HomeMy WebLinkAboutContract 33678 s� cny CONI'RACTC n BANDING(o. SPECIFICATIONS 22 CONSTRUCT M COPY CONTRACT DOCUMENTS orrY SECRErAW CIIEW DEPARTMENT FOR CONTRACT NO. 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS R.O.W. •. FROM GREENBELT " TO FM 157 CONTRACT 1, UNITS 1 AND 2 " WATER PROJECT NO. P264-605140035283 D.O.E. NO'S. 3600 (UNIT 1) & 5191 (UNIT 2) CITY PROJECT NO. 003521 IN THE CITY OF FORT WORTH, TEXAS 2006 MIKE MONCRIEF CHARLES R. BOSWELL MAYOR CITY MANAGER r ROBERT D.GOODE,P.E. DIRECTOR,TRANSPORTATION ^. AND PUBLIC WORKS DEPARTMENT FRANK S.CRUMB,P.E. r DIRECTOR,WATER DEPARTMENT OF Ph'F1%Iol A.DOUGLAS RADEMAKER,P.E. g4 �� DIRECTOR,ENGINEERING DEPARTMENT *too-" .•. tea..�'::��• 70 Prepared by: . r � TranSystems Corporation Consulta S- 500 500 West Seventh St.,Suite 600 -3 dno Fort Worth,Texas 76102 IGINAI cl WW'W'C1FW"*v*M' Horne J Council A�;enda 1 M&C I Employee Difectciry I Morning Repott I Ads PRS I IT Online t Departrvieflt5 I Site mat; Print M&C COUNCIL ACTION: Approved on 6/20/2006 DATE: 6/20/2006 REFERENCE NO.: C-21533 LOG NAME: 3030TRINITY CODE: C TYPE: NON-CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of a Contract with S.J. Louis Construction of TX Ltd., for 36-Inch Water Main Extension along Trinity Railway Express Right-of-Way (Greenbelt Road to FM 157) Contract 1, Units 1 and 2 (City Project No. 00352) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with S.J. Louis Construction of TX Ltd., in the amount of$3,989,167.57 for 36-inch Water Main extension along Trinity Railway Express Right-of-Way (Greenbelt Road to FM 157) Contract 1, Units 1 and 2. DISCUSSION: On March 19, 2002, (M&C C-18999) the City Council authorized the City Manager to execute an engineering agreement with TranSystems Corporation Consultants, to prepare plans and specifications for Trinity Boulevard Water Main Extension from Greenbelt Road to State Highway 360. In order to expedite construction, the contract was divided into two contracts: Contract 1 (Units 1 and 2) from Greenbelt Road to FM 157 and Contract 2 from FM157 to State Highway 360. Council approval is being sought for Contract 1 via this M&C and Contract 2 will be advertised for bid at a future date. The Contract 1 project consists of the installation of approximately 17,000 LF of primarily 36-inch water pipe and related appurtenances The project was advertised with both units on March 30 and April 6, 2006. On May 4, 2006, the following bids were received for Units 1 and 2 respectively: Bidder Amount Time of Completion UNIT 1 S. J. Louis Construction of TX Ltd. $1,566,497.50 180 Calendar Days Gin-Spen, Inc. $1,771,071.75 William J. Schultz Inc. dba Circle $1,815,503.75 UNIT 2 S. J. Louis Construction of TX Ltd $2,422,670.07 180 Calendar Days Gin-Spen, Inc. $2,532,854.70 William J. Schultz Inc. dba Circle $2,740,632.00 In addition to the contract cost, $363,000 is required for inspection, material testing, and other construction related costs and $119,675 is required for project contingencies. Since S.J. Louis Construction of TX Ltd., is the low bidder on both units, construction will begin simultaneously and the contractor will be allowed a total of 180 calendar days to complete construction of both units as stipulated in the project contract documents. S.J. Louis Construction of TX Ltd., is in compliance with the City's I\/ll/WBE Ordinance by committing to 17% MANBE participation. The City's goal for both units combined is 15%. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P264 541200 605140035283 $3,989,167.57 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS v.sic,. b� CITY OF FORT WORTH 2006 DEPARTMENT OF ENGINEERING ADDENDUM NO. 1 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. No. 3600 (Unit 1) & 5191 (Unit 2) Water Project No. P264-605140035283 BID RECEIPT DATE: 1:30 PM, April 27, 2006 ISSUED: April 18, 2006 This Addendum No. 1 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page 131-28) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. The Plans, Specification and contract documents for 36" Water Main Extension Along Trinity Railway Express from Greenbelt Road to FM 157 are hereby revised as follows: PLANS: 1. Replace Sheets 29 and 32 with the attached revised sheets 29 and 32. 2. On Sheet 13: Prospective bidders are hereby informed that a 16"X10" cap and tee will be installed close to station 2+50. The exact location of the tap will be identified by the city inspector and property owner during construction of the 16- inch main. A pay item for the tap is provided in the proposal section of the specifications and contract documents. SPECIFICATIONS AND CONTRACT DOCUMENTS: 1. Replace Part DA Additional Special Conditions item DA-46 "Recommended Sequence of Construction" with the attached revised DA-46. 2. Replace Proposal Sheet 131-8 with revised sheet 131-8R. 3. Replace Proposal Sheet B1-17 with revised sheet 131-17R. The entire addendum package will be sent over night to all prospective bidders. J� i�uVL;tr!�i GAFW01U64RSp,==NfRACf IWddmd.m IV.M-d 1,-dm kri;.i yip%NVi l All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal. RECEIPT ACKNOWLEDGED: A. Douglas Rademaker, P.E., Director, DOE By: By: o�y Tony Sholola, P.E., Manager Engineering Services C:�Docvmmts�ShciogsWudowQLocd SetlultylTmpoRy 51an4 Filal0llC9AlAddvd Itev.Qoc 7. DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION It is recommended that the proposed water improvements be conducted with a rigid schedule to meet the contract duration. Below is the recommended sequence of construction for operations at 36"water main and 24" & 16" connection lines. Plans state that the proposed 36" water main shall be connected into the existing 36" water main via a connection at the existing tee. After the work start date has been established, the selected contractor shall be required to submit the beginning and ending dates for all major work areas (including pavement repair on each of the project streets if applicable). Please be advised that the contractor has the option of submitting an acceptable alternate sequence of construction than stated below. The contractor shall not be allowed to begin work (but time charges will begin on the project) until the preferred sequence of construction and schedule of work has been submitted to and approved by the City. The following sequence is recommended' in order to coordinate construction activities with Fort Worth Field Operations. 1. All material must be on-site or available before the City will approve shut-down of the existing line. a. All connections to the existing lines shall be done in the winter (November to March). Installation in April or later will likely hinder water delivery due to seasonal increases in system water demand. b. The contractor is to work on the weekend as necessary to minimize the impact of the down water line. c. The contractor shall construct the proposed 36"& 24" line and put them in service before the connection of the proposed 16" line can be connected to the existing 24"water line (in Jimeson). d. Contractor shall limit the down time of the existing 36" and 24" water line to 8 hours for the connection of the proposed water line. If the line is not in service in the 8 hour period the contractor is to continue working until the line is back in service and the connection is approved by the City. 2. Contractor to notify the City Inspector who will contact Field Operations 2 weeks prior to beginning construction. 3. After the Contractor contacts the City Inspector who notifies Field Operations that construction is ready to start, the Field Operations will review tank levels and current operations to determine a time the system will be shut down for installation of the proposed 36" water main. The contractor will contact the City Inspector who will contact Field Operations 1 week prior to beginning construction on any of the connections to the existing water lines. Field Operations will operate existing valves. The Contractor is expected to dewater the water pipes between the shutoff valves prior to construction. The locations of the existing 36"shutoff valves that are adjacent to the proposed connection are described on sheet 6. The 16" shutoff valve is shown in the plan view. The total G:\FW0112643\Specs\C0NTRACT 11Addendum ftequence of construction.doc length of existing 36" pipe to be dewatered is approximately 6250 If. A map of the location of gate valves; blow off valves and air valves is on sheet 3 of the plans. Blow off valves are located at Trammel-Davis along Greenbelt Rd. and the south side of the Trinity River at Greenbelt Rd. Air release valves are located near the 16" water main near station 10+19, 500' north of Trammel-Davis Rd. along Greenbelt Rd. and north side of the Trinity River at Greenbelt Rd. 4. The Contractor shall prefabricate proposed valve, manhole and connection components prior to excavation at all connection locations. 5. The Contractor shall install the connection, valves and blocking. 6. Care shall be given to excavating or removing material near the existing water mains. Existing pipes shall be blocked at all times. Contact the City Inspector who will contact Field Operations when valves need to be opened or closed for construction activities. GAFW01\2643\Specs\C0NTRACT 1\Addendum 1\sequence of construcUon.doc k i- 36"Water Main Ext. Along TRE RO.W. Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price 19. 7 EA Exploratory D-Hole $ $ Dollars& Cents per FA 20. 1 LS Cathodic Protection $ $ Dollars& Cents per Ds 21. 300 LF Extra trench depth for 36 inch pipe and $ $ fitting in excess of 1 foot below the design grade complete in place as for the sum of Dollars& Cents per LF 22. 1 EA 36"Plug $ $ Dollars& Cents per FA 23. 1 EA 16"x 10"Cap&Tee $ $ Dollars& Cents per FA Unit 1: Total Water Bid, $ GAFWOI\2643\Spas\CONTPACT 1\Addenduml\Proposal-Uniland2rev 4-14-06.doc B 1-8R(Addendum No. 1) April 18, 2006 C *- .. 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No. 5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price 5. 3 EA 36-inch Resilient Seat Gate Valve $ $ w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances Dollars& Cents per EA 6. 5 EA 24-inch Resilient Seat Gate Valve $ $ w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances Dollars& Cents per EA 7. 2 EA 10-inch Resilient Seat Gate Valve $ $ w/Concrete Valve Vault and Ext. Stem, Including a By-Pass and all other appurtenances Dollars& Cents per EA 8. 1 EA 8-inch Resilient Seat Gate Valve $ $ w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances Dollars& Cents per EA G:TM1\264RSpem\CONTRACTMddendumt\Proposal-Uniltand2rcv4-14-06.dm B1-17R(Addendum No. 1) April 18, 2006 Aori?4, 2006 3 :22P1,;" Tr+aoSvstA,ms No .4332 P , 2/3 k s V+1 CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 2 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36"' WAFER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. NO. 3600 (Unit 1) & 5191 (Unit 2) Water Project No. P264-605140035233 BID RECEIPT DATE: 1:30 PM, April 27, 2006 ISSUED: April 24, 2006 This Addendum No. 2 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page 131-28) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification, The Plans Specification documents for 36" Water Main Extension Along Trinity Railway Express from Greenbelt Road to FM 157 are hereby revised by Addendum No, 2 as follows: SPECIFICATIONS: 1 Proposal Sheet 131-4 is replaced with B1-4R with a quantity revision to pay item 4. Ali other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect.. The Contractor shall acknowledge receipt of this Addendum in the space provide below, in the proposal (page B1-28) and acknowledge receipt on the outer envelope of your bid, Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal RECEIPT ACKNOWLEDGED- A. Douglas Rademaker, P-E,, Director By:_ 1 gy . Tony Sholola, P.E.., Manager Engineering Services C.Mmmm eoQ3vUNW6kVw&*A19dwW11*rvroy McRI TOWR1M�A&IwA2Ac , Air , ,,, 2006 3 22P0 *T;pSys tems No 4332 P . 3/3 4 36"Water Main Ego.Along TRE ILO.W.Contract I Unit 1,DOE No.3600 _ Pay Appraainge D acriodon of Rid Item Priers Lail Total Item dssatity Wrines Is Words Mee Prize " 4_ 4 EA 36-inch Resilient Scat Gate Valve $ _ $ w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances -- DoUm& Cc acs W EA 5. 2 EA 24-inch Resilient Scat Gatc Valve S S w/Concrete Valve Vault and Ext. Stern, Including a 4"By-Pass and all othtx appurtenances naw%& Cent per EA 6. 2 EA 16-inch Resilient Seat Gate Valve S $ w/Concrete Valve Vault and Ext. Stan, Including a By-Pass and all other appurtc-nances per City Detail wars a Casa per CA arlvoa �xa�co�Jtn.�crn.e+ zu�«.a«t.idesevs�asope B1-4R(Addendum No.2) April 24, 2006 W - 25 . 2Q06 1 :47PM TrdnSYStems No. 4ddi 9 CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 3 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. NO. 3600 (Unit 1) & 5191 (Unit 2) Watcr Project No. P264-605140035283 BID RECEIPT DATE: 1:30 PM, April 27, 2006 ISSUED: April 25, 2006 This Addendum No. 3 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page 131-28) and acknowledge receipt on the outer envelope of.your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. The Plans Specification documents for 36" Water Main Extension Along Trinity Railway Express from Greenbelt Road to FM 157 are hereby revised by Addendum No. 3 as follows: PLANS: 1. The Flexible Pipe Trenching, Embedment & Backfill detail shown on sheet 48 is to be omitted and not used for this project,. SPECIFICATIONS. 1. Proposal Sheet B1-17 is replaced with B1-17R with a revision to the description of pay item 8. 2. Proposal Sheet 81-19 is replaced with B1-19R with a revision to the description of pay item 13. O:S1M91V6iTSDeCMDHiRAR 1`Aaf vlN Tf00oC]dpi APF25. 2006 1 :48PM TranSvstems N0 .4W r 3 All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. The Contractor shall acknowledge receipt of this Addendum in the space provide below, in the proposal (page 81-28)and acknowledge receipt on the outer envelope of your bid. Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal„ RECEIPT ACKNOWLEDGED: A. Douglas Rademaker, P.E., Director By.. By: un S �— Tony Sholola, P.E., Manager Engineering Services 0 ww1:.�OCOM,cr I%ems.:,.nAsk=1 5AK 2 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 r7 Pay Approximate description of Sid Item Prices Unit Total Item Quantity Writfen is Words Price Price 5. 3 EA 36-inch Resilient Seat Gate Valve S $ w/Concrete Valve Vault and Ext. Stem, - Including a 4"By-Pass and all other appurtenances _Dollars& Cmc.per EA 6. 5 EA 24-inch Resilient Seat Gate Valve S S w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances Doifars& Cents per FA 7. 2 EA I0-inch Resilient Seat Gate Valve S $ w/Concrete Valve Vault and Ext. Stem, Including a By-Pass and all other appurtenances ants per FA 8. 1 EA 8-inch Resilient Seat Gate Valve $ $ w/Concrete Valve Vault and Ext Stem, Including all other appurtenances .. --Dollars& FA c•Fw0n2"�roHr"C-r man;\PMP="*1G3a Y•4-.2--fte« B1-17R(Addendum No. 3) April 25,2006 o f,,;✓J` i 1.040 , ` 36"Water Main EXit.Along TRE R.O.W. Contract 1, Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Price& Unit TOW mean Quantity WOWS in Words Price Pricc 11 5 EA 8-inch BIowoff Valves and 4-foot Dia. $ $ Sump Manhole,(Including Tee at Main, 2-3"Resilient Seat Valves and Adapters as Required) Douots� Cats per EA 12. 1 EA 24ncb Combination Air&Vacuum $ $ Release Valve and 4-foot Dia. Manhole, (Including Tee at Main and Adapters as Required) )onm — , Cents w EA 13. 1 EA 4-inch Blowoff Valves and 4-foot Dia. $ $ Sump Manhole, (Including Tee at Main, 24'Resilient Seat Valves and Adapters as Required) ,. ,r Dollars& Cents per EA 14. 1 LS Install and Maintain SWPPP $ S flvllatS& Cath per 1S Cr7WDr,?A3%SpaK'OM'R.%CTlk Medm*31Pmj &WJwtm.Vt"4-25-W BI-19R (Addendum No. 3) April 25, 2006 WN CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 4 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. NO. 3600 (Unit 1) & 51.91. (Unit 2) Water Project No. P264.605140035283 BID RECEIPT DATE: April 27, 2006 REVISED DID RECEIPT DATE: MAY 4, 2006 ISSUED: April 26, 2006 This Addendum. No. 4 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page 61-28) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. Prospective bidders are hereby informed that the bid opening date is delayed until May 4, 2006. All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect.. The Contractor shall acknowledge receipt of this Addendum in the space provide below, in the proposal (page 131-28) and acknowledge receipt on the outer envelope of your bid Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal.. RECEIPT ACKNOWLEDGED-. A. Douglas Rademaker, P.E.., Director By,, By; G Tony Sholola, P E,, Manager, Engineering Services caoo�.gem..e�r .owacma.bneen� ueuoucuaneemea.m. � May , 2 . 2006 3:09PM- ranSystems No -45234 P . 2/4 CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 5 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. NO. 3600 (Unit 1) & 5191 (Unit 2) Water Project No. P264-605140035283 BID RECEIPT DATE: 1:30 PM, May 4, 2006 ISSUED: May 2, 2006 This Addendum No. 5 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page B1-28) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. The Plans Specification documents for 36" Water Main Extension Along Trinity Railway Express from Greenbelt Road to FM 157 are hereby revised by Addendum No. 5 as follows: SPECIFICATIONS: 1. Proposal Sheet B1-3 is replaced with B1-3R with a revision to allow the use of 16-inch Ductile Iron Pipe only on pay item 3. CLARIFICATIONS: 1, With regard to Section 02617 — Buried Steel Pipe and Fittings, the following clarifications are noted: a. The minimum wall thickness for steel pipe shall be 0.23-inches or outside diameter/230, whichever is greater as per Part 1.03.E.3. b. The maximum steel pipe segment length shall be 40-linear feet as per Part 2.01,D, All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. The Contractor shall acknowledge receipt of this Addendum in the space provide below, in the proposal (page 131-28) and acknowledge receipt on the outer envelope of your bid. G-.%M6A2&i1Ap.oa'MMACT RA&WWum SaM d 5rul c 1 May . 2. 2006 3: 09PV ranSystems No - 4523,, P- 3/4 - 1s 16i Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal RECEIPT ACKNOWLEDGED: A.. Douglas Rademaker, P.E., Director By'. By: Tony Sholola, P.E., Manager Engineering Services r e u wotvse rnw:r VAMMm 0-ddoW AM- Z May . 2 , 2006 3:09PM TranSvstems No -4523� P. 4/4 .. 36"Water Main Ext Along TRE R.O.W. Contract 1,Uiait 1,DOE No.3600 Pay Approldmate Description of Sid Item Priem Unit Total Item Quantity Written in Words Pricc Price **2c. 211 LF 36-inch Steel pipe(min 200psi working Q $ pressure)furnished and installed in 54- inch Steel Casing(0.50"thick) furnished and installed by 011ier than.Open Cut ._,, rlonats& celtt>ra LF 3. 1,765 LF 16-inch DIP (min 200psi working $ $_ pressure)Water Line Wrapped in Polyethylene by Open Cut(Includes Excavation,Embedment and Backfill) [�o1Wn& Cents per U C:1YW011'64ASVec MWTNA('1'I\A4&rdum S)NpGftW*k19uVmI 5,l•06Ax B1-3R (Addendum No. 5) May 2,2006 May . 4, 2UU6 9 :UUAM IranSYstems No 4VJ N CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 6 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS FROM GREENBELT ROAD TO FM 157 D.O.E. NO. 3600 (Unit 1) & 5191 (Unit 2) 'W'ater Project No. P264-605140035283 BID RECEIPT DATE: 1:30 PM, May 4, 2006 ISSUED: May 4, 2006 This Addendum No. 5 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provide below, and in the proposal (page 131-28) and acknowledge receipt on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. The Plans Specification documents for 36" Water Main Extension Along Trinity Railway Express from Greenbelt Road to FM 157 are hereby revised by Addendum No. 5 as follows: SPECIFICATIONS: 1. Proposal items for Resilient Seat Gate Valves: Delete requirement for By-Pass Valve and Piping for all Resilient Seat Gate Valves (8 thru 36-inch) on this project. All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. The Contractor shall acknowledge receipt of this Addendum in the space provide below, in the proposal (page B1-28) and acknowledge receipt on the outer envelope of your bid. Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal. RECEIPT ACKNOWLEDGED: A. Douglas Rademaker, P-E., Director By: By: MW Tony Sholola, P.E., Manager Engineering Services G.ER'OtQf,TayKh0U1+TMGT h-66ndam WddW 64m I I SPECIFICATIONS CONTRACT DOCUMENTS FOR 36" WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRESS R.O.W. FROM GREENBELT RD TO FM 157 CONTRACT 1, UNITS 1 AND 2 WATER PROJECT NO. P264-605140035283 D.O.E. NO'S. 3600 (UNIT 1) & 5191 (UNIT 2) CITY PROJECT NO. 003521 IN THE CITY OF FORT WORTH, TEXAS 2006 MIKE MONCRIEF CHARLES R. BOSWELL MAYOR CITY MANAGER ROBERT D.GOODE,P.E. DIREC-OR,TRANSPORTATION AND Pl.3LIC WORKS DEPARTMENT FRANK S.CRUMB,P.E. "N-n`0 DIRECTOR,WATER DEPARTMENT �"$� OF�'� ,!! A.DOUGLAS RADEMAKER,P.E. DIRECTOR,ENGINEERING DEPARTMENT RM.l»....... ........ °. 64170 % Prepared by: til a TranSystems Corporation Consultants 500 West Seventh St.,Suite 600 Fort Worth,Texas 76102 TABLE OF CONTENTS Part A-Notice to Bidders Special Instructions to Bidders (Water Department) City of Fort Worth Minority/Women Business Enterprise Policy Part B-Proposal Part C-General Conditions Part C1 —Supplementary Conditions to section C Part D- Special Conditions Part DA-Additional Special Conditions Certificate of Insurance Part F-Bonds(City of Fort Worth) 0 Performance Bond 0 Payment Bond 0 Maintenance Bond Part G-Contract(City of Fort Worth) Appendix A-Permits Appendix B—Standard Drawings Appendix C—Misc. Specifications p. G.IRMI1164317pmIC0NMC7-lITC.dor TC-I Part A - Notice to Bidders - NOTICE TO BIDDERS Sealed proposals for the following: For: 36"Water Main Ext.Along TRE RO.W.Contract 1 (From Greenbelt to FM 157) D.O.E.Nos.—3600(Unit 1),5191 (Unit 2) Water Project No.P264-605140035283 Unit 1 211 LF 36-inch Water Main by Other Than Open Cut - 5,380 LF 36-inch Water Main by Open Cut 1,765 LF 16-inch Water Main by Open Cut Unit 2 - 433 LF 36-inch Water Main by Other Than Open Cut 7,182 LF 36-inch Water Main by Open Cut 1,751 LF 24-inch Water Main by Open Cut Addressed to Mr. Charles R.Boswell, City Manager for the City of Fort Worth, Texas,will be received at the Purchasing Office until 1:30 PM,Thursda r}_April 27,2006 and then publicly opened and read aloud at 2:00 PM in the Council Chambers. Contract documents, including Plans and specifications for this project may be obtained at the office of the Department of Engineering,Municipal Office Building, 1000 Throckmorton Street, Fort Worth,Texas. One set of plans and documents may be purchased at a cost of sixty dollars($60.00), such purchase being non-refundable. Additional sets may be purchased on a nonrefundable basis for sixty dollars ($60.00)per set. There will be a pre-bid conference on April 3,2006 at 10:30 AM,in the Transportation and Public Works Conference room No. 270, 20d floor, City Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. Bid security is required in accordance with the Special Instruction to Bidders. Bidders are responsible for obtaining all Addenda to the contract documents and acknowledging receipt of the Addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be - rejected as being non-responsive. Information regarding the status of Addenda may be obtained by contacting the Department of Engineering at 817-392-7910. The improvements included in this project must be performed by a contractor who is pre-qualified by the Water Department at the time of bid opening. The procedures for pre-qualification are outlined in the "Special Instructions to Bidders(Water Department)". The selected contractor(s)shall be prepared to submit pipe shop drawings(if applicable)within 14 days of being awarded contract(s)by the Fort Worth City Council. r For additional information concerning this project, please contact Rakesh Chaubey, P.E., Project Manager, at 817-392-6051 or Joseph C.Masterson,P.E.at 817-339-8950. Advertising Dates: March 30,2006 April 6,2006 Fort Worth,Texas G:IFW0112643VS wsICONTRACT 1 WB.doc NB-1 PART A - COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: For: 36"Water Main Ext Along TRE RO.W. Contract 1 (From Greenbelt to FM 157) D.O.E.Nos.—3600 (Unit 1),5191 (Unit 2) Water Project No. P264-605140035283 Addressed to Mr. Charles R. Boswell, City Manager for the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 PM, Thursday, April 27, 2006 and then publicly opened and read aloud at 2:00 PM in the Council Chambers. Plans for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents may be purchased at a cost of sixty - dollars ($60.00), such purchase being non-refundable. Additional sets may be purchased on a non- refundable basis for sixty dollars($60.00)per set. All bidders will be required to comply with Provisions 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400,Fort Worth City Code Sections 13- A-21 through 13-A-29,prohibiting discrimination in employment practices. There will be a pre-bid conference on April 3, 2006 at 10:30 AM, in the Transportation and Public Works Conference room No. 270,2 nd floor, City Municipal Building, 1000 Throckmorton Street,Fort Worth,Texas 76102. The Contractor(s) agrees to begin construction within 10 days after issue of the work order, and to complete the construction within 180 Calendar days (for Units 1 and 2 in the event individual contracts are awarded for each unit and 180 Calendar days in the event a single contract is awarded for both units) after beginning construction as set forth in the written work order to be furnished by the Owner. Liquidated damages shall be assessed as indicated in General Conditions section C7-7.10,except that the sum per day shall be$3,000.00 for this contract(s). The major work on the above project shall consist of the following: Unit 1 211 LF 36-inch Water Main by Other Than Open Cut 5,380 LF 36-inch Water Main by Open Cut 1,765 LF 16-inch Water Main by Open Cut Unit 2 433 LF 36-inch Water Main by Other Than Open Cut 7,182 LF 36-inch Water Main by Open Cut 1,751 LF 24-inch Water Main by Open Cut .. GAFW01126431SpecsICONTRACT 1WB2.doc NB-1 PART A- COMPREHENSIVE NOTICE TO BIDDERS Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. The improvements included in this project must be performed by a contractor who is pre-qualified by the Water Department at the time of bid opening. The procedures for pre- qualification are outlined in the"Special Instructions to Bidders(Water Department)". The City reserves the right to reject any and/or all bids and waive any and/or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date the MBE/WBE UTILIZATION FORM SUBCONTACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH - EFFORT FORM with Documentation and/or the JOINT VENTURE FORM as appropriate is received by the City. The award of contract, if made, will be within ninety (90) days after this documentation is received, but in no case will the award be made until all the necessary - investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817)392-7910. { This document is designed as two (2) separate contract documents and shall not be construed as being a single contract. The proposal sections are provided as two (2) individual proposals with two bidders to submit bids on one or all units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a contractor is the responsive low bidder on both units, a single set of contract documents consisting of both units will be created and one single award of contract shall be made. The Contactor shall comply with the City's M/WBE Ordinance on each unit unless NV WBE goals are provided for all possible combination of units. Construction time on all units will run concurrently. For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction time period. The successful bidder(s) for each unit or both units shall be prepared to submit pipe shop drawings within 14 days of being awarded contract by the Fort Worth City Council. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM with Documentation and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five(5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate GAFW0M643tSpecs1C0NTR4CT 1 WB2.doc NB-2 PART A- COMPREHENSIVE NOTICE TO BIDDERS employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Prospective bidders are hereby advised that the City has not acquired all necessary easements for the construction of the project. It is anticipated_that all the necessary easements will have been - acquired by the start of construction. No compensation shall be provided for delays if lack-of executed easement(s)cause work stoppage and the contractor shall honor his unit bid prices for the proj ect. Bidders are advised that 6 copies of the Storm Water Pollution Prevention Plan will be made available for review at the Engineering desk. Two copies of the Storm Water Pollution Prevention Plan will be provided to the contractor once the contract is awarded. The Contractor shall be prepared to commence construction without all executed easement and permits and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require easements or permits. r The Managing Department for this project is the Department of Engineering. For additional information concerning this.project, please contact Mr. Rakesh Chaubey, P.E., - Project Manager,at(817)392-6051 or Joseph C...M. P.E.at(817)339-8950. Charles R.Boswell City Manager Marty Hendrix City Secretary A.Douglas Rademaker,P.E.,Director Department of Engineering .r By; all old lel Tony Sholola,P.E. Engineering Manager Advertising Dates: March 30,2006 Ayri16,2006 Fort Worth,Texas G:%FW01%26431specstC0NTR/tcr iwB2.doc NB-3 Special Instructions to Bidders _ (Water Department) SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the v contractor. It is the bidder's responsibility to submit the following documentation:a current financial statement,an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7) calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous ur statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project,it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial w qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City,in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. - g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(50/6)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States _ secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. 3. BONDS: A performance bond,a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: T Section C3-3.13 of the General Conditions is deleted and replaced with the following: 06/04/03 (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, 4+ including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal fiords. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, �w Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract,shall,in connection with the employment,advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,employees, Y subcontractors,program participants,or persons acting on their behalf,shall specify,in solicitations or 06/04/03 advertisements for employees to work on this contract,a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend,indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal,state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM(`with Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request,Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or women business enterprise (WBE)on the contract and payment thereof. Contractor fimrther agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal,State or local laws or ordinances relating to false statements. Further,any such misrepresentation of facts(other than a negligent misrepresentation) +� and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. .�. 12. FINAL PAYMENT,ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less retainage)from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed,as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. 06/04/03 e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)final quantities,or(ii)liquidated damages,city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall attempt to resolve the differences within 30 calendar days. r .r 06/04/03 City of Fort Worth Minority/Women Business Enterprise Policy ATTACHMENT IA Page 1 of 4 --R�„WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime ` ST Lcut5 Co),j oF- 7CEIA5 LTD PROJECT NAME: M/W/DBE X NON-MNV/DBE 3(, V/ATER MAN EATDJSIOIQ �4tr T P"E. ila)til BID DATE M d Lw as M A ZooG City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 17 % 1 % Doc 36,00 i5191 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5)City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,Parker,Johnson,Collin,Dallas, Denton,Ellis,Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor,i.e.,a direct payment from the prime contractor to a subcontractor is considered 1'`tier,a payment by a subcontractor to its supplier is considered 2dd tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been - determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA),or the Texas Department of Transportation(TX DOT),highway division. Disadvantaged Business Enterprise(DBE)is synonymous with Minority/Women Business Enterprise(M/WBE). If hauling services are utilized,the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm,including M/WBE owner-operators,and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 0 6 P 0 4: 1 4 11 ATTACHMENT 1A SOK 05-09- Page 3of4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification (check one) c SUBCONTRACTOR/SUPPLIER T r � Company Name i N T Detail Detail Address I M wC X p Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D 1' E E R O 'E C T E A TM MaTeIZII L's v .Iol* Roar-_ PAAo � PO. 16OX 4% �NIS�DMr�lr ALVORAoC� TY :76ZZ5 1 82,-6_433 LKT = AssociA T€5 4,,-40a TROM As ✓ P,PE-, cp4wcX045. 33 6 iV Ro PI-, N1Ise- MEL-issA TX 35454 !'YI04T.t AL5/ 2114 4-6446 Cry _ AOT 914t_ t%o 5VOLt r 1DPYV I0 Sl_;r6_V_j mo o , zsa5- NE- 28 71}sr. NI A -5 �OR-7- ln/oQ.i 7� T,7Z AIM CR�i�, Oc.oe-rl ►n1C ,c�c. COD cR.P,t G o�a� �t�- �r9•� �Z1t 450. P, O. S03( 5,c�c� rrnE- a-M, M 45n(O8 Z Zg - OEM 90501x0- S 'nom.. Sy�prL 00 _ O=Vl 9.0 C_ T% 7385 M►47 I -S MuR.Qwlty Sm 1n,4 i 1l Z - 1 - AmEK.ICOW Nw-TILc DIP PIAS eo =uw IPA—= t i,35Z 461 errs rA �, INK GI�W Z14) Z,33--J200 Rev.5/30/03 ATTACHMENT IA FORT WORTH Page 4 of 4 B Total Dollar Amount of M/WBE Subcontractors/Suppliers $ to 77 9 t Q-7b , ^ 6 Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ 11 4 Z 11 7(o Od TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ Zi JCOf 83 - The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval o ChangelAddition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlinedin the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted,it will affect the final compliance determination. By affixing a signature to this form,the Offeror further agrees to provide, directly to the City upon request,complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books,records and files held by their company. The bidder agrees to allow the transmission of interviews with owners,principals,officers,employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s)on this contract,by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one(1)year. M IC.HAEL '0_ CA,M0_5 Audyfrized Signature Printed Signature C N1EF �5T JMAT6e- l aCOELT- N&WRL Title Contact Nameffitle(if different) .6T Louis C°rs m&xancAl o� 7&-mis �- J 6320 Company Name Telephone and/or Fax 5'ZO S. 6 �'�ir�,,k,�- M t K -0 @ STc.ou i s. Cork', Address E-mail Address M4rsrigLi) TX -:1-66A3 5-/9 A% City/State/Zip Date Rev.5/30/03 PART B-PROPOSAL— 36"Water Main Ext.Along TRE R.O.W. TO: CHARLES R.BOSWELL FROM: (Bidder's Name) CITY MANAGER NX6uCk6y,Q( ",(u. FORT WORTH,TEXAS 52o S.