the Fort Worth Convention Center: Street From To 14th Street Throckmorton Street Houston Street Throckmorton Street 13th Street 14th Street Houston Street 13th Street 14th Street After the proposed improvements are completed, all disturbed segments of paving will be permanently repaired with asphalt. The project was advertised for bid on May 4 and 11, 2006. On June 1, 2006, the following bids were received: Bidder Amount Time of Completion Tri-Tech Construction, Inc. $395,425.00 45 Calendar Days Conatser Construction, Inc. $447,750.00 Laughley Bridge and Construction, Inc. $483,920.00 Jackson Construction, Ltd $494,412.00 North Texas Contracting, Inc. $553,915.00 AUI Contractors, Inc. $700,503.00 In addition to the contract cost $39,950.00 is included for utility coordination, survey, inspection and other construction related tasks. In addition, $19,771.00 is provided for project contingencies. M/WBE — Tri-Tech Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 19% M/WBE participation. The City's goal on this project is 18%. The project is located in COUNCIL DISTRICT 9, Mapsco 77A. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the Specially Funded Capital Projects Fund. The unreserved, designated fund balance of the Culture and Tourism Fund will be $12,198927.00 after this appropriation. TO Fund/Account/Centers FROM Fund/Account/Centers 1)GG04 538070 0240400 $455,146.00 2GG04 538070 0240400 $455,146.00 3)C291 541200 309240013683 $415,196.00 4)C291 541200 309240013683 $395,425.00 3)C291 531350 309240013684 $4,000.00 3)C291 531350 309240013685 $24,000.00 3)C291 531350 309240013691 $780.00 2 &3)C291 472004 3092400136ZZ $455,146.00 3)C291 531350 309240013652 $10,000.00 3)C291 531350 309240013680 $1,170.00 Submitted for City Manager's Office by: Marc Ott (6122) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker(6157) ATTACHMENTS 303014th Rec 1 (2).doc 303014th Rec 3 1 ().do CITY OF FORT WORTH,TEXAS DEPARTMENT OF ENGINEERING ADDENDUM No. 1 For STORM DRAIN IMPROVEMENTS ON HOUSTON STREET (14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET (THROCKMORTON ST. TO HOUSTON ST.) THROCKMORTON STREET (13TH ST. TO 14TH ST.) FORT WORTH, TEXAS *Project No. C291-309240013683 ` D.O.E.No.4657 Addendum No. 1 issued—May 12,2006 *Bid Receipt Date—May 25,2006 Bidders are hereby informed of the following changes to the plans,specifications and contract documents for the project. Bidders must acknowledge receipt of this Addendum below and on the Proposal-Part B. I. GENERAL REVISIONS - The Project No.as identified in the plans and specifications is hereby changed from 309240013683 to C291-309240013683 - Clarification—Permanent Asphalt pavement repair shall be per Fig.2000-1B with Backfill per Fig.A. (Flowable fill for Backfill,as identified by Item 7 of Fig.2000-113,will not be required for this project) Il. PROJECT MANUAL REVISIONS PART A-NOTICE TO BIDDERS The Bid Opening Date is hereby revised to May 25,2006. PART A-COMPREHENSIVE NOTICE TO BIDDERS -- - The Bid Opening Date is hereby revised to May 25,2006. PART B—BID PROPOSAL - Replace page B-3 in its entirety with page B-3R—attached. - The contract construction time is hereby revised from Sixty(60)Calendar Days to Forty five(45) Calendar Days. *Project information modified by this addendum - Please acknowledge receipt of this addendum by placing a signed copy of the same into your proposal at the time of bidding. Failure to return a signed copy of the addendum with this proposal shall be grounds for rendering the bid non- respo e. �• Department of Engineering Re ipt Acknowledged: A.Douglas Rademaker,P.E. Director By: By: hn S o ` Tony Sholola,P.E. Engineering Manager,Engineering Services D Title: LD r v l .. J v �. 5-12-06 Addendum No. 1 ' L°c i ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT UNIT COST TOTAL COST } NO. COST WRITTEN IN WORDS 18. 1 EA Std.(Type 5)Storrs Drain Manhole Dollars and Cents per Each 19. 5 EA Reinforced Concrete Manhole Collar Dollars and Cents per Each h 20. 890 LF Trench Safety (for Trenches Greater Than Five Feet Deep) $ $ Dollars and Cents per Linear Foot 21. 200 SF Concrete Sidewalk Replacement Dollars $ $ and Cents per Square Foot 22. 200 LF Std.7"Concrete Curb and 18"Gutter Dollars and Cents per Linear Foot 23. 1000 LF Perm.Asphalt Pavement Repair Per Fig.2000-1 B Dollars and Cents per Linear Foot 24_ 5 EA Pre-Construction Exploratory Excavation(D-Hole) Dollars and Cents per Each 25_ 100 LF Removal and disposal of existing Flowable Fill Dollars and Cents per Linear Foot TOTAL AMOUNT OF BID= i B-3R A ld4WVV�� i� CITY OF FORT WORTH,TEXAS DEPARTMENT OF ENGINEERING ADDENDUM No.2 For STORM DRAIN IMPROVEMENTS ON HOUSTON STREET (14TH ST. TO SOUTH OF 13TH ST,) 14TH STREET (THROCKMORTON ST. TO HOUSTON ST.) THROCKMORTON STREET (13TH ST. TO 14TH ST.) FORT WORTH, TEXAS Project No. C291-309240013683 D.O.E. No.4657 Addendum No.2 issued—May 18,2006 *Bid Recent Date—June 1,2006 Bidders are hereby informed of the following changes to the plans,specifications and contract documents for the project. Bidders must acknowledge receipt of this Addendum below and on the Proposal-'Part B. I. The bid receipt date is hereby revised to June 1,2006. II. SPECIFICATIONS AND CONTRACT DOCUMENTS PART D—SPECIAL CONDITIONS The Prevailing Wage Rate for 2000 on page SC-56,is hereby deleted in its entirety. (The Prevailing Wage Rates for 2006 located in Part C shall remain and govern) PART DA—ADDITIONAL SPECIAL CONDITIONS - Items DA-66 and DA-116 are hereby deleted in their entirety. III.PLAN REVISIONS SHEET 2 Add the following GENERAL NOTE: 20. IN THE EVENT THAT CONFLICTS ARE DISCOVERED BETWEEN THE PROPOSED STORM DRAIN IMPROVEMENTS AND OTHER EXISTING UTILITIES BEFORE OR DURING CONSTRUCTION,THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING TFiE A.^PROPRIA T E PROVISiORTS FOR CONTI RdUING WORK AT OTHER LOCATIONS OF THE PROJECT UNTIL SUCH CONFLICTS ARE RESOLVED. NO ADDITIONAL COMPENSATION SHALL BE PROVIDED FOR DELAYS RESULTING FROM CONFLICTS WITH OTHER UTILITIES. SHEETS 8 AND 9 - NOTE 2 is hereby deleted in its entirety,and replaced with the following: 2. WORK HOURS SHALL BE LIMITED TO 7:00 A.M.TO 7:00 P.M.(6 DAYS A WEEK- MONDAY THROUGH SATURDAY,EXCLUDING SUNDAYS)AS DETERMINED BY THE CITY TRAFFIC ENGINEER AND IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE"CITY OF FORT WORTH TRAFFIC CONTROL HANDBOOK FOR CONSTRUCTION AND MAINTENANCE WORK AREAS. r - NOTE 3 is hereby deleted in its entirety. *Project information modified by this addendum 5-18-06 Addendum No. 2 1 of 2 Please acknowledge receipt of this addendum by placing a signed copy of the same into your proposal at the time of bidding. Failure to return a signed copy of the addendum with this proposal shall be grounds for rendering the bid non- responsive. - Department of Engineering Rece' t cknowledged: A.Douglas Rademaker,P.E. Director �. By: By: A v io t6 ,�o r Tony Sholola,P.E. Engineering Manager,Engineering Services Division Title: w w 5-18-06 Addendum No. 2 2 of 2 General Contract Documents Specifications for PLANS FOR THE CONSTRUCTION OF STORM DRAIN IMPROVEMENTS ON HOUSTON ST. (14TH ST. TO SOUTH OF 13TH ST.) 14TH ST. (THROCKMORTON ST. TO HOUSTON ST.) THROCKMORTON ST. (13TH ST. TO 14TH ST.) ProiecE No. 309240013683 D.O.E. No. 4657 FILE No. K-1941 FoRTWORTH MIKE MONCRIEF MAYOR CHARLES R. BOSWELL MARC A. OTT CITY MANAGER ASSISTANT CITY MANAGER A. DOUGLAS RADEMAKER. P.E. DIRECTOR, DEPARTMENT OF ENGINEERING S. FRANK CRUMB, P.E. DIRECTOR. WATER DEPARTMENT ROBERT D. GOODE, P.E. DIRECTOR. DEPARTMENT OF TRANSPORTATION & PUBLIC WORKS Pre" Br. 06 of rFx4,tsit++ LOPEZGARCIA GROUP i* ;S too E.15th Street (8M39D-IOD0 % BRENT E. LEWIS Suite 200 (817)882-9462 Fax Fort Woitk Texas 76102 i o. 92662 �r - wwwbpexgxdagroup can ++t�� /C E NSE IZFf t tFSSNV+ 1_%%//ONNAA`-1,71 y _ 2006 TABLE OF CONTENTS Part A - Notice to Bidders Comprehensive Notice to Bidders Special Instructions to Bidders—T/PW Part B - Minority/Women Business Enterprise Policy Bid Proposal Part C - Special Provisions—T/PW City of Fort Worth Wage Rates Part D - Water Department— Part D Water Department— Part DA Part E - Certificate of Insurance Contractor Compliance with Worker's Compensation Law Vendor Compliance to State Law Equipment Schedule Experience Record Payment Bond Performance Bond Maintenance Bond Part F - Contract Appendix A - Geotechnical Report Appendix B - Summary of Test Hole Information Appendix C - Details .. an .m an rr PART A NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS T/PW SPECIAL INSTRUCTIONS TO BIDDERS da .m i. am .. NOTICE TO BIDDERS Sealed proposals for the following: FOR: STORM DRAIN IMPROVEMENTS ON HOUSTON STREET (14TH ST.TO SOUTH OF 13TH ST.) 14TH STREET (THROCKMORTON ST.TO HOUSTON ST.) THROCKMORTON STREET(13TH ST. TO 14TH ST.) FORT WORTH, TEXAS Project No. 309240013683 D.O.E. No.4657 FILE No. K-1941 Addressed to Mr. Charles Boswell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m.,June 1,2006 and then publicly opened and read aloud at 2:00 p.m.in the Council Chambers. Plans,General Contract Documents and Specifications for this project may be obtained beginning May 8,2006 for a non-refundable fee of$30.00 in the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. The major work will consist of the following: Storm Drain Improvements: 206 LF 5'W X 4'H Pre-cast Reinforced Concrete Box Storm Drain 493 LF 48"(Class III) RCP Storm Drain 276 LF 24"(Class III) RCP Storm Drain A pre-bid conference will be held with prospective bidders on Monday, May 15, 2006 beginning at 3:00 p.m. in the T/PW Conference Room No. 270. For additional information, please contact Mr. Rakesh Chaubey, P.E., Project Manager,City of Fort Worth- Department of Engineering at (817) 392-6051, and/or Mr. Brent E. Lewis, P.E., Project Manager, LOPEZGARCIA GROUP at(817)390-1000. Advertising Dates: May 4, 2006 May 11, 2006 NTB-1 COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: STORM DRAIN IMPROVEMENTS ON HOUSTON STREET (14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET(THROCKMORTON ST.TO HOUSTON ST.) THROCKMORTON STREET(13TH ST.TO 14TH ST.) FORT WORTH, TEXAS Project No. 309240013683 D.O.E. No.4657 FILE No. K-1941 Addressed to Mr. Charles Boswell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m.,June 1,2006 and then publicly opened and read aloud at 2:00 p.m.in the Council Chambers. Plans,General Contract Documents and Specifications for this project may be obtained beginning May 8,2006 for a non-refundable fee of$30.00 in the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth-, Texas 76102. All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance no. 7400 (Fort Worth City Code Sections 13-A-221 through 13-A-29) prohibiting discrimination in the employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. The major work will consist of the (approximate)following: STORM DRAIN IMPROVEMENTS 229 CY Unclassified Street Excavation 940 CY Trench Excavation and Backfill for Storm Drains 206 LF 5'W X 4'H Pre-Cast Reinforced Concrete Box Storm Drain 493 LF 48" (Class III) RCP Storm Drain 276 LF 24" (Class III) RCP Storm Drain 2 EA Std.4'X 4' Storm Drain MH _ 2 EA Std. 6'X 6' Storm Drain MH 1 EA Std. 7'X 7' Storm Drain MH 2 EA Std. 10' Storm Drain Curb Inlet 1 EA 15' (Sump) Inlet 845 LF Permanent Asphalt Pavement Repair A pre-bid conference will be held with prospective bidders on Monday, May 15,2006 beginning at 3:00 p.m. in the T/PW Conference Room No. 270. Included in the above will be all other miscellaneous items of construction as outlined in the Plans,General Contract Documents and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made;will be within ninety(90)days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form(s). Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817)871-7910. CNTB-1 COMPREHENSIVE NOTICE TO BIDDERS Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specification book or face rejection of the bid as non-responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time-line stated below or the bidder may request a copy of said forms from the City Project Manager named in this solicitation. SUBMISSION OF BID AND AWARD OF CONTRACT This document is designed as a single construction contract. The prospective bidder must submit their bid and complete the Bid Summary on Page B-3. In accord with the City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals forthe participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBEIWBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM (with "Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the City received the Documentation. Failure to comply shall render the bid non-responsive. The managing department for this project is the Department of Engineering. For additional information, please contact Mr. Rakesh Chaubey, P.E., Project Manager, City of Fort Worth-Department of Engineering at(817)392-6051,and/or Mr. Brent E.Lewis, P.E.,Project Manager, LOPEZGARCIA GROUP at (817)390-1000. CHARLES BOSWELL MARTY HENDRIX CITY MANAGER CITY SECRETARY By: 1 0 Tony Sho ola, P.E., Engineering Manager, Department of Engineering, Engineering Services Division Advertising Dates: May 4, 2006 May 11,2006 CNTB-2 Am as SPECIAL INSTRUCTION TO BIDDERS (TRANSPORTATION AND PUBLIC WORKS) l. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than five(5%)per cent of the total of the bid submitted must accompany the bid,and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten(10)days after the contract has been awarded. To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition,the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the r� Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. ria 2. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. In this connection,the successful bidder shall be required to furnish a performance bond and a payment bond,both in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Chapter 2253,Texas Government Code. In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or r+r required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. +'a The City will accept no sureties who are in default or delinquent on any bonds or who have an interest in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall ,k immediately provide a new surety satisfactory to the City. If the contract amount is in excess of$25,000,a Payment Bond shall be executed,in the amount of the contract,solely for the protection of all claimants supplying labor and materials in the prosecution of the work. If the contract amount is in excess of$100,000,a Performance Bond shall be executed,in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications,and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. All contracts shall require a maintenance bond in the amount of one hundred percent (1001%) of the original contract amount to guarantee the work for a period of two (2) years after the date of acceptance of the project from defects in workmanship and/or material. .� UNIC"1w1 NCNB 10/27/04 1 r 3. LIQUIDATED DAMAGES:The Contractor's attention is called to Part 1,Item 8,paragraph 8.6,of the"General Provisions"of the Standard Specifications for Construction of the City of Fort Worth, Texas,concerning liquidated damages for late completion of projects. r 4. AMBIGUITY:In case of ambiguity or lack of clearness in stating prices in the proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the i proposal. 5. EMPLOYMENT:All bidders will be required to comply with City Ordinance No.7278 as amended by City Ordinance No.7400(Fort Worth City Code Section 13-A-21 through 13-a-29)prohibiting discrimination in employment practices. 6. WAGE RATES:Section 8.8 of the Standard Specifications for Street and Storm Drain Construction is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort 'M Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. +� (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work,maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of the special provision titled"Right to Audit"pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its .r subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating err that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. (e) The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. r Section 8.9 of the Standard Specifications for Street and Storm Drain Construction is hereby deleted. 7. FINANCIAL STATEMENT:A current certified financial statement may be required by the Department of Engineering if required for use by the CITY OF FORT WORTH in determining the successful bidder. This statement,if required,is to be prepared by an independent Public Accountant so holding a valid permit issued by an appropriate State Licensing Agency. 8. INSURANCE:Within ten(10)days of receipt of notice of award of contract,the Contractor must �,. provide,along with executed contract documents and appropriate bonds,proof of insurance for Worker's Compensation and Comprehensive General Liability(Bodily Injury-$500,000 each person, $1,000,000 each occurrence($2,000,000 aggregate limit);Property Damage-$250,000 each occurrence). The City reserves the right to request any other insurance coverages as may be required by each individual project. 9. ADDITIONAL INSURANCE REQUIREMENTS: .r a. The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers'compensation insurance policy. 10/27/04 2 .r b. Certificates of insurance shall be delivered to the City of Fort Worth,contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street,Fort Worth,TX 76102,prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation,non-renewal,and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M.Best rating of A:VII or equivalent measure of financial strength and solvency. Oft f. Deductible limits,or self-funded retention limits,on each policy must not exceed$10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance,in lieu of traditional insurance,City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups.The City must approve in writing any alternative coverage. h. Workers'compensation insurance policy(s)covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. " j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project,Contractor shall report,in a timely manner,to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. i Contractor's liability shall not be limited to the specified amounts of insurance required herein. a� in. Upon the request of City,Contractor shall provide complete copies of all insurance policies required by these contract documents. .r 10. NONRESIDENT BIDDERS:Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a non resident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. .n "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder"means a bidder whose principal place of business is in this state,and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. 10/27/04 3 w MW Im This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all non resident bidders in order for its bid "` to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. as 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be mm obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM : ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing ,r department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding +R actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE)on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three(3) years. ar 12. AWARD OF CONTRACT:Contract will be awarded to the lowest responsive bidder.The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of ninety(90)days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM,GOOD FAITH EFFORT FORM,and/or the JOINT VENTURE FORM("Documentation")as appropriate is received by the City. The award of contract, if made,will be within ninety(90)days after this documentation is received,but in no case will the award be made until all the responsibility of the bidder to whom it is proposed to award the contract has been verified. 13. PAYMENT:The Contractor will receive full payment(minus retainage)from the City for all work for each pay period. Payment of the remaining amount shall be made with the final payment,and upon acceptance'of the project. .. 14. ADDENDA:Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the plans desk of the Department of Engineering .s Construction Division at(817)871-7910.Bids that so not acknowledge all applicable addenda may be rejected as non-responsive. 15. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: A.Workers Compensation Insurance Coverage r 10/27/04 4 ..r ,. +fa a.Definitions: Certain of coverage("certificate").A copy of a certificate of insurance,a certificate of am authority to self-insure issued by the commission,or a coverage agreement(TWCC-81, TWCC-82,TWCC-83,or TWCC-84),showing statutory worker's compensation insurance coverage for the person's or entity's employees providing services on a project,for the M4 duration of the project. Duration of the project-includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the "ft governmental entity. Persons providing services on the project("subcontractor"in§406.096)-includes all persons +s or entities performing all or part of the services the contractor has undertaken to perform on the project,regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes,without limitation, independent contractors,subcontractors,leasing companies,motor carriers,owner-operators, employees of any such entity,or employees of any entity which furnishes persons to provide services on the project. "Services"include,without limitation,providing,hauling,or delivering equipment or materials,or providing labor,transportation,or toner services related �! to a project."Services"does not include activities unrelated to the project,such as food/beverage vendors,office supply deliveries,and delivery of portable toilets. b. The contractor shall provided coverage,based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code,Section 401.011 (44)or all employees of the contractor providing services on the project,for the duration of the project. r c. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. r d. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project,the contractor must,prior to the end of the coverage period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. e. The contractor shall obtain from each person providing services on a project,and provide r� to the governmental entity: (1) a certificate of coverage,prior to that person beginning work on the project,so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project;and (2) no later than seven days after receipt by the contractor,a new certificate of coverage L+ showing extension of coverage,if the coverage period shown on the current certificate of coverage ends during the duration of the project. +.a f. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter g. The contractor shall notify the governmental entity in writing by certified mail or personal delivery,within ten(10)days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. r 10/27/04 5 Mk h. The contractor shall post on each project site a notice,in the text,form and manner prescribed by the Texas Worker's Compensation Commission,informing all persons providing services on the project that they are required to be covered,and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project,to: (1) provide coverage,based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory .. requirements of Texas labor Code,Section 401.011 (44)for all of its employees providing services on the project,for the duration of the project; s (2) provide to the contractor,prior to that person beginning work on the project,a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project,for the duration of the project; (3) provide the contractor,prior to the end of the coverage period,a new certificate of coverage showing extension of coverage,if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person with whom it contracts,and provide to the contractor: Aft (a) a certificate of coverage,prior to the other person beginning work on the project;and (b) a new certificate of coverage showing extension of coverage,prior to the end so of the coverage period,if the coverage period shown on the current certificate of coverage ends during the duration of the project; rr (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the governmental entity in wiring by certified mail or personal delivery, " within ten(10)days after the person knew or should have known,of any change that materially affects the provision of coverage of any person providing services on the project;and i (7) contractually require each person with whom it contracts,to perform as required by paragraphs(1)-(7),with the certificates of coverage to be provided to the person for ar whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the ■"� contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project,that the coverage will be based on proper reporting of classification codes and payroll amounts,and that all coverage agreements will be filed with the appropriate insurance carver or,in the case of a self insured,with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative,criminal,civil penalties or other civil actions. r 10/27/04 6 sr M ma k. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. .i B. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered,and stating how a person may verify current coverage and W4 report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type,and shall be in both English and Spanish and any other language common to the worker m population. The text for the notices shall be the following text,without any additional words or changes: s "REQUIRED WORKER'S COMPENSATION COVERAGE" The law requires that each person working on this site or providing services related to this construction project must be covered by worker"compensation insurance.This includes persons providing,hauling .� or delivering equipment or materials,or providing labor or transportation or other service related to the project,regardless of the identity of their employer or status as an employee". r Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage,to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". 16. NON DISCRIMINATION:The contractor shall not discriminate against any person or persons because of sex,race,religion,color,or national origin and shall comply with the provisions of City Ordinance 7278,as amended by City Ordinance 7400(Fort Worth City Code Sections 13A-21 through 13A-29),prohibiting discrimination in employment practices. 17. AGE DISCRIMINATION:In accordance with the policy("Policy")of the Executive Branch of the federal government,contractor covenants that neither it nor any of its officers,members,agents,or employees,will engage in performing this contract,shall,in connection with the employment, advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against person because of their age except on the basis of a bona fide ' occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,or employees,or person r. acting on their behalf,shall specify,in solicitations or advertisements for employees to work on this Contract,a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirement. Contractor warrants it will fully comply with the Policy and will defend,indemnify and hold City harmless against any and all claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above referenced Policy concerning age discrimination u. in the performance of this Contract. 18. DISCRIMINATION DUE TO DISABILITY:In accordance with the provisions of the Americans As with Disabilities Act of 1990("ADA'),Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or current employees of Contractor.Contractor wan-ants it will fully comply with ADA's provisions and any other applicable federal state and local laws concerning disability and will defend indemnify and hold City harmless against any claims or allegations asserted by third parties against City arising out of Contractor's nr 10/27/04 7 rr sr alleged failure to comply with the above-referenced laws concerning disability discrimination in the performance of this Contract. 19. PROGRESS PAYMENTS FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(lest retainage)from the city for each pay period. b. Payment of the retainage will be included with the fmal payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the fmal punch list has been completed,as evidenced by a written statement signed by the contractor and the City. ,.� d. The warranty period shall begin as of the date that the fmal punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. L In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)fmal quantities,or(ii)liquidated damages,city shall make a +ft progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall w attempt to resolve the differences within 30 calendar days. i r i 10/27/04 8 PART B MIWBE SPECIFICATIONS BID PROPOSAL an FONT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT r It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MM/BE PROJECT GOALS The City's M/WBE goal on this project is 18 %of the total bid(Base bid applies to Parks and Community Services). r COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's MM/BE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION ... The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MWBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if you will received by 5:00 p.m., five (5) City business days after the bid eperform all subcontracting/supplier work: opening date,exclusive of the bid opening date. 5. Joint Venture Form,if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. o enin date,exclusive of the bid opening date. e FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817)392-6104. Rev.11/11/05 ^ ATTACHMENT 1A Page 1 of 4 F--RWORTH City of Fort Worth Subcontractors/Suppliers Utilization°066 " PRIME COMPANY NAME: -� Check applicable block to describe prime r i 7/- �-�n L- PROJECT NAME: MNV/DBE L NON-MNV/DBE STORM DRAIN IMPROVEMENTS ON BID DATE HOUSTON STREET(14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET(THROCKMORTON ST.TO HOUSTON ST.) THROCKMORTON STREET(13TH ST.TO 14TH ST.) !/ City's MNVBE Project Goal: Prime's MNVBE Project Utilization: PROJECT NUMBER: 18% 9 % D.O.E. No.4657 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five(5)City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the r, bid being considered non-responsive to bid specifications MMBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1"tier, a payment by a subcontractor to its supplier is considered 2"d tier ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE)is synonymous with Minority/Women Business Enterprise(M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 ATTACHMENT 1A Page 2 of 4 roxx Primes are required to identify ALL subcontractorstsuppliers,regardless of status;i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification N (check one) 0 SUBCONTRACTOR/SUPPLIERn Company Name i N T Detail Detail Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D W E E R 0 B C T E A r�beI P1crfrr iq S Track Bo. box 77/ "�- 10?)000, �O��G1d r76o6 3 I s�1Tic 7-57.1- �q�Ql 0��• 00 .Cowfown Red Mi X- 0. Box 14 ;27 i or Fora-kA I iK Pa) poo OV rax- g17- 75"9- l7ld 9ao� Raygl Po�k� X .� g000 f-Idy de n CAi rIn l -fa Sox 8369 CorcCM4e— Q� a,r-J-Vor b;TX WdY S+�,K re6 817-ti -�h5©i1 1�i�C� ro uc 1000 IV, V$C-Arfiw co n G road P�„NO q2�, a 0 -3601 �reC,A•� Rev.5/30/03 W-RTWORTH ATTACHMENT 1A r Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. 0 6—0 2 _ Certification N (check one) UBCONTRACTOR/SUPPLIER T N T Detail Detail Company Name i Address e M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T R D D B Vy E E C T E A r3wjer 5 i9orf;c4k3 .Inc ,y 41,15 4 /5` V .Ca.-j V/fft-A, 7X 74,111 'cq 5 3�pp p-2- 535- 3 931 ` rax_�j7-83/-7/7/ 63y oyt�el� ��� conefc* /6 33 C I.cirLq 3'Z I3 Goy aS+ po. goy Lwoe-e4, rx 73V-*f iia l y«-a'6/- 199/ r-Ox 817-0�/�3�!/y . L p0, en ti P � ()K 370 ck gess, TX '*10VV p 09 18 a Rev.5/30/03 JRTWORTH' ATTACHMENT 1A . Page 4 of 4 otal Dollar Amount of M/WBE Subcontractors/Suppliers $ 711 9/0, otal Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ (��� 074 OTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ I �/I vvy, p0 .� O he Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a .Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of ontract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed , 4/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.. ,,By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the "transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material —Rbreach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. Au ized ign a Printed Sig V4 Title Contact NameTtle(if different) C ey�. --�f'� c . 0917-yA(-33// yy�-3v�y Company Name Telephone and/or Fax 1/33 e,20 S. a a01.COQ Address E-mail Address I It WO A f Tx 2 �/2 —1-0i CRYIStateop Date Rev.5/30/03 BID PROPOSAL (This proposal must not be removed from this book of Contract Documents.) TO: Charles Boswell City Manager, City of Fort Worth Purchasing Division, Municipal Office Building 1000 Throckmorton Street v P.O. Box 17027 Fort Worth, Texas 76102 PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of various sanitary sewer improvements, including replacement and construction of sanitary sewer, manhole and sewer rehabilitation and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: STORM DRAIN IMPROVEMENTS ON HOUSTON STREET (14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET(THROCKMORTON ST. TO HOUSTON ST.) THROCKMORTON STREET (13TH ST. TO 14TH ST.) D.O.E. No. 4657 Y Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned has thoroughly examined the plans, specifications and contract documents and the site, understands the amount of work to be done and hereby proposes to do all the work, furnish all the labor, equipment and materials to fully complete all the work as provided in the plans, specifications and contract documents and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish a Performance Bond, a Maintenance Bond and a Payment Bond, approved by the City of Fort Worth, for performing and completing said construction work within the time specified for the following sum, to wit: Storm Drain Improvements ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT UNIT COST TOTAL COST NO. COST WRITTEN IN WORDS 1. 1 LS Utility Adjustment $ 10,000.00 $ 10,000.00 Ten Thousand Dollars and No Cents per Lump Sum 2. 2 EA Project Designation Sign $ 300.00 $ 600.00 Three Hundred Dollars and No Cents per Each 3. 229 CY Unclassified Street Excavation $ 2,9 �Gv ' 90 $ Ya 5� OO Dollars and Cen per Cubic Yard 4. 940 CY Trench Excavation and Backfill for Storm Drains n f 7 Dollars $ ay. 00 $ &V and---A19d CenW per Cubic Yard 7 B-1 ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT UNIT COST TOTAL COST NO. COST WRITTEN IN WORDS y 5. 150 LF Remove Existing Curb and Gutter J�L $ 5. 0,0 $ IISO. 00 RJ Dollars and g7t Cents per Linear Foot = 6. 100 SF Remove Existing Concrete Sidewalk,Driveways, Steps,Leadwalks and Wheel Chair Ramps 4AY192 Dollars and _✓J��o _Cents per Square Foot 7. 3 EA Remove Existing Curb Inlet _iw"V 1✓'_G A"k- Dollars $ $ and Cents per Each 8. 206 LF 5'W x 4'H Direct-Drive(HS20)Pre-Cast Reinforced ppp Concrete Box Sections $ ai O d•O Q $5q 38.0 / Dollars andC is r L ear Foot 9. 493 LF X488""((Class 111)RCP Storm Drain [� /!Gv Q l� / Dollars $ $//z and 0 Cen pe inear Foot 10. 276 LF 24"(Class 111)RCP Storm Drain P ee lvQ.l✓dDoilars $ //�• �O $ 912.00 and n4j, 0 Cents per Linear Foot 11. 26 LF 12"PVC Storm Drain Lead Q/�. n n w /• -Q✓Q'f�, Dollars $ O ' $g and Cents per Linear Foot _ 12. 3 EA 12"Cleanout w/Riser and Cap [� n UG//t U4 C�h Dollars $ T�Q•�O $ "93,00. 00 and_ 0 Cents per Each 13. 2 EA Standard 10'Curb Inlet nn dUp� �u/iaDollars $�2i5��00 $5,00,0- 00 and 0 Cents per Each 14. 1 EA 15'(Sump)Curb Inlet uwiouol Dollars and Cents per Each 15. 1 EA Std.4'x 4'(Square)Storm Drain Manhole and 0 Cents per Each 16. 2 EA Std 6 x 6'(Square)Storm Drain Manhole (/ /4�LGt�Dollars $ "Tj •010 $ and Cents per Each 17. 2 EA Std.7'x 7'(Square)t Drain Manhole $46,90. 00 s 9�0'0,9 liars / and KWO Cents per Each B-2 ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT UNIT COST TOTAL COST NO. COST WRITTEN IN WORDS 18. 1 EA Std.(Type 5)Storm Drain anhole kDollars and V Wo Cents per Each 19. 5 EA Reinforced Concrete Manhole Collar $ $ Dollars and Cents per Each ' 4 ► 20. 890 LF Trench Safety (for Trenches Greater Than Five Feet Deep) $ t% Lo $ 6p 0 1/0 Dollars {f 7 and Cents per Linear Foot 21. 200 SF Concrete Sidewalk Replacement Dollars $ 00 $ And.00 and__,.�_Cents per Square Foot 22. 200 LF Std.r Concrete Curb and 18"Gutter ¢/ Dollars $ Z.00 $57040 00 and tfjodents per Linear Foot 23. 1000 LF Perm.Asphalt Pavement Repair Per Fig.2000-1 B y� and 0 Cents per Linear Foot 24. 5 EA Pre-Construction Ex loratory ,Excavation(D-Hole) G�/ 1 P Dollars $ OD $�OAO. 00 andCents per Each 25. 100 LF Removal and disposal of existing Flowabie Fill 04 -ef) Dollars $ A60 $ o4o and Cents per Linear Foot TOTAL AMOUNT OF BID B-3R Addendum No. I Within ten (10)days after notification by the City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the Specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of_ Nonresident bidders in the State of , our principal place of business, are T required to be percent lower than resident bidders by state law. A copy of the statue is attached. Nonresident bidders in the State of_ , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F)of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under house Bill 11, enacted August 15, 1992. The successful Bidder shall be required to complete the attached Statement of Materials and Other Charges contractor at the time of executing the contract. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within: Sixty (60) Calendar Days after the beginning of construction as set forth in the written order to be furnished by the Owner. This project contract time will be strictly enforced. B-4 I(we)acknowledged receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: AP4 Addendum No. 1 (Initials) Respectively submitted, Addendum No. 2(Initials) Addendum No. 3(Initials) Addendum No. 4(Initials) By: Title: P S . Address: (\ 3 E, COOP 8:70 S�• (S E A L) Pr- to e rt.?4.r��Q -7610 Date: —1 `0 Telephone -5,3 G 1 Y Vi ! # i i # ! # B-5 .. am PART C SPECIAL PROVISIONS — T/PW CITY OF FORT WORTH WAGE RATES an .. SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS A- Table of Contents 1, SCOPE OF WORK...................................................................................................................................SP-3 .. 2. AWARD OF CONTRACT.......................................................................................................................SP-3 3. PRECONSTRUCTION CONFERENCE.................................................................................................SP-3 4. EXAMINATION OF SITE ................................................. ......SP-3 5. BID SUBMITTAL....................................................................................................................................SP-3 6. WATER FOR CONSTRUCTION 7. SANITARY FACILITIES FOR WORKMERS........................................................................................SP-3 8. PAYMENT................................................................................................................................................SP-4 9. SUBSIDIARY WORK.................-_..........................................................................................................SP-4 10. LEGAL RELATIONS AND RESPONSIBILITIES TOTHE PUBLIC......................................................................................................................................SP-4 11. WAGE RATES.........................................................................................................................................SP-4 12. EXISTING UTILITIES.............................................................................................................................SP-5 13. PARKWAY CONSTRUCTION..............................................................................................................SP-5 14. MATERIAL STORAGE...........................................................................................................................SP-5 .. 15. PROTECTION OF EXISTING UTILITIES ANDIMPROVEMENTS..........................................................................................................................SP-5 16. INCREASE OR DECREASE INQUANTITIES.......................................................................................SP-6 17. CONTRACTORS RESPONSIBILITY FOR DAMAGE CLAIMS..........................................................SP-6 .. 18. EQUAL EMPLOYMENT PROVISIONS................................................................................................SP-6 19. MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE)COMPLIANCE........................................................................................................................SP-7 20. FINAL CLEAN UP...................................................................................................................................SP-8 21. CONTRACTOR'S COMPLIANCE WITH WORKER'S COMPENSATIONLAW..........................................................................................................................SP-8 22. SUBSTITUTIONS....................................................................................................................................SP-11 .., 23. MECHANICS AND MATERIALSMEN'S LIEN....................................................................................SP-11 24. WORK ORDER DELAY ....................................... .SP-11 ................................................................................. 25. WORKING DAYS ....._.._...........»......... ......................................................................... ......................SP-11 26. RIGHT TO ABANDON...........................................................................................................................SP-11 27. CONSTRUCTION SPECIFICATIONS...................................................................................................SP-11 28. MAINTENANCE STATEMENT .............................................................................................................SP-11 29. DELAYS .....................................................:.............................................................................SP-12 .r 30. DETOURS AND BARRICADES ........................•--.................................................................................SP-12 31. DISPOSAL OF SPOIL/FILL MATERIAL ..............................................................................................SP-12 .. . 32. QUALITY CONTROL TESTING ............... ..........................................................................................SP-I2 33. PROPERTY ACCESS..............................................................................................................................SP-13 + 34. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES ...............................................SP-13 35. WATER DEPARTMENT PRE-QUALIFICATIONS ...............................„........................,...................SP-13 36. RIGHT TO AUDIT ..,......-•.....................................................................................................................SP-14 37. CONSTRUCTION STAKES ...................................................................................................................SP-14 .. 38. LOCATION OF NEW WALKS AND DRIVEWAYSSP-14 ............................................................................ 39. EARLY WARNING SYSTEM FOR CONSTRUCTION.........................................................................SP-14 40. AIR POLLUTION WATCH DAYS.........................................................................................................SP-15 an 05/27/05 SP-1 ..r Oft ^ SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS - Table of Contents CONSTRUCTION ITEMS: 41. PRE-BID ITEM-UTILITY ADJUSTMENT............................... .SP-16 .� ........................................................... 42. PRE-BID ITEM-PROJECT DESIGNATION SIGN..............................................................................SP-16 43. PAY ITEM-UNCLASSIFIED STREET EXCAVATION......................................................................SP-16 �. 44. PAY ITEM-TRENCH EXCAVATION AND BACKFILL FOR STORM DRAIN...............................SP-16 45. PAY ITEM- REMOVE EXISTING CURB AND GUTTER..................................................................SP-17 46. PAY ITEM-REMOVE EXISTING CONCRETE SIDEWALK,DRIVEWAYS,STEPS, LEADWALKS AND WHEELCHAIR RAMPS.................... ............SP-17 ^ 47. PAY ITEM- REMOVE EXISTING CURB INLET................................................................................SP-17 48. PAY ITEM- CONCRETE BOX SECTIONS..........................................................................................SP-17 49. PAY ITEM- CLASS III RCP STORM DRAIN......................................................................................SP-17 ^ 50. PAY ITEM- PVC STORM DRAIN LEAD.............................................................................................SP-17 51. PAY ITEM-STORM DRAIN INLETS...................................................................................................SP-17 52. PAY ITEM- STORM DRAIN MANHOLES..........................................................................................SP-18 53. PAY ITEM- REINFORCED CONCRETE MANHOLE COLLARS......................................................SP-18 .� 54. PAY ITEM-TRENCH SAFETY............................................................................................................SP-18 55. PAY ITEM-CONCRETE SIDWALK REPLACEMENT.......................................................................SP-18 56. PAY ITEM-STANDARD 7"CURB AND 18"GUTTER......................................................................SP-18 57. PAY ITEM- PERMANENT ASPHALT PAVEMENT REPAIR PER FIG.2000-1...............................SP-19 58. PAY ITEM- EXPLORATORY EXCAVATION(D-HOLE)..................................................................SP-19 r 59. NON-PAY ITEM-CLEARING AND GRUBBING_..............................................................................SP-19 60. NON-PAY ITEM- SPRINKLING FOR DUST CONTROL...................................................................SP-19 61. NON-PAY ITEM- PROTECTION OF TREES,PLANTS AND SOILS.......:........................................SP-20 62. NON-PAY ITEM-CONCRETE COLORED SURFACE.......................................................................SP-20 63. NON-PAY ITEM-PROJECT CLEAN-UP-.............................................................................................SP-20 64. NON-PAY ITEM-PROJECT SCHEDULE............................................................................................SP-20 65. NON-PAY ITEM-NOTIFICATION OF RESIDENTS..........................................................................SP-21 66. NON-PAY ITEM-PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION..............SP-21 67. NON-PAY ITEM-PRE-CONSTRUCTION NEIGHBORHOOD MEETING........................................SP-21 68. NON-PAY ITEM-WASHED ROCK---------•...........................................................................................SP-22 69. NON-PAY ITEM-SAWCUT OF EXISTING CONCRETE...................................................................SP-22 70. NON-PAY ITEM- LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES..........................................................................................SP-22 71. NON-PAY ITEM-TIE-IN INTO STORM DRAIN STRUCTURE........................................................SP-22 72. NON-PAY ITEM- SPRINKLER HEAD ADJUSTMENT......................................................................SP-23 73. NON-PAY ITEM-FEE FOR STREET USE PERMITS AND RE-INSPECTIONS...............................SP-23 74. NON-PAY ITEM-TEMPORARY EROSION,SEDIMENT AND WATER POLLUTION CONTROL(FOR DISTURBED AREAS LESS THAN 1 ACRE)...SP-23 .• 75. NON-PAY ITEM-TRAFFIC CONTROL ..............................................................................................SP-24 r 05/27/05 SP-2 s SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS FOR: STORM DRAIN IMPROVEMENTS ON .. HOUSTON STREET(14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET(THROCKMORTON ST. TO HOUSTON ST.) THROCKMORTON STREET(13TH ST. TO 14TH ST.) D.O.E. No. 4657 1. SCOPE OF WORK: The work covered by these plans and specifications consist of the following: Construction of Storm Drain Improvements and all other miscellaneous items of construction to be .. performed as outlined in the plans and specifications which are necessary to satisfactorily complete the work. 2. AWARD OF CONTRACT: Bidders are hereby informed that the Director of the Department of Engineering reserves the right to evaluate and recommend to the City Council the best bid that is considered to be in the best interest of the City. 3. PRECONSTRUCTION CONFERENCE: The successful Contractor, Engineer,and City shall meet at the call of the City for a pre-construction conference before any of its work begins on this project. At this time, details of sequencing of the work,contact individuals for each party, request for survey, and pay requests will be covered. Prior to the meeting, the Contractor shall prepare .. schedules showing the sequencing and progress of their work and its effect on others. A final composite schedule will be prepared during this conference to allow an orderly sequence of project construction. As used herein,the term "Engineer'shall mean the design engineer who prepared and sealed the plans, specifications and contract documents for this project. 4. EXAMINATION OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all •• conditions that may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual 1O conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. .,� During construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 5. BID SUBMITTAL: Bidders shall not separate,detach or remove any portion,segment or sheets from the contract documents at any time. Failure to bid or fully execute the contract without retaining contract documents intact may be grounds for designating bids as"non-responsive"and rejecting bids as appropriate and as determined by the Director of the Department of Engineering. 6. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense. ... 7. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 05/27/05 SP-3 .. 8. PAYMENT: The Contractor shall receive full payment from the City for all the work based on unit "` prices bid on the proposal and specified in the plans and specifications and approved by the Engineer per actual field measurement. an 9. SUBSIDIARY WORK: Any and all work specifically governed by documentary requirement for the projects,such as conditions imposed by the Plans,the General Contract Documents or these special Contract Documents,in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item or work, the cost of which shall be included in .. the price bid in the Proposal for each bid item,including but not limited to surface restoration cleanup and relocation of mailboxes. All objectionable matter required to be removed from within the right-of-way and not particularly Im described under these specifications shall be covered by Item No. 102"Clearing and Grubbing" and shall be subsidiary to the other items of the contract. ■. 10. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public"of the"Standard Specifications for Street and Storm Drain Construction". .. 11. WAGE RATES: Compliance with and Enforcement of Prevailing Wage Laws .. Duty to pay Prevailing Wage Rates. The contractor shall comply with all requirements of Chapter 2258,Texas Government Code .. (Chapter 2258),including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents. o. Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City$60 for each worker employed for each calendar day or part "' of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents.This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. aft Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker,concerning an alleged violation of 2258.023,Texas Government Code, by a contractor or subcontractor,the City shall make an .. initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial determination. .. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258,the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates,such amounts being subtracted from successive progress payments o' pending a final determination of the violation. Arbitration Required if Violation Not Resolved. ,... An issue relating to an alleged violation of Section 2258.023,Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act(Article 224 et seq., Revised 05/27/05 SP-4 Statutes)if the contractor or subcontractor and any affected worker do not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph(c)above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11 th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may .r be enforced in any court of competent jurisdiction. Records to be Maintained. _ The contractor and each subcontractor shall,for a period of three(3)years following the date of acceptance of the work,maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and(ii)the actual per diem wages paid to each worker. The records shall be open at all .. reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection. _ Pay Estimates. With each partial payment estimate or payroll period,whichever is less, the contractor shall submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. Postingof Wage Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)through(g)above. (Wage rates are attached at the end of this section.) 12. EXISTING UTILITIES: The locations and dimensions shown on the plans relative to existing utilities are based on the best information available. It shall be the Contractor's responsibility to .. verify location of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as are necessary in the construction process in order to provide adequate clearance. The Contractor shall take all necessary precautions in order to protect all services encountered. Any damage to utilities and any losses to the utility City due to disruption of service resulting from the Contractor's operations shall be at the Contractor's expense. 13. PARKWAY CONSTRUCTION: During the construction of this project, it will be required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Director of the Department of Engineering. 14. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has _ obtained permission from the property owner. 15. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all existing structures, improvements and utilities,which may be encountered. 05/27/05 SP-5 The utility lines and conduits shown on the plans are for information only and are not guaranteed .. by the City or the Engineer to be accurate as to extent, location and depth, they are shown on the plans as the best information available at the time of design,from the Owners of the utilities involved and from evidences found on the ground. 16. INCREASE OR DECREASE IN QUANTITIES: The quantities shown in the Proposal are approximate. It is the Contractor's sole responsibility to verify all the minor pay item quantities prior to submitting a bid. No additional compensation shall be paid to Contractor for errors in the .� quantities. Final payment will be based upon field measurements. The City reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in anticipated profits or shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of storm drain pipes in depth categories shall be interpreted herein as applying to the overall quantities of storm drain pipe in each pipe size but not to the various depth categories. 17. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to indemnify City's Engineer and Architect,and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and �. defend, at its own expense,the City, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death,arising out of,or alleged to arise out of,the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors,licensees or invitees, whether or not any such .. injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of City,its officers,servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's .� officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of City,its officers,servants or employees. .. In the event City receives a written claim for damages against the Contractor or its subcontractors prior to final payment,final payment shall not be made until Contractor either(a)submits to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or(b)provides City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may,if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 18. EQUAL EMPLOYMENT PROVISIONS: Contractor shall comply with City Ordinance Number 7278 as amended by City Ordinance Number 7400(Fort Worth City Code Sections 13-A-21 through 12- A-29)prohibiting discrimination in employments practices. ... The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided by assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may .•. be acquired from the Equal Employment Officer. 05/27/05 SP-6 a. dw 19. MINORITY AND WOMEN BUSINESS ENTERPRISE(M/WBE)COMPLIANCE: In accordance with City of Fort Worth Ordinance No. 15530,the City has goals for the participation of minority business enterprises and women business enterprises in City contracts. The Ordinance is m+ incorporated in these specifications by reference. A copy of the Ordinance may be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a material breach of contract. .r M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within fine(5)city business days after bid opening. Failure to comply shall render the bid non-responsive. ON Upon request, Contractor agrees to provide the City complete and accurate information regarding actual work performed by a Minority or Women Business Enterprise(M/WBE)on the contract and payment thereof. Contractor further agrees to permit an audit and/or examination of any books, o' records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of acts(other than a negligent misrepresentation)and/or the commission fraud by the Contractor will be grounds for termination of the contract and/or initiating .. action under appropriate federal, state, or local laws or ordinances relating to false statement. Further, any such misrepresentation(other than a negligent misrepresentation)and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time not less than three years. a. The City will consider the Contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance,or to demonstrate"good faith effort', MA shall result in a bid being rendered non-responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly .r reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract a" with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE Contractors used in meeting the goals must be certified prior to the award of the Contract. The M/WBE Contractor(s)must be .ft certified by either the North Central Texas Regional Certification Agency(NCTRCA)or Texas Department of Transportation(TxDOT), Highway Division and must be located in the nine(9) county marketplace or currently doing business in the marketplace at time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE "' utilization or good faith effort forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. .m Whenever a change order affects the work of an M/WBE subcontractor or supplier,the M/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order. .r During the term of the contract the contract shall: .r 1. Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or subsequent to the bid,and, 2. If substantial subcontracting and/or substantial supplier opportunities arise during the �+ term of the contract which the Contractor had represented he would perform with his forces,the Contractor shall notify the City before subcontracts or purchase orders are 05/27/05 SP-7 .r .. let,and shall be required to comply with modifications to goals as determined by the .. City,and, 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the Contractor desires .m to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: a. Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. .• b. Failure of Subcontractor to provide required general liability of other insurance. C. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his M/WBE Participation plan. .m d. Default by the M/WBE subcontractor or supplier in the performance of the subcontractor. am Within ten(10)days after final payment from the City, the Contractor shall provide the M/WBE Office with documentation to reflect final participation of each subcontractor and supplier used on the project, inclusive of M/WBEs. am 20. FINAL CLEAN-UP: Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been completed. No more than seven days shall elapse after completion of construction before the roadway and R.OW.is cleaned up to the satisfaction of the Engineer. The a, Contractor shall make a final cleanup of all parts of the work before acceptance by the City or its representative. This cleanup shall include removal of all objectionable rocks,pieces of asphalt or concrete and other construction materials,and in general preparing the site of the work in an orderly manner and appearance. on 21. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: A. Workers Compensation Insurance Coverage .. a. DEFINITIONS: on b. Certification of coverage("Certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement(TWCC- 81,TWCC-82, TWCC-83, OR TWCC-84),showing statutory workers'compensation insurance coverage for the person's or entity's employees providing services on a project, Oft for the duration of the project. Duration of the project-includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. in Persons providing services on the project("subcontractor"in§406.096)-includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes,without limitation, independent Contractors, subcontractors,leasing companies, motor carriers, City-operators,employees of any such entity,or employees of any entity which furnishes persons to provide services on the project. "Services"include,without limitation, providing,hauling,or delivering equipment or materials,or providing labor,transportation, or other services related to a project. "Services"does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries,and delivery of portable toilets. 05/27/05 SP-8 r .. The Contractor shall provide coverage,based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code, Section 401.011(44)or all employees of the a' Contractor providing services on the project,for the duration of the project. c. The Contractor must provide a certificate of coverage to the governmental entity prior to .m being awarded the contract. d. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project,the Contractor must, prior to the end of the coverage MM period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. oft e. The Contractor shall obtain from each person providing services on a project,and provide to the governmental entity: (1) a certificate of coverage, prior to that person beginning work on the project, so '• the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project;and me (2) no later than seven days after receipt by the Contractor,a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. a. f. The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. g. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within ten(10)days after the Contractor knew or should have known,or any change that materially affects the provision of coverage of any person providing services on the project. me h. The Contractor shall post on each project site a notice, in the text,form and manner prescribed by the Texas Worker's Compensation,informing all persons providing services on the project that they are required to be covered,and stating how a person may verify "' coverage and report lack of coverage. i. The Contractor shall contractually require each person with whom it contracts to provide 00 services on a project,to: (1) provide coverage, based on proper reporting.on classification codes and payroll amounts and filing of any coverage agreements,which meets the .m statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the project,for the duration of the project; (2) provide to the Contractor, prior to that person beginning work on the project,a �' certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project,for the duration of the project; me (3) provide the Contractor, prior to the end of the coverage period,a new certificate of coverage showing extension of coverage,if the coverage period shown on the current certificate of coverage ends during the duration of the Am project; 05/27/05 SP-9 ME an .. (4) obtain form each other person with whom it contracts, and provide to the "' Contractor: (a) a certificate of coverage, prior to the other person beginning work on am the project;and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the .� current certificate of coverage ends during the duration of the project; (c) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. .. (d) notify the governmental entity in writing by certified mail or personal delivery,within ten(10)days after the person knew or should have ... known,of any change that materially affects the provision of coverage of any person providing services on the project;and (e) contractually require each person with whom it contracts,to perform as required by paragraphs(1){7),with the certificates of coverage to be provided to the person for whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project,that the coverage will be based on proper reporting of classification codes and payroll amounts,and that all coverage agreements will be filed with appropriate insurance carrier or, in the case of a self- insured,with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative,criminal, civil penalties or other civil actions. k. The Contractor's failure to comply with any of these provisions is a breach of contract by .. the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten day after receipt of notice of breach from the governmental entity. B. The Contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered,and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other .. posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type,and shall be in both English and Spanish and any other language common to the Worker population. The text for the notices shall be the following text,without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE ... The law requires that each person working on this site or providing services related to"this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling,or delivering equipment or materials,or providing labor or �.. transportation or other service related to the project, regardless of the identify of their employer or status as an employee." 05/27/05 SP-10 Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". 22. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted .. until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the term"or equal",or"or approved equal"is used, it is understood that if a material, product,or piece of equipment bearing the name so used is furnished,it will be approvable,as the particular trade name was used for the purpose of .. establishing a standard of quality acceptable to the City. If a product of any other name is proposed substitutes is procured by the Contractor. Where the term"or equal",or"approved equal"is not used in the specifications,this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However,the Contractor shall ` have the full responsibility of providing that the proposed substitution is,in fact,equal,and the Engineer,as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to"substitutions"shall be applicable to .. all sections of these specifications. 23. MECHANICS AND MATERIALMEN'S LIEN: The Contractor shall be required to execute a release _ of mechanics and materialmen's liens upon receipt of payment 24. WORK ORDER DELAY:All utilities and right-of-way are expected to be clear and easements and/or permits obtained on this project within sixty(60)days of advertisement of this project. The work order for subject project will not be issued until all utilities, right-of-ways,easements and/or permits are cleared or obtained.The Contractor shall not hold the City of Fort Worth responsible for any delay in issuing the work order for this Contract. 25. WORKING DAYS:The Contractor agrees to complete the Contract within the allotted number of working days. Mft 26. RIGHT TO ABANDON:The City reserves the right to abandon,without obligation to the Contractor,any part of the project or the entire project at any time before the Contractor begins any construction work authorized by the City. .. 27. CONSTRUCTION SPECIFICATIONS:This contract and project are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION ` CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION .r NORTH CENTRAL TEXAS A copy of either of these specifications may be purchased at the Office of the Department of Engineering, 1000 Throckmorton Street,2r1 Floor, Municipal Building, Fort Worth,Texas 76102. The specifications applicable to each pay item are indicated in the call-out for the pay item by the Engineer. If not shown,then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth ,., document rather than Division 1 of the North Central Texas document. 28. MAINTENANCE STATEMENT:The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two(2)years from date of final 05/27/05 SP-11 r Mft acceptance of this project and will be required to replace at his expense any part or all of the project which becomes defective due to these causes. 29. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, .. except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any,which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Director of the Department of Engineering and if by him found correct shall be approved and .. referred by him to the Council for final approval or disapproval;and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work or by the performance of extra work or by the failure of the City to provide material or necessary instructions for carrying on the work,then such delay will entitle the Contractor to an .. equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council;and no such extension of time shall release the Contractor or the surety on his performance bond form all his obligations hereunder which shall remain in full force until the .. discharge of the contract. 30. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction as required by Engineer by providing barricades. Barricades,warning and detour signs shall conform to the Standard Specifications"Barriers and Warning and/or Detour Signs," Item 524 and/or as shown on the plans. Construction signing and barricades shall conform with"1980 Texas Manual on Uniform Traffic Control Devices,Vol. No. 1" 31. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the .� Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's Flood Plain Administrator("Administrator"),of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood ^. Plain Ordinance of the City of Fort Worth(Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal ^. sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies,shall be at ,. the Contractor's expense. In the event that the Contractor disposes of spoil/fill materials at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. 32. QUALITY CONTROL TESTING: (a) The Contractor shall furnish, at its own expense,certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The Contractor shall .� provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. 05/27/05 SP-12 (b) Tests of the design concrete mix shall be made by the Contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. (c) Quality control testing of on site material on this project will be performed by the City at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the Contractor and will be billed at commercial rates as determined by the City.The failure of the City to make any tests of materials shall in no way relieve the Contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. (d) Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system(if required) for the site to be tested and any work effort involved is deemed to be included in the unit price for the item being tested. (e) The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. 33. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. 34. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES: .. The following procedures will be followed regarding the subject item on this contract: (a) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING—UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." (b) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers and insulator links on the lift hood connections. (c) When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (TU Electric Service Company) which will erect temporary mechanical barriers, de-energize the line or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain •. an accurate log of all such calls to TU Electric Service Company and shall record action taken in each case. (d) The Contractor is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. ,.., (e) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph(c). 35. WATER DEPARTMENT PRE-QUALIFICATIONS: Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre-qualified with the Water Department to perform 05/27/05 SP-13 r on such work in accordance with procedures described in the current Fort Worth Water Department am General Specifications which general specifications shall govern performance of all such work. 36. RIGHT TO AUDIT: ow (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions on relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this on section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, under the expiration of three (3) years after .• final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor involving transactions to the subcontract and further, that City shall have access during normal working hours to all subcontractor facilities and shall be provided adequate and appropriate work space on in order to conduct audits in compliance with the provisions of this article together with subsection (c ) hereof. City shall give subcontractor reasonable advance notice of intended audits. on (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. on 37. CONSTRUCTION STAKES; The City, through its Surveyor or agent,will provide to the Contractor construction stakes or other .n customary methods of markings as may be found consistent with professional practice to establish line and grade for roadway and utility construction and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical.One set of stakes shall be set for all utility construction(water, sanitary sewer,drainage,etc.),one set of MM excavation/or stabilization stakes, and one set of stakes for curb and gutter and/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. _ If, in the opinion of the Engineer, a sufficient number of stakes or markings provided by the City have been lost,destroyed,or disturbed,that the proper prosecution and control of the work contracted for in the Contract Documents cannot take place, then the Contractor shall replace such on stakes or markings as required. An individual registered by the Texas Board of Professional Land Surveying as a Registered Professional Land Surveyor shall replace these stakes, at the Contactor's expense.No claims for delay due to a lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. on 38. LOCATION OF NEW WALKS AND DRIVEWAYS; The Contractor will make every effort to protect existing trees within the parkway, with the approval ON of the engineer the Contractor may re-locate proposed new driveways and walks around existing trees to minimize damage to trees. 39. EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this contract. In order to insure that the Contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: 05/27/05 SP-14 The work progress on all construction projects will be closely monitored. On a bi-monthty basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the Contractor is less than the percentage of time allowed by 20% or more(example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the Contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the Contractor receives such a letter, the Contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public _ Information Officer. 4. Upon receipt of the Contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, ., if necessary, then forward updated notices to the interested individuals. 5. If the Contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 40. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following d, guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS we TO EARLY AFTERNOON OZONE FORMATION. The Texas Commission on Environmental Quality, (TCEQ), in coordination with the National .. Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized .. equipment for periods in excess of 1 hour. However,the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or _ alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. 05/27/05 SPA 5 CONSTRUCTION 41. PRE-BID ITEM- UTILITY ADJUSTMENT: This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, .. neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the "Contractor" responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the .. Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the Contractor for utility adjustments shall be the actual .. cost of the adjustments plus ten percent(10%)to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. 42. PRE-BID ITEM-PROJECT DESIGNATION SIGN: The Contractor shall construct and install Project Designation Signs according to the proposal section and it will be the responsibility of the Contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and .. repairs as directed by the Engineer. It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. The quality of the paint, painting and lettering on the signs shall be approved by the Engineer. The height and arrangement of the lettering shall be in accordance with the enclosed detail. The sign shall be constructed of 3/" fir plywood, grade A-C (exterior) or better. These signs shall be installed on barricades or as directed by the Engineer .. and in place at the project site upon commencement of construction. The work, which includes the painting of the signs, installing and removing the signs,furnishing the materials, supports and connections to the support and maintenance shall be to the satisfaction of the Engineer. The unit price bid per each will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 43. PAY ITEM-UNCLASSIFIED STREET EXCAVATION: See Standard Specifications Item No. 106, "Unclassified Street Excavation" for specifications .. governing this item. The intention of the City is to pay only the plan quantity without measurement Should either contracting party be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for at the unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs necessary to verify the actual quantities. 44. PAY ITEM-TRENCH EXCAVATION AND BACKFILL FOR STORM DRAINS: See Standard Specifications Item No. 402, 'Trench Excavation and Backfill for Storm Drains" for specifications governing this item. .. All excavated material which is unacceptable as fill material shall become the property of the Contractor to be hauled off the site and disposed of properly. Unacceptable material shall be, but 05/27/05 SP-16 .. ., not limited to: rocks,concrete,asphalt,debris,etc. The cost for removal and disposal of unacceptable material shall be subsidiary to the unit prices. •. The intention of the City is to pay only the plan quantity without measurement. Should either contracting party be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for at the unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs necessary to .. verify the actual quantities. 45. PAY ITEM-REMOVE EXISTING CURB AND GUTTER: Where shown on the plans or where designated by the Engineer, existing curb and or gutter and existing laid down curb shall be removed and disposed of in a manner satisfactory to the Engineer. Measurement will be by the linear foot for curb and gutter,laydown curb removed,and for all labor, tools, and incidentals necessary to complete the job. 46. PAY ITEM-REMOVE EXISTING CONCRETE SIDEWALK DRIVEWAYS STEPS LEADWALKS AND WHEEL CHAIR RAMPS: .. This item includes removal of existing concrete sidewalks,driveways, steps, leadwalks and wheelchair ramps at location shown on the plans or as designed by the Engineer. See Item No. 104"Removing Old Concrete",for Specifications governing this item. 47. PAY ITEM-REMOVE EXISTING CURB INLET: This item shall include all labor, materials,and equipment necessary to remove and dispose of the existing inlet and existing RCCP lead pipe as shown on the Plans and as directed by the Engineer. 48. PAY ITEM-CONCRETE BOX SECTIONS: See Standard Specifications Item No. 441, "Pre-cast Reinforced Concrete Box Sections" for specifications governing this item. 49. PAY ITEM-CLASS III RCP STORM DRAIN: See Standard Specifications Item No. 440, 'Reinforced Concrete Pipe"for specifications governing this item. r. 50. PAY ITEM—PVC STORM DRAIN LEAD: This item shall include the installation of 12" diameter PVC pipe from the storm drain main, .� manhole or curb inlet to the proposed storm drain cleanout as shown on the plans. The Polyvinyl chloride plastic shall be schedule 40 pipe meeting the requirements of ASTM D2665. Connection to the storm drain main, manhole or curb inlet shall be a neat, watertight connection approved by the construction engineer. Measurement and payment shall be based on the unit price bid per linear foot for 12" PVC Storm Drain Lead and shall included the outfall connection to the storm drain, excavation, furnishing and Mft placing all necessary fittings, backfill, and for all labor, equipment, tools, materials and other incidentals necessary to complete the work. 51. PAY ITEM-STORM DRAIN INLETS: �• An alternative method of construction for these items will be"Pre-Cast'manholes and inlets. If the Contractor desires to use this method, he must submit details for the construction to the Transportation and Public Works Department for review and approval if said details are acceptable. The Pre-Cast construction must be equal or superior to the strength requirements for .. this item as set out in Item 444, "Manholes and Inlets"and said construction shall be in compliance with all other requirements of Item 444 where applicable. 05/27/05 SP-17 Mft rr 52. PAY ITEM-STORM DRAIN MANHOLES: .. See Standard Specifications Item No. 444, "Manholes and Inlets" for specifications governing this item. 53. PAY ITEM-REINFORCED CONCRETE MANHOLE COLLARS: This item shall be governed by Standard Specification Drawing No. S-S13,except 4-#4 bars shall be embedded, one along each side of the collar, in the Class A Concrete complying with Standard Specification Item 406 "Concrete for Structures". The unit price bid per each shall be full .� compensation for furnishing all materials, labor, tools, equipment and incidentals required to construct the manhole collars as specified at ALL proposed manholes within existing asphalt pavement. _ 54. PAY ITEM-TRENCH SAFETY: Description: This item will consist of the basic requirements which the Contractor must comply with in order to provide for the safety and health of workers in a trench. The Contractor shall .. develop,design and implement the trench excavation safety protection system. The Contractor shall bear the sole responsibility for the adequacy of the trench safety system and providing"a safe place to work"for the workman. The trench excavation safety protection system shall be used for all trench excavations deeper than five(5)feet. The Excavating and Trenching Operation Manual of the Occupational Safety and Health Administration, U.S. Department of Labor,shall be the minimum governing requirement of this item and is hereby made a part of this specification. The Contractor shall,in addition,comply with all other applicable Federal, State and local rules, regulations and ordinances. Measurement and Payment: All methods used for trench excavation safety protection shall be ... measured by the linear foot of trench or lump sum and paid at the unit price in the Proposal,which shall be total compensation for furnishing design, materials,tools, labor,equipment and incidentals necessary, including removal of the system. _ Trench depth for payment purposes for Trench Safety Systems is the vertical depth as measured from the top of the existing ground to the bottom of the pipe. 55. PAY ITEM -CONCRETE SIDEWALK REPLACEMENT: See Standard Specifications Item No. 504, "Concrete Sidewalks and Driveways" for specifications governing this item. _ 56. PAY ITEM-STANDARD 7"CURB AND 18"GUTTER: All provisions of Standard Specification No. 502'Concrete Curb and Gutter'shall apply except as modified herein: Subsidiary to the unit price bid per linear foot shall be the following: a. A minimum of 5"or greater as required depth of stabilized subgrade properly compacted under the proposed curb and gutter as shown in the construction details. b. If the Contractor fails to backfill either in from of the gutter or behind the curb within seven .� (7)calendar days of pouring the curb and gutter, the amount paid for the curb and gutter shall be reduced by 25% until the backfill operation is complete. Standard Specifications Item No. 502, shall apply except as herein modified. Concrete shall have .� minimum compressive strength of three thousand (3,000)pounds per square inch in twenty-eight (28)days. The quantity of mixing water shall not exceed seven(7)gallons per sack(94 lbs.)of Portland Cement. The slump of the concrete shall not exceed three(3)inches. A minimum cement content of five(5)sacks of cement per cubic yard of concrete is required. 05/27/05 SP-18 57. PAY ITEM-PERMANENT ASPHALT PAVEMENT REPAIR PER FIG. 2000-1: The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition,thickness,etc.,to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts,Figure 2000-1 HMAC Pavement dated 3/5/01. Limits of pavement removal shall be governed by Figure 2000-413 dated 3/5/01 and Figure 2000-4w dated 2/14/01. This finished grade shall be maintained in a serviceable condition until the paving has been .. replaced and as governed by Figure 2000-5 dated 3/5/01. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. 58. PAY ITEM—EXPLORATORY EXCAVATION(D-HOLE): The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory _ excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with .w the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation(D-Hole)to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation(D-Hole). Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration,field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s)conducted after construction has begun. 59. NON-PAY ITEM -CLEARING AND GRUBBING: All objectionable items within the limits of this project and not otherwise provided for shall be removed under this item in accordance with Standard Specification Item 102, "Clearing and Grubbing." However, no direct payment will be made for this item and it shall be considered incidental to this contract. 60. NON-PAY ITEM-SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered incidental .. to this contract. 05/27/05 SP-19 61. NON-PAY ITEM-PROTECTION OF TREES, PLANTS AND SOIL: ^' All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees,etc. shall be preserved or restored after completion of the work to a condition equal or better than existed prior to start of work. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal or root pruning) can be done on trees or shrubs growing on public property including street rights-of-way and designated alleys. This permit can be obtained by calling the .. Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City. To prevent the spread of the Oak Wilt fungus,all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is recommended. _ 62. NON-PAY ITEM-CONCRETE COLORED SURFACE: Concrete wheelchair ramp surfaces, excluding the side slopes and curb, shall be colored with LITHOCHROME color hardener or equal. A brick red color, a dry-shake hardener manufactured ,.. by L.M. Scofield Company or equal, shall be used in accordance with manufacturers instructions. Contractor shall provide a sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specifications. The sample, upon approval of the Engineer, shall be the acceptable standard to be ■' applied for all construction covered in the scope of this Non-Pay Item. No direct payment will be made for this item and it shall be considered incidental to this contract. The method of application shall be by screen, sifter, sieve, or other means in order to provide for a uniform color distribution. 63. NON-PAY ITEM-PROJECT CLEAN-UP: .. The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary,clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris .. • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition,on the next estimate payment(and all subsequent payments until completed)of the appropriate bid item(s)will be reduced by 25%. Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been constructed. No more than seven days shall elapse after completion of construction before the roadway and right-of-way is cleaned up to the satisfaction of the Engineer. 64. NON-PAY ITEM- PROJECT SCHEDULE: Contractor shall be responsible for producing a project schedule at the pre-construction conference. This schedule shall detail all phases of construction,including project clean up, and _ 05/27/05 SP-20 allow the Contractor to complete the work in the allotted time. Contractor will not move on to the jobsite nor will work begin until said schedule has been received and approval secured from the Construction Engineer. However, contract time will start even if the project schedule has not been �• turned in. Project schedule will be updated and resubmitted at the end of every estimating period. All costs involved with producing and maintaining the project schedule shall be considered subsidiary to this contract. 65. NON-PAY ITEM- NOTIFICATION OF RESIDENTS: In order to cut down on the number of complaints from residents due to the dust generated when saw-cutting joints in concrete pavement,the Contractor shall notify residents,in writing, at least 48 hours in advance of saw-cutting joints during the construction of paving projects. All costs involved with providing such written notice shall be considered subsidiary to this contract. 66. NON-PAY ITEM- PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any block in the project,the Contractor shall,on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction .. activity on each block in the project area.The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project(i.e. type of construction activity), actual construction duration within the block, the name of the Contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number.A sample of the'pre-construction notification'flyer is attached. The Contractor shall submit a schedule showing the construction start and finish time for each .. block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The Contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. An electronic _ version of the sample flyer can be obtained from the construction office at 871-8306. All work involved with the pre-construction notification flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 67. NON-PAY ITEM-PRE-CONSTRUCTION NEIGHBORHOOD MEETING: After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The Contractor,inspector,and project manager shall meet with all affected residents and present the projected schedule, including construction start date,and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks .. following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. 05/27/05 SP-21 sm 68. NON-PAY ITEM- WASHED ROCK: .� All washed rock used for embedment or backfill or as otherwise directed by the Engineer shall washed,crushed stone and shall meet the following gradation and abrasion:(Actual washing not required if gradation is met) _ Sieve Size % Retained 1" 0-10 1/2" 40-75 .. 3/8" 55-90 #4 90-100 #8 95-100 _ Los Angeles Abrasion Test: 50% Maximum wear per A.S.T.M. Designation C-131. 69. NON-PAY ITEM-SAWCUT OF EXISTING CONCRETE: .� When existing concrete or H.M.A.C. is cut, such cuts shall be made with a concrete saw. The Contractor may break out curb and gutter to the nearest joint if he chooses. All sawing shall be subsidiary to the unit cost of the respective item. 70. NON PAY ITEM-LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The Contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the recycling process commences for a particular street. The Contractor shall attempt to include the construction engineer(if he is available)in the observation and marking activity. In any event a street shall be completely marked a minimum to .• two(2)working days before recycling begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the Contractor's responsibility to notify the utility companies that he has commenced .� work on the project. As the recycling is completed(within the same day)the Contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the Contractor shall notify the utilities of this completion and indicate that start of the .. next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Number Contact Person Southwestern Bell Telephone (817)338-6275 "Hot Line" Texas Utilities (817)336-9411 ext.2121 Mr. Roy Kruger Lone Star (817)336-8381 ext.372 Mr.Jim Bennett .. Of course, under the terms of this contract,the Contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five(5)working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. �. Any deviation from the above procedure and allotted working days may result in the shut down of the recycling operation by the Construction Engineer. _ The Contractor shall be responsible for all materials,equipment and labor to perform a most accurate job and all costs to the Contractor shall be figured subsidiary to this contract. 71. NON PAY ITEM—TIE IN INTO STORM DRAIN STRUCTURE: The cost for making lateral tie-ins to the storm drain structure shall be subsidiary to the bid price for the respective lines. 05/27/05 SP-22 72. NON PAY ITEM—SPRINKLER HEAD ADJUSTMENT: The adjustment and/or relocation of sprinkler heads encountered shall be paid for under utility adjustment in the proposal section. No other compensation will be provided. 73. NON PAY ITEM-FEE FOR STREET USE PERMITS AND RE-INSPECTIONS: A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway construction, such as driveways,sidewalks, etc.,will be required. The fees are as follows: The street permit fee is$50.00 per permit with payment due at the time of permit application. A reinspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the Contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. 74. NON PAY ITEM-TEMPORARY EROSION SEDIMENT AND WATER POLLUTION CONTROL .. (FOR DISTURBED AREAS LESS THAN 1 ACRE): A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measure unless otherwise directed by the engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes,dams, berms,sediment basins,fiber mats,jute netting,temporary seeding,straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards,dikes, slope drains and other devices. B. CONSTRUCTION REQUIRMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface are of erodible-earth material exposed by preparing right-of- way,clearing and grubbing, the surface area of erodible-earth material exposed by excavation, .. borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams,other water course,lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms,dikes, dams, sediment basins,slope drains and use of temporary mulches,mats, seeding or other control •. devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of- way,clearing and grubbing,excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching,seeding,and other such permanent pollution-control measures current in accordance with the accepted schedule. Should .� seasonal conditions make such limitations unrealistic,temporary soil-erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. Frequent fordings of live streams will not be permitted;therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossing are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 05/27/05 SP-23 3. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 4. All waterways shall be cleared as soon as practicable of false work,piling,debris or other obstructions placed during construction operations that are not part of the finished work. .. 5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels,oils, bitumens,calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. SUBMITTAL: Prior to the start of the applicable construction, the Contractor shall submit for approval his schedules for accomplishment of soil-erosion-control work and his plan to keep the area of erodible-earth material to a minimum. He shall also submit for acceptance his proposed method of soil-erosion control on construction and haul roads and material sources and his plan for disposal of waste materials. No work shall be started until the soil-erosion control schedules and methods of operations have been reviewed and approved by the Engineer. D. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. 74. NON PAY ITEM-TRAFFIC CONTROL: The Contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the"Street Use Permit"a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of .. this project consistent with the provisions set forth in the"Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways"issued under the authority of the"State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos.27,29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer at (817)392-8712,at the pre-construction conference. Although work will not begin until the traffic control plan has been reviewed,the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign,instructional sign,street name sign or other sign,which has been erected by the City. If it is determined that a sign must be removed to permit required construction,the Contractor shall contact the Transportation and Public Works Department,Signs and Markings Division, (Phone Number 871-7738)to remove the sign. In the case of regulatory signs,the Contractor must replace the permanent sign with a temporary sign .. meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications,the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locations/streets during"peak traffic periods"as determination by the City Traffic Engineer and in accordance with the applicable provision of the"City of Fort Worth 05/27/05 SP-24 oft Traffic Control Handbook for Construction and Maintenance Work Areas."(To be printed on Contractor's Letterhead) Date. DOE No: PROJECT NAME: Water/Sanitary Sewer and Paving/Storm Drain Improvements for: MAPSCO LOCATION: .. LIMITS OF CONST.: Estimated Duration of Construction on your Street: days too Rk THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL <REPLACE WATER AND/OR SEWER LINES - RECONSTRUCT THE STREET> ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY . OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> .. AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. 05/27/05 SP-25 dM ON .. City of fort Worth Highway(Heavy)Construction Prevailing Wage Rates ibr 2606 = Classifications Hrly Rts Classifications Hrly Rts Air Tool Operator $10.06 Scraper Operator $11.42 Asphalt Raker $11.01 Servicer $12.32 Asphalt Shoveler $8.80 Slip Form Machine Operator $12.33 Asphalt Distributor Operator $13.99 Spreader Box Operator $10.92 ... Asphalt Paving Machine Operator $12.78 Tractor operator,Crawler Type $12.60 Batching Plant Weigher $14.15 Tractor operator,Pneumatic $12.91 Broom or Sweeper Operator $9.88 Traveling Mixer Operator $12.03 .. Bulldozer operator $13.22 Truck Driver-Single Axle(Light) $10.91 Carpenter(Rough) $12.80 Truck Driver-Single Axle(Heavy) $11.47 Concrete Finisher-Paving $12.85 Truck Driver-Tandem Axle Semi-Trailer $11.75 Concrete Finisher-Structures $13.27 Truck Driver-Lowboy/Float $14.93 Concrete Paving Curbing Mach.Oper. $12.00 Truck Driver-Transit Mix $12.08 Concrete Paving Finishing Mach.Oper. $13.63 Wagon Drill,Boring Machine,Post Hole Driller $14.00 Concrete Paving Joint Sealer Oper. $12.50 Welder $13.57 Concrete Paving Saw Oper. $13.56 Work Zone Barricade Servicer $10.09 ... Concrete Paving Spreader Oper. $14.50 Concrete Rubber $10.61 Crane,Clamshell,Backhoe,Derrick,Dragline,Shovel $14.12 .. Electrician $18.12 Flagger $8.43 Form Builder-Structures $11.63 Form Setter-Paving&Curbs $11.83 Foundation Drill Operator,Crawler Mounted $13.67 Foundation Drill Operator,Truck Mounted $16.30 ... Front End Loader $12.62 Laborer-Common $9.18 _ Laborer-Utility $10.65 Mechanic $16.97 Milling Machine Operator,Fine Grade $11.83 ... Mixer Operator $11.58 Motor Grader Operator(Fine Grade) $15.20 Motor Grader Operator,Rough Oiler $14.50 .. Painter,Structures $13.17 Pavement Marking Machine Oper. $10.04 Pipe Layer $11.04 i' Roller,Steel Wheel Plant-Mix Pavements $11.28 Roller,Steel Wheel Other Flatwheel or Tamping $10.92 Roller,Pneumatic,Self-Propelled Scraper $11.07 Reinforcing Steel Setter(Paving) $14.86 Reinforcing Steel Setter(Structure) $16.29 PART D WATER DEPARTMENT - PART D WATER DEPARTMENT - PART DA i ai 1 PART D - SPECIAL CONDITIONS D-1 GENERAL......................................................................................................................3 D-2 COORDINATION MEETING...............................................................,..........................4 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW.................5 D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT.................................7 D- 5 CROSSING OF EXISTING UTILITIES...........................................................................7 D-6 EXISTING UTILITIES AND IMPROVEMENTS...............................................................7 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES.........................,..................................8 D-8 TRAFFIC CONTROL .....................................................................................................8 D-9 DETOURS ............................................................................. ...................................9 D- 10 EXAMINATION OF SITE................................................................................................9 D- 11 ZONING COMPLIANCE.................................................................................................9 D- 12 WATER FOR CONSTRUCTION..................................................................................10 D- 13 WASTE MATERIAL ............................................................................... ...............10 D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE......................................................10 D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.................................10 D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES............................10 D- 17 BID QUANTITIES. ..............................................................................................-----....11 D- 18 CUTTING OF CONCRETE .........................................................................................11 D- 19 PROJECT DESIGNATION SIGN.........................................................:.......................11 D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT......................................12 D-21 MISCELLANEOUS PLACEMENT OF MATERIAL........................................................12 D-22 CRUSHED LIMESTONE BACKFILL............................................................................12 D- 23 2:27 CONCRETE................................................ ...... ... .......----.........12 D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION.........................................12 D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS............14 D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS)................15 D-27 SANITARY SEWER MANHOLES ................................................................................15 D- 28 SANITARY SEWER SERVICES ..................................................................................18 D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES................20 D- 30 DETECTABLE WARNING TAPES. .......................................... ...............................22 D- 31 PIPE CLEANING..........................................................................................................22 ,o D- 32 DISPOSAL OF SPOIL/FILL MATERIAL....................................... ..:..........,............,.....22 D- 33 MECHANICS AND MATERIALMEN'S LIEN................................................................23 D- 34 SUBSTITUTIONS ............... ....... .............. . ............ ....---..........................23 D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER.............23 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES.. ..........:............................26 D- 37 BYPASS PUMPING .......... .. ........... .............................................27 . .... ........ ... D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER...........27 .. D- 39 SAMPLES AND QUALITY CONTROL TESTING................. D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)......................................................30 D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES.........................31 D-42 PROTECTION OF TREES, PLANTS AND SOIL..........................................................31 D-43 SITE RESTORATION .......................................................... ...31 D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST ..............................................31 D-45 TOPSOIL, SODDING,SEEDING & HYDROMULCHING.............................................32 D-46 CONFINED SPACE ENTRY PROGRAM.....................................................................37 D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION............................37 D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS)......................38 D- 49 CONCRETE ENCASEMENT OF SEWER PIPE...........................................................38 D- 50 CLAY DAM. .................................................................................... ........................38 D- 51 EXPLORATORY EXCAVATION (D-HOLE)..................................................................39 10/27/04 SC-1 PART D - SPECIAL CONDITIONS D-52 INSTALLATION OF WATER FACILITIES....................................................................39 52.1 Polyvinyl Chloride (PVC)Water Pipe............................................................................39 52.2 Blocking ....................................... . ............................................................................39 52.3 Tape of Casing Pipe.....................................................................................................39 52.4 Tie-Ins. ........................................................................................................................40 52.5 Connection of Existing Mains..................................................... ..............................40 52.6 Valve Cut-Ins ............................................. -........................................................... .. 52.7 Water Services. ...........................................................................................................41 52.8 2-Inch Temporary Service Line....................................................................................43 52.9 Purging and Sterilization of Water Lines.......................................................................44 52.10 Work Near Pressure Plane Boundaries........................................................................44 52.11 Water Sample Station............................................................................... .....,............44 52.12 Ductile Iron and Gray Iron Fittings................................................................................45 D- 53 SPRINKLING FOR DUST CONTROL................................................................:.........45 D-54 DEWATERING. ...........................................................................................................45 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES.........................................................45 ,w D-56 TREE PRUNING..........................................................................................................45 D- 57 TREE REMOVAL.........................................................................................................46 D-58 TEST HOLES...............................................................................................................46 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION ................................................... ......................................47 D-60 TRAFFIC BUTTONS................. 48 . . . .. . .. ................................................. D-61 SANITARY SEWER SERVICE CLEANOUTS..............................................................48 D-62 TEMPORARY PAVEMENT REPAIR............................................................................48 D-63 CONSTRUCTION STAKES.........................................................................................48 .. D-64 EASEMENTS AND PERMITS......................................................................................49 D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING................................................49 D-66 WAGE RATES.......... ........................................................................... ............... .50 ,.. D-67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE .....................................50 D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN1 ACRE)............................................................................................................51 D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS....._............ ...........52 D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD...................................::........53 D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION.................:..........:.....................53 D- 72 AIR POLLUTION WATCH DAYS.................................................................................64 D- 73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS......................................54 ownw 1o127/04 SC-2 MW PART D - SPECIAL CONDITIONS This Part D —Special Conditions is complimentary to Part C—General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C—General Conditions and part C1 —Supplementary Conditions .. to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: STORM DRAIN IMPROVEMENTS ON HOUSTON ST. (14TH ST. TO SOUTH OF 13TH ST.) .. 14TH ST. (THROCKMORTON ST.TO HOUSTON ST.) THROCKMORTON ST. (13TH ST.TO 14TH ST.) D.O.E.No.4657 _ D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two(2)years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General *M Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers .0 name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. ,., Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 10127104 SC-3 p� 3)R-';1 �:2V E 7�a w'.OU HI TEK. i�ri, .. PART D - SPECIAL CONDITIONS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH P■ CENTRALTEXAS Any conflict between these contract documents and the above 2 publications shall be resolved in am favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and .. Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be ~ those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. *� INTERPRETATION AND PREPARATION OF PROPOSAL: r. A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided �. such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. ,. D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. ia27104 SC-4 PART D - SPECIAL CONDITIONS D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's .employees providing services on a project, for the duration of the project. oil 2. Duration of the project- includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. i 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, .. owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: do 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 10127/04 SC-5 PART D - SPECIAL CONDITIONS G. The contractor shall notify the governmental entity in writing by certified mail or personal .. delivery, within ten (10) days after the contractor knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the project. .. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing .. services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; - 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and _ b.) A new certificate 4 coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by -- paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's r compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-insurance Regulation: Providing false or .. 10/27/04 SC-6 r PART D - SPECIAL CONDITIONS misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach 1 from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or .delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to pro videcoverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet ' barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. '! Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be 10127/04 SC-7 r PART D - SPECIAL CONDITIONS considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing , utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection or relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The ` Contractor shall immediately notify the Owner of the damaged utility or service line, He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. • In case it is necessary to change or move the property of any QWner of a public utility, such property shall not be moved or interfered with until ordered to dri so by the Engineer. The right is .• reserved to the owner of public utilities to enter upon the linnits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the dans are for information only and are not guaranteed - by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D- 8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and 10127104 SC-8 PART D - SPECIAL CONDITIONS Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett City Traffic Engineer at (817) 871-8770, at the pre-construction conference. Although work will not begin until the .. traffic control plan has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works .. Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed ` correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. .. Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." r The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be r, allowed. D- 9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such ' examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the ■* submission of the Proposal. D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 10/27/04 SC-9 PART D - SPECIAL CONDITIONS D- 12 WATER FOR CONSTRUCTION .. The Contractor at his own expense will furnish water for construction. D- 13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the �. appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include,but not be limited to: .. • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed)of the appropriate bid iteni(s)will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth Department of Engineering shall give final acceptance of the completed project work. D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and ` completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut-sheets have been received from the City inspector. D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches; painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. .. 10127104 SC-10 on ar PART D - SPECIAL CONDITIONS ,., The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or amt, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers, de- energize the lines, or raise or lower the lines. The work done by the power company shall Auk not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCORE, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost,and expense. r 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D- 17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured +� quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. D- 18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. D- 19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure:30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be V-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (817) 1-8306 M-F 7:30 am to 4:30 p.m. or (81 1-8300 Nights and Weekends 10127/04 SG11 PART D - SPECIAL CONDITIONS Any and all cost for the required materials, labor, and equipment necessary for the furnishing of .. Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing •• width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. .. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D- 22 CRUSHED LIMESTONE BACKFILL ON Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard ,,w Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. on Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of ow Backfill Materials, Construction Specifications, and General Contract Documents. D-23 2:27 CONCRETE ,f Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call-out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two(2) sacks of cement per cubic yard of concrete. D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation'and Backfill of the General Contract 10127104 SC-12 .. PART D - SPECIAL CONDITIONS •m Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the .■ stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special .. Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type"C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type"C"or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type"C" back-fill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with •� Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: • Less than 10% passing the #200 sieve • P.I. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed 'Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: Sieve Size % Retained 1" 0-10 1/2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. .. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density(A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a .. combination of methods subject to approval by the Engineer. Backfill material to be compacted 10127104 SC-13 oft PART D - SPECIAL CONDITIONS as described above must be within +-4% of its optimum moisture content. The top two(2)feet of o, sewer line trenches and the top eighteen (18)inches of water line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial " rates as determined by the City. These soil density tests shall be performed at two(2)foot vertical intervals beginning at a level two(2)feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. *� 4. MEASUREMENT AND PAYMENT: All material, with the exception of Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and .. sewer pipe. Type "B" backfill shall be paid for at a pre-bid unit price of$15.00 per cubic yard. D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc_, to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for *� Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC +. depths on existing streets, are provided in these specifications and contract documents. All required paving cuts shall be made with a concrete saw in a true and straight line on both ,. sides of the trench, a minimum of twelve (12)inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2)feet or less in width. Therefore, at the locations in the project where the trench wall is three(3)feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job .. placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. *. 10127/04 SG14 PART D - SPECIAL CONDITIONS This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15)feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near-vertical surfaces between +4 levels. 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. 4. SHIELD SYSTEM _ Shields used in trenches are generally referred to as "trench boxes" or"trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. .r 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical: or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rails(wales)and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five(5)feet. .. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. •a D-27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract 10127/04 SG15 PART D - SPECIAL CONDITIONS Documents in addition to those located in the field and identified by the Engineer. All .• manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of this .. Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer I lines. The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional construction. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasket manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be " required for all pipe diameters 18"and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole .. shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half(1/2) inch above the �. surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. .. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. ML 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer ,. manhole. ON 1027104 SC-16 pa i PART D - SPECIAL. CONDITIONS we 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the ,.. joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing ` regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above-specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The .� manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2)rows (inside and outside)of Bitumastic joint sealer. .. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the ' frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjustments allowed. +� In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose .,� debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. 10127/04 SC-17 PART D - SPECIAL CONDITIONS If the inside diameter of the manhole is too large to safely support new adjustment rings or .. frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the tuft finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper"Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. .. 4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint .� sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. .. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. on The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to,joint sealing, lift hole sealing, and exterior surface coating. .. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D-28 SANITARY SEWER SERVICES Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis. The, Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an " 10127/04 SC-18 .r, am PART D - SPECIAL CONDITIONS as expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. me D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid No any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as • shown on the project plans. Prior to installing the applicable sewer main or lateral and the necessary service lines, the Contractor shall verify (by de-holing at the building clean-out) the elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service lines that are installed without pre-construction de- holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall �. obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re-routes .. that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The Contractor shall remove the existing clean-out and plug the abandoned sewer service line. IW7104 SC-19 PART D - SPECIAL CONDITIONS The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill, removal of existing clean-outs, plugging the " abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. a D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as -' shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. .. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department ,w warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill OR method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. on C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance n• with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the .. 10127104 SC-20 r PART D - SPECIAL CONDITIONS Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with .. backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s)and all other appurtenances required, shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the +. Engineer. Surface restoration shall be compatible with surrounding surface. 1. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be .i required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. ' C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities +� when said facility is not'being replaced in the same trench (i.e., when removal requires a separate trench). 10127104 SC-21 PART D - SPECIAL CONDITIONS Oft L. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item I. D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective .. inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2% pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Type of Utility Color Code Legends Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below — Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 = inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D- 31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOIL/FILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator '! ("Administrator'), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractors disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses ,. associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractors expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification .. by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its 10/27104 SC-22 .r PART D - SPECIAL CONDITIONS .. expense and dispose of such materials in accordance with the Ordinances of the City and this section. D-33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. D- 34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or"or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's- approval ngineer'sapproval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the .. intended .purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to "substitutions" shall be applicable to all sections of these specifications. D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit +■• television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. ., 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in " such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning .. devices whenever possible. 10/27/04 SC-23 PART D - SPECIAL CONDITIONS 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using .. high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. r. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The -" camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of .. any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, N cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, .. telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. .. 101227104 SC-24 am PART D - SPECIAL CONDITIONS •. The importance of accurate distance measurements is emphasized All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or .ft the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. s The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. r 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the .. Engineer, as long as such photographing does not interfere with the Contractor's operations. ,.. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The ' Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re-televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary .. sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of 10/27104 SC-25 an PART D - SPECIAL CONDITIONS sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged •+ during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping ,. required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. t D-36 VACUUM TESTING OF SANITARY SEWER MANHOLES A. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. .. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. Y The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the .. drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244-93: Table I MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg(10"H9 -9"Hg)(SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole pa 0 to 16' 40 sec. 52 sec. 18' 45 sec. 59 sec. Am IW7104 SC-26 .a PART D - SPECIAL CONDITIONS 20' 50 sec. 65 sec. 22' 55 sec. 72 sec. " 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. .. 28' 69 sec. 91 sec. 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 1. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, " and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or .r replacement of the sewer line. D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the .. camera shall be operative in 100% humidity conditions. The camera, television monitor, and 10127/04 SC-27 PART D - SPECIAL CONDITIONS other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of Mi any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between •� members of the crew. The importance of accurate distance measurements is emphasized. All television .. inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. .. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of .� each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. ,. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual .. and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television 10/27104 SC-28 .a PART D - SPECIAL CONDITIONS inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no .r payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post-Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping " required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project Eft and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine w+ days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as .. determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit r. price for the item being tested. 10127/04 SC-29 a. PART D - SPECIAL CONDITIONS E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to .. the job site. The ticket shall specify the name of the pit supplying the fill material. D-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL(FOR DISTURBED AREAS LESS THAN 1 ACRE) A DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the + contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction ,. operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary .. berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of--way, clearing and grubbing, excavation and t' borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such — limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 2. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 3. Frequent-fordings of live streams will not be permitted;-therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment Oft shall not be operated in live streams. 4. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from 'm entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 5. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 6. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and ' reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall 1012 4 SC-30 ra PART D - SPECIAL CONDITIONS am conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. .. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. s D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by this •. construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of .� construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or �► better than existed prior to start of work. Any trees or other landscape.features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound.dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association.- A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the Cityt To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred .ft will be considered a subsidiary cost of the project. D-43 SITE RESTORATION "w The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth(0.1)of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest " .. Standard Product List, for the bid to be considered responsive. Products and ls - 10127104 SC-31 ,, em PART D - SPECIAL CONDITIONS the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D-45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. n . 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas- as designated on the Drawings and in + accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist-6f live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a , healthy, virile moot system of dense, thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness ^, of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the ... laW/04 SC-32 .0 PART D - SPECIAL CONDITIONS requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the .. dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15)to twenty-five +� (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed an the prepared areas. The sod shall be so placed that the entire designated area shall be ., covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to ,r the height or slope of the surface or nature of the soil, shall,_ upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the buck sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread .. uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. ' The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING •. DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. 10/27/04 SC-33 am PART O - SPECIAL CONDITIONS The specified seed shall equal or exceed the following percentages of Purity and OM germination: Common Name Puri Germination P0 Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% Tall Fescue 95% 90% ,,, Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% .. Cody 95% 90% Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE(lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 - to Buffalograss 60 Berrnudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wt;zatgrass 50 May 1 Annual stye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. Oft b, Finishing. Where applicable, the shoulders, slopes, and nitches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be •- uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D-45, Construction Methods, is not applicable since no seed bed preparation is required. ravzr� SC-34 — -—— PART D - SPECIAL CONDITIONS DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three(3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. ,.. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than .by mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one-eight(1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to'be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one(1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of ' six(6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may .. be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six(6) inches in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications-of the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth- RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where .. temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration. -- * Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 10127104 SC-35 PART D - SPECIAL CONDITIONS - 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. •� 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the, analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to ., be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". !' MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only,on topsoils secured from borrow sources. Acceptable material for"Seeding"will be measured by the linear foot, complete in place. ON Acceptable material for"Sodding"will be measured by the linear foot, complete in place. am Acceptable material for"Fertilizer" shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract .- unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. r 10127104 SC-36 ma PART D - SPECIAL CONDITIONS .. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The ,., contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with .. the Drawings and these Specifications. The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type .. specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an " acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 7. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. .. 8. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 9. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. r. 10. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other +� deficiencies, which are discovered at the time of final inspection. 11. Final inspection shall be in conformance with general condition item "C5-5.18 Final .A Inspection" of PART C - GENERAL CONDITIONS. 10127/04 SC-37 PART D - SPECIAL CONDITIONS D-48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) r. 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be - considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at .. the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway)within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractors expense. .. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe .. installation shall be pressure grouted. D- 49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and .• reinforcement of the concrete encasement. D- 50 CLAY DAM .. Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. .. 10/27/04 SC-38 ON PART D - SPECIAL CONDITIONS .. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall am conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only "' at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in +o conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. , The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation(D-Hole). Payment shall not be made for verification of existing utilities per item D-6. Payment for _ exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D- 52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. .. 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 �+ Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as .. follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. 10127/04 SC-39 PART D - SPECIAL, CONDITIONS Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade , Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. IMA 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 52.4 Tie-Ins The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be + considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. .• The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall _be included in the linear foot + price bid for the appropriate pipe size. 52.6 Valve Cut-Ins It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require dosing valves in other lines and putting consumers out of service for that period of time necessary to cut in the ,. new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be + without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shalt be included in the price of the appropriate bid items. 10127/04 SC-40 I ' PART D - SPECIAL CONDITIONS .� 52.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to .� those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18)contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main .. tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector _ the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind �• Meter.. Any vertical adjustment of customer service line within the 5 foot area shalt be subsidiary to the service installation. .. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 1. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for 10127/04 SC-41 PART D - SPECIAL CONDITIONS one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five(5)feet behind the Meter. 2. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is �+ defined by a line extended from the service tap through the meter_. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. _ 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E1-18A—Reinforced Plastic Water Meter Boxes. _ Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five(5)feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as fumishing and setting new meter box shall be included in the price bid for furnish and set meter box. 1. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). 2. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. •� Payment shall be made at the unit bid price in the appropriate bid item(s). 10x7104 SC-42 PART D - SPECIAL CONDITIONS .. 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an _ expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation. The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct •• location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. .. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary _ service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, _the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be .. estimated as accurately as possible. At the pre-construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter .. Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. a 10127104 SC-43 on PART D - SPECIAL CONDITIONS 52.9 Purging and Sterilization of Water Lines ON Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The City will provide all water for INITIAL cleaning and on sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be .. measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the Pipe. �- 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross .. or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: _ All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. .. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper .. service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to 10/27104 SC-44 .. PART D - SPECIAL CONDITIONS provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. -� 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings,joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed. All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. D- 53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. D- 54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. _ D- 55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D- 56 TREE PRUNING �• A. REFERENCES: National Arborist Association's"Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner 10/22 7104 SC-45 PART D - SPECIAL CONDITIONS C. NATURAL RESOURCES PROTECTION FENCE 3. Steel "T" = Bar stakes, 6 feet long. 4. Smooth Horse-Wire: 14-1/2 gauge(medium gauge)or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 9. Backfill and compact the trench immediately after trenching. 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specked methods, equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. D- 58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and 10127104 SC-46 PART D - SPECIAL CONDITIONS: whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. •. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he-deems necessary to determine the nature of the material to be excavated. .. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the `pre-construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin .. construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, DOE number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses. 90/27104 SC-47 PART D - SPECIAL CONDITIONS Electronic versions of the sample flyers can be obtained from the Construction office at (817) 871-8306. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D- 60 TRAFFIC BUTTONS _ The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD)of the Transportation/Public Works Department to install the markings, .. the contractor shall contact SSMD at(817)871-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. .. D-61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. .. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cleanouts. D- 62 TEMPORARY PAVEMENT REPAIR _ The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the •• entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary .. pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. .. 1OP7104 SC-48 on PART D - SPECIAL CONDITIONS .. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the .� Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D-64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right-of-entry agreements, and/or permits to perform work on private property. .. The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it .. shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the plans desk at the Department of _ Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to .. the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the -� use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required •• for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all costs associated with compliance with the permit(s)including payment for flagmen shall be subsidiary .. to the bid item price for boring under the railroad. No additional payment will be allowed for this item. _ D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The .. contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks .. following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. 10127/04 SC-49 PART D - SPECIAL CONDITIONS D- 66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the .. Contractor or any Subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates of wages be paid. (Attached) D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE' A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a contract or other law, ordinance, regulation or policy whose requirements are more stringent. B. ACP is defined under NESHAP as a Category II, non-friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the .. removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) an F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe unless otherwise stated or indicated on the project plans or contract documents. 10127104 SC-50 PART D - SPECIAL CONDITIONS D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN 1 ACRE) PERMIT: As defined by Texas Commission on Environmental Quality(TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction Activity)or five or more acres of total land (Large Construction Activity). The contractor is defined as an `operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrec.state.b(.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and .. designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.htmi. Not all of the structural •. controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in .. minimum sediment retention of not less than 70%. NOTICE OF INTENT(NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI)form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit _ for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 A copy of the NOI shall be sent to: City of Fort Worth Department of Environmental Management 5000 MLK Freeway Fort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT)form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. _ The NOT should be mailed to: Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and 10127/04 SC-51 PART Q - SPECIAL CONDITIONS techniques to be employed to reduce the release of sediment and pollution from the construction site. Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY— DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent(NOI)form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT)form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY- DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching,soil retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown �- on the proposal as full compensation for all items contained in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D-40 SHALL BE APPLICABLE. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF dM EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may am obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this am 9Q@7AW SC-52 PART D - SPECIAL CONDITIONS .. activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief)and the Contractor will be prosecuted to .. the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. _ D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s)for a project to submit such additional information as the City, in sole discretion may .. require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested _ may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendation to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis _ the percentage of work completed will be compared to the percentage of time charged-to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more(example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of the Department of Engineering, Water .. Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public .� Information Officer. 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 10127/04 SC-53 PANT D - SPECIAL CONDITIONS 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON .� OZONE FORMATION. . The Texas Commission on Environmental Quality(TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting`, or equipment bums Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway _ construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee is $50.00 per permit with payment due at the time of permit application. 2. A re-inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. .. om .. .. 1W7104 SC-54 .. (To be printed on Contractor's Letterhead) Date: DOE No: 3176 PROJECT NAME:Main C1C4B Sanitary Sewer Drainage Area Part 15 MAPSCO LOCATION: 76L LIMITS OF CONST.: West of 9t°Avenue along FWWR between Rosedale and Oleander Estimated Duration of Construction on your Street : <XX>days THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE SEWER LINES ON OR AROUND YOUR PROPERTY. C-ONSTRUCTION WILL BEGIlV APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT -TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 - PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. PAIN D - SPECIAL CONDITIONS CITY OF FORT WORTH - .• HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 •- CLASSIFICATION HOURLY RATE Asphalt Raker $10.32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 Carpenter(Rough) $13.64 Concrete Finisher-Paving $10.16 Concrete Finisher Helper(Paving) $9.70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.41 Form Setter-Paving &Curbs $10.25 Form Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 Crane, Clamshell, Backhoe, Derrick, Dragiine, Shovel(< 1 1/2 $10.00 CY) - Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel(> 1 1/2 $11.52 CY) Front End Loader(2 1/2 CY& less) $9.94 _ Front End Loader(over 2 1/2 CY) $9.32 Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator(Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 ` Roller, Steel Wheel Other Flatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle(Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 "" Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 tavzM SC-56 FORTWORTH DOE NO. Xl= Project Mame: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MIL AT . .. (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR PART Q - SPECIAL CONDITIONS F TEXAS DEPARTMENT OF HEALTH DEMOLITION I RENOVATION NOTIFICATION FORM r NOTE:CIRCLE ITEMS THAT ARE AMENDED T T) H NOT*ICATION# # t) Abatement Contractor. TDH Luse Number. i Address: _ _ —City: Sian' zp: -m C Office Phone Number( i Job Site Phone Number,__ e site Supervsor: TDH Lkmnse Number U Site Supervisor. TOH License Number. s Trained On-$ice NESHAP individual: Certification Dale: a Demolition Contractor. Office Phone Numberf�) n Address: _ City: State: Zip: I y 2) PMed Consultant or fvpew or: 111H License tvutnhMer: Mailing Akldtess: Y' a Vie. OtFive Photo:Nurtber:t _ I T 3) Facility Owner M Attention: P Mailing Address: - city: State: Zip: Owner Phone Nu.nbur(- ) A "Nota:Tho Invoice for Um notification foo will be sant to the owner of tine butiding and the billing addressfor the iavoir:a will be obtained from Me information that is provided in this section. N 4) Dowription or Facifity Name: _ E Physical Address; County City Zip: S Facility Phone N umberf ) Facility Contact Person. •-� H Description of ArealRnom Number. A Prior Ilse; Future Use: _ P Age of 8uildinglFaci6ty: Size: Number of Fkmn%s_ Schoot(K-12): i YES ar; NO D 5) Type of Work: a Demolition a Renovation(Abatement) 0 Atuwai Coit�cl t7ad raw T Work will be during: p Dalt. Q EVWrg Q Not Ptmad Project d Description of work sdladttfar `� H 8) Is this a Public Building? a YES-, o NO Federal Facility?E YES ONO Industrial Site?a YES ONO Q NE15HAP-0risty filigi ❑ YES ' ONO is 8utidinpdt=wrdy Occupied? 