(c}h ve�VVlcuns �ldi Texas din bG3 (Address) For: 36"Water Main Ext.Along TRE R.O.W.,DOE No. 3600 and DOE No 5191 Water Project No.P264-605140035283 Pursuant to the foregoing "Notice to Bidders," the undersigned has thoroughly examined the plans, specifications, and the site, understands the amount of work to be done and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete the work as provided in the Plans and Specifications, and subject to the inspection and approval of the Director,Department of Engineering of the City of Fort Worth. Upon acceptance of this proposal, the bidder is bound to execute a contract and furnish Performance and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums to-wit: 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price Unit 1: Water Improvements *la. 5,380 LF 36-inch Pre-tensioned Concrete Cylinder $_ 8110_ $_ Pipe C-303 (min 200psi working pressure)by Open Cut,(Includes Excavation,Embedment and Backfill) 1Yb Dollars& Cents per LF ,50 p0 _ *lb. 5,380 LF 36-inch DIP(min 200psi working s159 $ Sj�B 10. pressure)Water Line Wrapped in Polyethylene by Open Cut(Includes Excavation,Embedment and Backfill) & I Pr _cents per LF # tractor shall select la,lb or lc s:Ww01v643\sp=\c0x►Racr1 -uki�az.a« B1-1 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price *lc. 5,380 LF 36-inch Steel Water Pipe(min 200psi $ N6 $ working pressure)by Open Cut,(Incl. Excavation,Embedment and Backfill) c { Dollars& Cents per LF **2a. 211 LF 36-inch Pre-tensioned Concrete Cylinder $ N6 _ $_ Pipe C-303 (min 200psi working pressure)pipe furnished and installed in 54-inch Steel Casing(0.50"thick) furnished and installed by Other than Open Cut, Dollars& Cents per LF ` 00 00 **2b. 211 LF 36-inch DIP(min 200psi working r- pressure)pipe Wrapped in Polyethylene famished and installed in 54-inch Steel Casing(0.50"thick)furnished an installed by Other than Open Cut F'tyc: I-Loqoaxo ,,MAjj�17q F6 V&_ Dollars& /Yy cents per LF ** Contractor shall select 2a,2b or 2c G:TM1\2b43\Spaa\C0NntACf Aftuposal-UnillarAM&c B1-2 '006 M lranystems No -4bN P . 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 1,DOE No.3600 Pay ApproAmte 1)"crirstion or Bid Item Prlcrs Unit Total Item Quantity Written in Words Pricc Price I — **2c. 211 LF 36-inch Steel pipe(min 200psi working $_ IV�_ $- &40 _ pressure) furnished and installed in 54- inch Steel Casing(0.50"thick) furnished and installed by Other t1=Open Cut nonats& emu pc7 LF 0o m 3. 1,765 LF 16-inch DIP (min 200psi working $_ o8p pressure)Water Line Wrapped in Polyethylene by Opcn Cut(Includes Excavation,Embedment and Backfill) _ SEyoaT-/ —_---TW Donars& NO _Cents per U c:vworx:.nsv�cou,k.c: aae��e�ms�N, �u.w��as,,�sl-os,,x B1-3R (Addendum No. 5) May , CC L,-,4. 2006 3: 22PM granSvstems No -4332 P. 3/3 36"Water Main Ezt.Along TRE ILO-W.C,ontraet ],Unit 1,DOE No.3600 Pay !f pp"Mutate Deteriodon of Ria I"prices (.sit run) Iters oaadl* whrtes In Words inset price oG 00 4. 4 EA 36-inch Resilient Scat Gate Valve 5 �z r _ ��� Ono w/Concrcte Valve VaWt and Ext. Stem, Including a 4"By-Pass and all other appurtenances — Fn P-Ty— T4s TNOus ps,4 0 DoUass& No Cents prr EA oe acs 5. 2 EA 24-inch Resilient Scat Gatc Valve $_ Z3.CM, � 4t/o�ow. w/Concrete Valvc Vault and Ext. Stem, Including a 4"By-Pass and all othur appurtenances 1�.1C>•= -FH � J h6,z i9r,l - Dollars& _ _ N Cents per EA ob Qp 6. 2 EA 16-inch Resiliem Seat Gate Valve $ SOU $ _ w/Concrete Valve Vault and Ext. Stan, Including a By-Pass and all other appurtenances per City Detail �HOUSA►.l D____�[�ouarsat n 10 Ccs per CA },poi ,cavrw,crn.e,e ,xr��«•���•� +�• «x B 1-4R(Addendum No. 2) AprH 24, 2006 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price i.n ****7a. 1 LS Furnish and Install Concrete Pressure $ $ Pipe Fittings for Pre-tensioned Conc. Mw Moo Cylinder Pipe(C -303) N6 NO 0 S to c:b►o° Dollars& Cents per LS ao 5� .� ****7b. 11.5 TN Furnish and Install Fittings for Ductile $ j, $ Iron Pipe,Including Conc.Blocking awl E Dollars& NO C"n,per TN Q ****7c. 1 LS Furnish and Install Fittings for Steel Pipe $ $ M65 mob �"A to ala ,�o oto C}R)1r MOD Dollars& M� Cents per LS 00 00 8. 4 EA 4-inch Combination Air&Vacuum $ 6�SCb• $ z7 Zino, Release Valve and 4-foot Dia.Manhole, (Including Tee at Main and Adapters as Required) �J l�l "T�IiCUS/3.l r> G 16,E WJ 1JA0goo Dollars& 1\10 Cents per EA i ****Contractor shall select 7a, 7b or 7c WE e:WMM643\spem\c0xrRncr1\r,oposa1-uv:1anu.a« B1-5 36"Water Main Ext.Along TRE R.O.W.Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price Ka QO Q� 9. 4 EA 8-inch Blowoff Valves and 4-foot Dia. $ Qa, $ d , Sump Manhole,(Including Tee at Main, 2-8"Resilient Seat Valves and Adapters as Required) rcup. Tj{i=&A O u R "Qg tt3 wuats& J Cents per EA 9L° o0 10. 1 LS Install and Maintain SWPPP $ 15:C00, $ S co . PrEEA -01k:06 PAO Donau& drib Cents per LS 4 0l 11. 7,145 LF Trench Safety System $ d $ Dollars& MO© DNC Cents per LF 12. 3 DY Railroad Flagman(Contractor to contact $ 800.00 $ 2,400.00 TRE&arrange schedule) �IGt�T Unl b�L D Dollars& NOCents per DY �' do 13. 1,406 LF Permanent Asphalt Pavement Repair per $ $ Figure 2000-1A(Trench Width) 1'1 PTY Dollars& ��� cenrs per LF r;:vFwmv.643\Sp=\coxrw+cr1unpos,.Un'h1wPD.dm B1-6 36"Water Main Ext.Along TRE R.O.W.Contract 1,Unit 1,DOE No.3600 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price 00 14. 400 SY Permanent Asphalt Pavement Repair per $ 6Z $ 20, .� Figure 2000-1A(Beyond Trench Width) r Dollars& Jilt J Cents per SY 15. 5,235 LF Hydromulch Seeding $ !. $ s Dollars& Celts per LF a i SS 16. 3,455 SY 6"Topsoil $ $ S4 i �4r Do]lar5& Celts per SY i aB 00 17. 330 SY Rock Rip Rap $ tP� $ i I X J ! �� Dollars& NO Certs per SY f � do 18. 40 SY Gravel Road Repair(6"Flex Base) $ 1 $ , i Dollars& \Y, Cents per SY G.TM1\2643\Spes\CONTRACP1Twposal-Unk1wW2.&c B1-7 36"Water Main Ext. Along TRE R.O.W. Contract 1,Unit 1,DOE No.3600 �. Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price i I* ao 19. 7 EA Exploratory D-Hole $_ ��S�. $ , C "L F\Vc IO2�b Dollars& Iw cents per EA 00 0� ., 20. 1 LS Cathodic Protection $ Zz rwleNTY —rwb i �Ha1SA�r-I0 Dollar-& Np Cent,per Is ap 40 21. 300 LF Extra trench depth for 36 inch pipe and $ $ Tow. fitting in excess of 1 foot below the design grade complete in place as for the sum of 1 9.j Dollars& +V(J Cents per LF 00 22. 1 EA 36"Plug $_ ('S►•1� "7 t1 0 KDollars& NG Cents per EA 23. 1 EA 16"x 10"Cap&Tee $ Dollars& No Cents per EA ' I, 566 49 � Unit 1: Total Water Bid, $ GAFR'011C643\SpecslCON7RACf Mddend=iTmposal-Unitland2rev4-14-06.da B1-8R(Addeiidwri No. 1) April 18, 2006 P264-605140035283, DOE 3600 Unit 1 LIST OF CAST IRON FITTINGS(>16") AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BID Weight Total Weight * Number of Fittings Size Type (lbs) (lbs) 1 6"x36" TEE Z 6 6" 45DEG. BEND 2, 137 2 ZZ 2 6" 90 DEG. LONG RADIUS BEND Z SZ I 5 1 4"x 24" TEE 15 /53S 1 6"X 16" REDUCER 1300 1300 1 4"X 16" REDUCER S9.S 595" ■ Total 14-3,964 Contractor shall fill in blanks for"Weight"and"Total Weight"as a part of his bid. (weight will be based on M.J. Fittings) er CrTW01 M3\sp=\00NTkncr1 urA1wxx.ac B1-9 LIST OF CONCRETE PRESSURE FITTINGS P264-605140035283 DOE 3600 Unit 1 C303 PRETENSIONED CONCRETE CYLINDER PIPE ADD OR SUBTRACT FOR THE FOLLOWING CONCRETE FITTINGS INCLUDING INSTALLATION ESTIMATED �D QUANTITIES 36"AWWA C303 BENDS i/t`' 00 36"-45 DEGREE V,op $ 3,q ao 36"-90 DEGREE(LONG RADIUS) $ Subtotal $ OTHERS 00 36"X 16"REDUCER $ 1, 700- Go 24"X 16"REDUCER $ 1,Z-+0- ao 36"X 36"TEE $ 3, qon 24"X 24"TEE $ 11 8 90 . Subtotal $ Total $ Contractor shall fill in blanks as part of bid. Note: Contractor is responsible for correct quantity total of all fittings and specials. no G-X1W01\2643\Spxs1C0NMACC1\ProposW-Lhvk1w&.&c B1-10 LIST OF STEEL PRESSURE FITTINGS P264-605140035283 DOE 3600 Unit 1 STEEL PIPE ADD OR SUBTRACT FOR THE FOLLOWING STEEL FITTINGS INCLUDING INSTALLATION ESTIMATED V QUANTITIES AWWA C200 BENDS 00 36"-45 DEGREE $ 2,250 36"-90 DEGREE(LONG RADIUS) 0 $ 4,400. ov Subtotal $ OTHERS oe .. 36"X 16"REDUCER $ S Z.� 00 24"X 16"REDUCER $ I L$• 00 36"X 36"TEE $ 7,500• CD 24"X 24"TEE $ 3,300. Subtotal $ Total $ Contractor shall fill in blanks as part of bid. Note: Contractor is responsible for correct quantity total of all fittings and specials. s an me GAFW0A2M3\Sp=\0OMRACT1%upos&UnA1wW2.&c B1-11 PART B-PROPOSAL(Continued) Within ten(10)days after notification by the City,the undersigned will execute the formal contract and will deliver an approved Survey Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the .n property of the City of Fort Worth,Texas,in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Project dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors,or employment agency in either finnishing or referring employee applicants to _ the undersigned are not discriminated against as prohibited by terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete construction within 180 calendar days as set forth in the written work order to be furnished by the Owner. Liquidated damages shall be assessed as indicated in General Conditions section C7-7.10, except that the sum per day shall be$3,000.00 for this contract. (Complete A or B below,as applicable): [ ]A. The principal place of business of our company is in the State of Me [] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [] Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. XB. The principal place of business of our company or our parent company or majority owner is in the State of Texas. MW c:vW0I\2E43\spcM\c0xrwAcrITroposal-Unklmz.a« B1-12 3611 Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price Unit 2: Water Improvements *1 a. 7,182 LF 36-inch Pre-tensioned Concrete Cylinder $_� $ k B10 Pipe C-303 (min 200psi working pressure)by Open Cut, (Includes Excavation,Embedment and Backfill) Dollars& Cents per LF ccy *Ib. 7,182 LF 36-inch DIP(min 200psi working $_ 1 GO $_ 1, 353 8d pressure)Water Line Wrapped in Polyethylene by Open Cut(Includes Excavation,E1i1bcd11 ent and Backfill) E1&O ---' /EXWl Dollars& !�t (::Ty Cents per LF *lc. 7,182 LF 36-inch Steel Water Pipe(min 200psi $_ $ working pressure)by Open Cut,(Incl. Excavation,Embedment and Backfill) 1110 Dollars& Cents per LF * Contractor shall select 1 a,lb or lc s:uwm\2643\sp=\CoN1RAcr1 -Unk1w&.aa B1-13 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No. 5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price **2a. 433 LF 36-inch Pre-tensioned Concrete Cylinder $ $ A16 Pipe C-303 (min 200psi working pressure)pipe furnished and installed in 54-inch Steel Casing(0.50"thick) furnished and installed by Other than Open Cut, Dollars& _ Cents per LF **2b. 433 LF 36-inch DIP(min 200psi working $ $ Z3- 00 Z�. pressure)pipe Wrapped in Polyethylene MpU M40 furnished and installed in 54-inch Steel Casing(0.50"thick)furnished an installed by Other than Open Cut S�l�arY � Dollars& 1Vcs ��a' .n rvc) cents per IF OWN **2c. 433 LF 36-inch Steel pipe(min 200psi working pressure)furnished and installed in 54- an inch Steel Casing(0.50"thick)furnished and installed by Other than Open Cut jo 8( o Dollars& Flo o 40 Qrt� t r cents per LF r , ** Contractor shall select 2a, 2b or 2c G:1FW01\2643\Specs\C0NTRAC 1\Proposa1-Unk1&n&.&x B1-14 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price F ***3a. 1,751 LF 24-inch Pre-tensioned Concrete Cylinder $ Nb So Pipe C-303 (min 200psi working pressure)by Open Cut,(Includes Excavation,Embedment and Backfill) Dollars& Cents per LF ***3b. 1,751 LF 24-inch DIP(min 200psi working 137. $ Z 9 0071 pressure)Water Line Wrapped in Polyethylene by Open Cut(Includes Excavation,Embedment and Backfill) Tft14:jy �cvtX4 Donal& i `I f Y 6 Cents per LF ***3c. 1,751 LF 24-inch Steel Water Pipe(min 200psi $ 810 working pressure)by Open Cut,(Incl. Excavation,Embedment and Backfill) Donau& Cents per LF ***Contractor shall select 3a,3b or 3c GAM01\264ASpesTONTRACT1\Proposa)-Umt1md2.&c B1-15 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price - ****4a. 310 LF 24-inch Pre-tensioned Concrete Cylinder $ Ro $ IV6 LRLo Pipe C-303 (min 200psi working pressure)pipe famished and installed in 42-inch Steel Casing(0.50"thick) furnished and installed by Other than Open Cut, Dollars& Cents per LF —4Q sSQ ****4b. 310 LF 24-inch DIP(min 200psi working $_ 6 Z 75(0, pressure)pipe Wrapped in Polyethylene furnished and installed in 42-inch Steel Casing(0.50"thick) furnished an installed by Other than Open Cut Y FVE 14Lsoat--o Dona& JJO cents per LF ****4c. 310 LF 24-inch Steel pipe(min 200psi working pressure)famished and installed in 42- inch Steel Casing(0.50"thick) furnished and installed by Other than Open Cut do so 3I0 Dollars& Cents per LF **** Contractor shall select 4a,4b or 4c Gu N01\26a3VRpeMX0DM ucr► &Unk1 &.ate B1-16 Apr -25 . 2006 1 :42PM r TranSystems No .4321 P . 4;5 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 y •ra+rf� Pay Appnotimate Dwription of Bid Item Prieeg Unit TOW Item Quantity Written in Words Pries Met 00 5. 3 EA 36-inch Resilient Seat Gate Valve $ 44 000. $_ LZ6 000 . w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances Ferry -Fwo -rio—ZANO 1)attars& No C.'WperEA 6. 5 EA ?A-inch Resilient Seat Gate Valve $ 23000D $��� w/Concrete Valve Vault and Ext.Stem, Including a 4"By-pass and all other appurtenances �1�rxas�ufl Dollas N6 mz:ptr EA oc3 7. 2 EA 10-,inch Resilient Seat Gate Valve $ w/Concrete Valve Vault and Ext Stem, Including a By-Pass and all other appurtenances -FW6 T-OUSg�I r Fvr� �02�-,� tats Imes pet EA 00 o 0 8. 1 EA 8-inch Resilient Seat Gate Valve $ Za Z5 $ �, 2SG. w/Concrete Valve Vault and Ext. Stem, Including all other appurtenances FA c!1fwa1%2&31SV=KONntACTIAd&ndlnAftopaw"Mlend3R,4.25.ueaoc B1-17R(Addendum No. 3) April 25,2006 ' r 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No. 5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price �. aB 00 5. 3 EA 36-inch Resilient Seat Gate Valve $ 440m, $ 1460 w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances T+10 U5 K-b-AD Dollars& ,1 IVO cents per EA CG QO 6. 5 EA 24-inch Resilient Seat Gate Valve $ LUPO. $ HS70M. w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other appurtenances TwcwrI T;+9-&-a- Ht�,1S19r►f7 Dollars& —NK� Cents per EA d0 00 7. 2 EA 10-inch Resilient Seat Gate Valve $ Z�SOb. $ w/Concrete Valve Vault and Ext. Stem, Including a By-Pass and all other appurtenances _ 'Twp T�sr-�.►,p Dollars& Cents per EA oc� 04 8. 1 EA 8-inch Resilient Seat Gate Valve $ z . s- 42,5-0, w/Concrete Valve Vault and Ext. Stem, Including a 4"By-Pass and all other \ appurtenances Tib -rhwsawo 1 wo &Iovm el e y Dollars& Cents per EA GAFW01\2643\Sp=\C0NTRAC'r Mddmdum l\Proposal-Unkland2 m 4-14-06.doc B 1-17R(Addendum No. 1) April 18, 2006 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price *****9a. 1 LS Furnish and Install Concrete Pressure $ Bin $_ Pipe Fittings for 36"Pre-tensioned Cone. Cylinder Pipe(C-303) No _ So t7 Dollars& Cents Per Is o� *****9b. 18 TN Furnish and Install Fittings for 36" $_ $_ 18 . Ductile Iron Pipe,Including Cone. Blocking CNE Dollars& N& cents per TN *****9c. 1 LS Furnish and Install Fittings for 36"Steel $ An $ k Rl P0 Pipe,Including Cone.Blocking No _gin Dollars& Cents per LS _ 00 00 10. 5 EA 4-inch Combination Air&Vacuum sARM, s34 ,oOp. Release Valve and 4-foot Dia.Manhole, t (Including Tee at Main and Adapters as Required) S�x "THOL66 ,O �lG NT (3.Pj---I sonars& JJa Cents per EA ***** Contractor shall select 9a,9b or 9c GAFW01\2643\Sp=\C0NrRACr 1\Proposa1-Uvd11sn z.&c BI-18 Apr .25 2096 TranSvstems No -4321 P . 5. 5 36"Water Main Ext.Along TRE R.O.W. Contract 1, Unit 2,DOE No.5191 Pay Approximate Deseripdan of Rid Item Prices Unit Total Item Qurndw wrilirn is Words Price Price as 11 5 EA 8-inch BIowoff Valves and 4-foot Dia. ZZr C)CU. Sump Manhole,(Including Tee at Main, 2-8"Resilient Seat Valves and Adapters as Required) ~ Fnoiz Tlqjs,�n Fu a- AAMC1&= Dollars& NO Sol.,per EA 12. 1 EA 2-inch Combination Air&Vacuum 4 � . Release Valve and 4-foot Dia Manhole, (Including Tee at Main and Adapters as Required) o0 13. 1 EA 4-inch Blowoff Valves and 4-foot Dia. $ $ 4 . Sump Manhole,(Including Tee at Main, 24"Resilient Seat Valves and Adapters as Required) & cmftpa CA � Oo 14. 1 LS Install and Maintain SWPPP ~ N� Co i x per Is trtwonzsu�spowcorntaCt,weeorwn,rA�pw,�u «,w s.2s.oedo* B1-19R (Addendum No. 3) April 25,2006 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price 33 15. 8,933 LF Trench Safety System $ $ 84 ZG 90 Dollars& ... CW r+ Cents per LF 16. 3 DY Railroad Flagman(Contractor to contact $ 800.00 $ 2.400.00 TRE&arrange schedule) !="�awr --�ut.►D�2cr� Dollars& Cents per DY O Ob 17. 186 LF Permanent Asphalt Pavement Repair per $ GIQ $ / Q. Figure 2000-1A(Trench Width) vl Don.& Nd Cents per LF an ,� 18. 400 SY Permanent Asphalt Pavement Repair per $ $ Q� Figure 2000-1A(Beyond Trench Width) Dollars& Cents per SY �d tx3 19. 8,749 LF Hydromulch Seeding $ $ 8 �• 0 N b Dollars& l�Cents per LF G:%V01\2643\Sp=W0NTRACr t\Proposat•Umcladz.aoc BI-20 36"Water Main Ext.Along TRE R.O.W. Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price 74 20. 5,774 SY 6"Topsoil Dollars& O*46- cents per sY — 21. 5 EA Exploratory D-Hole $ $ ��J��• OfQ67 'rMV)OV 0 FIdc /�N(JiCtm Dollars& Jt/b cents pe< EA 22. 379 LF Special Backfill Detail, Sheet 23 $ ZD $ �jn/Eshl7'y Dollars& !V� cents per ILS � oa 23. 1 LS Cathodic Protection $ $ QOO. T A ,•4 d Dollars& J cents per Is ba CC) 24. 300 LF Extra trench depth for 36 inch pipe and fitting in excess of 1 foot below the design grade complete in place as for the sum of TDollars& 140 cents per U GAFWO1N2643\8pxy\CON7RACT1\Proposa1-Uvaland2Aoe B1-21 36"Water Main Exit.Along TRE R.O.W.Contract 1,Unit 2,DOE No.5191 Pay Approximate Description of Bid Item Prices Unit Total Item Quantity Written in Words Price Price dG - 25. 2,357 LF Potential Petroleum Contaminated Material Handling(DA-37) Sta. 126+50 to Sta. 142+25-36"&Sta. 0+00 to Sta. 7+82-24" C�VC: Dollars& NO _cent,per IF OV pG 26. 640 CY Loading,Transportation,and Disposal of $ $�_y�, Contaminated Soil(DA-38)Sta. 126+50 to Sta. 142+25-36"& Sta. 0+00 to Sta. 7+82-24" Q+JL; Dollars& I cents per CY O� co 27. 1 EA 36"Plug 64 n Dollars& / O� cent,per EA 7A Z Z,(O� I Unit 2: Total Water Bid, $ G:\FWO1V643\Spe=W0NfRACf1\Praposat-Ura1=2.&c BI-22 P264-605140035283, DOE 5191 Unit 2 LIST OF CAST IRON FITTINGS (>16") AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BID �3 Weight Total Weight Number of Fittings Size Type (lbs) (lbs) 1 6"x36" TEE 8 6" 45 DEG. BEND Z, 137 11096 2 6"x 24" REDUCER cco VIA 4 4"X24" TEE / $ 6 6 24" 5 DEG. BEND has O 2 4"X10" REDUCER s2o /Qq0 1 4"X8" REDUCERS Total Contractor shall fill in blanks for"Weight"and "Total Weight"as a part of his bid. T (weight will be based on M.J. Fittings) A e.TM)\zcas\sp=\coxrnncriw -uM1wxU.aa B1-23 LIST OF CONCRETE PRESSURE FITTINGS P264-605140035283,DOE 5191 Unit 2 C303 PRETENSIONED CONCRETE CYLINDER PIPE ADD OR SUBTRACT FOR THE FOLLOWING CONCRETE FITTINGS INCLUDING INSTALLATION ESTIMATED QUANTITIES \�O 36"AWWA C303 BENDS 36"45 DEGREE $ Z,380 24"45 DEGREE $ 1,Lao +� Subtotal $ OTHERS00 _ 36"X 36"TEE $ 31' LO 36"X 24"REDUCER $ , Sw 0 24"X 24"TEE $ /1 880, 000 24"X 10"REDUCER $ �� eo0 q� 24"X 8"REDUCER g', �� bpd, ov Subtotal $ Total $ Contractor shall fill in blanks as part of bid. Note: Contractor is responsible for correct quantity total of all fittings and specials. C-1 GAFW01\2643\Sp=\C0WPACr Anoposa)-vnkJm,az.aoc BI-24 LIST OF STEEL PRESSURE FITTINGS P264-605140035283 DOE 5191 Unit 2 STEEL PIPE ADD OR SUBTRACT FOR THE FOLLOWING STEEL FITTINGS INCLUDING INSTALLATION ESTIMATED QUANTITIES ��� AWWA C200 BENDS eo 36"-45 DEGREE $ Z,250 - 24"45 DEGREE Subtotal $ OTHERS o0 36"X 36"TEE. $ g50C>. Ca 36"X 24"REDUCER $ 4,DOO- o0 24"X 24"TEE $ 3, 30o- cd 24"X 10"REDUCER $ Z, GID. o0 24"X 8"REDUCER $ Z, 800, — Subtotal $ Total $ Contractor shall fill in blanks as part of bid. Note: Contractor is responsible for correct quantity total of all fittings and specials. rr Am w F"1\zws\sP=\coxrnAcr1vopoft1-unkiw,az.ac B1-25 SUMMARY OF BIDS Q s� Unit 1 - Water Line Improvements o�- Unit 2- Water Line Improvements $ ,2_, 4 z 2., 6�d 989/Q S� Grand Total Units 1&2 $ 3 (o 7. G:Twm\zeas\spca\coxrxecr 1 -uv&1anaz_aa BI-26 PART B-PROPOSAL (Continued) Within ten (10)days after notification by the City,the undersigned will execute the formal contract and will deliver an approved Survey Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Project dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either famishing or referring employee applicants to the undersigned are not discriminated against as prohibited by terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete construction within 180 calendar days as set forth in the written work order to be famished by the Owner. Liquidated damages shall be assessed as indicated in General Conditions section C7-7.10, except that the sum per day shall be$3,000.00 for this contract. (Complete A or B below, as applicable): []A. The principal place of business of our company is in the State of [] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. w [] Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. AB. The principal place of business of our company or our parent company or majority owner is in the State of Texas. CrTMI\26e3\sn=\cox Cr i\»Wosat-u mIvr,&dm BI-27 Receipt is acknowledged of the following addenda: r. Addendum No. 1 Ot�f� -///�O & 11-Oa�� D � ^ 4 A O D&4 0 Urti. I40 S 5&/a6 moo Mt Addendum No.Z dafgd 6 5 J2Je. MOO Addendum No. 3 �Z��aDO/2s/OG Moo (Seal)If Bidder Corporation Respectfully submitted, By: as V.V. ww;/ ►ave Title: &wY4 Y A". r Address: 52o S. Coil Ave. )T0_66Y- 9' A Ma..vis�e.lA, Te�ccas —4-4 at.3 GrAFMJ\2 3\Sp=coNTRACfI\Pr tU,kamC.aa B1-28 Part C - General Conditions PART C- - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents C1-1 (1) C1-1. 3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2 ) C1-1.6 General'Conditions C1-1 (2 ) C1-1.7 Special Conditions Cl-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) Cf-1.11 Plans Cl-1 (3 ) C1-1.12 City C1-1 (3) C1-1.13 City Council Cl-1 (3 ) C1-1:14 Mayor C1-1 (3 ) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4) C1-1.18 Director, City Water Department C1-1 (4) C1-1.19 Engineer C1-1 (4) C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties Cl-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day Cl-1 (4) _ C1-1.25 Legal Holiday C1-1 (4 ) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6) C1-1. 28 Paved Streets and Alleys C1-1 (6) C1-1. 29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 City Streets C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6) �. C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2-.2 Interpretation of Quantities C2-2 (1) ' C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) .• C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) (1) C2-2.7- Delivery of Proposal C2-2 (4 ) C2-2.8 Withdrawing Proposals C2-2 (4) C2-2.9 Telegraphic Modification of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4) - C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3 (1). C3-3.2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (2) - C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) _ C3-3.8 Execution of Contract C3-3 (4) C3-3.9 Failure to Execute Contract C3-3 (4) C3-3.10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor 's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor ' s Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4. 2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased Quantities C4-4 (1) C4-4:4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4..6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and T Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 11) C5-5. 2 Conformity with Plans C5-5 .(1) C5-5. 3 Coordination of Contract Documents_ C5-5 (2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Fidld Office CS-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 .(5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5=5.14 Existing Structures and Utilities C5-5 (7) �- C5-5.'15 interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup C5-5 (8) C5-5.18 Final Inspection C5-5 (9) (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1 ) C6-6.2 Permits and Licenses . C6-6 (1 ) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2 ) C6-6.5 Public Safety and Convenience C6-6 (2 ) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3 ) C6-6.7 Railway Crossings C6-6 (4 ) C6-6.8 Barricades, Warnings and Watchmen C6-6 (4 ) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6) ' C6-6..11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor ' s Responsibility for Damage Claims C6-6 (8 ) 4 C6-6.13 Contractor' s Claim for Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11 ) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor' s Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS - C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7.4 Limitations of Operations C7-7 (2) C7-7.5 'Character of Workman and Equipment C7-7 (2 ) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (4 ) C7-7. 8 Extension of time of Completion. C7-7 (4 ) C7-7.9 Delays C7-7 (4 ) C7-7.10 Time of Completion C7-7 (5 ) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6 ) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7..15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Safety Methods and- Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8. 2 Unit Prices C8-8 '(1) (3 ) C8-8. 3 Lump Sum C8-8 (1) C8-8.4 Scope of Payment C8-8 (1) C8-8. 5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3 ) C8-8.7 Final Acceptance C8-8 (3) C8-8.8 Final Payment C8-8 (3) C8-8.9 Adquacy of Design C8-8 (4) — C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (5) C8-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5) (4) PART C - GENERAL CONDITIONS Cl-1 DEFINITIONS SECTION C1-1 DEFINITIONS - C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be un.derstood and ,,. interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CIT.Y) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green .� PART E - SPECIFICATIONS E1-White E2-Golden Rod 92A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT .DOCUMENTS : The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and - include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 . NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 , 5 BIDDER : Any. person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the. Contract Documents, constitutes a bidder. t1'-1 . 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth ' s charter and = promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS : The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be .met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to _ standard specifications, regulations, requirements , statutes , etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) dft faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3 .7) b. Payment Bond (see paragraph C3-3. 7) C, Maintenance Bond (see paragraph C3-3.7) .� d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1. 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1. 11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner' s representative showing in detail the location, dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such. supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY : The City of Fort Worth, Texas, a municipal corporation., authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform '4 specific duties . Responsibility for final enforcement. of Contracts involving the City of Fort Worth is by Charter vested in the City Manager . The terms City and Owner are r� synonymous. C1-1 . 13 CITY COUNCIL : The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR: The officially elected Mayor., or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. W C1-1. 15 CITY MANAGER: The officially appointed and authorized. City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth , Texas , or his duly authorized representative.. C1-1 (3 ) C1-1 . 17 DIRECTOR OF PUBLIC .WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth., Texas , or his duly authorized representative , -' assistant", or agents. . C1-1.19 ENGINEER: The Director of Public Works, the Director �. of .the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. C1=1 . 20 CONTRACTOR: The person ;• persons , partnership, company, firm, association, or corporation, entering into a - contract with the Owner for the execution .of the work, acting 'directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or` only labor, for work *at the .site of the project. Cl-1. 2.1 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes, therein. C1-1. 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar - day, not including Saturdays, Sundays , and legal holidays , in which the weather or other conditions. not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a.m, and 6 : 00 p.m.., with exceptions as permitted in paragraph C7-7. 6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted.. C1-1. 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: C1-1 (4 ) 1. New Year 's Day January 1 2. M. L. Ring, Jr. Birthday, Third Monday in January 3. Memorial Day Last Monday in' May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council . may determine When one of the above named holidays or a special holiday is declared. by the City Council , falls on Saturday, the holiday shall-be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1. 26 ABBREVIATIONS: Wherever the abbreviations defined = herein. appear in Contract Documents , the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R —Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D . - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D. I. - Ductile Iron C1-1 (5 ) C1-1 . 27 CHANGE ORDER : A " Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. CI-1 ' 28 -PAVED- STREETS AND ALLEYS : A paved street or alley shall be definedias a street or alley having one of the following- types of wearing surfaces applied over the natural unimproved surface: — 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1 . 30 CITY STREETS : A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 2 ' ) feet back of the curb lines or four (4 ' ) •feet back of the average edge of pavement where no curb exists. C1--1. 32 GRAVEL STREET: A -gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. Cl-1 (6 ) yr SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2. 1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the _ items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule, " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This statement must be current and not more than one ( 1 ) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten ( 10% ) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2. 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the- unit prices bid or any other requirements of the Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that :the Contract- Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of -the Contract. Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and. become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time requited for its completion, and obtain all information required to make an intelligent proposal ._ No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their, own estimates , investigation, research, tests , explorations-, and other data which are necessary for full and complete information upon which .the proposal is to. be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct . Neither the C2-2(2 ) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2 . 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals , the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm, association , or partnership, or by a person duly authorized . If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must .be in writing and submitted with the proposal. C2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders " and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, . and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. ,� �/J, � Q`'A 7 711-11 ML C2-2(3 ) C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered . Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas . C2-2. 8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for open.ing proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner , be returned unopened. C2-.2. 9 TELEGRAPHIC MODIFICATION OF. PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such - telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2. 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by. the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the - opening of bids. C2-2. 11 IRREGULAR PROPOSALS: Proposals shall be considered as being -"Irregular" if they show any omissions , alterations of form, additions , or conditions not called for , unauthorized alternate bids; or irregularities of any kind. However , the C2-2(4) Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2- 2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be -- disqualified and their proposals not considered for any of , but not limited to, the following reason: -- a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. c. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the' bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement , experience record, equipment schedule , and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the -- Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder . not filing with the Owner , one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer , is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(5 ) •k 04 Oft PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such formulas or other methods of bringing items to a common oasis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner , upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE ) on the contract and the payment therefor. Contractor further agrees , upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6 ) months. C3--3 . 