3 YES n NO 7) Notification Type CHECK ONLY ONE V 7.Original(10 Working days) 15 Cancellation G Amendment ❑ EmergencyfOrdered Who If this is an amendment,wNch amendment number is this?„_,(Enclose copy of original andlor last amendment) F If an emergency,who did you talk vAth at TDH? Emergency!#: + Date and Baur of Emergency(HtItMMIDDMf}: . Description of t ho sudden,unexpected event and expkNmtion of hoer Uta ni ea3vusadd afa conditions or Would equipment damage(compute(s.machinery,std - pq a $) t1)escripticxt af.ptsacedraes to be In the Meru that that uAmpected asbestos is found or previously non-triable asbestos mdedai becomes crumbled.putvetlad,or reduced to powder: E S :g) WaS an Asbestos survey performed? i1 'YES 13 NO Date: ! ! TDH Inspector License No: O Analytical Melhod:❑PLM ❑TEU❑Assumed TDH Laboratory,+Licese nNo: N (For TAHPA(public buddMM acts:an assumption must be made by a TDH Lich Inspector) .. SO) Dnm#*m of ptanned an or renowntion+;Fork,type of material,and me#iod(s)to be ttatttIL _—___ 17) �work�teed�oorttrols to bt:treed to pra�►eru sm�sians of asbast�os at the tteriwAtioNne,►tovafiOrt: 1027104 SC-58 PART D - SPECIAL CONDITIONS 12) ALL applicable items in the follovring table must be completed; IF NO ASBESTUS PRESENT CHECK HERE Aipproximate amount of Check unit of measurement ,., Asbestos-Containing Building Material Asbestos Type Pipes Surface Area Ln Ln so so Cu Cu Ft M Ft 1.4 Ft M .. RACNI to be removed RACM NOT removed Interior Category 1 non-friable removod Exterior Calegory I non-friable removed Cateco 1 non-friable NOT removed Interior Category.11 non-friable removed Exterior Category 11 non-friable removed Categ2rTtl non-friable NOT removed RACNI Off-Facility Component 13) Waste Transporter Name: TDH License Number_ Address, State: Zip: Contact Person; Phono IYiatrber. f ) 14) Waste Disposal Ste Name: AdOrew; Stals. Ax Tdlephdrlc:( ) TN SCC Permit Number. 15) For structurally unsound facilideS,attach a Copy of demalftri order and identify Governmental C ffacial below: Name: _PWORUation No: Title. 1 Date of order(MMtC3DlfYY). 1 1 Data oder to begin(r plYY) I 16) Scheduled Dates of Asbestos Abatement(rAkVDD" Start 1 1 Camoete; 1 f 17) Scheduled Dates Dem4liition,Penovation(hi0bDDNY) Start ! 1 Complete: '! I "Note:if the start date on this notification too not W met.thv TDN Regional or Local Program office Afustbe contacted by phone prior to the start data. Failure to do so Is a vtotstlon In accordance to TAMPA.Section 293$1. I hereby codify that al Information 1 have provided is correct.complete.and true to the best of my knowledge. I acknowledge that 1 am responsible for all aspects of the r otirication form,including,but not Nmiting.content and submission dates. The maximum penalty is$10.000 per slay per YMation. rr. ! {Signature of SuldN Owe#Operator (Pdraed Naha) (DOW) (T�) or delegated ConsultantlContradot) (Fax NumW) MAIL TO: ASBESTOS NOT]FICATION SECTION TOXIC SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH 'Faxis ala not PG BOX 143538 'faxes are not accepted• .. AUSTIN,TX 787143538 PH:5124334-8600.1-800-572-5548 Farm APB#5,dated 0709/02.Replaces TDII farm datad 0711 101!aror assistance in campfel r g form.cafl 1-800-572-5546 1027104 SC-59 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS.............OMITTED DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE.................................OMITTED DA-3 PIPE ENLARGEMENT SYSTEM.....................................................................OMITTED DA-4 FOLD AND FORM PIPE..................................................................................OMITTED DA-5 SLIPLINING........................................................................................ ..OMITTED ........... DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT.........................................................4 DA-7 TYPE OF CASING PIPE......................... .................................. ..........................7 .... .... .... DA-8 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR...............................................8 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION...................10 �. DA-10 MANHOLE REHABILITATION....................................................................................13 DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION...............................23 DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM.....OMITTED DA-13 INTERIOR MANHOLE COATING -QUADEX SYSTEM..................................OMITTED DA-14 INTERIOR MANHOLE COATING -SPRAY WALL SYSTEM..........................OMITTED DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM....................................24 DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER..............................................................................................................OMITTED DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM.........................OMITTED DA-18 RIGID FIBERGLASS MANHOLE LINERS......................................................OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION....................................OMITTED DA-20 PRESSURE GROUTING.............................................................................................27 DA-21 VACUUM TESTING OF REHABILITATED MANHOLES ............................................31 .. DA-22 FIBERGLASS MANHOLES.............................................................................OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES........OMITTED DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER............................................33 DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS....................................................34 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE..............................................34 DA-27 GRADED CRUSHED STONES ......................................................................... ..35 DA-28 WEDGE MILLING 2"TO 0" DEPTH 5.0'WIDE...........................................................35 DA-29 BUTT JOINTS - MILLED DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX).....................................................37 DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER............................................37 • DA-32 NEW 7" CONCRETE VALLEY GUTTER................:... ...........38 ................. . .................. DA-33 NEW 4" STANDARD WHEELCHAIR RAMP...............................................................38 DA-34 8" PAVEMENT PULVERIZATION,.........................:...............•,...................,............._.39 DA-35 REINFORCED CONCRETE PAVEMENT OR BASE(UTILITY CUT)..............OMITTED DA-36 RAISED PAVEMENT MARKERS......................................... .. = ..,...40 DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING.................40 DA-38 LOADING TRANSPORTATION AND DISPOSAL OF CONTAMINATED SOIL........44 DA-39 ROCK RIPRAP - GROUT-FILTER FABRIC...................................................OMITTED DA-40 CONCRETE RIPRAP............................................................................:..........OMITTED DA-41 CONCRETE CYLINDER PIPE AND FITTINGS...............................................OMITTED DA-42 CONCRETE PIPE FITTINGSAND`SPECIALS ...............................................OMITTED DA-43 UNCLASSIFIED STREET EXCAVATION....................................................................45 DA-" 6" PERFORATED PIPE SUBDRAIN...........................................................................45 •. DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS....................................................46 DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION................................................46 DA-47 PAVEMENT REPAIR IN PARKING AREA.................................................:................47 DA-48 EASEMENTS AND PERMITS ..........•..............................................................OMITTED DA-49 HIGHWAY REQUIREMENTS....................................................... ......OMITTED 11102104 ASC-1 M+ PART DA - ADDITIONAL SPECIAL CONDITIONS DA-50 CONCRETE ENCASEMENT.......................................................................................47 DA-51 CONNECTION TO EXISTING STRUCTURES ............................................................47 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION:................................47 DA-53 OPEN FIRE LINE INSTALLATIONS DA-54 WATER SAMPLE STATION. ......................................................................................48 DA-55 CURB ON CONCRETE PAVEMENT...........................................................................49 DA-56 SHOP DRAWINGS.....................................................................:................................49 r DA-57 COST BREAKDOWN.............................................................................. .........50 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY..................................50 DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP....................................................................50 DA-60 ASPHALT DRIVEWAY REPAIR. ................................................................................50 DA-61 TOP SOIL........................................................................................................OMITTED DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT..................50 DA-63 BID QUANTITIES .... _ ............................... ........... .... . .............51 .. DA-64 WORK IN HIGHWAY RIGHT OF WAY. ..........................................................OMITTED DA-65 CRUSHED LIMESTONE (FLEX-BASE).............................................:.....+..................51 DA-66 OPTION TO RENEW................... ................................................:...........................51 DA-67 NON-EXCLUSIVE CONTRACT...................................................................................51 DA-68 CONCRETE VALLEY GUTTER ...............:..................................................................52 DA-69 TRAFFIC BUTTONS....................................................................................................52 �+ DA-70 PAVEMENT STRIPING...............................................................................................52 DA-71 H.M.A.C. TESTING PROCEDURES......................................................e....................52 DA-72 SPECIFICATION REFERENCES.......................................................................:........53 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVEAND BOX. ......................................................................................................53 DA-74 RESILIENT-SEATED GATE VALVES.........................................................................53 DA-75 EMERGENCY SITUATION, JOB MOVE-IN ps DA-76 1 %" & 2" COPPER SERVICES..................................:...................:.:........................53 DA-77 SCOPE OF WORK(UTIL. CUT)......................................................................OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY(UTIL. CUT) ....OMITTED DA-79 CONTRACT TIME (UTIL. CUT).......................................................................OMITTED DA-80 REQUIRED CREW PERSONNEL& EQUIPMENT(UTIL. CUT) .....................OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL.CUT) ......... ..OMITTED DA-82 LIQUIDATED DAMAGES(UTIL. CUT). ..........................................................OMITTED DA-83 PAVING REPAIR EDGES(UTIL. CUT)...........................................................OMITTED DA-84 TRENCH BACKFILL(UTIL. CUT).......................................... ....OMITTED an DA-85 CLEAN-UP (UTIL. CUT)..................................................................................OMITTED 6A-86 PROPERTY ACCESS (UTIL. CUT).................................................................OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUT) ..............................................................OMITTED DA-88 STANDARD BASE REPAIR FOR UNIT I(UTIL. CUT)....................................OMITTED 6A-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT)..................OMITTED DA-90 2"TO 9" H.M.A.C. PAVEMENT(UTIL. CUT1...................................................OMITTED DA-91 ADJUST WATER VALVE BOXES, MANHOLES,AND VAULTS •� (UTIL. CUT)................................................................------................................OMITTED DA-92 MAINTENANCE BOND(UTIL. CUT)...............................................................OMITTED DA-93 BRICK PAVEMENT(UTIL. CUT)...................................................................OMITTED DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT).................................................OMITTED DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) .............................. .......OMITTED DA-96 REPAIR OF STORM DRAIN%STRUCTURES (UTIL. CUT).............................OMITTED DA-97 "QUICK-SET" CONCRETE (UTIL. CUT . ........OMITTED .• 11/02b4 ASC-2 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-98 UTILITY ADJUSTMENT(UTIL.CUT)..............................................................OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUA .... ............................................................................................OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL. CUT) ..........................OMITTED DA-101 CONCRETE CURB AND GUTTER(UTIL. CUT).............................................OMITTED DA-102 PAYMENT(UTIL. CUT) ..................................................................................OMITTED DA-103 DEHOLES (MISC. EXT.)........... . ..:...........................................................................54 DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.). DA-105 PRESSURE CLEANING AND TESTING(MISC. EXT.) ..................................OMITTED �+ DA-106 BID QUANTITIES (MISC. EXT.). ................................................................................55 DA-107 LIFE OF CONTRACT(MISC. EXT.)............................................................................55 DA-108 FLOWABLE FILL(MISC. EXT.)..................................................................................55 DA-109 BRICK PAVEMENT REPAIR(MISC. REPL.) .............................................................56 DA-110 DETERMINATION AND INITIATION OF WORK(MISC. REPL.)................................56 DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.).................................................57- _ DA-112 MOVE IN CHARGES (MISC. REPL.)..............................................................OMITTED DA-113 PROJECT SIGNS (MISC. REPL.)...............................................................................57 DA-114 LIQUIDATED DAMAGES (MISC. REPL.). .................................................................57' DA-115 TRENCH SAFETY SYSTEM DESIGN(MISC. REPL.)....................................OMITTED DA-116 FIELD OFFICE............................................................................................................58 DA-117 TRAFFIC CONTROL PLAN........................................................................................58 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS.................59 11102104 ASC-3 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS-OMITTED DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE -OMITTED DA-3 PIPE ENLARGEMENT SYSTEM -OMITTED DA-4 FOLD AND FORM PIPE-OMITTED DA-5 SLIPLINING - OMITTED DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad .. company, as applicable. B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI 636.10 and the following: a. Field Strength: 35,000 psi minimum. b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). d. Joints: Continuous circumferential weld in accordance with AWS D1.1. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slung. C. EXECUTION .. 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the 1110204 ASC-4 PART DA - ADDITIONAL SPECIAL CONDITIONS railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to _ safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or �• tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. c. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or +� other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. r b: In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 11/02104 ASC-5 PART DA - ADDITIONAL SPECIAL CONDITIONS 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. C. The Contractor shall prevent over-belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and specified by the Engineer. F e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. ,. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient .E strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State I tea ASO-6 PART DA - ADDITIONAL SPECIAL CONDITIONS of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud jacked. C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. .. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and .. materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if required, shall be paid separately. DA-7 TYPE OF CASING PIPE 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 .. Fabricated Electrically Welded Steel Water Pipe,and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: A. For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. B. Touch-up after field welds shall provide coating equal to those specified above. i C. Minimum thickness for casing pipe used shall be 0.375 inch. Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing" .. Company, Advanced Products and Systems, Inc., or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. 2. SEWER: .. Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 11/02/04 ASC-7 rr r 1. PART DA - ADDITIONAL SPECIAL CONDITIONS 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR A. GENERAL: The work covered by this item consists of furnishing all labor, material, equipment, supervision, etc. necessary to construct a point repair on the portion of a service line located within a utility easement, street right-of-way or on private property. Point repairs on private property shall only be addressed after the Contractor has received written permission from the property owner to do the work. A blank Right-of-Entry Agreement form to be completed by the Contractor and the individual property owners is .� included at the end of this section. The Contractor shall keep a record copy of all Right- of-Entry forms obtained and have it on hand at all times during construction. B. MATERIALS: i The pipe replacement material shall be gasketed joint, gravity PVC sewer pipe (ASTM D- 3034, SDR 26) and have a minimum cell classification of 12454 A or B as defined in r• ASTM D-1784. Installation shall be in strict compliance with the manufacturer, recommendations and the Uni-Bell Plastic Pipe Association. The method of jointing the ends of the replaced pipe with the existing pipe shall be water tight. C. EXECUTION: 1. After the location of the point repair,is determined, the Contractor shall excavate and remove the damaged pipe and replace with new pipe. The minimum length of pipe replaced shall be three (3) feet. All work shall be performed by a licensed f plumber. Determine whether additional lengths of line beyond "minimum length" '■ criteria need replacement. Report need for additional replacement to City and obtain approval before proceeding. 2. The Contractor shall excavate, shape the bottom of the trench and place the required pipe bedding so that the grade of the replaced pipe matches the existing service line grade. 3. Numerous service line point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of existing landscaping, structures, sidewalks, driveways, etc. Items removed or disturbed shall replaced or restored to original conditions or better. 4. Removal of Debris: Excess excavated material and debris are to be removed from -� the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for"Service Line Point Repair". 5. Roof and Yard Drains: At the locations indicated in Table_of the Attachments. The Contractor shall disconnect roof and yard drains from'the sanitary sewer service line. For yard drains, the Contractor shall excavate and remove the drain r. from the yard and plug the line at the property line. For roof drains, the Contractor 11102104 ASC-8 PART DA - ADDITIONAL SPECIAL CONDITIONS shall remove the downspout from the drain line and plug the line to prevent inflow. In addition, the Contractor shall install an elbow fitting at the bottom of the _ downspout to direct runoff, away from the building, and a concrete splash pad to prevent erosion. 6. Disconnected Service Lines: At the locations indicated in Table of Attachments to the Special Contract Documents, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. w 7. Abandonment of Point Repair: If a pipe is exposed and found in good condition, not requiring a point repair, notify City Engineer who will record abandonment of point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. 8. Cleanout Repair: The Contractor shall make appropriate repairs to cleanouts as indicated in Table and as shown on the PLANS. All cleanout repair work shall be performed by a licensed plumber. a. General This special condition describes the repair of sanitary sewer cleanouts located on private property as designated on the 1/1 Elimination Repair .. plans. Repair of the cleanouts shall consist of replacing defective cleanout caps or installing new caps where none exist, such that inflow is eliminated. There will be no repairs made to the existing cleanouts that require excavation, other than what is required to expose the top of the cleanout so that the new caps can be installed. b. Materials Replacement cleanout caps shall be Dal-Caps as manufactured by Dallas Specialty & Mfg. Company, or equal. The rubber caps are held down by stainless steel clamps. C. Excavation 1) The Contractor shall submit shop drawings on all materials and equipment to be installed. 2) The Contractor is responsible for obtaining right of entry from the property owners prior to performing any work. Property owners should be notified 48 hours in advance of any work on their property. 3) The Contractor shall restore any disturbed surface to its original or better condition at no separate pay. 11/02/04 ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS D. MEASUREMENT AND PAYMENT: 1. Payment for service line point repair shall be on a unit price basis for each repair performed on all sizes of service lines for the respective depths. The minimum length of service line point repair shall be three (3) feet. No separate pay if the work is done within the limits of a service line reconnect as defined in Special Condition, D-28, "Sanitary Sewer Services". 2. Measurements for extra length repair is on a linear foot basis for repairs in excess of the minimum 3 foot replacement length. 3. All pipe fittings, adapters, concrete collars, bedding, and removal and replacements of grass sodding required shall be considered incidental to service line point repair. 3. If no pay item is included for any work required to properly complete a service line point repair as specified, the cost to perform said work, including any required ^ removal and replacement of materials, shall be considered incidental to the service line point repair. 5. Depth of Bury is to be measured from Natural Ground Level to the Flow Line of the Sanitary Sewer Service Line at the Point of Replacement. The minimum trench width shall be T-0". 6. All excavation, backfill, removal and replacement of grass sodding and landscaping, plugs, fittings, and splash pads shall be considered incidental to removal of yard drains, disconnecting roof drains and plugging disconnected service lines. 7. No separate payment will be made for the Contractor to obtain written permission .. to enter private property. 8. Payment will be made for Abandonment of Point Repairs at the Contract Unit Price for Excavation and Backfill Abandoned Point Repairs. 9. Payment shall be made at the Contract Unit Price for each sanitary sewer cleanout successfully repaired. Payment shall be full compensation for all materials, ~ equipment, and labor required to perform the work. DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION A. GENERAL: 1. Scope: This section governs .all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion protection shall meet the requirements of this Specification (and items DA-14 and DA-15)and the Manufacturers recommendations and specifications. I vozioa ASC-10 i .. PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturers .. recommendations. 3. Manufacturer's Recommendations: Materials and procedures utilized for the lining .� process shall be in strict accordance with manufacturer's recommendations. 4. Corrosion Protection: Corrosion protection may be required on all structures ... where high turbulence or high H2S content is expected. B. MATERIALS: 1. Scope: This section governs the materials required for completion of protective coating of designated structures. .. 2. Protective Coating: The protective coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. or a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. •. 3. Specialty Cement (If required for leveling or filling): The specialty cement-based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification: The protective coating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Standard, Long Term Value " Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi r Flexural Modulus ASTM D-790 550,000 psi 5. Mixing and Handling: Mixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be.in �. accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray .. coating operations and coating installations. 11102104 ASC-11 PART DA - ADDITIONAL SPECIAL CONDITIONS C. EXECUTION: 1. General: Protective coating shall not be installed until the structure is complete and in place. 2. Preliminary Repairs: a. All foreign materials shall be removed from the interior of the structure using high pressure water spray(3500 psi to 4000 psi at spray tip). b. All unsealed lifting holes, unsealed step holes, and voids larger. than approximately one-half (1/2) inch in thickness shall be filled with patching compound as recommended by the material supplier for this application. C. After all repairs have been completed, remove all loose material. 3. Protective Coating: a. The protective coating shall be applied to the structure from the bottom of the frame to the bench, down to the top of the trough. The top of the *■ structure shall also be coated. b. The protective coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. .• 2) Place covers over the invert to prevent extraneous material from entering the sewers. 3) If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. -� 4) Spray the urethane or epoxy onto the structure wall and bench/trough -to a minimum uniform thickness of 125 mils (0.125 �. inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) Noapplications shall be made to frozen surfaces or if freezing is expected to occur inside the structure within 24 hours after .. application. 4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are -� vtroM ASC-12 .. PART DA - ADDITIONAL SPECIAL CONDITIONS dft complete in accordance with the Section D-36 - VACUUM TESTING OF SANITARY SEWER MANHOLES. .. D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price Bid per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all am labor, supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, .s bench and trough, and lower portion of a particular structure, if required by the Engineer, shall be paid for separately, as specified in Section DA-10, MANHOLE REHABILITATION. me DA-10 MANHOLE REHABILITATION A. GENERAL .. 1. Scope. This section covers the rehabilitation of sanitary sewer manholes and other appurtenances in accordance with the Manhole Rehabilitation Details in the specifications. The rehabilitation requirements for each manhole are listed in the " Manhole Rehabilitation Schedule in the specifications. Manhole rehabilitation includes repairing, replacing, or restoring manhole frame & cover, frame seal, chimney, corbel, wall, bench, invert and/or pipe seal(s). i The Contractor shall furnish all labor, supervision, materials, equipment and testing required to complete the rehabilitation of the manholes listed in these Contract Documents. 2. General: Contractor is responsible for locating all manholes scheduled for rehabilitation. Contractor shall notify City Engineer if a manhole cannot be located. " Contractor shall contact City Engineer to determine if materials removed from rehabilitated manholes will remain the property of the Owner. If so, Contractor shall coordinate when and where to deliver salvaged material to the Fort Worth Water .. Department. If not, Contractor shall be responsible for disposal of material. Contractor shall provide watchmen, barricades and warning signs to protect his workers, inspectors, and the public. Contractor shall, at no additional cost to the Owner, replace .. any portion of an existing manhole that is damaged during rehabilitation of the manhole. Contractor shall provide necessary means to prevent wastewater flow from contacting material used for rehabilitation prior to-fully curing. Loose and broken brick and mortar .r► shall be removed immediately from the manhole to eliminate the possibility of pieces entering the sewer lines. 3. Submittals: a. Product Information. Contractor shall submit manufacturer's information on products proposed to be used that are not specifically named in the Contract �• Documents. b. Personnel Qualifications. Prior to starting manhole coating, Contractor shall ■„ submit qualifications of personnel that will be performing wall repairs and coating procedures. Proposed personnel shall verify certification within the last two years 11102104 ASC-13 M PART DA - ADDITIONAL SPECIAL CONDITIONS by the coating manufacturer and verify working on at least three projects with similar coating within the previous 12 months. c. Work Schedule. Prior to beginning work on bench and invert replacements, complete manhole replacements, or construction of new maintenance manholes, Contractor shall submit for review by Owner's Representative a plan for maintaining wastewater flow without any interruptions. Contractor shall maintain " wastewater flow at all times. 4. Quality Assurance. Contractor will be responsible for all testing laboratory services in �.. connection with data required for review of materials proposed to be used in the Work. Contractor shall obtain Engineer's acceptance of the testing laboratory before having services performed and shall pay for all costs for testing. Owner may, at his discretion, Oft perform quality control tests on materials during and after their incorporation in the Work. If any of these tests fail, Contractor will be responsible for correcting situation and shall pay for any retest. All costs for quality assurance testing will be subsidiary to the Work. an 5. Delivery, Storage, and Handling. Upon delivery, all material shall immediately be stored and protected until installed in the Work. All material shall be labeled and stored in .ft accordance to the manufacturer's recommendations and all local, state, and federal regulations. Oft 6. Testing. All rehabilitated manholes shall be tested in accordance with Section D-63. B. MATERIALS on 1. Cleaners: Water Clean and free from deleterious substances. Cleaners Detergent, muriatic acid or approved equal. 2. Wall, Bench, Trough, Grouting, and Pipe Seal Repair Hydraulic Cement Strong-Seal Plug, Penny Grout, IPA "Octocrete", or-approved equal. Quick-setting Mortar Strong-Seal QSR, Rapid Set, or approved �. equal. Urethane Gel Grout Scotch-Seal "5610 and 5612" or approved equal. _ Cementitious Grout Material Sauereisen Cements "F-100 Grout" or approved equal. Activated Oakum 3M Scotch Seal"5600" or approved equal. on Two-Part Epoxy Adhesive Coating American Chemical Corp. "Aquatapoxy" or approved equal. Concrete Bonding Agent ThoroSeal"Acryl 60"or approved equal. am Concrete Material in accordance with City of Fort Worth Water Department General Contract Documents. .. 11ro2AM ASCA 4 MM PART DA - ADDITIONAL SPECIAL CONDITIONS 3. External Manhole Coating Coal Tar Tnemec "46-450 Heavy Tnemecol", Kop f Coat "Bitumastic Black Solution", or approved equal. 4. Internal Manhole Coatings Non-cementitious Sprayroq"Spray Wall" or Raven 405. Cementitious Standard Cement Materials"Refiner MSP" or ..r Quadex"QM-1 s". 5. Frames, Covers, and Inserts Manhole Frames and Covers McKinley "Type N with indented top", Neenah"R1 726A", or approved equal. Watertight Manhole Frames and Neenah "R1915-E, Type L" or approved Covers equal. .. Manhole Insert—Polyethylene Corrosion-proof high density polyethylene, 1/8" thick in accordance with Fort Worth Water Department General Standards E100- 4. Manhole Insert-Stainless Steel Southwestern Packing & Seals, Inc., "TetherLok". 6. Fiberglass Manhole Liner Material in accordance with Section DA-15 of these specifications. 7. PVC Lined Concrete Wall Material in accordance with Section DA-16 Reconstruction of these specifications. 8. Joint Material Adjustment Rings Single-piece, precast concrete, ASTM C478, 2" min. thickness. Bitumastic Gasket Material RAM-NEK, EZ-STIK or approved equal. Bitumastic Trowelable Material GS-702 compound or approved equal. 9. Miscellaneous Root inhibitor Dichlobenil 2,6 - dichlorobensonitrile, or .. approved equal. C. EXECUTION 1. Inspection. Prior to beginning the Work on a manhole, the Contractor shall inspect the manhole and notify City Engineer if actual conditions are in conflict with Manhole Rehabilitation Schedule. After City Engineer revises schedule, Contractor shall commence with Work. 2. Manhole Rehabilitation Repairs. Each manhole listed in the Manhole Rehabilitation Schedule will be repaired with at least one of the following repair methods. The requirements for each repair shall be completed as described in this section and as indicated on the Manhole Rehabilitation Details in the specifications. 11102104 ASC-15 PART DA - ADDITIONAL SPECIAL CONDITIONS a. Cover/Frame/Frame Seal Replacement. 1) Paved Areas: Make square full depth saw cut and remove the pavement to expose the entire manhole frame and exterior of manhole a minimum of 6 inches below the top of the structurally sound structure, keeping trench sides as vertical as possible. Remove the pavement by breaking out from saw cut toward the manhole to avoid breaking the frame. Non-paved Areas: Excavate adjacent to the manhole to expose the entire frame to a minimum depth of 6 inches below the top of the structurally .. sound structure, keeping trench sides as vertical as possible. Limit excavation to a 6-foot by 6-foot working area. 2) Remove and replace the existing frame, cover, and sealing material. Furnish bolt down frame and cover, if required by Manhole Rehabilitation Schedule in the Specifications. If grade rings are broken, deteriorated, or loose, Contractor shall notify Engineer prior to placing manhole frame. Also, if manhole contains brick grade adjustments on top of concrete corbel or chimney, Contractor shall replace the brick grade adjustments with precast concrete rings in accordance with manhole grade ring replacements. 3) Clean exposed interior and exterior surfaces of the existing chimney and �. inspect for reuse. Wire brush and apply a concrete bonding agent and quick setting hydraulic cement to the top surface of the manhole to provide a smooth surface prior to installing new grade rings and bitumastic material. R 4) Surfaces between the frame, adjustments, and corbel sections shall be free of dirt and debris. Bitumastic gasket material (minimum % inch thick) shall be placed in two concentric rings along the inside and outside edge of each joint or use bitumastic trowelable material. Butt joints of the two rows of bitumastic material shall be positioned opposite of each other. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. 5) In paved areas, frames shall be installed so the top of the casting will conform to the slope and finish elevation of the paved surface. Allowances for the compression of the bitumastic material shall be made to assure a .. proper final grade elevation. Manhole rims in parkways, lawns, or other improved lands shall be at an elevation not more than one(1) inch nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the manhole frame for not less than three (3) feet each direction to existing ground elevations. 6) In drainage areas, frames shall be installed so the top of the casting will be at the same elevation that existed prior to rehabilitating the manhole. 11102o4 _ ASC-16 .. PART DA - ADDITIONAL SPECIAL CONDITIONS 7) If the inside diameter of the manhole is too large to safely support new grade adjustments or frame, the corbel shall be replaced or a flattop installed prior to placing frame. 