3 EQUAL EMPLOYMENT PROVISIONS : The Contractor shall - comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1 ) The Contractor shall post the required notice to that effect on the project site, and, at his request , will be provided assistance by the City of Fort North ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS: After .a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not to exceed forty-five ( 45 ) days after the date of opening proposals, and .in no event will an- award be made until after investigations have been made as to the responsibility of the -- proposed awardee. . . The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids , the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award . All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which, they will be. returned by the -° City Secretary. C3-3 . 7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less. than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor , or improper execution of the work or the use of inferior materials . This performance C3-3 (2 ) bond shall guarantee the payment for all labor, materials, equipment, supplies , and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set 04 forth in paragraph C8-8.10. C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise, guaranteeing the _ prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the' work provided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner . All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas , and which is acceptable to the T owner . In order to be acceptable, the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties, and the amount of bond written by any one +s acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by theOwner; notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3 ) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and .have been accepted by the Owner. The contract shall not be operative nor will any payments be i due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate. resolution; or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the. Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE. CONTRACT The failure of the Awardee to . execute the required bond or bonds or to sign the required. contract within ten (10 ) -days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal , and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee' s failure to execute said bonds and contract within ten ( 10 ) days , the. proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3. 10 BEGINNING WORK: The Contractor shall not commence work ,until authorized in writing to. do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" ,. it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents , and such insurance has i been approved by the Owner . The prime Contractor shall be responsible for delivering to the Owner the sub-contractors '. i C3-3 (4) certificate of _insurance for approval. The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include. the coverage of all sub-contractors. a; COMPENSATION INSURANCE: The Contractor Will maintain , during the life of this. -contract , Workers ' Compensation Insurance ;on all of his 'employees to be engaged in work on the, project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not '+ protected under the Workers ' Compensation Statute, the Contractor shall provide adequate .employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this. contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 0,.00 cover "Mg each occurrence on account of' bodily injury, -including death, and in an amount not ,less than $500 , 000 covering each occurrence on account of "property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public .liability and property. damage,, the following insurance: r 1. Contingent Liability ( covers General Contractor ' s Liability- for acts of sub-contractors) . 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to .die performed adjacent to. same) . ..r 4. Damage to underground utilities for $500,000. C3-3 (5 ) mob 5. Builder' s risk (where above-ground structures. are involved) . 6. Contractual Liability ( covers all • indemnification requirements of Contract) . df AUTOMOBILE INSURANCE - BODILY INJURY AND, PROPERTY DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for 'each person an amount not less than $500 , 000 on account of one accident , and automobile property damage insurance in an amount not less than $100,000 . e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively,. against damage claims which may arise from operations under this contract, whether such operations be by -the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. t ME f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime .. Contractor ' s insurance not cover the sub-contractor ' s work operations . g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the- city limits of the C3-3 (6 ) City of Fort Worth, Tarrant -County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , 04 insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority .� must be vested in a local agent or Claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3 . 12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the ®r Contractor shall pay for all materials , labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering :payment of wages to all person engaged in work on the. project at the site of the project shall be furnished to the Owner's representative within seven ( 7 ) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted. in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3 . 14 CONTRACTOR' S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership , company , firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will Y have or shall establish a fully operational business office within the Fort Worth- Dallas metropolitan area . The Contractor shall charge, delegate , or assign this office ( or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract . This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or ,.r other expenditures, all claims against the work or any other C3-3 (7 ) matter assogiated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract t. shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed, and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as' though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration , whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the -Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority Satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE : Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. } C3-3 (8 ) r. ai PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK r SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions �► which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional „r proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4. 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4. 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the generai nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor im accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, ( 2 ) rental of equipment used on the extra work for the time so used at .Associated General Contractors of America current equipment rental rat-es ; ( 3 ) materials entering permanently into the project, and ( 4 ) actual cost of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in ( 1 ) , ( 2 ) , ( 3 ) , and ( 4 ) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 (2) raw .r suggested by the Owner and shall give the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. "i No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the Engineer. insists upon its performance, the Contractor shall proceed with the work after making written request for written orders 'and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C:) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work ' is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniitiated by a ' change order ' shall be a full , complete and final payment for all costs Contractor 'incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay , extended overhead, ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4. 6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof, a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. Them C4-4 (3 ) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten ( 10 )_ days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the dlte of which he will start the several major activities ( including procurement of materials, plans, and equipment) and the contemplated dates for completing the same.- 'The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule,. the Contractor shall review the draft schedule with the Engineer to ensure the Contractor' s understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $ 50 , 000 . Fabrication , delivery and submittal activities are exceptions to this guideline. C4-4 (4 ) C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule: Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal .review unless otherwise specified. The construction schedule shall as a minimum be divided - into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this .Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials . 1. Preparation and transmittal of submittals. 2. Submittal .review periods. 3. Shop fabrication and delivery. 4. Erection or installation. • 5. Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner's operator instruction ( if applicable) . 8 . Final inspection. �u � r, ����;^;0�1 0"F IC,I I �:i�10I.�� 9. Operational testing. 10. Final inspection. If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of- the work within the contract time. If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force, the construction plant and equipment, the number :of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time. specified. C4-4 ( 6 ) a, PART C - GENERAL CONDITIONS ,.� C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 AUTHORITY. OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction , interpretation of the Contract Documents , acceptable fulfillment of the. contract, ma compensation, mutual rights between Contractor and Owner under these Contract Documents , supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. MR He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract . The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of, any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. .r C5-5 .2 CONFORMITY WITH PLANS : The finished project in all cases shall conform with lines , grades , cross-sections , finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . "■ Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by .■ Change Order. i C5-5 (1) C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections , which , taken together, are _intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies , figured dimension shall govern over scaled dimensions , plans shall govern over .specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents , and the Owner shall be permitted. to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition_ to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other .portions of the. Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5. 4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the. constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other Contractors in every possible way. The Contractor shall at all times have competent personnel .. available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on the work . Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives . Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be — subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2 ) adequately provide for the safety or convenience of the traveling public or the owners of property across which the r project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or. Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours , the City may take such r+ remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25% , from any funds due the Contractor .� on the project. C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer , if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed,, well heated , air conditioned , lighted., and weather-proof, so that documents will not be damaged by the elements. C5-5. 7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and r� lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 (3 ) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer , any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5 -5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City Inspectors will be authorized to inspect all work done_ and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents , and to call. the attention of the Contractor to any such failure or other infringements . Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer . The City Inspector will not , ' however, be authorized to revoke, alter , enlarge, or release any requirement of these Contract Documents, nor to approve .or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents . He will in no case act as superintendent or foreman or ,perform any other duties for the Contractor, or _ interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties . The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents , provided, however, should the Contractor object to any orders or instructions of the City -� Inspector , the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4 ) ars r.a C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents . If the Engineer so requests,' the Contractor shall , at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor' shall restore said portions of the work to the standard required- by the .r Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials used without suitable supervision or inspection. C5-5 .10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials , or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by .. the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner . Work so done may be ordered removed at the Contractor ' s expense. Upon the failure on . the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph , the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor . Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : . ' If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference , make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed C5-5 (5 ) substitute from that specified and indicating available maintenance service . No substitute shall be ordered or installed without the written ,approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or = installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor ' s expense. Contractor shall indemnify and hold harmless Owner •• and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses (including attorneys fees) ..arising out- of the use of substituted materials or equipment. C5-5.12 SAMPLES AND TESTS OR MATERIALS: Where,. in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise, specifically provided. The failure of the -Owner to make any tests of materials shall be in no relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American. Society -for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not , without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the = Owner. In case of concrete, the aggregates , design minimum, and the mixing and transporting equipment shall be approved by the - Engineer before any concrete is placed, and the, Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete , using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change , new tests shall be made prior to the use of the new materials. C5-5 :13 STORAGE OF MATERIALS: All materials which are to be = used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the C5-5 (6 ) ground, and shall be placed under cover when directed. Stored materials shall be placed and, located so as to facilitate prompt 'inspection. C5-5 .14 EXISTING STRUCTURES AND UTILITIES: The location and Oft dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities . The location of many gas mains, water mains, conduits , sewer lines and service lines for all utilities , etc. , is unknown to the Owner , and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the Contract Documents , in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances . The Contractor shall take all necessary precautions in order to protect all existing utilities , structures and, service lines. Verification of existing utilities, structures and service lines shall include " notification of all utility companies at least forty eight (48) hours in advance of construction including exploratory excavation if necessary . All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosectuion of work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: 1. Notify the Water Department ' s Distribution Division as to location, time, and schedule of service interruption. C5-5 (7) 2. Notify each customer personally through responsible personnel as to time . and schedule of the interruption of their service, or 3. In the event that personal notification of a .r customer cannot be made, a prepared tag form shall be attached to the customer ' s entrance door knob . The tag shall be durable in composition, and in large bold type shall say: "NOTICE" Due to Utility Improvement in your neighborhood, your (water) (sewer) service will be inter- rt, rupted on between the hours of and This inconvenience will be as short as possible. Thank you, Contractor Address Phone b. Emergency: In the event that an unforeseen service interruption occurs , notice shall be as above,but - immediate. C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If , through acts or neglect on the part of the Contractor , any other Contractor or any sub-contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration. If = such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor , who - shall indemnify and save harmless the Owner against any such claim. C5-5 . 17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer . Twenty-fours fours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the — Engineer , if the Contractor fails to correct the C5-5 (8) unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25% of such costs , shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by these Contract Documents , and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials , temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean , polished and new appearing condition . No extra compensation will be made to the Contractor for any clean-up required on the project. C5-5 . 18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the Owner and request that the Final inspection be made. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper +ft resolution has been passed by the City Council . No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. h C5-5 (9) r. PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC ..� RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City -- ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers , agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order , whether it be by •. himself or his employees. C6-6. 2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges , costs and fees, and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6 . 3 PATENTED DEVICES, MATERIALS AND PROCESSES : If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such -use by suitable legal agreement with thepatentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that with exception the contract prices shall include all royalties or cost arising from patents, trade-marks, and copy rights in any way involved in the work. The Contractor and his sureties shall indemnify and save harmless the Owner from any and all .. claims for infringement by reason of the use of any such patented design , device , material or process, or any trade-mark or copy right in connection with the work agreed to be performed under these Contract Documents , and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion .of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon by, the .ft design , type of construction or material or equipment specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6 (1 ) C6-6. 4 SANITARY PROVISIONS: The Contractor shall establish and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a -nuisance -- about the work on any property either public or private , and such regulations as are required by Law shall be put into immediate force and effect by the Contractor. The necessary _ sanitary conveniences for 'use of laborers on the work , properly secluded from public observation , shall be constructed and maintained by the Contractor and their use shall be strictly enforced by the Contractor . All .such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All _sanitary laws and regulations of the State of Texas and the City shall be strictly complied with. C6-6 .5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted, as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The ` Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including, but not limited to, safe — and convenient ingress. and egress to property contiguous to the work area. The Contractor. shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all driveway crossings . Such provisions. may include bridging, placement of crushed stone or gravel or such other means of providingproper ingress and egress for the property served by. the. driveway as the Engineer. may approve as appropriate. Such other means may include the diversion of driveway traffic, with specific approval by the Engineer . if diversion of traffic is approved by the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer for the diversion of traffic, and shall, at his own expense, -provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion -of •• traffic. Sidewalks must not be obstructed except by special permission of the Engineer. The materials excavated and the construction materials such as pipe used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves , C6-6 (2) gas valves, or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its attention, after twenty-four hours notice in writing to the Contractor , save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor , after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus . The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets , alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams , his responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in MA settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6 . 6 -. PRIV.ILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract , the Contractor will be permitted to use and occupy such portions of the public streets and alleys , or other public places or other rights-of-way as provided for in the ordinances of the City , as shown in the Contract Documents , or as may be specifically authorized in writing by the Engineer . A reasonable amount 'of tools , materials , and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations . Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be C6-6 (3) carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the contract , enter upon the work and premises. used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work . Any - additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6 . 7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway, the City will secure the necessary easement for the work. Where the railway tracks are` - to be crossed , the Contractor shall observe all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for _ safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties . The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6 . 8 BARRICADES , WARNINGS AND WATCHMEN: Where the work is carried on 1n or adjacent to any street, alley , or public ! place, the Contractor shall at his own expense furnish, erect, and maintain such barricades , fences , lights and danger signals , shall provide such watchmen, and shall take all such - other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible .at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into, any work -under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways" , codified as Article 6701d Veron's Civil Statutes, pertinent sections being Section Nos. 27 , 29 , 30 and 31. C6-6 (4) The Contractor will not remove any regulatory sign , instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works department , Signs and Markings Division ( phone number 8780-.8075 ) , to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades , signs , fences , lights , or watchmen to protect them. Whenever evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor ' s own expense . The Contractor ' s responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation , except as specifically provided in these Contract Documents, will be paid to the Contractor for the work and materials involved in the constructing, providing, and maintaining of barricades , signs , fences, and lights or for salaries of watchmen , for the subsequent removal and disposal of such barricades , signs ,. or for any other incidentals necessary for the proper protection, safety, and convenience of the public during the contract period, as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. - C6-6 . 9 USE OF EXPLOSIVES , DROP WRIGHT, ETC. : Should the Contractor elect to use explosives, drop weight , etc. , in the prosecution of the work, the utmost care- shall be exercised at all times so as not to endanger life or property . The Contractor shall notify the proper representative of any public service corporation , any company, individual , or utility, and the Owner, not less than twenty-four h gin___ _ 01Py . ,A.1 . Z_D C6-6 (5 ) �e r. advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special Contract Documents , or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor ' s insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The City shall proceed to give' notice to the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the ... complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times . All. vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall, insofar as possible , not use heavy traffic routes. C6-6. 10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work. Any additional rights-of-way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such additional rights-o£-way or work area shall be acquired for the benefit of the City . The City shall be notified in writing as to the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of. the i property owner has been secured in writing by the Contractor and a copy furnished to the Engineer . Unless specifically provided otherwise , the Contractor shall clear all — rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations . The Contractor _ shall be responsible for the preservation of and shall use C6-6 (6 ) every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines , or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands .which might be affected by the work. Such notice shall be made at least 48 hours in 'advance of the beginning of the work. Notices shall be applicable to both public and. private utility companies or any corporation, company, individual, or - other, either as owners or occupants , whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act , omission , neglect , or misconduct in the manner or method or execution of the work, or at any time due to. defective work, material, or equipment. When and where any direct or indirect or injury is done to public or private property on account of any act, omission , neglect, or misconduct in the execution of the work, or in .., consequence of the non-execution thereof on the part of the Contractor , he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the Owner , or he shall make good such damages or injury in a manner acceptable. to the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid in the project. C6-6 (7 ) i f proposal . Therefore, no separate payment shall be allowed for any service associated with this work. r. In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the owner may, upon 48 hour written notice under ordinary circumstances, - and without notice when a nuisance or hazardous condition results , proceed to repair, rebuild, or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6. 11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer , agent , servant or employee of the Owner . -. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and _ shall be solely responsible for the acts and omissions of its officers , agents , servants , employees , contractors , subcontractors , licensees and invitees . The doctrine of respondeat superior shall not apply as between Owner and Contractor, its officers , agents , employees , contractors and subcontractors , and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. C6-6 . 12 CONTRACTOR ' S RESPONSIBILITY FOR DAMAGE CLAIMS : Contractor covenants and agrees to, and does hereby indemnify, - hold harmless and defend Owner , its officers , agents , servants, and employees from and against any an all claims or suits for property damage or loss and/or personal injury`, - including death, to any and all persons, of whatsoever kind or character , whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, contractors, subcontractors, licensees or invitees , whether or not caused , in whole or in part, by alleged negligence on the part of officers , agents , servants , employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, it's - officers agents., servants and employees for property damage or loss, and/or personal injuries, including death, to any and all persons of whatsoever kind or character , whether real or asserted, arising out of or in connection with, directly or indirectly, the work and services to be performed hereunder by Contractor , its officers , agents employees , contractors , subcontractors, licensees and invitees, whether or not caused, C6-6 (8 ) in whole or in part, by alleged negligence of officers, agents, servants , employees, contractors , subcontractors , .. licensees or invitees of the Owner . Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries,loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in 'whole or in part, any and all alleged acts or omissions of officers, agents, servants , employees, contractors , subcontractors , licenses, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department, as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the above 30--day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi-final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that: 1. The claim has been settled and a release has been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such _ outstanding claims , and such good faith efforts have failed. If condition (1) above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six month period, the Director may recommend that the final payment to the Contractor be made. At the C6-6 (9) expiration of the six month period the Director may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if he deems it appropriate, refuse to accept _ bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason ofthe acts or omissions. of the Owner, he shall within three days after. the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of the alleged damage, and on or before the 25th day of i the month succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be .filed as hereinabove required, the Contractor ' s claim for compensation shall be. waived, and he shall not be entitled to payment on account of such damages. C6-.6.14 ADJUSTMENT OR RELOCATION OF. PUBLIC UTILITIES, ETC. : In .case it is necessary to change , move , or alter in any manner the propertyof a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer . The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. C6-6 . 15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall , at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains _ and sewers , and for this purpose he shall provide and maintain, at his own cost and expense , adequate pumping facilities and temporary outlets or diversions. The Contractor, at his own cost and expense, shall construct such troughs , pipes , or other structures necessary, and be prepared at all times to dispose of drainage and sewage ... C6-6 (10 ) received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract , except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. C6-6 .16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main . All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor ' s responsibility in the use of all existing fire hydrant and/or valves is detailed in Section E2-1. 2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used , the charges , if any , will be as prescribed by the City Ordinance , or where no ordinance applies , payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6 .17 USE OF A .SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer , any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer , and such usage shall not be held to be in any way an acceptance 'of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents . All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be performed by the Contractor at his own expense. C6-6 . 18 CONTRACTOR ' S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution of the work. The Contractor , shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. - C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any .provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. The Owner reserves the right to correct any error that may be = discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6. 20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents and representatives of the. City. C6-6. 21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption = pursuant the provisions of Article 20 . 04 (H) of the Texas Limited Sales , excise , and Use Tax Act, the Contractor may purchase, rent or lease all materials, supplies and equipment used or, consumed in.. th.e performance of this contract by issuing to his. supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller ' s Ruling . 007 . Any such exemption certificate - issued- by the Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller ' s Ruling . 011 , and any other applicable State Comptroller _ rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer for the construction of a - publicly-owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization. which qualifies for exemption pursuant to the provisions of Article 20. 04 (H) 'of the Texas limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. C6-6 (12 ) Limited Sale, Excise and Use Tax permits and information can be obtained from: Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TX f. C6-6 (13) PART C - GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS .r SECTION C7-7 PROSECUTION AND PROGRESS: C7-7 . 