8) The exposed, exterior surfaces of manhole corbel, chimney, and frame shall be wire brushed and coated with two coats of coal tar, 14 mils DFT. f ' The grade adjustments shall be wrapped with a 6 mil polyethylene sheet. 9) In unpaved areas, backfill with excavated material and compact with mechanical equipment. In paved areas, backfill with granular material meeting requirements of Item 402 and Section E1-2 to the limits shown on figures in Section H. 10) A concrete collar shall be constructed in accordance with Figure 121. Concrete collars will be required on rehabilitated manholes and new .. replacement manholes as listed in the manhole rehabilitation schedule. Construction of concrete collar will be paid for separately for each manhole and shall include surface restoration (including seeding/sodding) and permanent pavement repair. Repair of pavement outside of 4 foot by 4 " foot concrete collar shall be equal to or superior in composition, thickness, etc., to existing pavement and/or as detailed in the Transportation and Public Works Department typical sections for Pavement and Trench Repair .. for Utility Cuts, Figures 1 through 5. Non-standard concrete collars shall be constructed at locations authorized by the Engineer. b. Reseating/Sealing of Existing Frame - Work shall be done in accordance with Section D-27, with the exception that the existing frame shall be reused. The frame and cover shall be inspected for any defects and notify the Owner's _ representative if it is damaged or deteriorated. All scale, dirt, and debris shall be removed from the existing casting with a wire brush. a. Grade Adjustment - All Work shall be done in accordance with Section D-27, with the exception that the existing frame shall be raised or lowered to surrounding surface elevations in accordance with the Grade Adjustment Detail. 1) In brick manholes, remove and replace the defective chimney up to a maximum of 24 inches below the frame. If chimney is defective below 24' inches, Contractor shall notify Engineer prior to completing manhole rehabilitation. 2) Existing defective concrete grade ring adjustments and all brick or block .. adjustments shall be replaced with precast concrete adjustment rings. 3) Where partial manhole replacement is required on the Manhole Rehabilitation Schedule, the following shall apply : a) The extent of partial manhole replacement shall be based on the .. depth of deterioration as determined by the Owner's 11102104 ASC-17 PART DA - ADDITIONAL. SPECIAL CONDITIONS Representative. The remaining structure shall be capable of supporting the newly constructed portions of the manhole. b) Excavate the work area to expose the entire depth of deterioration .. in the existing manhole to a minimum depth of 6 inches below the top of structurally-sound structure. C) Perform reconstruction to allow easy access into the manhole. No more than 12 inches of depth of precast concrete grade adjustment rings shall be allowed to obtain proper grade. Perform .• reconstruction in accordance with the Partial Manhole Replacement Detail. d) Seal manhole joints in accordance with Section D-27. e) Precast corbel, or barrel sections may be used as necessary. The diameter of the precast sections shall be consistent with the existing remaining structure. Place a flattop section on existing manhole structure prior to setting precast sections. Flattop sections shall not overhang existing manhole structures by more than 6 inches. If the clearance from the underside of the proposed flattop to the manhole invert is less than 4 Y2 feet, the manhole shall be completely replaced. •— f) Partial Manhole Replacement shall also include replacement of frame, cover, and sealing of frame and grade adjustments. .. g) Remove all debris from reconstruction from the manhole and dispose of properly. d. Interior Manhole Coating - Interior manhole coating shall meet the requirements of Section DA-12, DA-13, DA-14, DA-15, DA-16 and DA-1 7. e. Bench and Invert Rehabilitation 1) Remove existing deteriorated bench and invert material to solid material. Care shall be taken to avoid allowing broken pieces of brick and mortar to enter the sewer lines. 2) Apply concrete bonding agent and quick setting concrete to form a smooth surface and continuous invert with the sewer pipe. New bench and invert shall be formed in accordance with repair Bench and Invert Rehabilitation Detail. .. f. Bench and Invert Replacement 1) Remove the existing bench and trough completely. If the existing trough is formed of sewer pipe laid continuously through the manhole, special care shall be taken to ensure that the pipe seal and the sewer pipe to remain is not damaged. Contractor shall, at no additional cost, replace any portion of .. 11102M4 ASC-18 .. PART DA - ADDITIONAL SPECIAL CONDITIONS dM the existing manhole or sewer pipe to remain that is damaged during bench and invert replacement. _A 2) Install new bench and trough with Class A concrete in accordance with repair detail. Surface shall be troweled smooth and the invert of the trough shall form a continuous smooth flow path from pipes entering the manhole to where they exit. The bench and invert shall form a watertight seal with the manhole wall, pipe, and bench/trough area. 3) If the manhole base is deteriorated or nonexistent, the minimum thickness of the bench/trough shall be six inches. .. g. Removal of Existing Manhole -Work shall be conducted as specified in Section D- 29. h. Construct New Manhole 1) Completely remove the existing manhole structure. 2) Construct new manhole in accordance with Section D-27 of these specifications. Connect to existing sewers using flexible couplings. �• 3) Contractor shall maintain existing wastewater flows at all times. Contractor shall submit a plan for maintaining wastewater flows to the Engineer prior to beginning work. L Pressure Grout Pipe Seals, Bench and Trough, and Lower Portion of Manhole dft 1) All work shall be done in accordance with Section DA-19 of these specifications. 2) Remove all foreign materials from the manhole walls around the pipe seal "' and within the pipe seal itself, including all loose and protruding brick, mortar and concrete. Stop active leaks using products specifically for that purpose. .. 3) Remove deteriorated area of the pipe seal to sound material. Apply bonding agent to area and place hydraulic cement to fill voids to form a dft watertight seal around pipe. 4) Drill holes around the pipe seal, bench/trough and lower portion of the manhole and inject urethane gel grout into holes in accordance with repair .. detail. Activated oakum rope shall be used to fill the injection hole after removal of the grouting probe. Patch the injection hole with hydraulic cement and apply a water resistant two-part epoxy coating to the patch. .. Clean all grout from interior of manhole. j. Manhole Step Removal - Remove existing manhole steps and fill voids with .. hydraulic cement in accordance with repair detail. 11/OZV4 ASC-19 dft am PART DA - ADDITIONAL SPECIAL CONDITIONS k. Patch Holes - Clean and remove loose debris from holes to be patched. Apply bonding agent to surface of holes and fill voids with hydraulic cement in - accordance with repair Patch Holes Detail. 1. Watertight Manhole Insert - Install watertight gasketed manhole inserts as specified in Fort Worth Water Department Standard E100-4. m. Grout Flattop to Wall Joint- Injection holes shall be drilled through the manhole at 90 degree angles from each other within 4 inches of the bottom of the flattop. Provide additional holes near observed defects, if necessary. Urethane gel grout .� shall be injected through the holes under pressure with a probe designed for this purpose. Injection pressure shall not cause damage to the manhole structure or surrounding surface features. Grouting from the ground surface will not be allowed. Grout travel shall be verified by observation of grout at defects or adjacent injection holes. Provide additional injection holes, if necessary, to ensure grout travel. Injection holes shall be cleared with a drill and patched with a waterproof quick setting mortar. The flattop to wall joint shall be pressure washed, 4 cleaned, filled with a non-shrink grout, and finished smooth. n. Fiberglass Manhole Insert - Work shall be conducted as specified in Section DA-18. o. PVC Lined Concrete Wall Reconstruction - Work shall be conducted as specified ,.. in Section DA-19. p. Point Repair to Replace Sewer Line, 6"-15" Diameter - This item shall apply at .. those locations indicated in the Manhole Rehabilitation Schedule and those additional locations authorized by the Engineer. The Contractor shall excavate adjacent to the manhole to uncover the damaged sewer pipe. This pipe shall be carefully removed from the manhole to the first sound joint(maximum of 5 feet) of pipe. This pipe shall be replaced with SDR 35 PVC pipe of the same nominal size. This pipe shall be connected to the existing sewer using flexible connectors approved by the City. The connection of the new pipe to the manhole shall be .. made using flexible gaskets meeting the requirements of ASTM C-923, grouted into the manhole wall using non-shrink grout. Embedment material shall be installed around the pipe up to the pipe springline. Backfill material conforming to .. City specifications shall be placed and compacted as required. This item shall include surface restoration and permanent pavement repair. q. Bypass Pumping - The Contractor shall furnish and operate pumping equipment ` and piping as required for bypass pumping necessary to complete any manhole replacement or rehabilitation work. D. MEASUREMENT AND PAYMENT 1. Frame and Cover Replacement: Payment for installation of new manhole frames .. and covers shall be based on the Contract unit price and the actual quantity installed. The Contract unit price shall be full payment for the new manhole frame and cover, excavation, installation of the manhole frame and cover, minor grade adjustment, backfill, and demolition and disposal of waste materials. 11102104 ASC-20 am PART DA — ADDITIONAL SPECIAL CONDITIONS oft 2. Grade Ring Replacement: Payment for installation of new grade rings shall be based on the Contract unit price and the actual quantity of new grade rings Oft installed. The Contract unit price shall be full payment for the new grade rings. All costs for installing and sealing grade rings shall be included in the applicable Contract unit price for sealing of frame and grade rings. ` 3. Paved Frame and Grade Adjustment Sealing: Payment for sealing manhole frames and grade adjustment rings in paved areas shall be based on the Contract unit price and the actual number of manholes where sealing of the manhole frame .. and/or grade adjustments in paved are required. The Contract unit price shall be full payment for excavation, pavement removal, sealing materials, installation of grade rings, sealing, minor grade adjustment, backfill, and demolition and disposal .. of waste materials. 4. Non-Paved Frame and Grade Adjustment Sealing: Payment for sealing manhole w frames and grade adjustment rings in non-paved areas shall be based on the Contract unit price and the actual number of manholes where sealing of the manhole frame and/or grade adjustments in non-paved are required. The Contract unit price shall be full payment for excavation, sealing materials, as installation of grade rings, sealing, minor grade adjustment, backfill, surface restoration, and demolition and disposal of waste materials. oft 5. Interior Manhole Coating: Payment for interior manhole coating shall be based on the Contract unit price where interior manhole coating is applied. The Contract unit price shall be full payment for surface preparation, interior coating of the .,, corbel, wall and bench, and cleanup. 6. Pressure Grout Pipe Seals, Bench and Trough, and Lower Portion of Manhole: Payment for grouting pipe seals, bench and trough, and lower portion of the manhole shall be based upon the Contract unit price and the actual quantity of manholes where pipe seals, bench and trough and lower portion of the manhole were grouted. The Contract unit price shall be full payment for the preliminary repairs, rehabilitating the pipe seals, grout material, installation of the grout materials and cleanup. .. 7. Bench and Invert Rehabilitation_ Payment for bench and invert rehabilitation shall be based upon the Contract unit price and the actual number of manholes where the bench and invert were rehabilitated. The Contract unit price shall be full payment for materials and bench and invert rehabilitation. 8. Bench and Invert Replacement: Payment for bench and invert replacement shall be based upon the Contract unit price and the actual quantity of manholes where the bench and invert were replaced. The Contract unit price shall be full payment for materials, installation of materials, and demolition and disposal of waste materials. 9. Patch Holes: Payment for patching holes shall be based upon the Contract unit price and the actual number of manholes that were patched. The Contract unit .� price shall be full payment for surface preparation, patching of the holes, and cleanup. This item is allowed for payment only when it is included in the Manhole 11102104 ASC-21 PART DA - ADDITIONAL SPECIAL CONDITIONS .. Rehabilitation Schedule. Patching holes prior to interior coating of manholes is not a pay item. 10. Manhole Step Removal: Payment for manhole step removal shall be based upon the Contract unit price per manhole and the actual number of manholes that had steps removed. The Contract unit price shall be full payment for removal and disposal of the steps and patching of the voids created by step removal. on 11. Watertight Manhole Insert: Payment for watertight manhole inserts of the respective type shall be based upon the Contract unit price and the actual number ,. of inserts of each type installed. The Contract unit price shall be full payment for the watertight manhole insert and installation of the insert in the manhole. 12. New Sanitary Sewer Manhole: Payment shall be made as indicated in Measurement and Payment, Section D-27 in these specifications. This item shall include up to five (5) linear feet of new PVC pipe at each manhole pipe connection and connecting to the existing sewer. on 13. Concrete Manhole Collars: OW a. Paved Areas. Payment for manhole collars in paved areas shall be based on the Contract unit price and the actual quantity installed. The Contract unit price shall be full payment for labor, materials, pavement sawing, excavating, disposal of waste materials. Payment shall not include pavement replacement,which if required, shall be paid separately. b. Non-Paved Areas. Pavement for manhole collars in non-paved areas shall be based on the Contract unit price and the actual quantity installed. The Contract unit price shall be full payment for labor, materials, excavation, disposal of waste materials, and surface restoration. pa 14. Partial Manhole Replacement: Payment for partial manhole replacement shall be based on the Contract unit price per vertical foot measured from the top of the .ft frame to the top of the structurally sound existing manhole. The Contract unit price shall be full payment for furnishing all labor and materials necessary, including excavation and removal of the existing structure, replacement of the .. frame and cover, installation of new adjustment rings, fla,ttop, corbel or wall sections, sealing,backfilling, and unpaved surface restoration. Payment shall not include pavement replacement,which if required, shall be paid separately. 15. Interior Corrosion Protection: Payment shall be made as indicated in Measurement and Payment, Section DA-9 in these specifications. 16. Grout Flattop to Manhole Wall Joint: Payment for grouting the flattop to manhole wall joint shall be based upon the Contract unit price and the actual number of joints grouted. The Contract unit price shall be full payment for all material, labor and cleanup required to complete each joint grouting. 17. Fiberglass Manhole Insert_ Payment shall be made as indicated in Measurement and Payment, Section DA-18 in these specifications. '� »rovoa ASC-22 .. .. PART DA - ADDITIONAL SPECIAL CONDITIONS am 18. PVC Lined Concrete Wall Reconstruction: Payment shall be made as indicated in Measurement and Payment, Section DA-19 in these specifications. .. 19. Point Repair to Replace Sewer Line, 6" - 15" Diameter: Payment for each point repair shall be based upon the Contract unit price for each manhole connection actually repaired. The Contract unit price shall be full payment for all material, ON labor, and cleanup required to complete each manhole connection repair. 20. Flattop Replacement: Payment for each flattop replacement shall be based on the No Contract unit price for each flattop actually replaced. The Contract unit price shall be payment in full for all labor, material, and cleanup required to complete each flattop replacement. Payment for frame and cover replacement, grade rings, sealing, and concrete manhole collar as required to complete the manhole rehabilitation will be paid for separately at the applicable Contract Unit Prices. 21. Bypass Pumping: All bypass pumping shall be a subsidiary obligation of the Contractor. All costs for bypass pumping shall be included in the Contract unit price for the items requiring bypass pumping. DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION A. GENERAL: This item shall govern the preparation of surfaces for manhole rehabilitation. B. CLEANING: 1. Covers (screens) shall be placed over the pipe inverts to prevent extraneous material from entering the sewer system. 2. All concrete that is not sound or has been damaged by chemical exposure shall be removed from the manhole. Loose and protruding brick, mortar and concrete shall be removed using a masonry hammer and chisel and/or scrapers. Existing roots and manhole steps shall be removed by cutting them flush with the wall of the +�• manhole. 3. All contaminates including but not limited to. oils, grease, waxes, form release, curing compounds, efflorescence, sealers, salts, incompatible existing coatings, and: all other contaminants shall be removed. 4. Surfaces to receive protective coating shall be cleaned and abraded to produce a sound concrete/brick surface with adequate profile and porosity to provide a strong bond between the protective coating and the substrate. All foreign materials shall be removed from the manhole interior using high pressure water spray (3500 psi to 4000 psi). Cleaning equipment shall have a pressure gauge that indicates the water pressure being used. .� 5. Detergent water cleaning, muriatic acid, and hot water blasting shall be used, if necessary, to remove dirt, oils, grease, and other matter which may prevent a good bond of sealing material to the manhole surface. A mild chlorine solution (household bleach) may be used to neutralize the surface to diminish microbiological bacteria growth prior to final rinse and coating. 11/0ZV4 ASC-23 OR PART DA - ADDITIONAL SPECIAL CONDITIONS go C. PRELIMINARY REPAIRS 1. All unsealed lifting holes, unsealed step holes, voids larger than approximately one- half(1/2) inch in thickness shall be filled with patching compound at least one hour an (1) prior to application of the first spray coat. 2. Active leaks shall be stopped using City approved products specifically for that o' purpose and according to manufacturer's recommendation. Some leaks may require grouting to stop the inflow. Grouting shall be performed in accordance with City specifications and Section DA-20- PRESSURE GROUTING. ,. 3. Bench area shall be built up if required to provide a uniform slope from the circumferences to the manhole trough. City approved cementitious patching am compounds or epoxy grout as recommended by manufacture shall be used. 4. After all repairs have been completed, all loose material shall be removed from the manhole. Contractor shall insure no material is allowed to enter the sewer system. P' 5. Contractor shall ensure the manhole is clear of all detergents and cleaners and that all active infiltration has been stopped prior to application of protective manhole ON coatings for rehabilitation. D. INSPECTION on Applicator shall carefully inspect all surfaces prior to application of protective coating and shall notify Owner of any noticeable disparity in the surface which may interfere with the proper performance of the repair mortar and protective coating. E. MEASUREMENT AND PAYMENT Payment for Surface Preparation shall be considered subsidiary to the cost for Interior Manhole Coating or Protective Manhole Coating for Corrosion Protection. DA-12 INTERIOR MANHOLE COATING -OMITTED DA-13 INTERIOR MANHOLE COATING -OMITTED DA-14 INTERIOR MANHOLE COATING -OMITTED DA-15 INTERIOR MANHOLE COATING- RAVEN LINING SYSTEM A. GENERAL 1. Scope This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section 1. Interior manhole coating shall . . meet the requirements of this Section, or of Section DA-12, DA-13, DA-14,.DA-16 or DA-17. 11102104 ASC-24 r PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Description ., The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. .. 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) specialty cement-based coating material (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. B. MATERIALS 1. Scope +. This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating .. Raven Ultra High-Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement The specialty cement-based coating material shall be either Quadex QM-1s as " manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification Contractors will completely identify the types of grout, mortar, sealant, and/or root control chemicals proposed and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performance. These _grouting materials shall be compatible with Raven 405 interior coating. The contractor shall be responsible for .. getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting materials. 5. Mixing and Handling Mixing and handling of interior coating, which may be toxic under certain conditions .. shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor 1 vovoa ASC-25 PART DA - ADDITIONAL SPECIAL CONDITIONS to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION ONES 1. General Manhole coating shall not be performed until sealing of manhole from frame and .. grade adjustments, partial manhole replacement, manhole grouting or sewer replacement/repairs are complete. 2. Temperatures .Normal_ interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. " 3. Interior Manhole Coating r• a. Manholes scheduled for interior coating are shown on the Manhole Rehabilitation Schedule. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the benchttrough, including the bench/trough. b. The interior coating shall be installed in accordance with the manufacturers recommendations and the following procedure. 1) The surface preparation shall comply with the requirements of Section DA-11, SURFACE PREPARATION FOR MANHOLE RESTORATION. 2) Apply a minimum of one-half (1/2) inch specialty cement-based •• product (Quadex QM-1s or Reliner MSP) smooth surface for the urethane coating material. i 3) The surface prior to application may be damp but shall not have noticeable free water droplets seeping or running water. Material shall be spray applied per manufacturer's recommendations with a minimum thickness of 125 mils(0.125 inch). ' 4) After the walls are coated, the wooden bench covers shall be removed and the bench sprayed to the same average and minimum .. thickness as required for the walls. 5) The final application shall have a minimum of three (3) hours cure .. time or be set hard to the touch, before being subjected to active flow. 11102104 ASC-26 Its PART DA - ADDITIONAL SPECIAL CONDITIONS 6) No applications shall be made to frozen surfaces or if freezing is expected to occur in side the manhole within 24 hours after ,ft application. 4. Testing of Rehabilitated Manholes a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abrading the surface and brushing the lining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot check of coating thickness may be made by Owner's Representative,and the contractor shall repair these areas as required, at no additional cost to the Owner. b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21 —VACUUM TESTING OF REHABILITATED MANHOLES. D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full .. for performing the work and for furnishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and trough and manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. DA-16 INTERIOR MANHOLE COATING-OMITTED DA-17 INTERIOR MANHOLE COATING-STRONG -OMITTED DA-18 RIGID FIBERGLASS MANHOLE LINERS -OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION -OMITTED DA-20 PRESSURE GROUTING A. GENERAL 1. Scope. This Section governs all work, materials and testing required for the pressure grouting of manhole defects. Manholes or sections of manholes with active leaks shall be repaired as indicated in the Manhole Rehabilitation Schedule. 2. Description_ The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of pressure grouting of manhole defects in.accordance with the Contract Documents. 3. Manufacturer's Recommendations. Materials, additives, mixture ratios, and procedures utilized for the grouting process shall be in accordance with manufacturer's recommendations. .,, 4. Manholes. Manholes to be grouted are of brick, concrete, or fiberglass construction. 11102104 ASC-27 i PART DA - ADDITIONAL SPECIAL CONDITIONS B. MATERIALS - 1. Grouting Materials: a. Urethane Gel Grout: Urethane gel grout, such as Scotch-Seal 5610 gel or equal shall be a hydrophilic polymer. The chemical shall be mixed within the range of from 8 to 10 parts of water and shall contain a reinforcing agent supplied by the same manufacturer. The material shall gel and cure to a - tough flexible elastomeric condition. When wet, the gel shall exhibit strength properties of at least 25 psi tensile at 150 percent elongation. The material shall not change in linear dimension more than eight percent when subjected to wet and dry cycles. b. The chemical grout shall be applied so as to have the grout material flow freely into the defects. To avoid any wastage of the material flowing through the defects, a gel control agent may be added. The following properties shall be exhibited by the grout: 1) Documented service of satisfactory performance in similar usage. 2) Controllable reaction times and shrinkage through the use of chemicals supplied by the same manufacturer. The minimum gel set time shall be established so that adequate grout travel is achieved. 3) Resistance to chemicals; resistant to most organic solvents, mild acids and alkali. 4) Compressive recovery return to original shape after repeated .. deformation. 5) The chemical shall be essentially non-toxic in a cured form. 6) Sealing material shall not be rigid or brittle when subjected to dry atmosphere. The material shall be able to withstand freeze/thaw and .� moving load conditions. 7) Sealing material shall be noncorrosive. a. A reinforcing agent such as Scotch-Seal Brand 5612 reinforcing agent or equivalent shall be utilized in accordance with manufacturer's recommendations. Any 5612 reinforcing agent which contains lumps must Oft be discarded. Care must be taken to be sure that the pH of the water in the tank is from 5 to 9. As a precaution against the possibility of the pH being outside this range, take a small amount of water from the tank to which Gel O- Reinforcing Agent 5612 is to be added. Add a few drops of 5612 to this test sample. Scotch-Seal Brand Gel Reinforcing Agent 5612 should disperse readily. If precipitation occurs, drain the tank and retest. Repeat as .ft necessary until dispersion occurs. If dispersion does not occur, do not use the water source. pa IMOWN ASC-28 .. .• i PART DA - ADDITIONAL SPECIAL CONDITIONS b. A filler material such as Celite 292 (diatomaceous earth) from Johns Mansville or equivalent shall be utilized. The addition of the filler material shall not exceed the quantity specified by the manufacturer, and continuous agitation of the water side of the mixture is required. The filler material may also be utilized as a reinforcing agent in accordance with the urethane gel grout manufacturer's recommendations. 1. Additives: Grout additions may be utilized .for catalyzing the gel reaction, inhibiting the gel reaction, buffering the solution, lowering the freezing temperature of the solution,acting as a filler, providing strength or for inhibition of root growth. 2. Root Control: A root inhibiting chemical such as dichlobenil shall be added to the .. chemical grout mixture at a safe level of concentration and shall have the ability to remain active within the grout for a minimum of 12 months. 3. Material Identification: Contractor shall completely identify the types of grout, mortar, sealant, and/or root control chemicals used and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performance, to the satisfaction of the " Engineer. 4. Mixing and Handling: Mixing and handling of chemical grout and forming constituents,which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate ., protective measures to ensure that chemicals or gels produced by the chemicals are under control at all times and are-not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the grout material and additives shall perform the grouting operations. C. EXECUTION 1. General. Manhole grouting shall not be performed until sealing of manhole frame and grade adjustments, partial manhole replacement, or manhole repairs are complete. 2. Preliminary Repairs: a. Seal all unsealed lifting holes, unsealed step holes, voids larger than approximately one-half (1/2) inch in thickness. All cracked or deteriorated material shall be removed from the area to be patched and replaced with .. Octocrete, as manufactured by. IPS Systems, Inc. or equal, in accordance with manufacturer's specifications. an b. Cut and trim all roots within the manhole. 3. Temperature. Normal grouting operations including application of interior coating .m shall be performed in accordance with manufacturer's recommendations. 11102104 ASC-29 s on PART DA - ADDITIONAL SPECIAL CONDITIONS oft 4. Grouting Material Usage. Grouting of the manhole may include corbel, wall, pipe seals, manhole joints, wall to flattop joint, and/or bench/trough. Areas of the manhole designated to be grouted will be directed by the Engineer. If entire manhole is scheduled for grouting, grouting shall include the entire manhole including corbel, wall, pipe seals and bench/trough. Pipe seal grouting shall include all pipe seals in the specified manhole and grouting of the specified manhole including the bench/trough to the maximum height of 18 inches from the crown. 5. Drilling and Injection: om a. Injection holes shall be drilled through the manhole wall at locations indicated in the appropriate detail(s). b. Grout shall be injected through the holes under pressure with a suitable .. probe. Injection pressure shall not cause damage to the manhole structure or surrounding surface features. Grout shall be injected through the lowest holes first. The procedure shall be repeated until the manhole is externally on sealed with grout. C. Grouting from the ground surface shall not be allowed. ON d. Grout travel shall be verified by observation of grout to defects or adjacent injection holes. Provide additional injection holes, if necessary, to ensure ^, grout travel. e. Injection holes shall be cleaned with a drill and patched with a waterproof quick setting mortar for brick and concrete manholes. '� 6. Testing of Rehabilitated Manholes. Testing of rehabilitated manholes for water tightness shall be performed by the Contractor in the presence of the Engineer in .. accordance with the requirement of Section DA-21, VACUUM TESTING OF REHABILITATED MANHOLES of these specifications. D. MEASUREMENT AND PAYMENT If the entire manhole is grouted,the Contract Unit Price shall be per vertical foot grouted as indicated on the Manhole Rehabilitation Schedule included in these specifications or as required by the Engineer. Payment for grouting pipe seals, bench and trough, and 18 inches above crown of pipe, and .. grouting flattop to wall joint, shall be based on the Contract Unit Price per each manhole rehabilitated as indicated on the Manhole Rehabilitation Schedule. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment, preliminary repairs and testing necessary to complete the work including grouting with urethane grout. z 1fflZ 4 ASC-30 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-21 VACUUM TESTING OF REHABILITATED MANHOLES A. GENERAL Scope. This section describes manhole testing to effectively confirm the watertight integrity of existing manholes following structural ,infiltration and inflow related repairs and that the appearance of the work is acceptable. Description: Infiltration maybe observed in manhole defects at manhole walls, pipe seals or bench/trough areas. Infiltration related repairs are intended to eliminate leakage of groundwater into manholes. Inflow may be observed in manhole defects at manhole frames, covers, frame seals, grade adjustments, grade adjustment seals, corbels, or walls. Inflow related repairs are intended to .. eliminate sources of surface water entry that become active during rainfall events. Structural repairs may be required when making 1/1 related manhole repairs. Structural repairs may include defects in any manhole components but not displaying 1/1. Testing, Observations and Guarantee Periods: r+ The testing required shall be performed by the Contractor at locations designated by the Engineer and documented to the satisfaction of the Engineer. Any new or rehabilitated manholes that are observed to be leaking by the Engineer during periods of high groundwater or during inflow conditions shall be subject to additional repairs. The Contractor shall be responsible for all additional repairs required on these unsatisfactory manholes during the guarantee period. All manhole rehabilitation work shall be warranted to be free of defects and of good workmanship for a minimum of three(3)years from the date of final acceptance of the project. Any manhole .. repairs completed by the Contractor which fail during the warranty period shall be repaired to the satisfaction of the City at no additional cost to the City. .. B. MATERIALS - Not specified. C. EXECUTION Infiltration Testing_ All interior coated manholes and all partial replacement manholes shall be observed (tested)by the .. Contractor in the presence of the Engineer for sources of infiltration. Observations will be made during high groundwater conditions,wherever possible. Manholes shall be tested after installation with all connections(existing and/or proposed)in place. Drop-connections and gas sealing connections shall be installed prior to testing. The lines entering the manhole shall be temporarily plugged with the plugs braced to prevent them from being drawn .. into the manhole. The plugs shall be installed in the lines beyond drop-connections, gas sealing 11102104 ASC-31 PART DA - ADDITIONAL SPECIAL CONDITIONS connections, etc. The test head shall be placed inside the frame at the top of the manhole(so that the manhole frame seal is tested)and inflated in accordance with the manufacturer's - recommendations. A vacuum of 10 inches of mercury shall be drawn,and the vacuum pump will be turned off. With the valve closed,the level of vacuum shall be read after the required test time. If the drop in the level is less than 1-inch of mercury(final vacuum greater than 9-inches of mercury), the manhole will have passed the vacuum test. After a successful test,the temporary plugs will be removed. The required test time is determined from Table I. �* Table I MINIMUM TIME REQUIRED FOR A VACUUM DROP OF 1" H9(10"H9-9"H9)(SEC) DEPTH OF M.H. 48-Inch Dia. 60-Inch Dia. 72-Inch Dia. (FT.) Manhole Manhole Manhole 8 20 sec. 26 sec. 33 sec. 10 25 sec. 33 sec. 41 sec. 12 30 sec. 39 sec. 49 sec. .. 14 35 sec. 45 sec. 57 sec. 16 40 sec. 52 sec. 67 sec. 18 45 sec. 59 sec. 73 sec. *` T=5 sec. T=6.5 sec. T=8 sec. "For all Manholes over 18 feet in depth, add"T'seconds as shown for each respective diameter for each two feet of additional depth of manhole to the time shown for that 18 foot depth. [Example: A 30(thirty)foot deep,48(forty-eight)inch Manhole Total Test Time would be 75.0 seconds. 45.0+6(5.0)=75.0 seconds] (Values listed above are extrapolated from ASTM C924-85). Manhole vacuum levels observed to drop greater than 1-inch of mercury(Final vacuum less than 9- inches of mercury)will have failed the test and will require additional rehabilitation. The Contractor shall make the necessary repairs to the already completed rehabilitation work at no additional compensation. If the failure of the vacuum test is determined to be due to preexisting conditions not on the manhole rehabilitation schedule for that manhole,this additional work may be authorized by the Owners Representative. After completion of the additional rehabilitation the manhole shall then be re-tested as described above until a successful test is made. Only one payment for manhole vacuum testing will be made on each manhole. Vacuum testing is required on all manholes having interior rehabilitation. on Inflow Testing: an All partially rehabilitated manholes shall be dyed water tested unless the manhole has successfully passed the vacuum test. Manholes shall be dyed water tested in the presence of the Engineer. The dye test shall consist of applying a concentrated dye solution around the manhole frame. Dyed water shall be applied for at least ten minutes. Manholes observed to be actively leaking greater than one drip per five seconds will have failed the test and will not be acceptable. Manholes failing the test will require additional rehabilitation by the Contractor at no additional compensation. Other Testing: r 11102104 ASC-32 w r. i PART DA - ADDITIONAL SPECIAL CONDITIONS i One(1)rehabilitated manhole will be randomly selected for further testing. A laboratory selected by the City will take core samples of wall sections of manholes with wall coatings. Testing of the core Mft samples will be done to evaluate material thickness, compressive strength,flexural strength and slant shear bond strength. The following are the minimum required strengths for cementitious and non-cementitious wall coatings: Compressive Strength. Compressive strength shall conform to ASTM C 495 and C 109 and shall meet or exceed a minimum 28-day break of 4,000 psi. Flexural Strength. Flexural strength shall conform to ASTM C 348 and shall meet or exceed a minimum 28-day break of 1,200 psi. "" Slant Shear Bond Strength. Slant shear bond strength shall conform to ASTM 882 modified and shall meet or exceed a minimum 28-day break of 2,400 psi. as If the manhole tested fails to pass any of these requirements,another manhole shall be selected and tested. If the second manhole fails,the City may,at its option, stop work until the Contractor can provide assurance that testing requirements can be met. MW Guarantee: Contractor shall warrant that the workmanship and materials are free from defects and that the manholes are sealed from inflow and infiltration for a period of three(3)years from the date of final acceptance of the project. i D. MEASUREMENT AND PAYMENT Payment for manhole vacuum testing shall be made at the Contract Unit Price bid for each Manhole Vacuum Test actually performed and passed and the appearance of the completed manhole is visually acceptable. Payment shall be full compensation for all labor and materials necessary to complete each test. No payment will be made for additional vacuum tests or any dyed water testing. Payment for manhole core testing, including all labor and materials necessary to complete each test, shall be made at the Contract Unit Price bid for each Manhole Core Test actually performed and passed. DA-22 FIBERGLASS MANHOLES - OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES -OMITTED DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, .. laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104"Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to .. removal. Included, and figured subsidiary to this unit price, will be the required sawcut 11102104 ASC-33 OR PART DA - ADDITIONAL SPECIAL CONDITIONS .m excavation, as per specification Item No. 706 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to a suitable dump site. The street void shall be filled an with H.M.A.C. "Type D" mix as per specification No. 300"Asphalts, Oils and Emulsions", Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil",.if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water ^ meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date'of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a$100 dollar liquidated damage will be assessed per block per day. .. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. .. DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal and replacement of existing concrete driveways, due to ^ deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" .. Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE .. The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all .. unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated,to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the .. permanent pavement patch, with "Type D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch .. thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the _ surface mix lifts shall not exceed 3 inches with vibrator compactions_ to follow each lift. 11/0204 ASC-34 PART DA - ADDITIONAL SPECIAL CONDITIONS Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304"Prime Coat", and 312 "Hot-Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. •• DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0'WIDE A. Description This item shall consist of milling the existing pavement from the lip of gutter at a depth of 2" and transitioning to match the existing pavement(0" cut) at a minimum width of 5'. The existing pavement to be milled will either be asphalt, concrete, or brick pavement. The removal and disposal of the milled materials shall be as directed by the Engineer. The milled surface shall provide a smooth surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured appearance. In all situations where the existing H.M.A.C. surface contacts the curb face the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along the face of curb. The wedge milling operations for this project will be performed in a continuous manner along both sides of the street. Details of milling locations are at the back of this document. Contractor is required to begin the overlay, within five (5) calendar days from the date of the wedge milling completion of any one street. Should the contractor fail to meet this condition, the wedge milling will be shut down, and liquidated damage of$500.00 per day per street will be assessed until all wedge milled streets are overlayed. The overlay, once` begun on a street shall continue uninterrupted until complete. The Contractor shall haul-off the removed material to a suitable dump site. B. Equipment The equipment for removing the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. 11102104 ASC-35 .. PART DA - ADDITIONAL SPECIAL CONDITIONS ow The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation. Adequate back-up equipment(mechanical street ow sweepers, loaders, water truck, etc.) and personnel will also be provided to keep flying dust to a minimum and to insure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the Engineer. The machine shall be equipped with means to control dust created by ow the cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. The speed of the machine an shall be variable in order to leave the desired grid pattern specified under Surface Texture. an The unit price bid per linear feet shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. DA-29 BUTT.POINTS-MILLED am A. Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay .. shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 9 -Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with wedge milling in general -are shown in plan form at the back of this document. B. Construction Details Prior to the milling of the butt joints, the Contractor shall consult with the Construction •� Engineer for proper location of these joints and verify that ,the selected limits of the projects'street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 2".This milled area shall be tapered within the 20 feet to a depth from 0" to 2" at a line adjacent to the beginning and .- ending points or intermediate transverse items. This butt joint - when overlayed - will consist of a asphalt section that will transition the new overlay to match the existing pavement elevation. .. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. 11102M4 ASC-36 PART DA - ADDITIONAL SPECIAL CONDITIONS C_ Measurement and Payment Butt joints as prescribed above, will be measured by the unit of each butt joint milled. The disposal of excess material involved will not be measured for payment. Each butt joint-milled, measured as above, complete-in place-in accordance with these specifications, will be paid for at the unit price shown in the proposal for"Butt,Joints". The unit price bid per each shall be full compensation for all milling, including material haul-off, tools, labor, equipment and incidentals necessary to complete the required work. DA-30 2" H.M.A.C. SURFACE COURSE(TYPE "D" MIX) .. All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling-Asphalt Concrete" shall apply to the construction methods for this portion of the project. Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic .. material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. .� The contractor shall fumish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. .. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at .. locations to be determined in field: Removal of existing concrete valley, asphalt pavement, concrete base, curb *and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208"Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. .. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314"Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work at locations identified in the field. 11102104 ASC-37 PART DA - ADDITIONAL SPECIAL CONDITIONS The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven(7)calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. .. DA-32 NEW 7" CONCRETE VALLEY GUTTER This item shall include the construction of concrete valley gutters at various locations to be determined in field. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be ■- subsidiary to this Pay Item. See standard specification Item No. 314", Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314"Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. • If the Contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard_ for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. .. DA-33 NEW 4" STANDARD WHEELCHAIR RAMP .- The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. on The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and replacement of existing curb and gutter as required for the installation of new wheelchair ramps .• shall be included in Pay Item 5 (Removal and Replacement of Curb and Gutter). Pay limits for 11102104 ASC-38 PART DA - ADDITIONAL SPECIAL CONDITIONS laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-1). The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504"Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete flared surface shall be colored with LITHOCHROME color hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake- type, and shall be used in accordance with manufactures instructions. Concrete stain may be applied after concrete is poured (Product sold by BAER). .. "Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item. The method of application shall be by screen, sifter,sieve or other means in order to provide for a uniform color distribution." The unit price bid per square yard for 4" standard wheelchair ramp as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to compete •• the work. DA-34 8" PAVEMENT PULVERIZATION Contractor shall pulverize the existing pavement to a depth of 8".After pulverization is completed, contractor shall temporarily remove and store the 8" deep pulverized material, then cut the base 2" to provide place for the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8" from the existing pulverized surface. After the undercut operation is completed, contractor shall spread, mix, and compact the pulverized material to a 95% compaction per City's Standard Specifications or as directed by the Engineer in the field. A 3.5% portland cement shall be used to -" mix the pulverized material. If the existing pavement has a combination of 10" H.M.A.C. and crushed stone/gravel, undercut .. will not be required, the contractor will pulverize 10 inches, the 2' inch cut will be taken from the 10" pulverized material. (see soil test report) _ Pulverization shall start within ten (10) calendar days after all concrete work has been completed on a street. If the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per block per day. After the pulverization material is cured, the contractor shall overlay it with 2" H.M.A.C. surface within five (5) calendar days. If the contractor fails to begin the work within five (5)calendar days, a $200 dollars liquidated damage will be assessed per block per day. The unit price bid per sq. yd. shall be full compensation for all labor, material, equipment, tools,: and incidentals necessary to pulverize, remove and store the pulverized material, undercut the base, mixing, compaction, haul off, sweep, and dispose of the undercut material. 11102104 ASC-39 PART DA - ADDITIONAL SPECIAL CONDITIONS The 2" H.M.A.C. surface will be paid by separate item. DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT)-OMITTED DA-36 RAISED PAVEMENT MARKERS All applicable provisions of Standard Specifications for Roadway Markers (Buttons) shall apply. The-Contractor shall install standard roadway markers according to city specifications as shown on plan sheet or as directed by the Engineer. Please refer to"Roadway Markers Specifications". DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING A. GENERAL: Where known by the design engineer, the locations of potentially petroleum contaminated material (soil) that may be encountered during excavation and/or construction activities will be shown on the plans. For all locations where material is excavated and suspected of ^ being contaminated with petroleum products, whether known or not, these special conditions are to be followed. The contractor is also to follow all applicable Federal. State and Local regulations when handling known or suspect contaminated materials(soils). .. 1. WORK INCLUDED a. Excavation, stockpiling and testing of Potentially Petroleum Contaminated Material. b. Removal,testing,and disposal of petroleum contaminated groundwater. c. Obtaining and paying for required permits. d. Hiring of qualified environmental professional consultant(s). Contractor will be required to submit the environmental consultant's experience and qualifications to the City prior to beginning work in areas of Potentially Petroleum Contaminated Material. •- e. Hiring of qualified environmental sampling professionals that will collect and submit samples to the applicable City of Fort Worth testing laboratory. The City of Fort Worth's Department of Environmental Management for coordination of laboratory testing. 2. REFERENCES a. All applicable OSHA regulatory requirements. b. All applicable Environmental Protection Agency(EPA)regulatory requirements. c. All applicable State of Texas regulatory requirements. d. All applicable City of Fort Worth (City)regulatory requirements. e. All applicable NIOSH standards. f. All applicable TNRCC requirements. 11/02104 ASC-40 ON PART DA - ADDITIONAL SPECIAL CONDITIONS ON 3. SUBMITTALS on a. The contractor shall prepare and submit to the City's Department of Environmental Management, Senior Specialist in Compliance, plans for handling Potentially Petroleum Contaminated Material (PPCM) not less than 30 days prior to am commencing excavation. b. The Contractor shall take necessary precautions while performing this project. Contractor shall not commence PPCM work (1) Contractors submittal for dealing " with PPCM is reviewed by the City and (2) the plans (i.e., drawing and description) for discharging any treated liquid into the storm sewer or sanitary sewer are reviewed by the City(3)and acceptable stockpile area is identified by the Contractor. c. Contractor shall submit the name of his proposed qualified environmental professional consultant(s) and proposed PPCM Handling Plan to the City. The PPCM Handling Plan shall include the detailed sequence of construction including, proposed excavation and handling methods, proposed carriers for contaminated materials, waste disposal site, and a list of any permits that may be required for PPCM handling or contaminated materials disposal. The above data must be compiled and arranged in a format that is acceptable to the Texas Natural Resource Conservation Commission(TNRCC). d. Contractor shall submit actual limits of PPCM excavation, as prepared by his qualified environmental consultant(s)and testing lab. e. Contractor shall submit for review the proposed carrier pipe material to be used with the actual limits of PPCM excavation, including pipe gasket and carrier pipe coating or liner. B. PRODUCTS: 1. PIPE GASKET MATERIAL. Materials used within the actual limits of PPCM excavation, including pipe gaskets, shall be resistant to petroleum hydrocarbon deterioration. C. EXECUTION: 1. POTENTIALLY PETROLEUM CONTAMINATED AREAS a. Areas suspected of having petroleum contaminated material (soils) are shown in on the engineering drawings. b. In areas other than those noted on the plans and where potentially petroleum contaminated materials are either detected or suspected, the City of Fort Worth and the Engineer should be notified immediately and the work should proceed in accordance with this section. 2. SCREENING POTENTIALLY PETROLEUM CONTAMINATED AREAS .. a. Care should be taken during all excavation and dewatering activities to identify areas potentially contaminated by petroleum. I vovoa ASC-41 PART DA - ADDITIONAL SPECIAL CONDITIONS b. When a petroleum odor is encountered during excavation or when there is visual evidence of potentially petroleum contaminated soil, the Contractor shall notify the Engineer without delay. c. The Contractor shall have retained the services of an environmental consultant who shall be present at the site to screen suspect soil with a photo-ionization detector (PID) or a flame ionization detector (FID). A reading of 20 ppm above ambient conditions or greater on PID or FID tested soil sample will be considered potentially petroleum contaminated. The soul sample should be a recent sample from the excavation face. The sample should be stored in a laboratory supplied glass jar with .. a teflon gasket lined lid. The City of Fort Worth Department of Environmental Management will be notified prior to all sample collection and submittal to the current testing laboratory identified by the City. The PID or FID tests should be performed in a confined location. Soils producing a reading of less than 20 ppm above ambient will not be considered potentially petroleum contaminated. The PID or FID shall be calibrated according to manufactures instructions. d. Water encountered during excavation or dewatering shall be considered to be potentially contaminated if there is a visible sheen, a hydrocarbon odor, adjacent soil that appears visually to be contaminated by hydrocarbons or at any time the Contractor has reason to believe that hydrocarbon contamination may have .. occurred. The Contractor shall immediately notify the City and the TNRCC whenever contaminated water is encountered. a. The Contractor shall contact the City whenever contamination from any source is suspected. 3. HANDLING POTENTIALLY PETROLEUM CONTAMINATED SOIL(PPCS) a. Contractor shall coordinate with the City to determine a suitable location for the stockpiling of contaminated soil. The following procedure shall be followed in preparing the chosen site: 1. Provide a diked enclosure large enough to hold all material and prevent runoff. 2. The diked area shall be lined with 20-30 mil plastic tp prevent seepage into the existing soil. 3. At the end of each work day, Contractor shall completely cover stockpile with 20 mil plastic. During the day, the Contractor shall keep the stockpile covered, as necessary,to prevent release of contaminated materials due to rain or wind. 4. Sampling and evaluation of materials will be performed at the Contractor's expense. (The City of Fort Worth will provide laboratory services) b. PPCS shall be handled, tested, observing all standard chain-of-custody procedures and sampling preservation and analyses shall conform to published and recognized standards. c. The stockpiled PPCS shall be sampled and tested every 50 cubic yards for Total .. Petroleum Hydrocarbons(TPH) (TX1005)and Benzene, Toulene, Ethylbenzene and Xylene (BTEX) (EPA 8020). All test results will be forwarded to the City of Fort Worth Department of Environmental Management. 11102Jo4 ASC-42 PART DA - ADDITIONAL SPECIAL CONDITIONS d. Contaminated soil identified by test results will be disposed of according to DA-36, Loading, Transportation, and Disposal of Contaminated Soil. e. It is the intent of the City of Fort Worth that uncontaminated soils be utilized as backfill material, if the soils also meet the Type C or B backfill classifications. 4. HANDLING POTENTIALLY PETROLEUM CONTAMINATED WATER(PPCW) a. Water pumped from the excavation or from dewatering activities that has an oily sheen, a hydrocarbon odor, or is otherwise suspect, shall be considered potentially petroleum contaminated. ,., b. PPCW shall be handled, tested, and discharged in accordance with the TNRCC's appropriate state regulation. PPCW shall be tested no later than 15 days prior to extraction. PPCW shall, if necessary, be treated in an appropriately sized oil/water separator, air stripper or GAC canisters. Contractor shall have his testing laboratory determine that the oil/water separator treated discharge is within the limits established by the TNRCC's regulations before being allowed to discharge (discharge to sanitary sewer). Contractor shall be responsible for furnishing the effluent test reports to the City. c. Alternatively, the Contractor may dispose of contaminated water, after appropriate .. pretreatment, into the sanitary sewer collection system. It shall be the responsibility of the Contractor to obtain the necessary permit(s)and to perform all testing required by the City of Fort Worth Pretreatment Services Division. d. All treated water shall be discharged into a Contractor supplied Frac Tank, sampled, and analyzed before discharge into the sewer system. e. The product that is recovered shall be disposed of in accordance with all applicable regulations. Any phase separate product recovered from the oil/water separator and air stripper shall be transported in accordance with Department of Transportation rules and regulations for flammable. products. When transporting product for disposal, transportation shall also be performed by a licensed carrier. The Contractor is responsible for proper manifesting of the material from the site to the waste disposal facility. Completed Manifests shalt. be returned to the City Department of Environmental Management within 90 days of shipment. 5. HANDLING VAPOR CONCENTRATIONS a. In order to maintain safe w6rking conditions, the vapor concentrations should not exceed 20 percent of the Lower Explosive Limit (LEL). During construction, measures should be taken to maintain LEL levels below 20 percent in all working areas. b. To monitor vapor levels and oxygen levels a combustible gas indicator(CGI)with,a LEU02 meter should continuously operate in the working area. The CGI should be properly calibrated and should have an alarm that sounds if 20 percent LEL is reached. Monitoring data from the GCI.should be recorded periodically to determine if ventilation or other methods are effective. In the event local health and safety 11102104 ASC-43 PART DA - ADDITIONAL SPECIAL CONDITIONS agencies require more stringent monitoring, the local regulations must be implemented. D. MEASUREMENT AND PAYMENT: ~ Payment for handling PPCS, PPCW and Vapor Concentrations, obtaining and paying for any permits required, hiring the services of a qualified professional environmental consultant(s), environmental issues, stockpiling and all issues included and incidental to this section will be full compensation for all labor, equipment, materials, and supervision. Measurement and Payment for this section will be per linear foot of trench excavated where the excavated material is handled as a contaminated material. No separate payment will be made for handling of contaminated water,vapor concentrations, sampling, stockpiling, etc. DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL A. GENERAL: This item has been established for the loading, transportation and disposal of contaminated soils in a State of Texas approved disposal site (landfill) to handle special wastes (petroleum contaminated soils). A bid item has been established in the proposal for the ow proper loading, transportation and disposal of the material to a designated site and the quantity established is the engineers best estimate of the quantity that may be removed. This quantity may vary depending upon actual conditions and testing results. The unit .m price bid will not be increased regardless of the actual amount'of material disposed and may be decreased if a larger volume of material, than that listed in the bid proposal, results in a unit cost reduction for disposal. fm B. WASTE MANIFESTS: Any and all non-hazardous liquid and petroleum substance waste removed from the site ` t of generation and transported for treatment and/or disposal must be accompanied by a waste shipment record/manifest detailing required generator, transported, destination and waste description information. These results may not be uniform throughout the entire site. For all petroleum substance waste, the waste shipment record utilized shall be the TNRCC PETROLEUM-SUBSTANCE WASTE AFFIDAVIT (Form TWC-0332). The Contractor shall be responsible for obtaining, originating and maintaining manifests in accordance with federal and state laws. The Contractor shall sign the manifests forms as Independent Contractor to the Owner. AUTHORIZATION OF PAYMENT FOR REMOVAL TRANSPORT AND TREATMENT / DISPOSAL OF WASTES IN CONTINGENT UPON RECEIPT BY THE ENGINEER OF FULLY COMPLETED AND SIGNED MANIFEST FORMS that are in agreement with regard to the type and amount of waste removed from the site and received by the treatment/disposal facility. The Contractor shall immediately resolve any manifest discrepancies. Completed Manifests .. shall be returned to the City Department of Environmental Management within 90 days of shipment. C. MEASUREMENT AND PAYMENT: Payment for this item shall be made per in place cubic yard of contaminated soils that are loaded, transported and disposed of in an approved special disposal site. No 11102104 ASC-44 PART DA - ADDITIONAL SPECIAL CONDITIONS separate payment will be made for loading, transportation and disposal of contaminated ground waters collected; these costs considered subsidiary to DA-37, POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING. The proposed landfill shall be included in the Contractor's bid submittal and approved by the City of Fort Worth Department of Environmental Management prior to contract award. Contractor shall be responsible for all landfill costs, including, but not limited to landfill fees, transportation costs and landfill operator requested analytical testing and waste characterization. DA-39 ROCK RIPRAP- GROUT- FILTER FABRIC- OMITTED .. DA-40 CONCRETE RIPRAP - OMITTED DA-41 CONCRETE CYLINDER PIPE AND FITTINGS- OMITTED DA-42 CONCRETE PIPE FITTINGS AND SPECIALS-OMITTED DA-43 UNCLASSIFIED STREET EXCAVATION This item will be used if additional excavation is needed that is not covered by "8" PAVEMENT .. PULVERIZATION". Additional Excavation is the removal of the excessive crown and base to bring the new base to proper grade and City standard specifications for street reconstruction. All applicable provisions of Item No. 106 "Unclassified Street Excavation" shall apply, work shall be paid per cubic yard. DA-44 6" PERFORATED PIPE SUBDRAIN This item shall consist of furnishing and installing 6" perforated subdrain and filter material all as shown on the enclosed details, or as directed by the Engineer. All applicable provision of standard Specifications Item 500 "SUBDRAINS" shall apply except as herein modified. The pipe material shall be poly vinyl chloride (PVC) with the standard dimensional ratio of 35 (SDR35) and meet the ASTM D 1784. Filter shall have the capability of passing ground water without transporting the soil placed around the filter fabric. The fabric shall be constructed exclusively of synthetic thermoplastic fibers and may be either woven or non- woven to form a mat of uniform quality. Fabric fiber may be either continuous or discontinuous and oriented in either a random or an aligned pattern throughout the fabric. The fabric shall be mildew resistant, rot proof, shall be satisfactory for use in a wet soil and aggregate environment, contain'ultraviolet stabilizers and have nonravelling edges. The fabric shall meet the following requirements when sampled and tested in accordance with the methods indicated. Test Original Physical Properties Method Requirements Fabric weight, on an ambient SDHPT Test Method 4.0 minimum for under drains Temperature air-dried tension Tex-616-J and Slope Stabilization, 6.0 free sample, expressed "Testing of Construction Fibers" minimum for Gabions in ortsq.yd. Revetment Water flow rate by falling head Tex-616-J 80 minimum method, 7.9 inches (20 cm) to 3.9 11/02104 ASC-45 PART DA - ADDITIONAL SPECIAL CONDITIONS inches (10 cm) on 2 inch ID cylinder with 1 inch diameter orifice, with flow rate expressed in gal/sq. ft/minute. Breaking load in either machine or ASTM Designation: 100 minimum cross-machine direction, expressed D 1682 grab method G as in pounds. modified by Tex-616-J Equivalent opening size (US CW-02215, US Army Corps of 70 to 100 Standard sieve no.) Engineers, Civil Works Construction Guide Specification. "Plastic Filter Fabric: November, 1977. "Apparent elongation" at breaking AST, Designation: 100 maximum load in either machine or cross- D 1682 grab method G as machine direction, expressed as modified by Tex-616-J percent. The "Filter Fabric" shall be installed in accordance with the manufacturer's recommendations, as .�. indicated or as directed by the Engineer. When lapping is required, it shall be in accordance with the manufacturer's recommendations. Backfilling around the Filter Fabric shall be done in such a way as not to damage the Filter Fabric material during the placement. The unit price bid per L.F. shall be full compensation for all labor, materials, equipments, tools, and incidentals necessary to complete the work. DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS This item shall include the removal and replacement of existing concrete sidewalk due to failure r• or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item see Item No. 104 "Removing Old Concrete", and Item No. 504 "Concrete Sidewalk and Driveways". The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the removal and replacement work. DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION In order to facilitate timely reconstruction of the affected roadway surfaces (subsequent to storm drain installation) under the City's roadway maintenance program, it is recommended that the proposed storm drain improvements be conducted on the project streets based upon the following sequence: 111OW04 ASC-46 PART DA - ADDITIONAL SPECIAL CONDITIONS 1. Houston Street 2. 1 e Street 3. Throckmorton Street After the work start date has been established, the selected contractor shall be required to submit the beginning and ending dates for all work (including pavement repair) on each of the project streets. Please be advised that the contractor has the option of submitting a different sequence of construction_than stated above. The contractor shall not be allowed to begin work (but time charges will begin on the project) until the preferred sequence of construction and the start and end work dates for each street have been submitted to the City. DA-47 PAVEMENT REPAIR IN PARKING AREA The unit price bid under appropriate BID ITEM(S) of the Proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement. All _ required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with crushed limestone base material, compacted and level with the finished adjacent surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. DA-48 EASEMENTS AND PERMITS-OMITTED DA-49 HIGHWAY REQUIREMENTS-OMITTED DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and .. E2-20 of the General Contract Documents. Payment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. .. DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities, shall consist of a watertight seal. Concrete used in the connection shall be Class A(3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connecting to existing facilities including all labor, tools, equipment, and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM. DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION All combination turbo meter installations will be per attached Figure 33 unless otherwise directed by the Engineer. 77/02104 ASC-47 PART DA - ADDITIONAL SPECIAL CONDITIONS The contractor shall use Bilco Type J-3 Model 30" x 36" Steel Single Leaf Doors or approved equal unless the vault door is subject to vehicular traffic i.e.: in a street, parking lot,or driveway. _ The appropriate size turbo meter with strainer and check valve if required will be fumished to the Contractor free of charge; however, the Contractor will be required to pick up these item(s)at the Field Operations Warehouse. Payment for all work, materials, and all necessary appurtenances from bypass tee to bypass tee which are required to provide a complete and functional Combination Turbo Meter Installation complete with Bypass and Concrete Vault shall be included in the price bid for each. DA-53 OPEN FIRE LINE INSTALLATIONS All open fire line installations will be per attached Figure 32 unless otherwise directed by the Engineer. The appropriate size detector check meter, 3/4-inch meter and class 'B' meter box will be fumished to the Contractor free of charge; however, the Contractor will be required to pick up the items at the Field Operations Warehouse. Payment for all work, materials, and all necessary appurtenances from the City side flange coupling adapter to the customer side gate valve and box; including incidental 5 linear feet of pipe, which are required to provide a complete and functional open fire line installation shall be included in the price bid for each. Payment for the City side gate valve or tap valve depending on which is required will be paid for under the appropriate bid item(s). DA-54 WATER SAMPLE STATION GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. �* The appropriate water sampling station will be fumished to the Contractor free of charge; - however,the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are .- required to provide a complete and functional water sampling station shall be included in the price bid for the water main. 11102104 ASC-48 PART DA - ADDITIONAL SPECIAL CONDITIONS PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. DA-55 CURB ON CONCRETE PAVEMENT Standard Specification Item 502 shall apply except as herein modified. INTEGRAL CURB: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty(30)minutes after the concrete in the slab. SUPERIMPOSED CURB: Concrete shall have a minimum compressive strength of three thousand (3,000) pounds per square inch at twenty-eight(28) days. The quantity of mixing water 'r shall not exceed seven (7) U.S. gallons per sack(94 lbs.) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. PAYMENT: Payment shall be made for cutting and replacing curbs and gutters required in this Project under the appropriate bid item and shall be in compliance with Public Works Department standard requirement Item 502. DA-56 SHOP DRAWINGS 1. Submit seven (7) copies of shop drawings, layouts, manufacturers data and material schedules as may be required by the Engineer for his review. Submittals may be checked by and stamped with the approval of the Contractor and identified as the Engineer may require. Such r. review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated actions by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittals are not change orders. The purpose of submittals by the Contractor is to demonstrate .. that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of` other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement .. included with the submittal, which signifies compliance with plans and specifications and dimensions suitable for the application. Any deviation from the specified criteria shall be 11/02/04 ASC-49 r PART DA - ADDITIONAL SPECIAL CONDITIONS i expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be submitted for the following items prior to installation: List the required submittals here Additional shop drawing requirements are described in some of the material specifications. 3. Address for Submittals-The submittals shall be addressed to the Project Manager: Rakesh Chaubey, P.E. City of Fort Worth 1000 Throckmorton .. Fort Worth, TX 76102 DA-57 COST BREAKDOWN In order to establish a basis upon which partial payments to the Contractor may be authorized, immediately after execution of the contract the Contractor shall furnish a detailed cost breakdown .� of his contract price arranged and itemized to meet the approval of the Engineer. DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY Aft All work involving paving and/or drainage shall conform to the two following published specifications, except as modified herein: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION — CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL �* TEXAS DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP When H.M.A.C. greater than 9 inches in depth is encountered, it shall be replaced with a combination of H.M.A.C. and 2:27 concrete base, as determined by the Engineer, to achieve the Y required thickness of pavement. DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. DA-61 TOPSOIL- OMITTED DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT This item shall include raising or lowering an existing meter box to the parkway grade specified No payment will be made for adjusting existing boxes which are within 0.001 feet of specified 11102104 ASC-50 PART DA - ADDITIONAL SPECIAL CONDITIONS parkway grade. The unit price bid shall be full and sufficient payment for all labor, equipment and materials used in the adjustment of the meter box. DA-63 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. In particular,the Contractor shall be aware that it is the City's intention that the quantities in Unit I be used on an "emergency" basis only. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of$200,000 (see Options to Renew) shall be awarded with final payment based on actual measured " quantities and the unit price bid in this proposal. Moreover, there is to be not limit on the variation between the estimated quantities shown and actual quantities performed. .. It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City bit will in not case exceed $200,000 (see Options to Renew) including all change orders. DA-64 WORK IN HIGHWAY RIGHT OF WAY- OMITTED DA-65 CRUSHED LIMESTONE (FLEX-BASE) Crushed limestone required for use as a flexible base material shall conform to Specification Item No. 208 of the Standard Specifications for Street and Storm Drain Construction for the City of .. Fort Worth Transportation and Public Works Department. DA-66 OPTION TO RENEW r The City has the right to renew this contract for three (3) one year terms/expenditures of $200,000 under the same terms, conditions, and unit prices. The City shall give at least sixty(60) _ days notice prior to the expiration of one year from the date of execution of this contract or of an option period or a like notice at such time as there is less than $20,000 left unexpended. DA-67 NON-EXCLUSIVE CONTRACT This contract is non-exclusive. During the term of this contract or any renewal hereof, the City reserves the right to advertise and award another contract for like or similar work. If a second .. contract is awarded, the City further reserves the right to issue work orders under either contract" as it deems in its best interest,without recourse. 