1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workman under his immediate super intendance, work of a value of not less than fifty (50%) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under — these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer _ will be with the Contractor . Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times; when the work is in operation, be represented either in person or by a superintendent or other designated representatives. C7-7 . 2 ASSIGNMENT OF CONTRACT : The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part. thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to any person or persons , partnership , company , firm, or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to dispose of the contract may, at the option of the Owner be revoked and annulled , unless the Sureties shall successfully complete said contract, and in the event of any such revocation. or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7 . 3 PROSECUTION OF THE WORK : Prior to beginning any construction operation, the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a _progress schedule preferably in chart or diagram form, or a brief outlining in detail and step by step the manner of C7-7 (1) prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials , and labor as is necessary to insure its completion within the time limit. The sequence requested of all construction operations shall, be at all times as specified in the Special Contract Documents . Any deviation from scuh sequencing shall be submitted to the Engineer for his 'approval. Contractor shall not proceed with - any deviation until he has received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of. thisAgreement, and a progress schedule shall not constitute a change in the contract time. C7-7 . 4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor' so as to create a minimum amount of inconvenience to the public. ,At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. _ C7-7 . 5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor 'shal.l be used by the Contractor is available.. The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. All other workmen-, including equipment operators , may be imported only after the local supply is exhausted . The Contractor shall employ only such superintendents , foremen , and workmen who are careful-, competent, and fully qualified to perform the duties or tasks assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion 'of the Owner , shall misconduct himself or be found to, be incompetent , disrespectful , intemperate , dishonest , or C7-7 (2) otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses ., to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill , ability , and experience to properly perform the work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress . All equipment , tools , and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory , safe and efficient working condition. Equipment on any portion of the work shall be such .. that no injury to the work, workmen or adjacent property will result from its use. .. C7-7 . 6 WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in C1-1 . 23 "WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a specific Saturday, Sunday or Legal Holiday must be, in the opinion of the Engineer , essential to the timely completion of the project. The Engineer ' s decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C1-1. 24 and the Contractor may work as he so desires. C7-7 (3) C7-7 . 7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time - specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner _ may proceed as he sees fit. The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extensiorPof time as may be properly authorized by the Owner. C7-7. 8 EXTENSION OF TIME COMPLETION: The Contractor's request for an extension of time of completion shall be considered only , when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval . - In adjusting the contract time for completion of work , .� consideration will be given to unforseeable causes beyond the control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner , fire , flood , tornadoes , epidemics , quarantine restrictions, strikes, freight embargoes , or delays of sub-contractors due to such causes. When the date of completion is based on a calendar day bid, a request for extension of time because of inclement weather will not be considered. A request for extension of time due 'to inability to obtain supplies and materials will be considered only when a review of the Contractor ' s purchase order dates and other pertinent data as requested by the _ Engineer indicates that the Contractor has made a bonafide attempt to secure delivery on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. If satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. C7-7 . 9 DELAYS : The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the - failure of the City to provide information or material , if C7-7 (4) any, which is to be furnished by the City. When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval ; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work , then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall , however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until + the discharge of the contract. C7-7 . 16 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate + in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of ,.. completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents , or the increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following schedule , unless otherwise specified in other parts of the Contract Documents , will be deducted from monies due the Contractor, not as a penalty, but as liquidated damages t suffered by the Owner. AMOUNT OF CONTRACT Less than $ 5,000 inclusive $ 35.00 $ 5,001 to $ 15,000 inclusive $ 45.00 $ 15,001 to $ 25,000 inclusive $ 63.00 $ 25,001 to $ 50, 000 inclusive $ 105.00 $ 50,001 to $ 100, 000 inclusive $ 154. 00 $ 100,001 to $ 500,000 inclusive $ 210. 00 C7-7 (5 ) $ 500,001 to $1, 000,000 inclusive $ 315.00 $1,.000,001 to $2,000,000 inclusive $ 420.00 $2,000,001 and over $ 630.00 The parties hereto understand and agree that any harm to the City caused by the Contractor ' s delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult of accurate estimation , and that the "Amount of Liquidated Damages Per Day" , as set out above, is a reasonable forecast of just compensation due the City for harm caused by any delay. C7-7 . 11 SUSPENSION BY COURT ORDER: The Contractor shall suspend operations on such part or parts of the work ordered by any court , and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is suspended by a Court Order . Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7. 12 TEMPORARY SUSPENSION: The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason , — the Owner will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. �. Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in Paragraph C7-7 . 8 EXTENSION OF THE TIME OF COMPLETION , and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer C7-7 (6 ) that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to AQP another construction project for the City of Fort North. The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7. 13- TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor , materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months , the Contractor shall within seven days notify the City - in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials , and equipment not obtainable . If , "after } investigations , the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days , the Contractor may request the Owner to terminate the contract 4 and the Owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shalt be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to , the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the _City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be considered grounds for suspension or cancellation: a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the owner. C7-7 (7) b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time.. - C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply .with any orders given- by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed in writing by the Engineer or the Owner. h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j. If the Contractor shall for any -cause whatsoever not carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against ` the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor ' s Sureties . When work is suspended for any cause or causes , or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as the Owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written C7-7 ( 8 ) - consent of the Owner , sublet the work or that portion of the work as taken over, provided however_ , that the Sureties shall exercise their option, if at all , within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents . The Sureties , in such event shall assume the Contractor ' s place in all respects , and shall be paid by the Owner for all work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses , subject to all of the terms of the Contract Documents. In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract responsibilities , or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials , plants , tools , equipment, supplies , and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials , tools , equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or may become due at any time thereafter -to the Contractor under and by virtue of the Contract or any part thereof . The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work. in case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contractor, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shalt continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with performance of the work by the Owner. C7--7 . 15 FULFILLMENT OF CONTRACT : The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have w C7-7 (9 ) been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by .� the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: -� A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole , or from time to time in part , in accordance with this section , whenever the Owner shall determine that such termination is in the best interest of the Owner . Any such termination shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is -� terminated , and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further , it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in the notice of - termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated, 3. terminate all orders and subcontracts to the extent that they -relate to the performance of -- work terminated by the notice of termination; 4. transfer.. title to the Owner and deliver in the manner, at the times , and to the extent, if any, directed by the Engineer: C7-7 (10 ) a. the Fabricated or unfabricated parts , work in process , completed work , supplies and other material produced as a part of , or acquired in connection with the performance of , the work terminated by the notice of • termination; and b. the completed, or partially completed plans, drawings , information and other property which , if the contract had been completed , would have been required to be furnished to the Owner. . 5. complete performance of such part of the work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner -has or may acquire the rest. At a time not later than 30 days after the termination date specified in the notice of termination , the Contractor may submit to the Engineer a list , certified as to quantity and guality , of any or all items of termination w. inventory not previously disposed of , exclusive of items the disposition of which has been directed or authorized by the Engineer. Not later than 15 days thereafter , the Owner shall accept title to such items provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or , if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. TERMINATION CLAIM: Within 60 days after notice of termination , the Contractor shalt submit his • termination -claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon request of the Contractor , made in writing within such 60-day period or authorized extension thereof, any and all such claims shall be conclusively deemed waived. +i C7-7 (11 ) D. AMOUNTS : Subject to the provisions of Item - C7-7.16(C) , the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto ; provided, that such agreed amount or amounts shall never exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated . The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits . Nothing in C7-7 . 16 ( E ) hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise. determine or affect the - amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the event of the failure of the. Contractor and the Owner to agree as provided in C7-7 . 16 (D) upon the whole amount to be paid to the Contractor by reason of the termination of work .pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of #- the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost or anticipated profits. F. DEDUCTIONS : In arriving at the amount due the contractor under this section , there shall be deducted ( a ) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with this contract; and (c ) the agreed price for , or the proceeds of sale of , any materials, supplies or other things kept by the Contractor or sold , pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT : If the termination hereunder be partial, prior- to the settlement of the terminated portion of this contract, the Contractor may file with the Engineer a request in writing for an C7-7 (12) r� .r .s equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion riot terminated by the notice of termination ) , such equitable adjustment as may be agreed upon shall be made in such price or prices ; nothing contained herein , however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this rr section shall limit or alter the rights which the Owner may have for termination of this contract under C7-7 . 14 hereof entitled "Suspension of Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach of contract by Contractor. C7-7. 17 SAFETY METHODS AND PRACTICES:- The Contractor shall be responsible for initiating, maintaining, and supervising all saf ety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13) r� M01 apt PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT �+ SECTION C8-8 MEASUREMENT AND PAYMENT C8-8 . 1 MEASUREMENT OF QUANTITIES : The determination of quantities of work performed -by the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer , based on measurements made by the Engineer. These measurements will T be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents , numbers , -and weights of the materials and items installed. C8-8. 2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by .the Contractor of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished, overhead expense, bond, insurance, patent R fees, royalties, risk due to the elements and other causes, delays , profits , injuries, damages claims , taxes , and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation'. C8-8 . 3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to. furnish all labor , tools , materials , machinery, equipment, appurtenances , and all subsidary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. �* C8-8. 4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials , and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the 'work or from the action of the elements , for any unfore.seea defects or obstructions which may arise or be encountered during the prosecution of the work at any time C8-8 (1) before its final acceptance by the Owner, (except as provided in paragraph C5-5 . 14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified , or any and all infringements of patents , trademarks , copyrights , or other legal reservations, and for completeing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or - equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace .at his own .and proper expense any defects or imperfections in the - construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract- and its appurtenances, -„ or any damage due or attributed to such defects , which defects , imperfection, or damage shall have been. discovered. on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects , imperfections , or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8. 5 PARTIAL ESTIMATES AND RETAINAGE: Between the 1st and 5th day of each month the Contractor shall submit to the Engineer a statement showing an estimate of the value of the work done during the previous month, or estimate period under the Contract Documents . Not later than the 10th day of the month the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred 'dollars _ ( $100.. 00 ) in amount, 90% of such estimated sum will. be paid to the Contractor if the total contract amount is less than $ 400 , 000 , or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000 or greater within twenty-five (25) days after the regular estimate .period. The City will have the option of preparing estimates on forms furnished by the City . The partial estimate -may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work. as a permanent part thereof, but which at the the time of the estimate have -not been installed. ( such payment will be allowed on a basis of 85% of the net invoice value thereof. ) The Contractor shall furnish the Engineer such information as he may request to aid C8-8 (2) him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and payment will be subject to correction in the estimate rendered following the discovery of an error in any previous F estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8 . 6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of_ the construction operations is not in accordance with the requirements of the Contract Documents. C8-8 . 7 FINAL ACCEPTANCE: Whenever the improvements provided. for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contractor., the Contractor shall notify the Engineer in writing that the improvements are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, will within a reasonable time make such final inspection , and if the work is satisfactory , in an acceptable condition , and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer 4 will initiate the processing of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in C8-8.8 below. C8-8 .8 FINAL PAYMENT: Whenever all the improvements provided or by the Contract Documents and all approved modifications thereof shall have been .completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor , a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. C8-8 (3) The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents , will be 'paid to the Contractor within 60 days after final acceptance by -the Owner on a proper resolution of the City Council, provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons , firms, - associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are -no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any actor neglect of said City relating to or connected with the Contract. The making of the final payment by the Owner shall not relieve the Contractor of any guarantees or other . requirements of- the Contract Documents which specifically continue thereafter. C8-8 . 9 ADEQUACY OF DESIGN: It is understood, that the Owner .believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the ,f approved Contract Documents . It is , therefore, agreed that the Owner shall be responsible for the adequacy of its own design features , sufficiency of the Contract Documents, the safety of the structure , and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions �- and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the said requirements of the Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. C8-8 . 10 GENERAL GUARANTY: Neither the final certificate of ` payment nor any provision in, the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in ... accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and C8-8 (4 ) T pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline. The Owner will give notice of observed defects with reasonable promptness. C8-8 . 11 SUBSIDIARY WORK: Any and all work specifically governed by documentary requirements for the project, such as conditions imposed by the Plans , the General Contract i Documents or these Special Contract Documents , in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration , rock excavation and cleanup are general items of work which fall in the category of subsidiary work. C8-8 . 12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer , depending on field conditions . Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit . Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. C8-8.. 13 RECORD DOCUMENTS: Contractor shall keep on record a copy of all specifications , plans , addenda, modifications , shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process . These shall be delivered to Engineer upon completion of the work. C8-8 (5 ) Supplementary Conditions to Section C AM .. SECTION Cl: OR SUPPLEMENTARY CONDITIONS TO PART C- GENERAL CONDITIONS A. General 04 These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. am B. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in ,b its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate,payment shall be based upon 85%of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent(10%). For contracts of$400,000 or more at the time of execution,retainage shall be five percent(5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5)business days after receipt by Contractor of the payment by City. Contractor's failure ... to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. ~' It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered Aft following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the 00 Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other "ft provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and .% replaced with D-3 of Part D - Special Conditions. D. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" Revised Pg. 1 10/24/02 Ma AM E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 ,M (8),is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of,the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iniury, damaze or death is caused, in whole or in Part, by the neklipence or alleged negli�ence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in Part by the nalikence or alleXed negligence of Owner, its officers, servants or employees. `. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a +r• release from the claimant involved, or(b)provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. F. INCREASED OR DECREASED QUANTITIES: Part C -General Conditions, Section C4-4 SCOPE OF WORK,Page C 4-4(1),revise paragraph C4-4.3 INCREASED OR DECREASED QUANTITIES to read as follows: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and .,, the Contractor shall perform the work as altered,increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in- lost nlost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted .. herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. Revised Pg. 2 �r 10/24/02 rr .. G. C3-3.11 INSURANCE:Page C3-3 (7): Add subparagraph"h. ADDITIONAL INSURANCE REQUIREMENTS" a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers'compensation insurance policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M.Best rating of A:VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups.The City must approve in writing any alternative coverage. " h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. Revised Pg. 3 � l��a 10/24/02 'E(V-E R i Y tl Ua �V 1. Contractor's liability shall not be limited to the specified amounts of insurance .. required herein. in. Upon the request of City, Contractor shall provide complete copies of all insurance ■• policies required by these contract documents. H. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4, Scope of Payment at page C8-8(1) is 'r deleted in its entirety and replaced with the following: The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage ,., arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such .. prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct,renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or .r equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, .� imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contctor shall be liable to the Owner for failure to correct the same as provided herein. .. I. C8-8.10 GENERAL GUARANTY:Delete C8-8.10,General Guaranty at page C8-8(4)is deleted in its entirety and replaced with the following: ..► Neither the final certificate of payment nor any provision in the Contract Documents,nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two(2)years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract Revised Pg. 4 i"' 10/24/02 Mod s which shall assure the performance of the general guaranty as above outlined. The Owner will 00 give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the ., specifications shall be resolved in favor of this specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. "' In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2. �. J. Part C-General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL,Page C2-2 (4)exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the .� following: C2-2.7 DELIVERY OF PROPOSAL:. No proposal will be considered unless it is delivered, accompanied by its proper Bid Security,to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper .. place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager,City of Fort Worth Purchasing Division,P.O. Box 17027,Fort Worth,Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing,addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud,the proposals for Mft which non-consideration requests have been properly filed may, at the option of the Owner,be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such ,., telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48)hours after the proposal opening time,no further consideration will be given to the proposal K. C3-3.7 BONDS (CITY LET PROJECTSJ:Reference Part C,General Conditions,dated November 1, 1987;(City let projects)make the following revisions: Revised Pg. 5 01HICIA11A PEN`@ �" 10/24/02 Uri R"IR i` IKY 1i 1.Page C3-3(3);the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a ,r reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2.Pg. C3-3(5)Paragraph C3-3.11 INSURANCE delete subparagraph"a. COMPENSATION INSURANCE". 3.Pg. C3-3(6),Paragraph C3-3.11 INSURANCE delete subparagraph"g.LOCAL AGENT FOR INSURANCE AND BONDING". w L. RIGHT TO AUDIT: Part C-General Conditions, Section C8-8 MEASUREMENT AND PAYMENT,Page C8-8 (5), add the following: C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three(3)years after final �+ payment under this contract,have access to and the right to examine and photocopy any directly pertinent books,documents,papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. (b)Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall,until the expiration of three(3) years after final payment under the subcontract,have access to and the right to examine and photocopy any directly pertinent books, documents,papers and records of such subcontractor, involving transactions to the subcontract, and further,that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space,in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. (c)Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: Revised Pg. 6 10/24/02 ar .. 1. 50 copies and under- 10 cents per page OR 2,More than 50 copies- 85 cents for the first page plus fifteen cents for each page thereafter ., M. SITE PREPARATION: .r The Contractor shall clear rights-of-way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project .construction operations. The contractor's attention is directed to paragraph C6-6.10 work �» within easements,page C6-6(4),part C - General Conditions of the Water Department General Contract Document and General Specifications. Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. N. Reference Part C -General Conditions, Section C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: 1. Wherever the word Watchmen appears in this paragraph,it shall be changed to the word flagmen. 2. In the first paragraph, lines five(5) and six (6),change the phrase take all such other .. precautionary measures to take all reasonable necessary measures. O. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be .�. deleted in its entirety and replaced with the following: Upon request,Contractor agrees to provide to Owner complete and accurate information •. regarding actual work performed by a Minority Business Enterprise(MBE) and/or a Woman Business Enterprise(WBE)on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation(other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3)years. Revised Pg.7 "' 10/24/02 P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a)The contractor shall comply with all requirements of Chapter 2258,Texas .. Government Code,including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage.rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these �+ contract documents. (b)The contractor shall, for a period of three(3)years following the date of acceptance of the work,maintain records that show (i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1,L.Right to Audit-(Rev. 9/30/02)pertain to this inspection. (c)The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a) and(b)above. (d)With each partial payment estimate or payroll period,whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas ,., Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. .. RM .. no Revised Pg. 8 "` 10/24/02 Part D - Special Conditions PART D - SPECIAL CONDITIONS D-1 GENERAL. ........................................................................................................................3 D-2 COORDINATION MEETING. ............................................................................................4 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW.....................4 •+ D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT ....................................7 5-- 5 CROSSING OF EXISTING UTILITIES...............................................................................7 D-6 EXISTING UTILITIES AND IMPROVEMENTS ..................................................................7 D-7 CONSTRUCTION TRAFFIC OVER PIPELINES. ..............................................................8 5-- 8 TRAFFIC CONTROL ................................................................................................ .......8 D-9 DETOURS ........................................................................................................................9 D- 10 EXAMINATION OF SITE................................................................................................9 D- 11 ZONING COMPLIANCE. ...............................................................................................9 D- 12 WATER FOR CONSTRUCTION. ..................................................................................9 D- 13 WASTE MATERIAL .....................................................................................................10 'r D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE 10 5-71-5 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.................................10 D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES............................10 "'. D- 17 BID QUANTITIES.........................................................................................................11 D- 18 CUTTING OF CONCRETE..........................................................................................11 D- 19 PROJECT DESIGNATION SIGN.................................................................................11 .r D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT......................................11 D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL........................................................12 D-22 CRUSHED LIMESTONE BACKFILL............................................................................12 D-23 2:27 CONCRETE.........................................................................................................12 67-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION.........................................12 6--25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS............14 5---26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS)................14 D- 27 SANITARY SEWER MANHOLES................................................................................15 D-28 SANITARY SEWER SERVICES..................................................................................18 D-29 REMOVAL SALVAGE AND ABANDONMENT OF EXISTING FACILITIES................20 D- 30 DETECTABLE WARNING TAPES. .............................................................................22 6---31 PIPE CLEANING..........................................................................................................22 D-32 DISPOSAL OF SPOIL/FILL MATERIAL.......................................................................22 " 6-33 MECHANICS AND MATERIALMEN'S LIEN. ...............................................................22 5--34 SUBSTITUTIONS .................................................................................................._.....23 D-35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER.............23 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES..........................................26 D- 37 BYPASS PUMPING.................................................................,...................................27 D-38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER..........27 D-39 SAMPLES AND QUALITY CONTROL TESTING.........................................................29 U-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)................................................................................29 D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ........................30 6-42 PROTECTION OF TREES, PLANTS AND SOIL..........................................................31 D-43 SITE RESTORATION .................................................................................................31 D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST..............................................3t �. D-45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING 5-46 CONFINED SPACE ENTRY PROGRAM.....................................................................37 D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION............................37 D-48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS)......................37 5-49 CONCRETE ENCASEMENT OF SEWER PIPE ..........................................................38 D- 50 CLAY DAM. .................................................................................................................38 D- 51 EXPLORATORY EXCAVATION (D-HOLE)..................................................................38 10127/04 SC-1 .s PART D - SPECIAL CONDITIONS D- 52 INSTALLATION OF WATER FACILITIES..................................................... ...39 52.1 Polyvinyl Chloride (PVC)Water Pipe. ..........................................................................39 52.2 Blocking .......................................................................................................................39 52.3 Type of Casing_Pipe. ...................................................................................................39 .. 