111022104 ASC-51 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-68 CONCRETE VALLEY GUTTER This item shall include the repair/replacement of existing concrete valley gutters as directed by the Engineer. The proposed valley gutters will be constructed according to the detail included in these documents as well as conforming to Specification Item No. 314 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. .• The unit price bid for this item shall be full compensation for all materials (including applicable sub-base), labor, equipment and incidentals necessary to complete the work. ,. DA-69 TRAFFIC BUTTONS The Contractor shall supply all materials and labor necessary to install traffic buttons of the same type as were previously installed at locations designated by the Engineer. The buttons to be supplied shall be generally, but not limited to Type W-4 and Type 11 C-R4 and installed with a Type III Epoxy. _n The unit price bid for this item shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-70 PAVEMENT STRIPING Pavement striping, whenever and wherever encountered, shall be replaced to match the existing striping or as directed by the Engineer. Materials used shall be of 420 Type intersection grade tape(in 18-inch width)such as Stamark as manufactured by 3M company or approved equal. The unit price bid for this item shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-71 H.M.A.C. TESTING PROCEDURES The contractor is required to submit a SMix Design fog both Type "B" and "D" asphalt that will be used for each project. This should be submitted at the Pre-Construction Conference. This design shall not be more than two (2) years old. Upon submittal of the design mix a Marshal (Proctor) will be calculated, if one has not been previously calculated, for the use during density PQ testing. For type "B" asphalt a maximum of 20% rap may be used. No Rap may be used in type "D" Upon approval of an asphalt mix design and the calculation of the Marshal (proctor) the contractor is approved for- placement of the asphalt. The contractor shall contact the City Laboratory, through the inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to assist in the monitoring of the number of passes by a roller to establish a rolling pattern that will provide the required densities. The required Density for Type "B" and for Type"D"asphalt will be 91% of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing. After a rolling pattern is established, densities should be taken at locations not more than 300 feet apart. The above requirement applies to both Type "B" and "D" asphalt. Densities on type "B" must be done before Type"D"asphalt is applied. 11102104 ASC-52 PART DA ADDITIONAL SPECIAL CONDITIONS Cores to determine thickness of Type "B" asphalt must be taken before Type "D" asphalt is applied. Upon completion of the application of Type"D" asphalt additional cores must be taken to determine the applied thickness. DA-72 SPECIFICATION REFERENCES .. When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVE AND BOX The relocation and reconnection of sprinkler system control valve and box will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. A minimum of twenty-four (24) hours advance notice shall be given when service interruption will be required. When the relocation is required, separate payment will be allowed for the relocation of sprinkler back-flow preventer or control valve and box. Payment for all work and material such as back-fill, fittings, five (5) feet of PVC Schedule 40 and all material labor, and equipment used by and for the licensed plumber shall be included in the price bid for the relocation of sprinkler back-flow preventer or control valve and box. All other costs will be included in other appropriate bid item(s). DA-74 RESILIENT-SEATED GATE VALVES Any resilient-seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT-SEATED GATE VALVES, with the .. exception of size requirements in sections E-26.1. All resilient-seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List. " DA-75 EMERGENCY SITUATION, JOB MOVE-IN The Owner or Engineer shall determine when an emergency situation shall exist. When water emergency work is required, the Contractor shall mobilize to the said location within twenty-four (24) hours after given notification from the Inspector and/or Project Manager. The Contractor shall make all necessary arrangements for bypass pumping, setting up barricades, notifying citizens, etc., while waiting for other utilities to be located as directed by the Engineer. The, Contractor shall work continuously until the emergency work order has been completed at a time:, agreed to by the Project Manager, Inspector, and Contractor. After the emergency work order has been completed, there will be no additional "Job Move-In" charges paid to remobilize back to the previous project location site. DA-76 1 %" &2" COPPER SERVICES The following is an addendum to E1-17, Copper Water Service Lines and Copper Alloy_ Couplings: 11102104 ASC-53 .. PART DA - ADDITIONAL SPECIAL CONDITIONS All fittings used for 1 %Z" and 2" water services lines shall be compression fittings of the type produced with an internal "gripper ring"as manufactured by the Ford Meter Box Co., Inc., Mueller Company, or approved equal. Approved equal products shall submit shop drawings and manufacturer's catalog information for approval. Contractor shall make all cuts to the copper tubing with a copper tubing cutter tool specifically designed for this purpose in order to provide a clean, square cut. The use of hacksaws or any other type of cutter will not be allowed. Prior to installing the compression fittings, the copper tubing will be made round by the use of a .. .rounding tube" specifically made for that purpose. Payment for all work and materials associated with 1 Y2"and 2" copper services shall be included in the price of the appropriate bid item. DA-77 SCOPE OF WORK(UTIL. CUT) -OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY(UTIL. CUT)-OMITTED DA-79 CONTRACT TIME(UTIL. CUT) - OMITTED DA-80 REQUIRED CREW PERSONNEL& EQUIPMENT(UTIL. CUT) -OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS(UTIL. CUT)-OMITTED DA-82 LIQUIDATED DAMAGES (UTIL. CUT)-OMITTED DA-83 PAVING REPAIR EDGES (UTIL. CUT)-OMITTED DA-84 TRENCH BACKFILL(UTIL. CUT) -OMITTED DA-85 CLEAN-UP (UTIL. CUT)-OMITTED DA-86 PROPERTY ACCESS(UTIL. CUT)-OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUT)-OMITTED DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT)-OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT)- OMITTED DA-90 2"TO 9" H.M.A.C. PAVEMENT(UTIL. CUT) - OMITTED DA-91 ADJUST WATER VALVE BOXES, MANHOLES,AND VAULTS(UTIL. CUT)-OMITTED *` DA-92 MAINTENANCE BOND (UTIL. CUT)-OMITTED DA-93 BRICK PAVEMENT(UTIL. CUT) -OMITTED DA-94 LIME STABILIZED SUBGRADE(UTIL. CUT) -OMITTED .. DA-95 CEMENT STABILIZED SUBGRADE(UTIL. CUT)-OMITTED DA-96 REPAIR OF STORM DRAINI STRUCTURES (UTIL.CUT)-OMITTED DA-97 "QUICK-SET" CONCRETE (UTIL. CUT)-OMITTED DA-98 UTILITY ADJUSTMENT(UTIL. CUT)-OMITTED r� DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) -OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL. CUT)-OMITTED DA-101 CONCRETE CURB AND GUTTER(UTIL. CUT)-OMITTED DA-102 PAYMENT(UTIL. CUT) -OMITTED 0M DA-103 DEHOLES(MISC. EXT.) The Contractor excavates for existing water and/or sanitary sewer main as detailed by work order together with a sketch. The location and dimensions shown on the plans relative to other existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, _ existing underground utilities. It shall be the Contractor's responsibility to verify locations of 11102M4 ASC-54 P• /1 PART DA - ADDITIONAL SPECIAL CONDITIONS adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the dehole process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all services .. encountered. Any damage to utilities resulting from the Contractor's operations, shall be restored at his expense. Payment for work such as backfill and all other associated appurtenants required, shall be included in the price of the appropriate bid item. •• DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.)-OMITTED DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) -OMITTED DA-106 BID QUANTITIES (MISC. EXT.) Bid quantities of the various items in the proposal are for comparison only and may not reflect the dW actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. .. DA-107 LIFE OF CONTRACT(MISC. EXT.) It is contemplated that Work Orders will be issued to the Contractor for work to be performed = under this Contract for not to exceed 365calendar days following the date of the Contract-nor to exceed the limit of the bid price, whichever should occur first. The Contractor shall be required to complete any work covered by a Work'Order issued prior to that date of termination but.will not be required to accept any work order for execution dated after that date of termination.'If the cost of the work performed under this Contract is less than the limit of the bid 'price at the end of the 365 calendar day period, at the City's option and the Contractor's concurrence, the Project may be extended to the limit of the bid price. DA-108 FLOWABLE FILL (MISC. EXT.) .. 1. Description: The flowable fill material shall be delivered to the site, free flowing and self-leveling and shall s have a consistency enabling it to fill all voids without tamping, vibrating or compacting. The flowable fill material shall have an in place density of not less than 95 and not more than 115 lbs./cu. ft., with a maximum twenty-eight (28) day compression strength of not less than 60 and not more than 85 PSI allowing the material to be removed with hand tools such as picks and shovels. The height of free fall of the flowable fill shall not exceed four(4)feet. 2. Material Specifications: Flowable fill shall consist of. r� 11102104 ASC-55 PART DA - ADDITIONAL SPECIAL CONDITIONS a. An appropriate amount of Portland Cement meeting ASTM C-150 (with other additives as necessary). b. Aggregates meeting ASTM C-33 c. Sand or fine aggregates as per City of Ft. Worth Standard Specifications for Street and Storm Drain Construction Item 406 d. Flyash, Class C or F, meeting ASTM C-618 e. Admixtures 1. Mineral admixtures will be pozzolanic 2. Chemical admixtures shall be in liquid or powder form used in standard ready-mix concrete products unless specifically designed for flowable fill. Permissible types of admixtures are: a. High air generators, as manufactured by Grace Construction Products or approved equal, which are specifically designed for .. flowable fill to lower unit weights, reduce shrinkage and subsidence, and control compressive strength. b. Air entraining admixtures conforming to ASTM C-260. c. High range water reducers conforming to ASTM C-494 Type F or G. "" d. Accelerating admixtures conforming to ASTM C-494, Type C. 1. Non-chloride, non-corrosive accelerators used where metals are present in concrete or embedded members. •■ 2. Calcium chloride DA-109 BRICK PAVEMENT REPAIR(MISC. REPL.) ,n Contractor shall take all precautions to carefully remove all existing brick pavers. The brick pavers shall be handled with extreme care to avoid chipping and/or breaking of pavers. Until installed, they shall be cleaned and neatly stacked on pallets (not to exceed 3 feet in height). If necessary, all new brick pavers used on this project shall meet the specifications for ASTM C1272. The brick shall be a Type F heavy vehicular paving brick a minimum 2 5/8" thick, with spacer nibs or lugs, and match the existing brick in size, shape, and color. The brick pavers will be set on a %-inch sand/cement bedding mixture. The sand used shall conform to ASTM C33 excluding all stone screenings that may pass the C33 sieve analysis. The .• cement sand ratio shall be 1 sack of cement per 1 CY of sand or as directed by the Engineer. Filter fabric 12-inches wide will be installed over every construction, and/or expansion joint as well as all vertical surfaces. Once the brick pavers have been installed they will be vibrated into the sand bed. Sand conforming to C33 will then be swept into joints and vibrated again. All brick shall be installed per the manufacturer's recommendations. The resulting repair shall provide a smooth driving surface .. and match all applicable street grades,cross slopes, and crowns. The price bid per linear foot for "BRICK PAVEMENT REPAIR" as shown in the Proposal will be +� full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. DA-110 DETERMINATION AND INITIATION OF WORK(MISC. REPL.) The Engineer shall determine and designate to the Contractor the location of the service main requiring replacement by a Work Order together with a sketch for each such replacement, giving 11102104 ASC-56 PART DA - ADDITIONAL SPECIAL CONDITIONS the limits, size and nature of work required. The Engineer will notify the Contractor that a Work Order is ready and fax the Contractor a copy of the Work Order notification. The Contractor is to provide his fax number to the Engineer at the pre-construction conference. Single or several .. Work Orders may be issued at one time. The Contractor shall initiate work on a replacement within seven (7)working days of the date the Work Order is faxed to the Contractor,and continue work on the Work Order until it has been completed, not including paving. The Contractor shall furnish and supply sufficient equipment and personnel to complete the Work Order in the amount of time provided for in the Work Order. Should the Contractor fail to start any Work Order within the time specified, he shall add the necessary work crews and equipment to prosecute the work •• to complete the Work Order or Work Orders in the time provided therefore. DA-111 WORK ORDER COMPLETION TIME(MISC. REPL.) Should the contractor fail to complete an individual work order in the given amount of calendar days as specified on each individual work order, liquidated damage charges as prescribed in Part C- General Conditions C7-7.10 Time of Completion will be subtracted from the final pay estimate of that particular work order. The estimated amount for each particular work order will be used for determining the amount of damages charged per calendar day of time exceeding the specified amount. The first two paragraphs of Part C - General Conditions C7-7.10 Time Of Completion shall be replaced with the following: The time of completion of each individual work order in an essential element of this contract. Each work order issued will have the maximum allowed number of calendar days allowed for the completion of that specific work. The number of calendar days specified will be calculated as follows: The total estimated cost for the specific work order divided by 2000 (rounded up) + 10 days = Number of Calendar Days allowed for Construction of Individual Work Order. DA-112 MOVE IN CHARGES (MISC. REPL.) -OMITTED DA-113 PROJECT SIGNS (MISC. REPL.) �.. Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B`_Proposal. Project Signs shall be in accordance with Figure 30 (dated 9-18-96) of the General Contract Documents. The signs may be mounted on skids or on posts. The exact locations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. DA-114 LIQUIDATED DAMAGES (MISC. REPL.) The Contractor shall pay liquidated damages of one hundred dollars ($100.00) per day per Work Order, for failure to begin a Work Order within the seven (7) working days of the date the Work Order is faxed to the Contractor. Failure to complete project within the stipulated construction time on the Work Order, the Contractor will pay liquidated damages in the amount stipulated in these contract documents. 11/02104 ASC-57 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) -OMITTED DA-116 FIELD OFFICE ^ As specified in Part C, General Conditions C5-5.6, the contractor shall provide a field office exclusively for the City of Fort Worth Construction Manager and coordination meetings for the following: *� A. Temporary field office shall be established on the job site where approved or directed by the Engineer, adequately furnished. .. B. Contractor shall provide either a separate building or a partitioned-off space of at least 140 sq ft of floor space with solid lockable door in Contractor's building for the exclusive use of the City ^ of Fort Worth Construction Manager throughout the period of construction. The temporary office shall be weathertight, have a tight floor at least 8-in off the ground and shall be insulated and suitably ventilated. The office shall be provided with janitor service, heating and cooling equipment,electrical wiring,outlets and fixtures suitable to light the tables and desk ^ adequately as directed. Provide separate toilet facilities in the field office. C. Provide the following furniture and equipment in the Construction Manager's office: — 1. One plan table, 3-ft by 5-ft and one stool 2. Desk about 3-ft by 5-ft with desk chair _ 3. Two additional chairs 4. Two-drawer, filing cabinet with lock Field office shall also have available to the Construction Manager the following: 'R 1. One conference table(6-ft). 2. Eight folding chairs. ^ 3. First aid kit suitable for ten people with manual, American White Cross No. K10 or equal. 4. Duplicating machine, Xerox Model 10251 or equal. r D Contractor shall furnish temporary light and power, including wiring, lamps and similar equipment as required to adequately light all work areas and with sufficient power capacity to meet the reasonable needs of the Construction Manager. Contractor shall make all necessary arrangements with the local electric company for temporary electric service and pay all expenses in connection therewith and pay all electrical bills. DA-117 TRAFFIC CONTROL PLAN Traffic control shall be in accordance with item D-8 of the Special Conditions with the exception of �+ the Contractor providing the traffic control plan. A traffic control plan has been prepared and is included in the project plans. All other requirements of D-8 shall apply. om »mtioa ASC-58 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS The contractor shall coordinate his work with the work of other contractors on remaining units of this project. The contract documents indicate the starting and stopping points for each of the units of the project. The plans indicate "connecting to an existing pipeline" constructed by others and ending the line with the installation of a plug. If the start of the project cannot be connected as to the previous unit, the contractor will begin his line with a plugged section of pipe. If the pipeline is constructed for the connecting unit the contractor shall connect his line with the adjoining unit in lieu of installation of a plug. Contractor will be paid for"connection" to existing line or installation of blind flanges based on the unit price bid for the water or sewer main. an dft .r r oft �r an r3 11102V4 ASC-59 am ax s PART E CERTIFICATE OF INSURANCE .. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW VENDOR COMPLIANCE TO STATE LAW EQUIPMENT SCHEDULE EXPERIENCE RECORD PAYMENT BOND PERFORMANCE BOND MAINTENANCE BOND VENDOR COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to non-resident bidders. This law provides that, in order to be awarded a contract as low bidder, non-resident bidders(our-of-state contractors whose corporate office or principal place of business are outside of the state of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non-resident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non-resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. w Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders. Our principal place of business or corporate offices are in the State of Texas PROJECT: STORM DRAIN IMPROVEMENTS ON HOUSTON STREET(14TH ST. TO SOUTH OF 13TH ST.) 14TH STREET (THROCKMORTON ST.TO HOUSTON ST.) i THROCKMORTON STREET(13TH ST. TO 14TH ST.) D.O.E. No. 4657 BIDDER: Company Name (Please Print) ►�-(tlo► 4 , 76 1(9 Signature: City State ZIP cA�ln Title: (Please Print) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION i EQUIPMENT SCHEDULE List of Equipment owned by Bidder that is in serviceable condition and available for use: Portions of work Bidder proposes to sublet in case of Award of Contracts including amount and type: EXPERIENCE RECORD List of Rrpjects y2ur or anization has successful) completed: Amount Of Contract Type of Work Date Accepted Name and Address of Owner Award List of projects your organization is now engaged in completing: Amount Of Contract Type of Anticipated Name and Address of Owner Award Work Date of Completion List Surety Bonds in force on above incomplete work: Date of Contract Award Type of Work Amount of Name and Address of Bond Bond Surety ACCRA CERTIFICATE OF LIABILITY INSURANCE 06/0/26' RoDuCER (817)457-6700 FAX (817)457-7246 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE SWEENEY COMPANY ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1121 E. Loo 820 South HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR p ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P 0 Box 8720 Fort Worth, TX 76124-0720 INSURERS AFFORDING COVERAGE NAIC# AIWSURED Tri-Tech Construction, Inc. INSURERA: Bituminous Casualty Corp 1133 East Loop 820 South INSURERB: Fort Worth, TX 76112 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DDT TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS DATE JMMIDDIYY) GENERAL LIABILITY CLP 3 227 805 04/30/2006 04/30/2007 EACH OCCURRENCE $ 1,000,00 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 300,00 LCLAIMS MADE FX] OCCUR MED EXP(Any one person) $ 5,00 � X CONTRACTUAL,BFPD PERSONAL&ADV INJURY $ 1,000,00 X XCU,INDEP CONT GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICYFX PRO LOC JECT AUTOMOBILE LIABILITY CAP 3 505 266 04/30/2006 04/30/2007 COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1,000,00 X ALL OWNED AUTOS BODILY INJURY X SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ L__j AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY CUP 2 577 260 04/30/2006 04/30/2007 EACH OCCURRENCE $ 4,000,00 X OCCUR F] CLAIMS MADE AGGREGATE $ 4,000,00 �A $ DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND WC 3 227 804 04/30/2006 04/30/2007 X I WC STATU- OTH- TORY LIMITS EMPLOYERS'LIABILITY E.L.EACH ACCIDENT $ 1,000,000 A ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYE $ 1,000,000 EXCLU If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS rr-TORM DRAIN IMPROVEMENT ON 14TH ST, THROCKMORTON & HOUSTON ST,CITY PROD #00136, PROD#C291-309240013683 ITY OF FT WORTH, ITS OFFICERS, EMPLOYEES & SERVANTS NAMED ADLN INSURED ALL POLICIES EXCEPT WORKERS OMP WITH GENL LIAB BEING PRIMARY & NON-CONTRIBUTORY WITH WAIVER OF SUBROGATION ALL POLICIES AS OMP BY WRITTEN CONTRACT. 30 DAY CANC NOTICE AMENDED TO 10 DAY FOR NON-PAY OF PREMIUM CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL KIX]1sX011�MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, CITY OF FORT WORTH X►Xx X+XX)WM )iiXXLYJWUUXD6>xlXdfXXX 1000 THROCKMORTON ST KK*JiANXXAkKKY4)VWMK)tXXd1M31XKXIXUXXXKALVXXXXXXXXXX FT WORTH, TX 76102 AUT RIZED REPRESENTATIVE SL 7CORD 25(2001/08) © COR RATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.A statement P, on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s),authorized representative or producer,and the certificate holder, nor does it affirmatively or negatively amend,extend or alter the coverage afforded by the policies listed thereon. r'^ A ACORD 25(2001/08) CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Engineering No.4657 and City of Fort Worth Project No. C291- 309240013683. CONT OR Tri-Te h onstrcution Inc. V By: if By: VV �dOD� Title: -7 Date: STATE OF TEXAS § COUNTY OF TARRANT § Beforee, the undersigned authority, on this day personally appeared 64W U).06 flan , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of Tri-Tech Constrcution, Inc. for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this day of , 20 0 4 NoO—Jpulbic in and for the State of Texas 1QiY �4+ JOYCE WOMACK Notary Public * ' STATE OF TEXAS ��FOF ° My Comm.Exp.04/10/20M PERFORMANCE BOND Bond No. 8205-79-46 THE STATE OF TEXAS § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § That we (1) Tri-Tech Construction, Inc. as Principal herein, and (2) Vigilant Insurance Company, a corporation organized under the laws of the State of (3) New York , and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein,in the sum of- Three £Three Hundred Ninety-five Thousand Four Hundred Twenty-five and no/100.......................................... ($395,425.00)Dollars for the payment of which sum we bind ourselves,our heirs,executors,administrators, successors and assigns,jointly and severally,firmly by these presents. IIIUN 13 2006 WHEREAS,Principal has entered into a certain contract with the Obligee dated the of ,2006 a copy of which is hereto attached and made a part hereof for all purposes,for the construction of: Storm Drain Improvements on 14th Street,Throckmorton Street and Houston Street(City Proiect No. 00136) NOW THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statue,tor the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. Jui'V I ') Zoub SIGNED AND SEALED this day of .2006. ATTEST: ��— ✓ Tri-T ch lonstruction,Inc. (Principal)Secretary PRIM P (4) BY: - Q) i y. Title: (SEAL) 1133 E.Loop 820 S. -- Fort Worth,TX 76112 (Address) Gl�.Ge/ VIGILANT INSURANCE COMPANY Witne ISVS10 Prmccpal Surety Address BY: ATTEST: (Attorney-in-6490 5) Charles D.Sweeney (Surety)Secretary 2001 Bryan Street,Suite 3400 Dallas,Texas 75201 (Address) (S, ��." NOTE: Date of Bond Must not be prior to date of Contract _ _ I (1) Correct name of Principal (2) Correct name of Surety (3) State of incorporation of Surety Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. The date of bond shall not be prior to date of Contract. Witness to Surety Jennifer R.Borock P. Box 872 ort Worth Texas 76124 (Address) IMPORTANT NOTICE To obtain information or make a complaint: You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P.O. Box 149104 Austin, Texas 78714-9104 Fax # (512) 475-1771 PREMIUM OR CLAIM DISPUTES The address of the surety company making this bond to which any notice of claim should be sent may be obtained by calling the Texas Department of Insurance at the above number. Should you have a dispute concerning your premium or about a claim, you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached document. This notice is given to comply with Section 2253.048, Texas Government Code and Section 53.202, Texas Property Code effective September 1, 2001. PAYMENT BOND Bond No. 8205-79-46 THE STATE OF TEXAS § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF TARRANT § That we (1) Tri-Tech Construction,Inc.as Principal herein,and(2)Vigilant Insurance Company a corporation organized and existing under the laws of the State of(3)New York as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Three Hundred Ninety-five Thousand Four Hundred Twenty-five and no/100........................ Dollars ($395,425.00) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents: 'JUN 11 20w WHEREAS,the Principal has entered into a certain written contract with the Obligee dated the day of 2006, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length,for the following project: - Storm Drain Improvements on 14th Street,Thorckmorton Street and Houston Street(City Proiect No.00136) NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas Government Code, as amended)supplying labor and materials in the prosecution of the work under the contract,then this obligation shall be void;other wise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said y statue,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and Surety have executed this instrument. SIGNED AND SEALED this day of ,2006. Tri-Tec C struction Inc. PRINCI ATT � By: �p Name: `l� (Principal)Secretary Title: (SEAL) Address: 1133 E.LOOP 820 S. Fort Worth,Texas 76112 Witness as to Principal VIGILANT INSURANCE COMPANY SURETY AItESTc BY: Name: Charles D.Sweeney Stcretaty Attorney in Fact (SEAL)F- Address: 2001 Bryan Street,Suite 3400 n Dallas,Texas 75201 tness as to urety Jennifer R.Borock Telephone Number: 214-754-0777 NOTE: (1) Correct name of Principal(Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of the bond shall not be prior to date of Contract. MAINTENANCE BOND Bond No. 8205-79-46 THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That Tri-Tech Construction, Inc. ("Contractor"), as principal, and Vigilant Insurance Company a corporation organized under the laws of the State of New York , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of Three Hundred Ninety-five Thousand Four Hundred Twenty-five and no/100................................................................................................................... Dollars ($395,425.00) lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors,jointly and severally. This obligation is conditioned,however; that: WHEREAS, said Contractor has entered into a written Contract with the City of Fort Worth,dated the day of copy of which is hereto attached and made a part hereof, for ' the performance of the following described public improvements: Storm Drain Improvements on 14th Street,Throckmorton Street and Houston Street(City Proiect No.00136) the same being referred to herein and in said contract as the Work and being designated as project number(s) C291-309240013683 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and made a part hereof, and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of Two (2) years after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Two(2)years; and WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to -repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to .. maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and said City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 8 counterparts, each one of which r shall be deemed an original,this day of . A.D.2006. - ATTEST: TRITE H CQNSTRUCTIQN.INC. (SEAL) Contrac or �%✓ By: Secretary Name: r 46 Title: w VIGILANT INSURANCE COMPANY Surety A - By Secretary Name: Charles D. Sweeney Title: Attorney-in-Fact 2001 Bryan Street,Suite 3400 Dallas,Texas 75201 Address NEChubb POWER Federal Insurance Company Attn: Surety Department OF Vigilant Insurance Company 15 Mountain View Road Surety ATTORNEY Pacific Indemnity Company Warren, NJ 07059 Know Ail by These Presents,That FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation, and PACIFIC INDEMNITY COMPANY,a Wisconsin corporation,do each hereby constitute and appoint Kyle W. Sweeney, Charles D. Sweeney, Bobby E. Mayo and Michael A. Sweeney of Fort Worth, Texas------------------------ each as their true and lawful Attomey-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or aftering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this 30th day of April, 2003 Kenneth C.Wendel,Assistant Secretary If Fra k E.Robertson, ice President STATE OF NEW JERSEY ss. County of Somerset On this 30th day of April, 2003 before me,a Notary Public of New Jersey,personally came Kenneth C.Wendel,to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY,the companies which executed the foregoing Power of Attorney,and the said Kenneth C.Wendel being by me duly swom,did depose and say that he is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof;that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of the By-Laws of said Companies;and that he signed said Power of Attorney as Assistant Secretary of said Companies by like authority;and that he is acquainted with Frank E.Robertson,and knows him to be Vice President of said Companies;and that the signature of Frank E.Robertson, subscribed to said Power of Attorney is in the genuine handwriting of Frank E.Robertson,and was thereto subscribed by authority of said By-Laws and In deponent's presence. Notarial Seal \iLRU �P 'O,c• JANA KRUMPFER NOTAR),�9 Notary Public,State of New Jersey No. 2297116 Z PUBLIC Commission Expires February 25,200EI Notary Public JEP`o CERTIFICATION Extract from the By-Laws of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY: "All powers of attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company,either by the Chairman or the President or a Vice President or an Assistant Vice President,jointly with the Secretary or an Assistant Secretary,under their respective designations. The signature of such officers may be engraved,printed or lithographed. The signature of each of the following officers: Chairman,President,any Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." I,Kenneth C.Wendel,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY (the"Companies")do hereby certify that (i) the foregoing extract of the By-Laws of the Companies is true and correct, (ii) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are authorized by the U.S.Treasury Department;further, Federal and Vigilant are licensed in Puerto Rico and the U.S. Virgin Islands,and Federal is licensed in American Samoa,Guam,and each of the Provinces of Canada except Prince Edward Island;and (iii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Warren,NJ this day of I I j LUh,. SV C lay grlRANC%� Sop X0 * i �DIAN .rn.. �S(Ot15�� SEW 0 YO�� Kenneth C.Wendel,Assist nt Secretary IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY Telephone (908) 903-3485 Fax (908) 903-3656 e-mail: surety@chubb.com Forth 15.10-0225(Ed.498)CONSENT CITY OF FORT WORTH,TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT 2006 This agreement made and entered into this the day of A.D.,2006,by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 1 It'day of December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, Tri-Tech Constrcution,Inc.,HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: y 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Storm Drain Improvements on 14th Street,Throckmorton Street and Houston Street(City Project No. 00136) 2. That the work herein contemplated shall consist of furnishing as an independent contractor all y labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten(10) days after being notified in writing to do so by the Department of Engineering of the City i of Fort Worth. 4. i` The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 45 calendar days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of$210 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof,the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of - Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of _ any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a -- surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount(including/excluding) alternates n/a, shall be Three Hundred Ninety-five Thousand Four Hundred Twenty-five and no/100.......................................................................................................................Dollars,($395,425.00). 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. JUN 13 2006 Done in Fort Worth,Texas,this the day of ,A.D.,2006. RECOMMENDED: CITY OF FORT WORTH BY: DIRECTOR,DEPARTMENT OF CITY MANAGER ENGINEERING APPROVED: C y Marc A. Ott,Assistanity Manager TRANSPORTA ION/PUBLIC WORKS DIRECTOR ATTEST: Tri-Tech Constrcution,Inc. 1133 E.Loop 820 S. Fort Worth,TX 76112 CONTRACTOR CITY SECRETARY (SEAL) 0 _ I Contract Auth rization BY: Date TITLE APPROVED AS TO FORM AND LEGALITY: ADDRESS tva ASST. CIT. AT ORNEY November 1960 Revised May 1986 Revised September 1992 APPENDIX A GEOTECHNICAL REPORT T (The Geotechnical Investigation Report is provided for Contractor information purposes only. The information indicates subsurface conditions only at the specific locations where samples were obtained, only at the time they were obtained, and only to the depths penetrated. Samples cannot be relied upon to accurately reflect the strata variations that usually exist between sampling locations.) GEOTECHNICAL INVESTIGATION THROCKMORTON AND 14TH STREET .. WATER AND SANITARY SEWERS CITY OF FORT WORTH,TEXAS SUBMITTED TO PARSONS 45000 MERCANFILE PLAZA DRIVE,SUITE 228 FORT WORTH,TEXAS 76137 a r BY FI VJ ASSOCIATES,INC. DALLAS,TEXAS DECEMBER 12,2005 REPORT NO.04-102GD-0 MAPSCO NO.77A Houma 9200 King Arthur Dr. Oatlas,lX 75247-3610 Austin 214.6780227 Ph Dallas 214-678.0228 Fax .. "ASSOCIATES San Antonio W—Jr4-COM a. December 12,2005 Mr.jack Thibodeau,P.E. .. Parsons 4500 Mercanfile Plaza Drive,Suite 228 Fort Worth,Texas 76137 + Re. Geotechnical Investigation Throckmorton Sanitary Sewers Between 11d,and 14th Streets Fort Worth,Texas Owner City of Fort Worth HVJ Report No.04-102GD-0 + Dear Mr.Allen. Submitted herein is the report of our geotechnical investigation for the above referenced project r. The study was conducted in general accordance with our proposal number 04-102GD-0 dated September 13,2004 and is subject to the limitations presented in this report We appreciate the opportunity of working with you on this project Please read the entire report •• and notify us if there are questions concerning this report or if we may be of further assistance. Sin OF T1D HVJ ASSOC TES,INC. „�P��•.. ... Sy�,i *...S•A Ht M•ESMAIL* Hossam Fsmzil,P.E. i a': 89980 Professional Services Manager �Pfi3O,NN ICENSEO.'`�w� .. HE/PH:he tan coo���`�`�,. Copies submitted: Two pound and one loose The seal appearing on this document was authorized by Hossam Email- P.E. 89980 on December 12, 2005. Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act The following lists the pages which complete this report: Main Ten—16 pages o Plates—11 pages .■ on .r rn .r rr Flo rR63ffWl TEX.