52.4 Tie-Ins. ........................................................................................................................39 52.5 Connection of Existing Mains.......................................................................................40 52.6 Valve Cut-Ins ..............................................................................................................40 .. 52.7 Water Services. ...........................................................................................................40 52.8 2-Inch Temporary Service Line ....................................................................................42 52.9 Purging and Sterilization of Water Lines ......................................................................43 52.10 Work Near Pressure Plane Boundaries........................................................................44 52.11 Water Sample Station..................................................................................................44 52.12 Ductile Iron and Gray Iron Fittings. ..............................................................................44 D- 53 SPRINKLING FOR DUST CONTROL..........................................................................45 D-54 DEWATERING.............................................................................................................45 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES.........................................................45 D- 56 TREE PRUNING..........................................................................................................45 .. 6- 5-7 TREE REMOVAL.........................................................................................................46 D- 58 TEST HOLES. ...................................................................... ..... ................................46 D_- 5 9 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION. ......................................................................................................................47 D- 60 TRAFFIC BUTTONS....................................................................................................47 6- 6-1 SANITARY SEWER SERVICE CLEANOUTS..............................................................48 D- 62 TEMPORARY PAVEMENT REPAIR....................................................L.......................48 U- 63 CONSTRUCTION STAKES.................................................................................,.......48 .. D- 64 EASEMENTS AND PERMITS. ....................................................................................48 6-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING................................................49 D- 66 WAGE RATES.............................................................................................................49 U- 6-7 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE.....................................49 D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN1 ACRE)............................................................................................................................50 D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS. ..................................................................................................52 D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD.................................................52 D-71 EARLY WARNING SYSTEM N T TION ..................................................... D-72 AIR POLLUTION WATCH DAYS.....................................................................................53 D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS..........................................54 10/27/04 SC-2 PART D - SPECIAL CONDITIONS out This Part D — Special Conditions is complimentary to Part C—General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C— General Conditions and part C1 —Supplementary Conditions .. to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: PROJECT DESCRIPTION 36"Water Main Ext. Along TRE R.O.W. Contract 1 Unit 1 & 2 FORT WORTH, TEXAS DOE PROJECT NOs. 3600 & 5191 WATER DEPARTMENT PROJECTS NO. P264-605140035283 D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2)years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. r. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the .. General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govem performance of all such work. �. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRALTEXAS 10127104 SC-3 ■a PART D - SPECIAL CONDITIONS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. •• Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining .. contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact Oft that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth — Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot •• be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- .n consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be'returned unopened. ow C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purd,,asing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-2 COORDINATION MEETING .. For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 10/27/04 SC-4 w PART D - SPECIAL CONDITIONS 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Duration of the project- includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, -- or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change 10127104 SC-5 PART D - SPECIAL CONDITIONS that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner .. prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 1. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: .. 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas .. Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; .. 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the .. contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage .• agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil ,. penalties or other civil actions. 10/27/04 SC-6 PART D - SPECIAL CONDITIONS r� 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes .. persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D-5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine they,required length of -• replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work,the cost of which shall be included in the price bid in the Proposal for each bid item. D-6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the •. Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. 10127/04 SC-7 PART D - SPECIAL CONDITIONS The Contractor shall be responsible for verifying the locations of and protecting all existing .. utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection or relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. .. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. .. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on •• the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D-7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damaqe to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's .• expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D- 8 TRAFFIC CONTROL _ The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vemon's Civil Statutes, pertinent sections being Section _ Nos. 27, 29, 30 and 31. 10/27/04 SC-8 PART D - SPECIAL CONDITIONS A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer at (817) 871-8770, at the pre-construction conference. Although work will not begin until the — traffic control plan has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed .. correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." dM The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be .. allowed. _ D-9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress .. and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. -� D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D-12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. 10/27/04 SC-9 PART D - SPECIAL CONDITIONS D-13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a •- manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D-14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include,but not be limited to: .. • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed)of the appropriate bid item(s)will be reduced by 25%. •� Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or .. concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth Department of Engineering shall give final acceptance of the completed project work. D-15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for 3leanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut-sheets ,. have been received from the City inspector. D-16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 10/27/04 SC-10 9M PART D - SPECIAL CONDITIONS "' 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. .. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers, de- .t energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCORE, and shall record action taken in each case. i 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and AM expense. 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D- 17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C44.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. L. D- 18 CUTTING OF CONCRETE .. When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. _ D-19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the ,., exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloringwon the barricades. Barricade signs shall be in .. accordance with Figure 30, except that they shall be V-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (817)871-8306 M-F 7:30 am to 4:30 p.m. or .. (817)871-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT 10/27/04 SC-1 1 PART D - SPECIAL CONDITIONS At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. •- Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will .. be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for �- trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2- Materials and Division 2 Item 208.3- Materials Sources. Trench backfill and compaction shall meet the .. requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. _ D-23 2:27 CONCRETE Transportation and -Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call- out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways, gravel surfaced roads,within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial 10/27/04 SC-12 MR PART D - SPECIAL CONDITIONS — measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special on Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than .. 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or _ no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C"or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back-fill material is not suitable, at the direction of the Engineer, Type"B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: • Less than 10% passing the #200 sieve • P.I. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be .. replaced with the following: .. Sieve Size % Retained in 0-10 1/2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A-S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a .. combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The top two (2)feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all .. trench backfill. Any retesting required as a result of failure to compact the backfill material to 10/27/04 SC-13 PART D - SPECIAL CONDITIONS meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2)foot vertical intervals beginning at a level two (2)feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. .. 4. MEASUREMENT AND PAYMENT: All material, with the exception of Type"B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. Type"B" backfill shall be paid for at a pre-bid unit price of$15.00 per cubic yard. D-25 TRENCH PAVEMENT(PERMANENT) REPAIR(E2-19) FOR UTILITY CUTS .. The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for .. Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC depths on existing streets, are provided in these specifications and contract documents. All required paving cuts shall be made with a concrete saw in a true and straight line on both _ sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2)feet or less in width. Therefore, at the locations in the project where the trench wall is three (3)feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches .. outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job .. placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) .. A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and .. 10/27/04 SC-14 PART D - SPECIAL CONDITIONS all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby ,., made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15)feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a MM series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. �+ 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. .. 4. SHIELD SYSTEM- Shields used in trenches are generally referred to as"trench boxes"or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent ,., structures or can be designed to be portable and move along as the work progresses. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety — systems shall be based on the linear foot amount of trench depth greater than five (5)feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, touls, .. materials, equipment and incidentals necessary for the installation and removal of trench safety systems. 4 , D-27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract — Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract .. Documents and Specifications, unless amended or superseded by requirements of this Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer lines. The plugs shall not be removed until the applicable manhole complete with cone 10127/04 SC-15 PART D - SPECIAL CONDITIONS section has been constructed and the lid installed to keep out debris as a result of additional .. construction. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasket manhole inserts shall be .. installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be •• required for all pipe diameters 18" and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole .. shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3)feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. .. Covers shall set flush with the rim of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All !hallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manho[e. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec"46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the ,. joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. 10/27/04 SC-16 .. PART D - SPECIAL CONDITIONS This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible .. joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above-specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of -� the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside)of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjustments allowed. -� In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone jsection below this level are structurally unsound, notify the Engineer prior to replacement oithe grade rings and manhole frame. Existing .. brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. r� If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not 10/27104 SC-17 PART D - SPECIAL CONDITIONS specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10)feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with • two mop coats of coal tar epoxy. Kopper"Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for adjusting and/or sealing of existing manholes shall include all labor, •- equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to,joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D-28 SANITARY SEWER SERVICES Any reconnect,,)n, relocation, re-routes, replacement, or new sanitary sewer service shall be .. required as shown on the plans, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum "` bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid la*27iO4 SC-18 PART D - SPECIAL CONDITIONS +. any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees,fittings incidental four .. (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as + approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the ., necessary service lines, the Contractor shall verify (by de-holing at the building clean-out) the elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two .. (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service lines that are installed without pre-construction de- holing at the affected residences (to verify design elevations) shall be removed and replaced .. as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been .. installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re- routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The .. Contractor shall remove the existing clean-out and plug the abandoned sewer service line. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private A property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the 10/27104 SG-19 ��� � � PART D - SPECIAL CONDITIONS Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill, removal of existing clean-outs, plugging the abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract #- Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated r material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the .. Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. 10/27104 SC-20 .. PART D - SPECIAL CONDITIONS no F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either -� clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the ` Engineer. Surface restoration shall be compatible with surrounding surface. I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be 'r included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). *� L. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item I. no 10/27/04 SC-21 .r PART D - SPECIAL CONDITIONS D-30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2% pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Type of Ufilit Color Code Legends Water Safety Blue Caution! Buried Water Line Below -- Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D-31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOIUFILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the .. Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section. D-33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. 10/27/04 SC-22 PART D - SPECIAL CONDITIONS D-34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or"or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to"substitutions" shall be applicable to all sections of these specifications. D-35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be ., abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment �+ shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring �• manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be 6611ppsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. if, again, successful cleaning cannot be performed or equipment fails to traverse the entire .. manhole section, it will be assumed that a major blockage exists, and the cleaning effort 1027/04 SC-23 r PART D - SPECIAL CONDITIONS shall be abandoned. When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the r' Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. .. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. .. The importance of accurate distance measurements is emphasized. All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. 10127104 SC-24 PART D - SPECIAL CONDITIONS The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at ,i the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. .r 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes r� shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re-televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. +� Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. 1ar227ioa SC-25 a PART D - SPECIAL CONDITIONS Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion ., of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances,when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244-93: nr Table I MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg -9"Hg) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. 18' 45 sec. 59 sec. .. 20' 50 sec. 65 sec. 22' 55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. 10/27/04 SC-26 PART D - SPECIAL CONDITIONS 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 1. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is, less than one-inch of mercury (1" Hg) after the required test time. Any .. manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal '* condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. �+ C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all incidentals, including all bypass pumping, required to complete the test as specified herein. D-37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. D-38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television dk inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either f direction at a moderate rate, stopping when necessary to permit proper documentation of 10/27104 SC-27 PART D - SPECIAL CONDITIONS any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, _ telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at .. the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the -� television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photogr- Shing does not interfere with the Contractor's operations. .� 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor Quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- televise and provide a good tape of the line at no additional cost to the City. If a good *� 10/27/04 SC-28 PART D - SPECIAL CONDITIONS 4+ tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner)to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item- Post-Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all " materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish�pterials and equipment conforming to the requirements of the contract. .r D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. }-* E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-40 TEMPORARY EROSION, SEDIMENT,AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE) A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water rr pollution control measures deemed necessary by the Engineer for the duration of the 10127104 SC-29 PART D - SPECIAL CONDITIONS contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, .� fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by �. excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 2. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 3. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. .. 4. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 5. All waterways shall be cleared as soon as practicable of false work, piling, debris or other *� obstructions placed during construction operations that are not a part of the finished work. 6. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and — reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES tW27104 SC-30 no PART D - SPECIAL CONDITIONS •. The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D-43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D-45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING This item shall be performed in accordance with the City of Fort Worth Parks and Community •+. Services Department Specifications for Topsoil, Sodding and Seeding. 10/27104 SC-31 Awl1. TOPSOIL PART D - SPECIAL CONDITIONS DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of " topsoil, free from rock and foreign material, in all parkways and medians to the lines and grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shalt be either "spot" or "block'; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all 10/27104 SC-32 Am PART D - SPECIAL CONDITIONS ,. furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15)to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact �* solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed'fumished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and " germination: Common Name Eq[L Germination -� Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% Tall Fescue 95% 90% Western Wheatgrass 95% 90% 10127/04 SC-33 i PART D - SPECIAL CONDITIONS Buffalo Grass Varieties Top Gun 95% 90% Cody 95% 90% _ Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for .. Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) — Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this -- Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas s'�own on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D-45, Construction Methods, is not applicable since no seed bed preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D45, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than by .. 10/27/04 _ SC-34 PART D - SPECIAL CONDITIONS .. mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one-eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the"Cultipacker"type. All rolling of the slope areas shall be on the contour. .w ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. " After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specked, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, d► the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six(6) inches in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. +M RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the ,rr following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration. * Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER 10/27/04 SC-35 PART D - SPECIAL CONDITIONS DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas .. as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled ,. showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures .. in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. " CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for"Seeding"will be measured by the linear foot, complete in place. i Acceptable material for"Sodding"will be measured by the linear foot, complete in place. +r Acceptable material for"Fertilizer"shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract -� unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. 1027/04 SC-36 PART D - SPECIAL CONDITIONS The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all ..� materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and �. subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain ., an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 7. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 8. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 9. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 10. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 11. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. +� D-48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified .oa 10127/04 SC-37 .a PART D - SPECIAL CONDITIONS at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. +r 5. Before excavation (off the roadway)within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. .. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. ` 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D-49 CONCRETE ENCASEMENT OF SEWER PIPE �•r Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D-50 CLAY DAM =` Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. D-51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the P existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the ` start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole)to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the +M 10/27/04 SC-38 PART D - SPECIAL CONDITIONS .. approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D-6. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No '~ payment shall be made for exploratory excavation(s) conducted after construction has begun. D-52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). At 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1. WATER: +� The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. .. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. -- 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 52.4 Tie-Ins .s 10/27/04 SC-39 r. i PART D - SPECIAL CONDITIONS The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. r 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. 52.6 Valve Cut-fns It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shall be included in the price of the appropriate bid items. 52.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to .•. those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured .r tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18) contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. ' 10/27/04 SC-40 PART D - SPECIAL CONDITIONS �. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be p subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and ,�. fittings shall be included in the price bid for Service Taps to Main. 1. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. Tha contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5)feet from Main to five (5)feet behind the Meter. 2. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate '* payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the as centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, la27/04 SC-41 PART D - SPECIAL CONDITIONS 0; labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not , justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E1-18A— Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5)feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings �- shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. 1. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). ,. 2. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction „ shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shalt be made at the unit bid price in the appropriate bid item(s). '~ 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation. 101271104 SC42 rr PART D - SPECIAL CONDITIONS The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary +� service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. n Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre-construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this spec project and location only. Any water that the contractor may need for personal use will r require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications ft except as modified herein. The City will provide all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities "k to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 10127/04 SC-43 PART D - SPECIAL CONDITIONS 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge; .. however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. ow Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, �. fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron Oft fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings,joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed. All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with .• polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13.' Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, *. 1027104 SC-44 ]:I&- .a PART D - SPECIAL CONDITIONS *• horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. D-53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. D-54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. �r The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. • Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. ,r D-55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D-56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2. Vermeer V-155ORC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel"T"= Bar stakes, 6 feet long. 4. Smooth Horse-Wire: 14-1/2 gauge (medium gauge)or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 10127/04 SC-45 Oft PART D - SPECIAL CONDITIONS B. Using the approved specified equipment, make a cut a minimum of 36 inches deep in " order to minimize damage to the undisturbed root zone. 9. Backfill and compact the trench immediately after trenching. ,t 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. _ 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill,with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D-57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball .. removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. D-58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and .. maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. 10/27/04 SC-46 rr PART D - SPECIAL CONDITIONS 3W D-59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction �► activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name �. of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the `pre-construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. in the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: .r Name of the project, DOE number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review �. prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Construction office at (817) 'i 871-8306. All work involved with the notification flyers shall be considered subsidiary to the contract price �- and no additional compensation shall be made. D-60 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD)of the Transportation/Public Works Department to install the markings, " the contractor shall contact SSMD at (817) 871-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. 1027/04 SC-47 r PART D - SPECIAL CONDITIONS D-61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cleanouts. D-62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D-63 CONSTRUCTION STAKES The City, through its Surveyor or agent,will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. •• If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to .. lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D-64 EASEMENTS AND PERMITS ~ The performance of this contract requires certain temporary construction, right-of-entry agreements, and/or permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it 10/27104 SC-48 r. PART D - SPECIAL CONDITIONS +• shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the plans desk at the Department of Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of ,r Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide .. the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all costs associated with compliance with the permit(s) including payment for flagmen shall be subsidiary to the bid item price for boring under the railroad. No additional payment will be allowed for this item. D- 65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. D-66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as ._ being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates of wages be paid. (Attached) D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a_ 10/27/04 SC--49 w s+ PART D - SPECIAL CONDITIONS contract or other law, ordinance, regulation or policy whose requirements are more .. stringent. B. ACP is defined under NESHAP as a Category II, non-friable material in its intact state but "' which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas .. Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency .0 (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. .. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable .s or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is OR responsible to employ those means, methods, techniques and sequences to ensure this result. am E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the .n responsibility of the Excavator. (Copy of forms attached) F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe ,. unless otherwise stated or indicated on the project plans or contract documents. D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN 1 ACRE) PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction .. Activity)or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. 10/27/04 SC-50 PART D - SPECIAL CONDITIONS +• NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI)form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 A copy of the NOI shall be sent to: �+ City of Fort Worth Department of Environmental Management 5000 MLK Freeway .. Fort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT)form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to: Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction •. site. Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY-- DISTURBED AREA EQUAL TO OR GREATER THAN 5 �r ACRES: A Notice of Intent (NOI)form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval.The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared +� and submitted by the contractor to the engineer for review and approval. A Notice of Terr f' 60,011-: 10/27/04 SC-51 ��" � I i. PART D - SPECIAL CONDITIONS (NOT)form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or,when another permitted operator assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY- DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall ^ result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D -40 SHALL BE APPLICABLE. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS .. It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. dft In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s)for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested 10/27/04 SC-52 PART D - SPECIAL CONDITIONS may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendation to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is +�► responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time .,r allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the pr contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. " 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. if necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public Information Officer. ,., 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contact, the bonding company will be notified appropriately. D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically,the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 " a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. . The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the 10/27104 SC-53 r. PART D - SPECIAL CONDITIONS responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However,the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. •� D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway construction, such as driveways, sidewalks, etc.,will be required. The fees are as follows: 1. The street permit fee is $50.00 per permit with payment due at the time of permit application. 2. A re-inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the contractor for all street use permits and re-inspections shall be considered �. subsidiary to the contract cost and no additional compensation shall be made. 1012704 SC-54 (To be printed on Contractor's Letterhead) DOE No. PROJECT NAME: MAPSCO LOCATION: LIMITS OF CONST.: r THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE SEWER LINES ON OR AROUND YOUR PROPERTY. ,4 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS ` FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR �► Mr. <CITY INSPECTOR> AT <TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970 PLEASE KEEP THIS FLYER HAIVDY WHEN YOU CALL. as PART D - SPECIAL CONDITIONS Classifications Hrly Rts Classifications Hrly Rts Air Tool Operator $10.06 Scraper Operator $11.42 �- Asphalt Raker $11.01 Servicer $12.32 Asphalt Shoveler $8.80 Slip Form Machine Operator $12.33 Asphalt Distributor Operator $13.99 Spreader Box Operator $10.92 rr Asphalt Paving Machine Operator $12.78 Tractor operator,Crawler Type $12.60 Batching Plant Weigher $14.15 Tractor operator,Pneumatic $12.91 Broom or Sweeper Operator $9.88 Traveling Mixer Operator $12.03 _ Bulldozer operator $13.22 Truck Driver-Single Axle(Light) $10.91 Carpenter(Rough) $12.80 Truck Driver-Single Axle(Heavy) $11.47 Concrete Finisher-Paving $12.85 Truck Driver-Tandem Axle Semi-Trailer $11.75 Concrete Finisher-Structures $13.27 Truck Driver-Lowboy/Float $14.93 Concrete Paving Curbing Mach.Oper. $12.00 Truck Driver-Transit Mix $12.08 Concrete Paving Finishing Mach.Oper. $13.63 Wagon Drill,Boring Machine,Post Hole $14.00 Driller Concrete Paving Joint Sealer Oper. $12.50 Welder $13.57 Concrete Paving Saw Oper. $13.56 Work Zone Barricade Servicer $10.09 Concrete Paving Spreader Oper. $14.50 Concrete Rubber $10.61 Crane,Clamshell,Backhoe,Derrick,Dragline, $14.12 Shovel Electrician $18.12 Flagger $8.43 Form Builder-Structures $11.63 Form Setter-Paving&Curbs $11.83 _ Foundation Drill Operator,Crawler Mounted $13.67 Foundation Drill Operator,Truck Mounted $16.30 Front End Loader $12.62 Laborer-Common $9.18 Laborer-Utility $10.65 Mechanic $16.97 Milling Machine Operator,Fine Grade $11.83 .. Mixer Operator $11.58 Motor Grader Operator(Fine Grade) $15.20 Motor Grader Operator,Rough Oiler $14.50 r. Painter,Structures $13.17 Pavement Marking Machine Oper. $10.04 Pipe Layer $11.04 Roller,Steel Wheel Plant-Mix Pavements $11.28 .. Roller,Steel Wheel Other Fiatwheel or Tamping $10.92 Roller,Pneumatic,Self-Propelled Scraper $11.07 Reinforcing Steel Setter(Paving) $14.86 Reinforcing Steel Setter(Structure) $16.29 r 10/27/04 SC-56 FoRTWORTH Date: DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) r THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, .r ,CONTRACTOR a•s PART D - SPECIAL CONDITIONS on F TEXAS DEPARTMENT OF HEALTH DEMOLITION I RENOVATION * NOTIFICATION FORM e>s NOTE:CIRCLE ITEMS THAT ARE AMENDED T D H NOTIFICATION# _ 1) Abahment Contractor Ti]H Licen5a Number, Address; City; Stater Zip: + Offica,Phone Number( 1 .lob Site Phone Number: e SuRerviser. Tt1H License fit+mber, Site Supeevfaor_ - TDH License Number: 8 Trained Orr-Site NESHAP IndividualsOarficaticrl pate: Demolition Comm Chk Office Phone Number j 1 Addnpaes' Oily StEi139:, Zin: �} P�eject O�cs4pasa�r' TDH Lioetwsa Fbl�l�t: •• Cv. 7m: office Phoria Nut tw.( ] - p 3) Faclitiy Owner: •• Attention: Mailing Address: City,_ Statw. Zip; OwntrPhone3Nurnbert .-- "Novo:the involm for no notion fee will be sant to the owner of the buliding and Rhes billing address for they invoice will be obteinesd Imm the infomalion that is provided In this section 4) Descripdon or Facfhry Name: Pl-w u l Address: Oorrrtty City ZIP: Facility Phone Numbers} Fac+Tsy Contact Person; .r Description ofAraalt om Number. Prior Use; f=uture Use: Age of 6uildinglFacility: Sias: Number OfFmrw, School(K-12): o YES ❑ NO S) Typo of Work: 0 Demolition a Re rw altIon(Abatement) O Annual Cwt�altdated Work win be during: 0 My ❑ Everft ❑ Night O Phased Project i . Desc*tlon of work schedules: -.6) Is this a PumUo Building? 4 YES 0 NO Federal Faci11W❑YES n NO Industteal Site?DYES D NO NESHAP. )Wy Facility? ❑ YES ❑ NO Is BulldIr4Tacll4 t]ccuplad? C YES ONO 7) Notffaatlon Type CHECK ONLY ONE C Original(10 Wariting Days) Q Cancell241on ❑Amendment a ErnesrgencytOrdered It this is an amendment,whilrh amendment number is this?_(Enclose copy of atiginaf andtor last amendment) If an emergency,vrtso did you talk~Milt at TDH? Emerger>gf: e Date and Hour of Emergency(HHIM1t+tPODfYY): Description of the sudden,unexpected event and explanation of hour the event caused unsafe condgivns or Would cause equipment damage(campulairs,machinery,etc e� 8) Desoloon of procedures to be followed In the event that unexpected asbestos is found or praviou*non4riabte usbeasloes mat anal bworne s,crumbled.pulverrizad,or reduced to powder: 8) Was an Asbestos survey performed? 0,YES p NO Date: ! 1 TDH Inspector License No: Analytical Method:❑PLM ❑TEM❑Assumed. T13H Let story I.1cer*e N . (For TAHPA(pliblte building)project$:an assumption rmat be made by a TDH Licensed IhspGVJ oft 10) Description of planned demntidon or reno"fion work,type of materiel,and methods)to be used: - ee. 11_) Dowipsoft of woo practice and engineering controls to be used to preve3nt em&km of ftbaslos at the tiemc>llllOrt►r>mave�liOn 10127104 SC-58 PART D - SPECIAL CONDITIONS 12) ALL applicable Ilems in titsfolloWing table must be completed: IF NO ASBESTOS PRESENT CHECK HERE t= Approximate amount of Check unit of measurement r Adwatb6-Containing Building Material Asbestos Type Pipes Surface Area Ln Ln SO SO Cu Cu F1 Im 1=t I t R M r. RACM to t*removed RACM NOT removed Interior Category 1 non-friable removed sr Exterior CaWgory 1 non-ftiable removed Categ2ry I non-friable NOT removed .. interior Ca 11 non-friable removed Exterior Catagn 11 cion-friable removed ro Ca It non-frhable NOT removed RACM Off-FacHity Component 13) Waste Traraparler Name:._ _ _ TDH Ucense Number. = Addresw Oily state: Contact Person', Phana Number: f 1 14) Waste bbl sde NanW. .. Addiesrq City Ste19. 21p: Tdephone (- 1 TNtRCC Pem*Number. lila For structurally unsound to lillas,attach a copy of demolition order and identify Governmental Official below. Namee__.v...._-_ _ Reglstralion Nlo: AS* Title: Date of order(MM0DM) 1 1 Date order to begin(MWDDfYY) 1. . 1 16) Scheduled Dates of Asbestos Abatement"WDE]f1'Y) Start i I Complete: 1 / am 17) Scheduled Dong$Dernolltivn/Renovetlon(MtrVDDNY) Man. f 1 Corn lew 1 1 `"Nate:lithe start date on Ota eotiticption eon not be nwk the TDK titogtonai or Loral Program aR6ee Hustbe eonbctad by phone prior to the start date. Failure to do so Is a 0olatron In accordance to TAHPA.Section 299.81. am 1 hereby ceridy that all Information I have provided Is enrrect,complete.and huA to tha best of my knowledge. i ocknowledge that 1 ant responsible for all aspects of the nofificafion form,includatE,but not limiting.rpntent and submission dries. The maximum penally is$10,000 per day per violation. ar% a Oonsuttaowned erator {Printed Name) (Date) ( t (Telephix ) (Face Nirnlber) MAIL TO- ASBESTUS NOTIFICATION ION SECTION TOXIC SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH 'Faxes ans,not accopro& PO BOX 143538 *Alxes are not&ccapioor* AUSTIN.TX 78714.3539 PH.6124U-6600,1-ODO-572-5548 Form APM dated 07129)0.2.Replaces T DDH farm dated 0711WI.For assistance in c amplef nB fam caN i-800.572-5546 10127104 SC-59 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS..............5 DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE (OMITTED)...............5 DA-3 PIPE ENLARGEMENT SYSTEM(OMITTED).........................................................5 DA4 FOLD AND FORM PIPE(OMITTED) ........................................................................5 DA-5 SLIPLINING(OMITTED).............................................................................................5 DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT..................................................5 DA-7 TYPE OF CASING PIPE................................................................................................8 DA-8 SERVICE LINE POINT REPAIR!CLEANOUT REPAIR(OMITTED)................9 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMITTED).....................................................................................................................................9 DA-10 MANHOLE REHABILITATION (OMITTED)..........................................................9 DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMITTED)9 DA-12 INTERIOR MANHOLE COATING-MICROSILICATE MORTAR SYSTEM so (OMITTED)............................. ...............9 ......................................................................................... DA-13 INTERIOR MANHOLE COATING-QUADEX SYSTEM (OMITTED)................9 DA-14 INTERIOR MANHOLE COATING-SPRAY WALL SYSTEM(OMITTED).......9 Im DA-15 INTERIOR MANHOLE COATING-RAVEN LINING SYSTEM(OMITTED)...9 DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY so LINER(OMITTED)........................................................................................................................ 9 DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM(OMITTED)......9 DA-18 RIGID FIBERGLASS MANHOLE LINERS(OMITTED)........................................9 sm DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTED)..................9 DA-20 PRESSURE GROUTING(OMITTED)........................................................................9 DA-21 VACUUM TESTING OF REHABILITATED MANHOLES(OMITTED)............ 10 •. DA-22 FIBERGLASS MANHOLES (OMITTED)................................................................. 10 DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES......... 10 DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER.................................... 10 oft DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (OMITTED)................... 11 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE..................................... 11 DA-27 GRADED CRUSHED STONES................................................................................... 11 DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE(OMITTED)............................. 12 DA-29 BUTT JOINTS—MILLED(OMITTED).................................................................... 12 DA-30 2" H.M.A.C.SURFACE COURSE(TYPE "D" MM.............................................. 1^ DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER(OMITTED)............ 12 DA-32 NEW 7" CONCRETE VALLEY GUTTER(OMITTED)........................................ 12 DA-33 NEW 4" STANDARD WHEELCHAIR RAMP(OMITTED).................................. 12 DA-34 8" PAVEMENT PULVERIZATION (OMITTED).................................................... 12 DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) (OMITTED)................................................................................................................................... 12 DA-36 RAISED PAVEMENT MARKERS (OMITTED)...................................................... 12 DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING. 12 DA-38 LOADING,TRANSPORTATION,AND DISPOSAL OF CONTAMINATED SOIL 17 DA-39 ROCK RIPRAP-GROUT-FILTER FABRIC......................................................... 17 ..a 11/02/04 ASC-1 PART DA - ADDITIONAL SPECIAL CONDITIONS DA40 CONCRETE RIPRAP(OMITTED)............................................................................21 DA41 CONCRETE CYLINDER PIPE AND FITTINGS.....................................................21 DA42 CONCRETE PIPE FITTINGS AND SPECIALS ......................................................21 DA43 UNCLASSIFIED STREET EXCAVATION(OMITTED) .......................................22 DA44 6"PERFORATED PIPE SUBDRAIN (OMITTED)..................................................22 •• DA45 REPLACEMENTOF4"CONCRETE SIDEWALKS (OMITTED).......................22 q ........................................22 DA47 PAVEMENT REPAIR IN PARKING AREA(OMITTED)......................................23 DA48 EASEMENTS AND PERMITS....................................................................................23 DA49 HIGHWAY REQUIREMENTS...................................................................................23 DA-50 CONCRETE ENCASEMENT .............23 ........................................................................ DA-51 CONNECTION TO EXISTING STRUCTURES.......................................................24 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION (OMITTED)24 DA-53 OPEN FIRE LINE INSTALLATIONS (OMITTED)................................................24 DA-54 WATER SAMPLE STATION (OMITTED)...............................................................24 DA-55 CURB ON CONCRETE PAVEMENT........................................................................24 DA-56 SHOP DRAWINGS.......................................................................................................24 DA-57 COST BREAKDOWN...................................................................................................25 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C.OVERLAY.........................25 DA-59 H.M.A.C.MORE THAN 9 INCHES DEEP................................................................25 DA-60 ASPHALT DRIVEWAY REPAIR...............................................................................26 DA-61 TOP SOIL.......................................................................................................................26 .. DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT (OMITTED) ............ ............ ... ....................................... .............................................................26 DA-63 BID QUANTITIES........................................................................................................26 DA-64 WORK IN HIGHWAY RIGHT OF WAY..................................................................26 DA-65 CRUSHED LIMESTONE(FLEX-BASE) ..................................................................27 _ DA-66 OPTION TO RENEW(OMITTED)............................................................................27 DA-67 NON-EXCLUSIVE CONTRACT(OMITTED).........................................................27 DA-68 CONCRETE VALLEY GUTTER(OMITTED)........................................................27 DA-69 TRAFFIC BUTTONS(OMITTED).............................................................................27 DA-70 PAVEMENT STRIPING(OMITTED).......-...............................................................27 DA-71 H.M.A.C.TESTING PROCEDURES .........................................................................27 dft DA-72 SPECIFICATION REFERENCES..............................................................................27 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVE AND BOX(OMITTED)..................................................27 - DA-74 RESILIENT-SEATED GATE VALVES.....................................................................28 DA-75 EMERGENCY SITUATION,JOB MOVE-IN(OMITTED)....................................28 DA-76 1 %:"&2"COPPER SERVICES(OMITTED)...........................................................28 DA-77 SCOPE OF WORK(UTIL. CUT)(OMITTED).........................................................28 DA-78 CONTRACTOR'S RESPONSIBILTY(UTIL. CUT)(OMITTED).........................28 DA-79 CONTRACT TIME UTIL.CUT OMITTED .......28 DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL.CUT) (OMITTED) 28 DA-81 TIME ALLOWED FOR UTILITY CUTS(UTIL. CUT) (OMITTED)...................28 dft 11/02/04 ASC-2 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-82 LIQUIDATED DAMAGES (UTIL.CUT)(OMITTED)...........................................28 DA-83 PAVING REPAIR EDGES (IML.CUT)(OMITTED)............................................28 DA-84 TRENCH BACKFILL(UTIL.CUT)(OMITTED)....................................................28 DA-85 CLEAN-UP(UTIL.CUT) (OMITTED)......................................................................28 DA-86 PROPERTY ACCESS (UTIL.CUT)(OMITTED)....................................................28 .................... DA-87 SUBMISSION OF BIDS(UTIL.CUT)(OMITTED) ................................................28 DA-88 STANDARD BASE REPAIR FOR UNIT I(UTIL. CUT)(OMITTED)..................28 DA-89 CONCRETE BASE REPAIR FOR UNIT II&UNIT III(UTIL. CUT) (OMITTED)...................................................................................................................................28 DA-90 2"TO 9"H.M.A.C.PAVEMENT(UTIL. CUT)(OMITTED).................................28 DA-91 ADJUST WATER VALVE BOXES,MANHOLES,AND VAULTS (UTIL.CUT) (OMITTED) ...................................................................................................................................28 DA-92 MAINTENANCE BOND(UTIL.CUT) (OMITTED)...............................................28 DA-93 BRICK PAVEMENT (UTIL.CUT)(OMITTED)......................................................28 DA-94 LIME STABILIZED SUBGRADE (UTIL.CUT)(OMITTED)...............................28 DA-95 CEMENT STABILIZED SUBGRADE (UTIL.CUT) (OMITTED)........................28 DA-96 REPAIR OF STORM DRAIN\STRUCTURES (UTIL.CUT)(OMITTED)..........29 DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) (OMITTED)........................................29 DA-98 UTILITY ADJUSTMENT(UTIL.CUT) (OMITTED).............................................29 DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS(UTIL. CUT) (OMITTED).........................................................................................................................29 .. DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL.CUT)(OMITTED)..29 DA-101 CONCRETE CURB AND GUTTER(UTIL.CUT) (OMITTED)........................29 DA-102 PAYMENT(UTIL. CUT)(OMITTED)..................................................................29 DA-103 DEHOLES (MISC.EXT.)(OMITTED)..................................................................29 DA-104 CONSTRUCTION LIMITATIONS (MISC.EXT.)(OMITTED)........................29 DA-105 PRESSURE CLEANING AND TESTING(MISC.EXT.)(OMITTED).............29 DA-106 BID QUANTITIES(MISC.EXT.)(OMITTED)....................................................29 DA-107 LIFE OF CONTRACT(MISC.EXT.) (OMITTED).............................................29 DA-108 FLOWABLE FILL(MISC.EXT.) (OMITTED)...................................................29 " DA-109 BRICK PAVEMENT REPAIR(MISC.REPL.)(OMITTED) ...................... DA-110 DETERMINATION AND INITIATION OF WORK(MISC.REPL.) (OMITTED)................................................................................................................... 29 DA-111 WORK ORDER COMPLETION TIME (MISC.REPL.) (OMITTED)..............29 DA-112 MOVE IN CHARGES(MISC. REPL.)(OMITTED)............................................29 DA-113 PROJECT SIGNS.................................... ................................................................29 DA-114 LIQUIDATED DAMAGES (MISC.REPL.) (OMITTED) ...................................29 DA-115 TRENCH SAFETY SYSTEM DESIGN(MISC.REPL.)(OMITTED)...............29 DA-116 FIELD OFFICE (OMITTED)..................................................................................30 DA-117 TRAFFIC CONTROL PLAN...................................................................................30 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS.30 m,. DA-119 PIPELINE CROSSING HIGHWAYS,STREETS AND RAILROADS BY BORING TUNNELING OR OPEN CUT ...................................................................................30 DA-120 RAILROAD REQUIREMENTS................................................................................37 r 11102104 ASC-3 on PART DA - ADDITIONAL SPECIAL CONDITIONS DA-121 EXPLORITORY D-HOLE.........................................................................................37 low am .. am .. .. oft oft oft Jos oft 11102104 ASC-4 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS The City reserves the right to abandon without obligation to the contractor, any part of the project, or the entire project, at any time before the contractor begins any construction work authorized by the City. Award, if made, shall be to the lowest responsible bidder. The following shall apply for contract documents with multiple units of work. Each unit represents a separate project, each with an individual M/WBE specification and proposal section. The .., proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the lowest responsible bidder for each individual unit. If a contractor is the low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance for the applicable unit or combination of units and shall submit monthly M/WBE reports for the applicable unit or combination of units. Construction time on all units will run concurrently. For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction time period. DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE (OMITTED) DA-3 PIPE ENLARGEMENT SYSTEM (OMITTED) DA-4 FOLD AND FORM PIPE (OMITTED) DA-5 SLIPLINING (OMITTED) DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of a" the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. rr 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad -ft company, as applicable. B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI 1336.10 and the following: 11/02104 ASC-5 on PART DA - ADDITIONAL SPECIAL CONDITIONS an a. Field Strength: 35,000 psi minimum. b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). Oft d. Joints: Continuous circumferential weld in accordance with AWS D1.1. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as On specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or .. as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits ,. or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and .. workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and 11102104 ASC-6 PART DA - ADDITIONAL SPECIAL CONDITIONS grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or r+ other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. C. The Contractor shall prevent over-belling the pipe while installing it through the casing. A method of restricting the movement between the assembled a. bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and -� specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at ..� the ends of the casing as shown on the drawings or as required by the Engineer. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe 11/02104 ASC-7 PART DA - ADDITIONAL SPECIAL CONDITIONS shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed .. by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used, with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient .. strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mud jacked. C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement _ replacement,which if required, shall be paid separately. DA-7 TYPE OF CASING PIPE 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: 11102104 ASC-8 .. PART DA - ADDITIONAL SPECIAL CONDITIONS A. For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. B. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company,Advanced Products and Systems, Inc., or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. r 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR (OMITTED) DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMITTED) DA-10 MANHOLE REHABILITATION (OMITTED) DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMITTED) DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM (OMITTED) DA-13 INTERIOR MANHOLE COATING -QUADEX SYSTEM (OMITTED) DA-14 INTERIOR MANHOLE COATING -SPRAY WALL SYSTEM (OMITTED) DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (OMITTED) DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER (OMITTED) DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM (OMITTED) DA-18 RIGID FIBERGLASS MANHOLE LINERS (OMITTED) DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION (OMITTED) r DA-20 PRESSURE GROUTING (OMITTED) 1110204 ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-21 VACUUM TESTING OF REHABILITATED MANHOLES (OMITTED) DA-22 FIBERGLASS MANHOLES (OMITTED) DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a particular street. .. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of .� two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the Contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day)the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next — one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Number Contact Person Southwestern Bell Telephone 338-6275 "Hot Line" Texas Utilities 336-9411 Mr. Roy Kruger Ext. 2121 Lone Star 336-8381 Mr. Jim Bennett Ext. 6982 City of Fort Worth, 871-8100 Mr. Jim Bob Wakefield Street Light and Signal Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5) working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. ^, The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104 "Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to removal. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, — »102104 ASC-10 PART DA - ADDITIONAL SPECIAL CONDITIONS as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to a suitable dump site. The street void shall be filled with H.M.A.C. "Type D" mix as per specification No. 300 "Asphalts, Oils and Emulsions", Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City -� densities and top soil as per specification item No. 116 "Top Soil", if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better .. at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS (OMITTED) DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE Mft The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar No means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable No sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All .o excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type D" surface mix. This item will always be used even if no am base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness -� will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. -- Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. .., All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304 "Prime Coat% and 312"Hot-Mix Asphaltic Concrete"shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES Mft 11/02/04 ASC-11 am PART DA - ADDITIONAL SPECIAL CONDITIONS This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208"Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-28 WEDGE MILLING 2"TO 0" DEPTH 5.0'WIDE (OMITTED) DA-29 BUTT JOINTS—MILLED (OMITTED) DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling-Asphalt Concrete"shall apply to the construction methods for this portion of the project. Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay.The City will provide laboratory control as necessary. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER (OMITTED) DA-32 NEW 7" CONCRETE VALLEY GUTTER (OMITTED) DA-33 NEW 4" STANDARD WHEELCHAIR RAMP (OMITTED) .. DA-34 8" PAVEMENT PULVERIZATION (OMITTED) DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) (OMITTED) DA-36 RAISED PAVEMENT MARKERS (OMITTED) .. DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING A. GENERAL: Where known by the design engineer, the locations of potentially petroleum contaminated material (soil) that may be encountered during excavation and/or construction activities will wa2/0a ASC-12 PART DA - ADDITIONAL SPECIAL CONDITIONS be shown on the plans. For all locations where material is excavated and suspected of being contaminated with petroleum products, whether known or not, these special conditions are to be followed. The contractor is also to follow all applicable Federal. State and Local regulations when handling known or suspect contaminated materials (soils). -� 1. WORK INCLUDED a. Excavation, stockpiling and testing of Potentially Petroleum Contaminated Material. b. Removal, testing, and disposal of petroleum contaminated groundwater. c. Obtaining and paying for required permits. d. Hiring of qualified environmental professional consultant(s). Contractor will be required to submit the environmental consultant's experience and qualifications to .. the City prior to beginning work in areas of Potentially Petroleum Contaminated Material. e. Hiring of qualified environmental sampling professionals that will collect and submit samples to the applicable City of Fort Worth testing laboratory. The City of Fort Worth's Department of Environmental Management for coordination of laboratory -• testing. 2. REFERENCES a. All applicable OSHA regulatory requirements. b. All applicable Environmental Protection Agency(EPA) regulatory requirements. c. All applicable State of Texas regulatory requirements. d. All applicable City of Fort Worth (City) regulatory requirements. e. All applicable NIOSH standards. f. All applicable TNRCC requirements. 3. SUBMITTALS .. a. The contractor shall prepare and submit to the City's Department of Environmental Management, Senior Specialist in Compliance, plans for handling Potentially Petroleum Contaminated Material (PPCM) not less than 30 days prior to commencing excavation. b. The Contractor shall take necessary precautions while performing this project. Contractor shall not commence PPCM work (1) Contractor's submittal for dealing with PPCM is reviewed by the City and (2) the plans (i.e., drawing and description) for discharging any treated liquid into the storm sewer or sanitary sewer are reviewed by the City(3)and acceptable stockpile area is identified by the Contractor. c. Contractor shall submit the name of his proposed qualified environmental professional consultant(s) and proposed PPCM Handling Plan to the City. The .. PPCM Handling Plan shall include the detailed sequence of construction including 11102104 ASC-13 sm PART DA — ADDITIONAL SPECIAL CONDITIONS am proposed excavation and handling methods, proposed carriers for contaminated materials, waste disposal site, and a list of any permits that may be required for sm PPCM handling or contaminated materials disposal. The above data must be compiled and arranged in a format that is acceptable to the Texas Natural Resource Conservation Commission (TNRCC). am d. Contractor shall submit actual limits of PPCM excavation, as prepared by his qualified environmental consultant(s)and testing lab. as e. Contractor shall submit for review the proposed carrier pipe material to be used with the actual limits of PPCM excavation, including pipe gasket and carrier pipe coating or liner. ow am B. PRODUCTS: 1. PIPE GASKET MATERIAL. Materials used within the actual limits of PPCM excavation, ^m including pipe gaskets, shall be resistant to petroleum hydrocarbon deterioration. C. EXECUTION: am 1. POTENTIALLY PETROLEUM CONTAMINATED AREAS a. Areas suspected of having petroleum contaminated material (soils) are shown in on am the engineering drawings. b. In areas other than those noted on the plans and where potentially petroleum am contaminated materials are either detected or suspected, the City of Fort Worth and the Engineer should be notified immediately and the work should proceed in accordance with this section. ma 2. SCREENING POTENTIALLY PETROLEUM CONTAMINATED AREAS am a. Care should be taken during all excavation and dewatering activities to identify areas potentially contaminated by petroleum. b. When a-petroleum odor is encountered during excavation or when there is visual evidence of potentially petroleum contaminated soil, the Contractor shall notify the Engineer without delay. c. The Contractor shall have retained the services of an environmental consultant who shall be present at the site to screen suspect soil with a photo-ionization detector (PID) or a flame ionization detector (FID). A reading of 20 ppm above ambient conditions or greater on PID or FID tested soil sample will be considered potentially petroleum contaminated. The soul sample should be a recent sample from the excavation face. The sample should be stored in a laboratory supplied glass jar with a teflon gasket lined lid. The City of Fort Worth Department of Environmental Management will be notified prior to all sample collection and submittal to the current testing laboratory identified by the City. The PID or FID tests should be performed in .. 11/02/04 ASC-14 PART DA - ADDITIONAL SPECIAL CONDITIONS a confined location. Soils producing a reading of less than 20 ppm above ambient will not be considered potentially petroleum contaminated. The PID or FID shall be calibrated according to manufactures instructions. d. Water encountered during excavation or dewatering shall be considered to be potentially contaminated if there is a visible sheen, a hydrocarbon odor, adjacent soil that appears visually to be contaminated by hydrocarbons or at any time the Contractor has reason to believe that hydrocarbon contamination may have occurred. The Contractor shall immediately notify the City and the TNRCC •• whenever contaminated water is encountered. a. The Contractor shall contact the City whenever contamination from any source is ., suspected. 3. HANDLING POTENTIALLY PETROLEUM CONTAMINATED SOIL(PPCS) a. Contractor shall coordinate with the City to determine a suitable location for the stockpiling of contaminated soil. The following procedure shall be followed in preparing the chosen site: — 1. Provide a diked enclosure large enough to hold all material and prevent runoff. 2. The diked area shall be lined with 20-30 mil plastic tp prevent seepage into the existing soil. 3. At the end of each work day, Contractor shall completely cover stockpile with 20 mil plastic. During the day, the Contractor shall keep the stockpile covered, as necessary, to prevent release of contaminated materials due to rain or wind. 4. Sampling and evaluation of materials will be performed at the Contractor's expense. (The City of Fort Worth will provide laboratory services) b. PPCS shall be handled, tested, observing all standard chain-of-custody procedures and sampling preservation and analyses shall conform to published and recognized standards. c. The stockpiled PPCS shall be sampled and tested every 50 cubic yards for Total Petroleum Hydrocarbons (TPH) (TX1005)and Benzene, Toulene, Ethylbenzene and Xylene (BTEX) (EPA 8020). All test results will be forwarded to the City of Fort Worth Department of Environmental Management. d. Contaminated soil identified by test results will be disposed of according to DA-38, Loading,Transportation, and Disposal of Contaminated Soil. e. it is the intent of the City of Fort Worth that uncontaminated soils be utilized as backfill material, if the soils also meet the Type C or B backfill classifications. .. 4. HANDLING POTENTIALLY PETROLEUM CONTAMINATED WATER(PPCW) a. Water pumped from the excavation or from dewatering activities that has an oily sheen, a hydrocarbon odor, or is otherwise suspect, shall be considered potentially petroleum contaminated. — »rovoa ASC-15 PART DA - ADDITIONAL SPECIAL CONDITIONS b. PPCW shall be handled, tested, and discharged in accordance with the TNRCC's appropriate state regulation. PPCW shall be tested no later than 15 days prior to extraction. PPCW shall, if necessary, be treated in an appropriately sized oil/water separator, air stripper or GAC canisters. Contractor shall have his testing laboratory determine that the oil/water separator treated discharge is within the limits established by the TNRCC's regulations before being allowed to discharge (discharge to sanitary sewer). Contractor shall be responsible for furnishing the effluent test reports to the City. c. Alternatively, the Contractor may dispose of contaminated water, after appropriate pretreatment, into the sanitary sewer collection system. It shall be the responsibility of the Contractor to obtain the necessary permit(s) and to perform all testing required by the City of Fort Worth Pretreatment Services Division. d. All treated water shall be discharged into a Contractor supplied Frac Tank, sampled, and analyzed before discharge into the sewer system. e. The product that is recovered shall be disposed of in accordance with all applicable regulations. Any phase separate product recovered from the oil/water separator and air stripper shall be transported in accordance with Department of Transportation rules and regulations for flammable products. When transporting product for disposal, transportation shall also be performed by a licensed carrier. The Contractor is responsible for proper manifesting of the material from the site to the waste disposal facility. Completed Manifests shall be returned to the City Department of Environmental Management within 90 days of shipment. 5. HANDLING VAPOR CONCENTRATIONS a. In order to maintain safe working conditions, the vapor concentrations should not exceed 20 percent of the Lower Explosive Limit (LEL). During construction, measures should be taken to maintain LEL levels below 20 percent in all working areas. b. To monitor vapor levels and oxygen levels a combustible gas indicator (CGI) with a LE!102 meter should continuously operate in the working area: The CGI should be properly calibrated and should have an alarm that sounds if 20 percent LEL is MW reached. Monitoring data from the GCI should be recorded periodically to determine if ventilation or other methods are effective. In the event local health and safety agencies require more stringent monitoring, the local regulations must be implemented. o' D. MEASUREMENT AND PAYMENT: am Payment for handling PPCS, PPCW and Vapor Concentrations, obtaining and paying for any permits required, hiring the services of a qualified professional environmental consultant(s), environmental issues, stockpiling and all issues included and incidental to this me section will be full compensation for all labor, equipment, materials, and supervision. Measurement and Payment for this section will be per linear foot of trench excavated where 00 11102104 ASC-16 PART DA - ADDITIONAL SPECIAL CONDITIONS the excavated material is handled as a contaminated material. No separate payment will be made for handling of contaminated water,vapor concentrations, sampling, stockpiling, etc. DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL A. GENERAL: This item has been established for the loading, transportation and disposal of contaminated INN soils in a State of Texas approved disposal site (landfill) to handle special wastes (petroleum contaminated soils). A bid item has been established in the proposal for the proper loading, transportation and disposal of the material to a designated site and the .. quantity established is the engineers best estimate of the quantity that may be removed. This quantity may vary depending upon actual conditions and testing results. The unit price bid will not be increased regardless of the actual amount of material disposed and .. may be decreased if a larger volume of material, than that listed in the bid proposal, results in a unit cost reduction for disposal. B. WASTE MANIFESTS: Any and all non-hazardous liquid and petroleum substance waste removed from the site of generation and transported for treatment and/or disposal must be accompanied by a waste shipment record/manifest detailing required generator, transported, destination and waste description information. These results may not be uniform throughout the entire site. For all petroleum substance waste, the waste shipment record utilized shall be the TNRCC PETROLEUM-SUBSTANCE WASTE AFFIDAVIT (Form TWC-0332). The Contractor shall be responsible for obtaining, originating and maintaining manifests in accordance with federal and state laws. The Contractor shall sign the manifests forms as Independent Contractor to the Owner. AUTHORIZATION OF PAYMENT FOR REMOVAL TRANSPORT AND TREATMENT / DISPOSAL OF WASTES IN CONTINGENT UPON RECEIPT BY THE ENGINEER OF FULLY COMPLETED AND SIGNED MANIFEST FORMS that are in agreement with regard to the type and amount of waste removed from the site and received by the treatment/disposal facility. The Contractor shall immediately resolve any manifest discrepancies. Completed Manifests shall be returned to the City Department of Environmental Management within 90 days of shipment. C. MEASUREMENT AND PAYMENT: Payment for this item shall be made per in place cubic yard of contaminated soils that are loaded, transported and disposed of in an approved special disposal site. No separate payment will be made for loading, transportation and disposal of contaminated ground waters collected; these costs considered subsidiary to DA-37, POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING. The proposed landfill shall be included in the Contractor's bid submittal and approved by the City of Fort Worth Department of Environmental Management prior to contract award. Contractor shall be responsible for all landfill costs, including, but not limited to landfill fees, transportation costs and landfill operator requested analytical testing and waste characterization. DA-39 ROCK RIPRAP -GROUT- FILTER FABRIC 111OM4 ASC-17 "M - - PART DA - ADDITIONAL SPECIAL CONDITIONS A. GENERAL: 1. General Conditions, Supplemental Conditions, applicable requirements of Division 1 - - General Requirements and the North Central Texas Council of Governments (NCTCOG) Standard Specifications, are hereby made a part of this section. 2. This item shall govern for the installation of rock riprap of the various sizes shown on the plans. B. DESIGN CRITERIA: 1. The toe of the riprap revetment shall be entrenched in stable channel bottoms. If the •� channel bottom is not stable, the design shall incorporate other requirements needed to stabilize the revetment toe. 2. The channel side slope shall be as shown on the drawings. 3. Engineering filter fabric material shall be placed underneath the riprap. 4. Riprap shall extend up the bank to an elevation where vegetation will provide adequate protection. See cross sections. C. PRODUCT: 1. RIPRAP MATERIAL: Stone for riprap shall be durable and of a suitable quality to insure permanence in the structure. It shall be free from cracks, seams and other defects that would tend to increase deterioration. Rock shall be reasonably well graded between the following prescribed limits: Sieve Size (Square Mesh) Percent Passing 24" 24 inch 100 Riprap 18 inch 80-90 12 inch 45-55 6 inch 0-20 Sieve Size (Square Mesh) Percent Passing 18" 18 inch 100 Riprap 12 inch 60-85 6 inch 15-45 3 inch 0-15 2. RIPRAP WEIGHT: Weight of rock shall be one hundred fifty five pounds per solid cubic foot(min.) calculated from the bulk specific gravity(saturated surface dry). 3. FILTER FABRIC BLANKET: •� 11/02J04 ASC-18 PART DA - ADDITIONAL SPECIAL CONDITIONS Approved Manufacturer: • Supac- Heavy Grade 8NP (UV) • Trevira 011/280 Amoco 4553 • or Equal Heavy Grade 4. RIPRAP GROUTING a. FINE AGGREGATE: Fine aggregate for grouting mix shall consist of natural sand, manufactured sand, or a combination of natural and manufactured sands. The grading and uniformity of the fine aggregate shall conform to the following requirements as delivered to the mixers: Sieve Designation, U.S. Permissible Limits Standard Square Mesh Percent by Weight. Passing 3/8 in. (9.5 mm) 100 No.4 (4.75 mm) 95- 100 No. 8 (2.36 mm) 80-95 No. 16 (1.18 mm) 55-75 No. 30(600 um) 30-60 No. 50(300 um) 12-30 No. 100 (150 um) 2- 10 D. EXECUTION: 1. CONSTRUCTION: .. a. The channel side slope and the toe excavation shall be prepared to the required lines and grades. b. Filter fabric and riprap shall be placed in succession to the required thicknesses and elevations. Riprap shall be hand placed around structures to prevent damage to the structures. .. 2. INSTALLATION OF THE FILTER FABRIC (GEOTEXTILE): The geotextile shall be placed in the manner and at the locations shown on the drawings. At the time of installation, the geotextile shall be rejected if it has defects, rips, holes, flaws, deterioration or damage incurred during manufacture, transportation or storage. The surface to receive the geotextile shall be prepared to a relatively smooth condition free of obstructions, depressions, debris, and soft or low density pockets of material. -� Erosion features such as rills, gullies, etc. must be graded out of the surface before geotextile placement. The geotextile shall be placed with the long dimension perpendicular to the centerline of the channel and laid smooth and free of tension, stress, folds, wrinkles, or creases. The strips shall be placed to provide a minimum width of 24-inches of overlap for each joint. Temporary pinning of the textile to help hold it in place until the rock riprap is placed. The temporary pins shall be removed as .,, the riprap is placed to relieve high tensile stress which may occur during placement of material on the geotextile. The specified placement procedure requires that the length of the geotextile be greater than the actual slope length. The Contractor shall adjust the actual length of the geotextile used based on initial installation experience. The 11/02/04 ASC-19 PART DA - ADDITIONAL SPECIAL CONDITIONS geotextile shall be protected at all times during construction from contamination by surface runoff and any geotextile so contaminated shall be removed and replaced with .. uncontaminated geotextile. Any geotextile damaged during its installation or during placement of riprap shall be replaced by the Contractor at no cost to the Owner. The work shall be scheduled so that the covering of the geotextile with a layer of the ^„ specified material is accomplished within seven (7) calendar days after placement of the geotextile. Failure to comply shall require replacement of geotextile. The geotextile shall be protected from damage prior to and during the placement of rock riprap. Before placement of gabion units, the Contractor shall demonstrate that the placement technique will prevent damage to the geotextile. In no case shall any type of equipment be allowed on the unprotected geotextile. 3. RIPRAP PLACEMENT: Stone for riprap shall be placed on the filter fabric blanket in such a manner as to produce a reasonably well graded mass of rock with the minimum practicable percentage of voids and shall be constructed within the specified tolerance to the lines and grades shown on the drawings. Then intent of these specifications is to require placement of riprap to the thickness shown and to allow isolated stones to extend as much as six inches above grade. Riprap shall be placed .. to its full course thickness at one operation and in such a manner as to avoid displacing the fabric. The larger stones shall be well distributed and the entire mass of stones in their final position shall conform to the gradation specified hereinbefore. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source, by controlled dumping of successive loads during final placing, .. or by other methods of placement which will produce the specified results. Rearranging of individual stones, by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well graded distribution of stone specified above. The Contractor shall maintain the riprap protection until accepted. Any material displaced by any cause shall be replaced at his erosion to the lines and grades shown on the Drawings. 4. GROUT PLACEMENT: Grout shall be composed of cement, water and air-entraining admixture and sand mixed in the proportions of 1 part of Portland cement to 3 parts of .. sand, sufficient water to produce a workable mixture, and that amount of admixture which will entrain sufficient air to produce durable grout, as determined by the ENGINEER. Sand for grouting shat: conform to the requirements of paragraph: FINE AGGREGATE. The grout shall be mixed in a concrete mixer in the manner specified for concrete except that the time of mixing shall be increased to that necessary to produce a mixture having a consistency such as to permit gravity flow into the interstices of the .. riprap with the help of limited spading and brooming. The grout shall be used in the work within a period of one (1) hour after mixing. Retempering of ground will not be permitted. Riprap shall not be grouted when the ambient temperature is below 35 degree F. or above 95 degrees F. unless approved by the ENGINEER in writing; nor when the grout, without special protection, is likely to be subjected to freezing temperatures before final set has occurred. Prior to grouting, all surfaces of riprap shall be wetted. The riprap shall be grouted in successive longitudinal strips, approximately 10 feet in width, commencing at the lowest strip and working up the slope. Grout shall be brought to the place of final deposit by approved means, and in no case will grout be permitted to flow on the riprapped surface a distance in excess of 10 feet. Immediately 1 110tio4 ASC-20 PART DA - ADDITIONAL SPECIAL CONDITIONS after dumping the batch of grout, it shall be distributed over the surface of the strip by the use of brooms and the grout worked into place between stones with suitable spades, trowels, or vibrating equipment. As a final operation, the grout shall be removed from the top surfaces of the upper stones and from pockets and depressions in the surface of the stone protection. After completion of any strip as specified, no workman or any load shall be permitted on the grouted surface for a period of at least 24 hours. The grouted surface shall be protected from rain, flowing water, and mechanical injury. The surface of all grouted riprap shall be cured by keeping the surface continuously wet for a period of not less than 7 days. E. MEASUREMENT AND PAYMENT i 1. FILTER FABRIC: Filter fabric will be measured by the square yard for material used including that required at toes and thickened edges of riprap. Payment for filter fabric _ will be made at the contract unit price per square yard which includes all plant, labor, material, and all installation costs in-place, complete. 2. STONE RIPRAP: Stone (rock) riprap will be measured by the cubic yard using actual plan dimensions. Payment for riprap will be made at the contract unit price per cubic yard which includes all plant, labor, material, and installation costs in-place, complete. 3. GROUT: Grout for rock riprap will be measured by the square yard using actual plan dimensions. Payment for grout will be made at the contract unit price per square yard which includes all plant, labor, material, and installation costs in-place, complete. DA-40 CONCRETE RIPRAP (OMITTED) DA-41 CONCRETE CYLINDER PIPE AND FITTINGS Concrete cylinder pipe on this project shall be Class 150 A.W.W.A. C-303 pretensioned concrete cylinder pipe or Class 150 AWWA C-301 prestressed concrete cylinder pipe as specified on the plans and manufactured in accordance with Material Standard E14 contained in the General Contract documents. Payment for work such as backfill, bedding, blocking, excavation and all other associated appurtenances; required, shall be included in the Linear Foot price of the pipe and lump sum for the pipe fittings in the appropriate BID ITEM(S). DA-42 CONCRETE PIPE FITTINGS AND SPECIALS Bidders shall submit the following for C-303 pretensioned concrete cylinder pipe to be installed on this project: 1. A complete list of fittings and specials upon which the lump sum is bid. 2. Provide a unit price indicating the cost for furnishing and installing each of the various items of fittings and specials. The lump sum as bid in the Proposal shall be payment in full for all fittings and specials necessary for the construction of the project as designed. Payment for the installation of the pipe fittings, specials, and random lengths shall be included. Should the Engineer approve any changes to the fittings, specials or random pipe lengths listed as justifying the amount bid in the Proposal, the price submitted with the Proposal shall be used to determine the increase or i 11/02/04 ASC-21 .. PART DA - ADDITIONAL SPECIAL CONDITIONS decrease in the value of the lump sum of the Proposal, and the Contractor shall be paid on the basis of this adjusted value under that bid item. DA-43 UNCLASSIFIED STREET EXCAVATION (OMITTED) DA-44 6" PERFORATED PIPE SUBDRAIN (OMITTED) DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS (OMITTED) It is recommended that the proposed water improvements be conducted with a rigid schedule to meet the contract duration. Below is the recommended sequence of construction for operations at 36"water main Station 10+19. Plans state that the proposed 36"water main shall be connected into the existing 36"water main Via a connection at the existing tee. After the work start date has been established, the selected contractor shall be required to submit the beginning and ending dates for all major work areas (including pavement repair on each of the project streets if applicable). Please be advised that the contractor has the option of submitting a different sequence of construction than stated above. The contractor shall not be allowed to begin work (but time charges will begin on the project) until the preferred sequence of construction and the start and end work dates for each major work item has been submitted to the City The following sequence is recommended in order to coordinate construction activities with Fort Worth Field Operations. .. 1. Connection of proposed 36"water main, valve and vault shall be installed before the start of other construction activities. It is recommended to start this activity in A§' the winter i _ �'Aot *^ _ie). Installation in April or later will likely hinder water delivery due to seasonal increases in system water demand. 2. The Contractor shall notify the Field Operations 1 week prior to starting construction activities. 3. The Contractor shall determine existing conditions of the existing 36"water main including but not limited to pipe, gate valves, fittings (including plug in existing tee .. at station 10+19), connecting mains, blow-off valves, air release valves and limits of existing blocking. Care shall be given to excavating or removing material near the existing water mains. Existing pipes shall be blocked at all times. Contact Field Operations when valves need to be opened or closed for construction activities. The Contractor shall prefabricate proposed valve, manhole and connection components prior to excavation at station 10+19. The Contractor shall develop a .. schedule of all aspects of the operation to complete the water connection including blocking 'tt� o�a#cap , Malt finch cfowt'tie.'oi the;exEsting 36''' e _ 5. After the Contractor contacts Field Operations that construction is ready to start, the Field Operations will review tank levels and current operations to determine a time the system will be shut down for installation of the proposed 36"water main. -■ 11102104 ASC-22 r PART DA - ADDITIONAL SPECIAL CONDITIONS Field Operations will operate existing valves. The Contractor is expected to dewater the water pipes between the shutoff valves prior to construction. The locations of the existing 36"shutoff valves that are adjacent to the proposed connection are described on sheet 6. The 16" shutoff valve is shown in the plan view. The total length of existing 36" pipe to be dewatered is approximately 6250 If. A map of the location of gate valves; blow off valves and air valves is on sheet 3 of the plans. Blow off valves are located at Trammel-Davis along Greenbelt Rd. and the south side of the Trinity River at Greenbelt Rd. Air release valves are •• located near the 16"water main near station 10+19, 500' north of Trammel-Davis Rd. along Greenbelt Rd. and north side of the Trinity River at Greenbelt Rd. 6. The Contractor shall install the connection, valves and blocking. .. 7. Field Operations shall be contacted to inspect the dewatered existing 36"water main. 8. The Contractor shall contract Field Operations to close valves. Rapid closure of system valves will damage the water system. 9. The Contractor shall clean up area of construction to pre-existing conditions or better. DA-47 PAVEMENT REPAIR IN PARKING AREA(OMITTED) DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at this time and made a part thereto. Any easements and/or permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits until the .. necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. MM DA-49 HIGHWAY REQUIREMENTS The Texas Department of Transportation requirements pertaining to the construction of this project are enclosed herein and made part of these specifications. DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall •. conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. 11/02/04 ASC-23 PART DA - ADDITIONAL SPECIAL CONDITIONS Payment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete — Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a ^ gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connecting to existing facilities including all labor, tools, equipment, — and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM. DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION (OMITTED) DA-53 OPEN FIRE LINE INSTALLATIONS (OMITTED) — DA-54 WATER SAMPLE STATION (OMITTED) DA-55 CURB ON CONCRETE PAVEMENT Standard Specification Item 502 shall apply except as herein modified. INTEGRAL CURB: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty (30) minutes after the concrete in the slab. — SUPERIMPOSED CURB: Concrete shall have a minimum compressive strength of three thousand (3,000) pounds per square inch at twenty-eight (28) days. The quantity of mixing water shall not exceed seven (7) U.S. gallons per sack (94 lbs.) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. PAYMENT: Payment shall be made for cutting and replacing curbs and guttPrs required in this Project under the appropriate bid item and shall be in compliance with Public Works Department .., standard requirement Item 502. DA-56 SHOP DRAWINGS 1. Submit seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Submittals may be checked by and .. stamped with the approval of the Contractor and identified as the Engineer may require. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated actions by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing 11102104 ASC-24 .. PART DA - ADDITIONAL SPECIAL CONDITIONS MR submittals are not change orders. The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding am by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to ., or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of •. other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement included with the submittal, which signifies compliance with plans and specifications and .r dimensions suitable for the application. Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be submitted for the following items prior to installation: -Shop drawing for all water main pipe material -Steel casing pipe -Trench safety system Additional shop drawing requirements are described in some of the material specifications. .. 3. Address for Submittals-The submittals shall be addressed to the Project Manager: Rakesh Chaubey, P.E. Project Manager .n City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 DA-57 COST BREAKDOWN In order to establish a basis upon which partial payments to the Contractor may be authorized, immediately after execution of the contract the Contractor shall furnish a detailed cost breakdown of his contract price arranged and itemized to meet the approval of the Engineer. DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY All work involving paving and/or drainage shall conform to the two following published specifications, except as modified herein: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION — CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL TEXAS DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP 11/02104 ASC-25 an PART DA - ADDITIONAL SPECIAL CONDITIONS .. When H.M.A.C. greater than 9 inches in depth is encountered, it shall be replaced with a combination of H.M.A.C. and 2:27 concrete base, as determined by the Engineer, to achieve the P, required thickness of pavement. DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. DA-61 TOP SOIL Where directed by the Engineer, top soil shall be applied in accordance with the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction, Item 116, except as follows: All labor, equipment, tools and incidentals shall be included in the square yard bid price for the top soil. DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT (OMITTED) DA-63 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the ,.., actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. In particular, the Contractor shall be aware that it is the City's intention that the quantities in Unit I be used on an "emergency" basis only. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of$200,000 (see Options to Renew) shall be awarded with final payment based on actual measured .• quantities and the unit price bid in this proposal. Moreover, there is to be not limit on the variation between the estimated quantities shown ar�J actual quantities performed: It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City bit will in not case exceed $200,000 (see Options to Renew) including all change orders. DA-64 WORK IN HIGHWAY RIGHT OF WAY When the Engineer directs'the Contractor to perform work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (Tex-Dot), the Contractor shall obtain approval from the Texas Department of Transportation prior to commencing any work therein. All work performed in the Tex-Dot right-of-way shall be performed in compliance with and subject to } approval from the Texas Department of Transportation and Item E2-29.1 "Construction Within Highway Right-of-Way" of the General Contract Documents and Specifications, effective July 1, 1978, as amended. 11/02104 ASC-26 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-65 CRUSHED LIMESTONE (FLEX-BASE) Crushed limestone required for use as a flexible base material shall conform to Specification Item No. 208 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. DA-66 OPTION TO RENEW (OMITTED) DA-67 NON-EXCLUSIVE CONTRACT (OMITTED) .. DA-68 CONCRETE VALLEY GUTTER (OMITTED) DA-69 TRAFFIC BUTTONS (OMITTED) DA-70 PAVEMENT STRIPING (OMITTED) DA-71 H.M.A.C.TESTING PROCEDURES The contractor is required to submit a Mix Design for both Type "B" and "D" asphalt that will be used for each project. This should be submitted at the Pre-Construction Conference. This design shall not be more than two (2) years old. Upon submittal of the design mix a Marshal (Proctor) will be calculated, if one has not been previously calculated, for the use during density testing. For type "B" asphalt a maximum of 20% rap may be used. No Rap may be used in type "D" Upon approval of an asphalt mix design and the calculation of the Marshal (proctor) the • contractor is approved for placement of the asphalt. The contractor shall contact the City Laboratory, through the inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to assist in the monitoring of the number of passes by a roller to establish a .. rolling pattern that will provide the required densities. The required Density for Type "B" and for Type "D"asphalt will be 91% of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing. After a rolling pattern is established, densities should be taken at locations not more than 300 feet apart. The above requirement applies to both Type "W and "D" asphalt. Densities on type "B" must be done before Type"D"asphalt is applied. Cores to determine thickness of Type "B" asphalt must be taken before Type "D" asphalt is applied. Upon completion of the application of Type "D"asphalt additional cores must be taken to determine the applied thickness. DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTERICONTROL VALVE AND BOX (OMITTED) 1iovoa ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-74 RESILIENT-SEATED GATE VALVES Any resilient-seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT-SEATED GATE VALVES, with the exception of size requirements in sections E-26.1. All resilient-seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List. DA-75 EMERGENCY SITUATION, JOB MOVE-IN (OMITTED) DA-76 1 %" &2" COPPER SERVICES (OMITTED) DA-77 SCOPE OF WORK (UTIL. CUT) (OMITTED) DA-78 CONTRACTOR'S RESPONSIBILTY(UTIL. CUT) (OMITTED) DA-79 CONTRACT TIME (UTIL. CUT) (OMITTED) r DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) (OMITTED) DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) (OMITTED) DA-82 LIQUIDATED DAMAGES (UTIL. CUT) (OMITTED) DA-83 PAVING REPAIR EDGES (UTIL. CUT) (OMITTED) DA-84 TRENCH BACKFILL (UTIL. CUT) (OMITTED) DA-85 CLEAN-UP (UTIL. CUT) (OMITTED) DA-86 PROPERTY ACCESS (UTIL. CUT) (OMITTED) DA-87 SUBMISSION OF BIDS (UTIL. CUT) (OMITTED) DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) (OMITTED) DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT) (OMITTED) DA-90 2"TO 9" H.M.A.C. PAVEMENT (UTIL. CUT) (OMITTED) DA-91 ADJUST WATER VALVE BOXES, MANHOLES,AND VAULTS (UTIL. CUT) (OMITTED) DA-92 MAINTENANCE BOND (UTIL. CUT) (OMITTED) DA-93 BRICK PAVEMENT (UTIL. CUT) (OMITTED) DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) (OMITTED) DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) (OMITTED) 11/0204 ASC-28 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-96 REPAIR OF STORM DRAINI STRUCTURES (UTIL. CUT) (OMITTED) DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) (OMITTED) DA-98 UTILITY ADJUSTMENT(UTIL. CUT) (OMITTED) DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) (OMITTED) DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) (OMITTED) DA-101 CONCRETE CURB AND GUTTER(UTIL. CUT) (OMITTED) DA-102 PAYMENT (UTIL. CUT) (OMITTED) DA-103 DEHOLES (MISC. EXT.) (OMITTED) DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) (OMITTED) rn DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) (OMITTED) DA-106 BID QUANTITIES (MISC. EXT.) (OMITTED) DA-107 LIFE OF CONTRACT(MISC. EXT.) (OMITTED) DA-108 FLOWABLE FILL (MISC. EXT.) (OMITTED) DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) (OMITTED) DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) (OMITTED) DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.) (OMITTED) DA-112 MOVE IN CHARGES (MISC. REPL.) (OMITTED) DA-413 PROJECT SIGNS Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal. Project Signs shall be in accordance with Figure 30 (dated 9-18-96) of the General Contract Documents. The signs may be mounted on skids or on posts. The exact locations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials, labor, and equipment necessary for the ' furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. DA-114 LIQUIDATED DAMAGES (MISC. REPL.) (OMITTED) DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) (OMITTED) 11102104 ASC-29 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-116 FIELD OFFICE (OMITTED) DA-117 TRAFFIC CONTROL PLAN Traffic control shall be in accordance with item D-8 of the Special Conditions with the exception of the Contractor providing the traffic control plan. All requirements of D-8 shall apply. DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS The contractor shall coordinate his work with the work of other contractors on remaining units of this project. The contract documents indicate the starting and stopping points for each of the ^ units of the project. The plans indicate "connecting to an existing pipeline" constructed by others and ending the line with the installation of a plug. If the start of the project cannot be connected to the previous unit, the contractor will begin his line with a plugged section of pipe. If the pipeline is constructed for the connecting unit the contractor shall connect his line with the adjoining unit in lieu of installation of a plug. Contractor will be paid for"connection" to existing line or installation of blind flanges based on the unit price bid for the water or sewer main. r• DA-119 PIPELINE CROSSING HIGHWAYS, STREETS AND RAILROADS BY BORING TUNNELING OR OPEN CUT ... 1.00 GENERAL 1.01 WORK INCLUDED Furnish labor, materials, equipment and incidentals necessary to install pipe casings or tunnel liners by boring, tunneling or open cut as specified. This section sets forth the requirements for utility lines crossing roadways or railroads using bore, tunneling, or open cut. 1.02 QUALITY ASSURANCE — A. DESIGN CRITERIA 1. TUNNEL LINER PLATE The tunnel liner plate shall be designed by the Manufacturer in accordance with the methods and criteria as specified in AASHTO Standard Specifications for Highway Bridges, Section 16. Soil parameters shall be determined by the Tunnel Liner Plate Manufacturer. The tunnel liner plate shall be designed to allow a maximum deflection of 3%. The thickness of the tunnel liner plate specified herein is the minimum acceptable and shall be increased as necessary to obtain adequate joint strength, stiffness, buckling strength, and resistance to deflection. 2. CASING INSULATORS Casing insulators shall be designed by the Manufacturer to adequately support and electrically isolate the carrier pipe within the casing pipe under all conditions. Number and location of spacing insulators shall be determined by the Manufacturer to protect carrier pipe from damages. One insulator shall be placed '.. within 2' of ends of casing. B. INSTALLER'S QUALIFICATIONS _ 1110W4 ASC-30 no PART DA - ADDITIONAL SPECIAL CONDITIONS Installation shall be by a competent, experienced contractor or sub-contractor. The installation contractor shall have a satisfactory experience record of at least five (5) years engaged in similar work of equal scope. C. PERFORMANCE REQUIREMENTS Lateral or vertical variation in the final position of the pipe casing or tunnel liner from .. the line and grade established by the engineer shall be permitted only to the extent of 1" in 10', provided that such variation shall be regular and only in the direction that will not detrimentally affect the function of the carrier pipe. 1.03 SUBMITTALS Submittals shall include: A. Shop drawings of the tunnel liner plate and fasteners from the tunnel liner plate manufacturer. Shop drawings shall include calculations for the design of the tunnel liner plate. B. Provide shop drawings of casing insulators including sketches of insulators with material components and dimensions and proposed locations of insulators. 1.04 STANDARDS AWWA C-206 "Field Welding of Steel Water Pipe" AWWA C-210 "Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines" AASHTO M-190 "Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches" AASHTO Standard Specifications for Highway Bridges, 1989. •� ASTM A-36 "Structural Steel" ASTM A-123 "Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products" ASTM A-135 "Electric— Resistance—Welded Steel Pipe" ASTM A-139 "Electric— Fusion (Arc)—Welded Steel Pipe" ASTM A-153 "Zinc Coating (Hot Dip)on Iron and Steel Hardware" ASTM A-307 "Carbon Steel Bolts and Studs, 60,000 PSI Tensile" ASTM A-449 "Quenched and Tempered Steel Bolts and Studs" �+ ASTM A-569 "Steel, Carbon, Hot-Rolled Sheet and Strip, Commercial Quality" ASTM A-570 "Hot Rolled Carbon Steel Sheet and Strip, Structural Quality" ASTM C-76 "Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe" .. ASTM D-4254 "Test Methods for Minimum Index Density of Soils and Calculation of Relative Density" 1.05 JOB CONDITIONS; PERMITS AND EASEMENT REQUIREMENTS 11/02/04 ASC-31 PART DA - ADDITIONAL SPECIAL CONDITIONS A. Where the work is in the public right-of-way or railroad company right-of-way, the Owner will secure the appropriate permits or easements. The Contractor shall .. observe regulations and instructions of the right-of-way Owner as to the methods of performing the work and take precautions for the safety of the property and the public. Negotiations and coordination with the right-of-way Owner shall be carried on by the Contractor, not less than five (5) days prior to the time of his intentions to begin work on the right-of-way. B. Comply with the requirements of the permit and/or easement, a copy of which is included in the Appendix. The work within the Texas Department of Transportation (TxDot) Right-of-Way shall comply with TxDot specifications. If required by the Right- of-Way Owner, obtain Protective Liability Insurance in the amount required by the ^ particular company or other insurance as is specified in the permit at no cost to the Owner. Acquire a permit, agreement, or work order from the right-of-way Owner as is required. — C. Construction along roads and railroads shall be performed in such manner that the excavated material be kept off the roads and railroads at all times, as well as, all operating equipment. Construction shall not interfere with the operations of the roads and railroads. D. Barricades, warning signs, and flagmen, when necessary and specified, shall be �- provided by the Contractor. E. No blasting shall be allowed. Existing pipelines are to be protected. The Contractor shall verify location and elevation of any pipe lines and telephone cable before proceeding with the construction and plan his construction so as to avoid damage to the existing pipe lines or telephone cables. Vertification of location of existing utilities r"' shall be the complete responsibility of the Contractor. 1.06 OPTIONS " A. CASING MATERIAL Unless specified otherwise, the Contractor may use steel pipe or tunnel liner plate where bore and/or tunnel is specified. Unless specified otherwise, the Contractor shall use steel pipe where c,pen cut casing is specified. The material specification for casing pipe and tunnel liner are the minimum acceptable. The Contractor shall be fully responsible to insure the materials used are of sufficient strength for the installation method chosen and the soil conditions encountered. B. BORE AND TUNNEL METHODS Unless specified otherwise, the Contractor may use boring, jacking, tunneling for the ` installation method of casing material. Tunnel liner plate shall not be used where bore or jack methods are used. The Contractor shall be fully responsible to insure the methods used are adequate for the protection of workers, pipe, property, and the public. Provide a finished product as required. 2.00 PRODUCTS PM 11/02/04 ASC-32 PART DA - ADDITIONAL SPECIAL CONDITIONS 2.01 MATERIALS A. STEEL PIPE: Steel casing pipe shall have a minimum yield strength of 35,000 psi. Casing shall meet ASTM A-36, ASTM A-570, ASTM A-135, ASTM A-139, or approved equal. Pipe shall be coated and lined in accordance with AWWA C-210 or approved equal. Pipe joints shall be welded in accordance with AWWA C-206. After pipe is welded, coating and lining shall be repaired. Unless specified otherwise, the minimum wall thickness of steel casing pipe shall be as follows: 4" -2411 0.375" - 25"-42" 0.375" 4311 -60" 0.50" 72" 0.625" B. TUNNEL LINER PLATES: Corrugated metal tunnel liner plates shall be galvanized and asphalt coated; made from steel sheets conforming to the requirements of ASTM A- 569. Material to be galvanized shall be zinc coated in accordance with ASTM A-123, except that the zinc shall be applied at a rate of 2.0 oz. per square foot on each side. Asphalt coating shall comply with AASHTO M-190. Tunnel liner plates and fasteners shall comply with the requirements of AASHTO Standard Specifications for Highway Bridges, 1989. Liner plates shall be punched for bolting on both longitudinal and circumferential seams, fabricated to permit complete erection from the inside of the tunnel. Bolts and ,.� nuts shall be galvanized to conform to ASTM. Where groundwater is encountered, gasketed liner plates shall be used. r A-153. Plates shall be of uniform fabrication and those intended for one size tunnel shall be interchangeable. Welding of tunnel liner plate shall not be allowed. The material used for the construction of these plates shall be new, unused, and suitable for the purpose intended. Workmanship shall be first class in every respect. Minimum thickness of tunnel i' liner plate shall be as follows: sijnet Iiatt�ete ► _ , , 60" & 72"—2 Flanged 0.179" 60" & 72"—4 Flanged 0.250" •r 2.02 MIXES A. CEMENT MORTAR: Consisting of one (1) part cement to two (2) parts clean sand with sufficient water to make a thick workable mix. B. PRESSURE GROUT MIX: Comprised of 1 cubic foot of cement and 3.5 cubic feet of clean fine sand with sufficient water added to provide a free flowing thick slurry. If desired to maintain solids in the mixture in suspension, one cubic foot of commercial grade bentonite may be added to each 12 to 15 cubic feet of the slung. "M C. CELLULAR GROUT MIX: The cellular grout shall be a low-density, non-shrink grout composed of Type II Portland cement, water, and a preformed foam. The cellular grout shall have the following characteristics: 11102104 ASC-33 .. PART DA - ADDITIONAL SPECIAL CONDITIONS 1. Minimum 28-day Compressive Strength = 1000 psi 2. Slurry (Wet) Density = 95 to 105 pcf " 3. Cement= Type II, per ASTM C150 4. Water= Potable 5. Foam= Per ASTM C869 �+ 6. Water/Cement Ratio = 0.50 to 0.55 2.03 MANUFACTURED PRODUCTS A. TUNNEL LINER: Manufactured by Armco Steel Corp., Commercial Shearing, Inc., or approved equal. „ B. CASING INSULATORS: Use casing insulators for any type of carrier pipe. Insulators shall consist of pre-manufactured steel bands with plastic lining and plastic runners. Insulators shall fit snug over the carrier pipe and position the carrier pipe approximately in the center of the casing pipe, to provide adequate clearance between the carrier pipe bell and the casing pipe. Fasteners for insulators shall be stainless steel or cadmium-plated. Insulators shall be as manufactured by Cascade w Waterworks Manufacturing Company or Pipeline Seal and Insulators, Incorporated or Perry Equipment Corporation. C. MORTAR BANDS: Concrete cylinder pipe and mortar coated steel pipe may have thickened outside mortar bands in lieu of casing insulators. Mortar bands shall be properly position the pipe within the casing or tunnel liner. 3.00 EXECUTION 3.01 GENERAL CONSTRUCTION PROCEDURES A. EXCAVATION AND BACKFILL OF ACCESS PITS 1. Do not allow excavation over the limits of the bore or tunnel as specified. Trench walls of access pits adjacent to the bore or tunnel face shall be truly vertical. Shore the trench walls as necessary to protect workmen, the public, structures, roadways, and other improvements. 2. Excavations within the right-of-way and not under surfacing shall be backfilled, with type B backfill, and consolidated by tamping in 6" horizontal layers to 95% of 't maximum density as measured by ASTM D-698. Surplus material shall be removed from the right-of-way and the excavation finished to original grades. Backfill pits immediately after the installation of the carrier pipe is completed. If carrier pipe is not installed immediately after casing pipe installation, the Right-of- Way Owner may require the access pits be temporarily backfilled until installation of carrier pipe. B. INSTALLING CARRIER PIPE IN CASINGS 1. Pipe to be installed within the casing or tunnel liner shall meet the requirements for this type of pipe as specified. Where indicated, place, align, and anchor guide 11/02/04 ASC-34 ma PART DA - ADDITIONAL SPECIAL CONDITIONS am rails and/or casing insulators inside the casing. If guide rails are used, place cement mortar on both sides of the rails. an 2. Pull or skid pipe into place inside the casing. Lubricants such as flax soap or drilling mud may be used to ease pipe installation. Do not use petroleum products, oil or grease for this purpose. If guide rails are used, install pipe and hold down .. jacks after installation of carrier pipe. 3. After installation of the carrier pipe, mortar inside and outside of the joints as applicable. Verify electrical discontinuity between the carrier pipe and tunnel liner. If continuity exists, remedy the short prior to applying cellular grout. 4. After carrier pipe installation is complete, if hold down jacks or casing spacers are used, seal or plug the ends of the casing. 5. After carrier pipe installation is complete, if hold down jacks or casing spacers are not used, the annular space between the carrier pipe and tunnel liner or casing shall be completely filled with cellular grout. The Contractor shall take precautions to prevent flotation of the carrier pipe are not required to be mortared if flex-protex is used. Exterior joint coating (heat shrink sleeves) is required for polyurethane coated pipe. Provide necessary bulkheads as recommended by the cellular grout supplier. If pressure is used to apply grout, verify the maximum allowable +� pressure with the carrier pipe manufacturer, and do not exceed this pressure. C. FREE-AIR SYSTEM If required by OSHA standards, free-air systems shall be installed and maintained. D. INSTALLATION OF PRESSURE GROUT MIX 1. Install pressure grout mix in the void space between the outside of the casing pipe or tunnel liner and the excavation. For bore or jacks with casing pipe, install pressure grout mix immediately upon completion of setting casing pipe. For tunnel liner plate, install pressure grout mix at the end of each work day or more often as conditions warrant. ' 2. Unless specified otherwise, install pressure grouting through grout fittings for the casing pipe or tunnel liner plate 48" in diameter or larger. Grout fittings shall be fabricated into casing pipe and tunnel liner plate at a maximum spacing of 6'. Remove and plug grout fittings after pressure grouting. 3. Install pressure grout from the low end for all crossings where grout fittings are not used. Seal the low end and pressure grout until grout is extruded from the �. opposite end. 3.02 CROSSINGS INSTALLED BY BORING A. Perform the boring from the low or downstream end unless specified otherwise. Bore the holes mechanically and use a pilot hole. By this method, an approximate 2" pilot hole shall be bored the entire length of the crossing and shall be checked for line and grade. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Place excavated material near the top of the working pit and dispose of material as required. The use of water or other fluids in r connection with the boring operation will be permitted only to the extent to lubricate cuttings. Jetting shall not be permitted. 11102104 ASC-35 PART DA - ADDITIONAL SPECIAL CONDITIONS -- B. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10% of high grade carefully processed bentonite may be used to .. consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. C. In locations where the soil formation is other than consolidated rock, insert the casing pipe simultaneously with the boring operation. This requirement applies to all bored holes of 18" or greater in diameter. For smaller diameter bored holes, it is desirable that the casing be installed as the boring progresses, but because of MM differences in soil formations, the time for inserting the casing shall be the Contractor's responsibility. In the event that caving sand or water bearing materials are encountered, insert the casing pipe simultaneously with the boring r operation regardless of the diameter of the bored hole. In all cases, the security and integrity of the roadway is the primary concern. The Contractor shall be held fully responsible for the continued integrity of the structure of the roadway being i crossed, whether or not a casing pipe is inserted simultaneously with the boring operation. .. 3.03 CROSSINGS INSTALLED BY TUNNELING AND JACKING A. Jack the pipe from the low or downstream end, unless specified otherwise. Provide heavy duty jacks suitable for forcing the pipe through the embankment. In operating "r jacks, apply even pressure to the jacks used. Provide a suitable jacking head and bracing between jacks so that pressure will be applied to the pipe uniformly around the ring of the pipe. Provide a suitable jacking frame or back stop. Set the pipe to be jacked on guides, properly braced together, to support the section of the pipe and to direct it in the proper line and grade. Place the whole jacking assembly so as to line up with the direction and grade of the pipe. In general, excavate embankment .. material just ahead of the pipe and material removed through the pipe. Force the pipe through the embankment with jacks into the space provided. B. The excavation for the underside of the pipe, for at least 1/3 of the circumference of the pipe, shall conform to the contour and grade of the pipe. Provide a clearance of not more than 2" for the upper half of the pipe. This clearance shall be tapered off to zero at the point where the excavation conforms to the contour of the pipe. Extend the distance of the excavation beyond the end of the pipe depending on the character of the material, but do not exceed 2' in any case. Decrease the distance if the character of the material being excavated makes it desirable to keep the advance excavation r closer to the end of the pipe. C. If desired, use a cutting edge of steel plate around the head end of the pipe extending ` a short distance beyond the end of the pipe with inside angles or lugs to keep the cutting edge from slipping back onto pipe. D. When jacking of pipe has begun, carry on the operation without interruption to prevent the pipe from becoming firmly set in the embankment. Remove and replace any pipe damaged in the jacking operations. The Contractor shall absorb the entire expense. -� 3.04 CROSSINGS INSTALLED WITH TUNNEL LINER PLATE 11102104 ASC-36 i PART DA - ADDITIONAL SPECIAL CONDITIONS A. Install the tunnel liner plates to the limits indicated and as specified in AASHTO Standards Specifications for Highway Bridges, Section II-26, Construction Tunnels Using Steel Tunnel Liner Plates. Assemble steel liner plates into circumferential rings. Liner plates shall be of the type to permit segments to be installed completely from inside the tunnel or bore. B. Accurately maintain the face of the excavation inside the tunnel so as to allow the absolute minimum of void space outside the liner plate. Maintain a maximum of 1/2" tolerance between the outside of the liner plate and the excavation wherever possible. The tunnel diameter shall not be greater than 2" larger than the liner O.D. C. Liner plate installation shall proceed as closely as possible behind the excavation. r Excavation shall at no time be more than 6" ahead of the required space to install an individual tunnel liner plate. Use breast plates, poling boards or other suitable devices to maintain accurate excavation with the minimum of unsupported excavation at any time. Tunnel liner plate shall not be allowed to deflect vertically during installation. 3.05 CROSSINGS WITH CASING INSTALLED BY OPEN CUT This article covers the requirements for the construction of crossings where pipe casing is required for installation by the open cut method. Excavation, backfill, and embedment of casing pipe shall be as specified in Section 02202, PIPELINE EXCAVATION AND BACKFILL. All other requirements shall be as specified herein. DA-120 RAILROAD REQUIREMENTS The Contractor is required to install temporary fencing 25' from the centerline of track. This fencing is to be installed prior to any construction within railroad right-of-way, the cost for the fence shall be subsidiary to the contract amount. It is estimated that a flagman will be required no more than 2 days per unit, any additional time will be at the expense of the contractor. No equipment or person shall enter railroad right-of-way without a flagman approved by the railroad. If equipment or a person enter the right-of-way, then all railroad requirements apply. The cost of a flagman is set by the railroad at a price of$ 800.00 a day. DA-121 EXPLORITORY D-HOLE This specifications clarifies d-holes as indicated in the plans and Part B Proposal. The Contractor .� shall d-hole prior to construction unless approved otherwise by the City Representative. The d- hole item includes all activities related to uncovering existing utilities by non destructive excavation, obtaining coordinates and dimensions of existing utility, coordination, providing coordinates to the City Representative and backfilling excavations with either native material or flowable grout. Care shall be taken to not disturb existing utilities. Utility owners shall be notified of d-hole activities. Coordination with utility owners is required. o. 11/02/04 ASC-37 Certificate of Insurance s CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH Date: June 12, 2006 NAME OF PROJECT: 36-inch Water Main Extension along Trinity Railway Express Right-of-Way(Greenbelt Road to FM 157) Contract 1, Units 1 and 2 PROJECT NUMBER: P264-605140035283 IS TO CERTIFY THAT: S.J. Louis Construction of Texas Ltd. is,at the date of this certificate,Insured by this Company with respect to the business operations hereinafter described,for the type of insurance and accordance with provisions of the standard policies used by this Company,and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liability _ Worker's Compensation WC9307201 11/01/05 11/01/06 Statutory Comprehensive General Bodily Injury: Liability Insurance(Public Ea.Occurrence: $1,000,000 Liability) GLO9307200 11/01/05 11/01/06 Property Damage: Ea.Occurrence: $Included Blasting GLO9307200 11/01/05 11/01/06 Ea.Occurrence: $ 1,000,00 Collapse of Building or structures adjacent to GLO9307200 11/01/05 11/01/06 Ea.Occurrence: $ 1,000,00 excavations Damage to Underground Utilities GLO9307200 11/01/05 11/01/06 Ea.Occurrence: $1,000,00 _ Builder's Risk Comprehensive Bodily Injury: Automobile Liability Ea.Person: $ N/000,000 Ea.Occurrence:$ = Property Damage: BAP9307199 11/01/05 11/01/06 Ea.Occurrence:$Included Bodily Injury: Contractual Liability Ea.Occurrence: $1,000,00 Property Damage: GLO9307200 11/01/05 11/01/06 Ea.Occurrence: $ Included Other m re a 7 8 1/ 5 11/01/06 $10,000,000 Each Occurrence $10,000,000 Aggregate Locations covered: All Locations within United State of America Description of operations covered: All Operations of Named Insured The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or cancellation. Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement thereto attached. The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. A encu ia of Minnesota, Inc. Insurance Co.: Zurich Insurance Company T Agent Beverly A. Spreigl By Address 4300 MarketPointe Drive Title Sr. Account Manager Bloomington, MN 55435 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096(2000),as amended,Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Department of Engineering No.3600/5191 and City of Fort Worth Project Number P264-605140035283 S.J.Louis Construction of TX Ltd. CONTRACTOR t By: L%A 6 �G Les V . Whitman General Manager Title June 15 , 2006 Date STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME,the undersigned authority,on this day personally appeared Les Y_• Whitman . known to me be the person whose name is subscribed to the foregoing instrument,and acknowledged to me that he executed the same as the act and deed of S.J.Louis Construction of TX Ltd.the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 15day of 4 I14 .2006. BECKY JONES tary Public i and MY CpMMI°5109�ES the State of Te s December PERFORMANCE BOND Bond No. 190-016-232 THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we (1) S.J. Louis Construction of TX Ltd. as Principal herein, and (2) Liberty Mutual Fire Insurance Company a corporation organized under the laws of the State of (3) Massachusetts , and who is authorized to issue surety bonds in the State of Texas, Surety herein,are held and firmly bound unto the City of Fort Worth,a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein,in the sum of: Three Million Nine Hundred Eiehty-nine Thousand One Hundred Sixty-seven and 57/100................................ Dollars($3,989,167.57)for the payment of which sum we bind ourselves,our heirs,executors,administrators, successors and assigns,jointly and severally,firmly by these present. WHEREAS, Principal has entered into a certain written contract with the Obligee dated the of 2006 a copy of which is hereto attached and made a part hereof for all purposes, for the construction of: 36-inch Water Main Extension alone Trinity Railway Express Riaht-of-Way(Greenbelt Road to FM 157) Contract 1,Units 1 and 2 T NOW THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly au���??'tzed representatives of the Principal and the Surety have executed this instrument. tJUiv L -) LuuU SIGNED AND SEALED this_day of ,2006. ATT ST: kv— S.J.Louis Construction of TX Ltd. (Principal)Se etary PRINCIPAL t BY: PA lot, (SEAL) Title:Les V.Whitman, General Manager 520 S.6th Avenue Mansfield,TX 76063 Witness as to Principal Liberty Mutual Fire Insurance Company Surety B . Name: Laurent R. Laventure ATTEST: (Attorney-in-fact) N/A Address: 4300 MarketPointe Drive Secretary Bloomington, MN 55435 (S ALS r'I Telephone Number:952-830-3000 .. Witness as to Surety NOTE: (1) Correct name of Principal(Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of the bond shall not be prior to date of Contract. LIMITED PARTNERSHIP ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF TARRANT On this day ofUt ,a6a�y before me personally appeared Les V. Whitman to me known, who being by me duly sworn that he is the General Manager the S. J. LOUIS CONSTRUCTION OF TEXAS LTD. the Limited Partnership described in and which executed the foregoing instrument; that he signed his name thereto by order of the Board of Governors of said Limited Partnership. BECKYJONES _� Notary Public =�•' c: MY COMMISSION EXPIRES ." December 19,2006 (Not S I ACKNOWLEDGMENT OF CORPORATE SURETY STATE OF MINNESOTA COUNTY OF HENNEPIN On this 4 day ofd ., before me appeared Laurent R. Laventure to be - known, who being by me duly sworn, did say that he is the aforesaid Attorney-in-Fact of the LIBERTY MUTUAL FIRE INSURANCE COMPANY, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer, by authority of its Board of directors; and the aforesaid officer acknowledged said instrument to be the free act and deed of said corporat' n Notary Public, lu�)t (Notary Seal) TER ESA HAMMERS Notary public-Minnesota W Commission Expires Jan 31,2010 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 1843310 This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY i� KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Fire Insurance Company (the "Company), a Massachusetts stock insurance company,pursuant to and by authority of the By-law and Authorization hereinafter set forth,does hereby name,constitute and appoint TONY D. BECKER, NATHAN P. HUGHES, STEVEN C.ARONSON, JANET D. BUERG,TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON,TODD A. KELSEY,AMY M. BURNS,ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA......................................... , each individually if there be more than one named,its true and lawful attorney-in-fact to make,execute, seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed, any and all undertakings,bonds, recognizances and other surety obligations in the penal sum not exceeding FIFTY MILLION AND 00/100******************** DOLLARS(s 50,000,000.00***** )each,and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed-pursuant to and by Guth oly.of the fo211owing By-law and Authorization: ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such b attomeys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the Company by their N signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be N LCLas binding as If signed by the president and attested by the secretary. n iN By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attomeys-in-fact: e Pursuant to Article XIII, Section 5 of the By-Laws,Garnet W. Elliott,Assistant Secretary of Liberty Mutual Fire Insurance Company,is hereby = Rf authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute,seal,acknowledge and C deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. O � r� V I•- r 7 That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. W I LIN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of L E > Liberty Mutual Fire Insurance Company has been affixed thereto in Plymouth Meeting,Pennsylvania this8th day of November oa 2005 Q Cl) .,p C� y LIBERTY MUTUAL FIRE INSURANCE COMPANY 3 c L By tr a i C Garnet W.Elliott,Assistant Secretary y o If• ` L COMMONWEALTH OF PENNSYLVANIA ss r y COUNTY OF MONTGOMERY o On this 8th day of November 2005 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and d C•— acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he E N executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the >a r direction of said corporation. N =J v IN TESTIMONY WH , unto subscribed my name and affixed my notarial seal at Plymouth Meeting;Pennsylvania,on the day and year C14 L first above written. tZ. ,c31t N COMMONWEALTH OF PENNSYLVANNOW*SOW 0 C Tercet 8k Nay P1bk $y V +� P4 >ATVJPw1M"0_vc0Ur Ter sa Pastella,Notary Public 0 FAy Comnorx F.�pitsas Mar.20, CERTIFICATE memtw,Nnnsyi&M&Asudadonor*"?i" I, the undersigned, Assistan ecretary of Liberty Mutual Fire Insurance Company, do.hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy,is in full force and effect on the date of this certificate;and I do.further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attomeys-in-fact as provided in Article XIII,Section 5 of the By-laws of Liberty Mutual Fire Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Fire Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds,shall be valid and binding upon the company with the same force and effect as though manually affixed.IN TESTIMONY WHEREOF,I have hereunto subscribed my name and affixed the'corporate seal of the said company,this day of 01110 B David M.Carey,Assipt6iii Secretary PAYMENT BOND Bond No. 190-016-232 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we (1) S.J. Louis Construction of TX Ltd.as Principal herein, and """ (2) a corporation organized and existing under the laws of the State of(3)Massachusetts ,as surety, are held and firmly bound unto the City of Fort Worth,a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein, in the amount of Three Million Nine Hundred Eighty-nine Thousand One Hundred Sixty-seven and 57/100................................Dollars ($3,989.167.57) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents: •••_Liberty Mutual Fire Insurance Company o„ kE 20 2006 WHEREAS,the Principal has entered into a certain written contract with the Obligee dated the day of A.D. , 2006, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length,for the following project: 36-inch Water Main Extension alone Trinity Railway Express Right-of-Way(Greenbelt Road to FM 157) Contract 1,Units 1 and 2 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined in Chapter 2253,Texas Government Code,as .. amended)supplying labor or materials in the prosecution of the work under the contract,then this obligation shall be void;otherwise,to remain in full force and effect. _ PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. UN 20 2006 SIGNED AND SEALED this_day of ,2006. a MM .n .n S.J. Louis Construction of TX Ltd. ATTEST: PRINCIPAL BY:_____y�7� J� /�` Qtk (Principal)S cr tary Name: Les V.Whitman Title:General Manager (SEAL 520 S.6th Avenue Mansfield,TX 76063 nes as to Principal Liberty Mutual F' Insurance Company SURETY ATTEST: By: � N/A Name: Laurent R. Laventure y„ Secretary Attorney in Fact (SEAL) Address: 4300 MarketPointe Drive Bloomington, MN 55435 Witness as to Surety •� Telephone Number: 952-830-3000_ NOTE: I. Correct name of Principal(Contractor). 2. Correct name of Surety. 3. State of incorporation of Surety. Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. LIMITED PARTNERSHIP ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF TARRANT On this �J— day ofd^ , a� before me personally appeared Les V. Whitman to me known, who being by me duly sworn that he is the General Manager the S. J. LOUIS CONSTRUCTION OF TEXAS LTD. the Limited Partnership described in and which executed the foregoing instrument; that he signed his name thereto by order of the Board of Governors of said Limited Partnership. �� BECKYJONES `meq *; MY COMMISSION EXPIRES Deomber19,2006 Notary Publi iTF ZE+` (Not Sea ACKNOWLEDGMENT OF CORPORATE SURETY STATE OF MINNESOTA COUNTY OF HENNEPIN On this day of Tu,"_, aA7-& before me appeared Laurent R. Laventure to be known, who being by me duly sworn, did say that he is the aforesaid Attorney-in-Fact of the LIBERTY MUTUAL FIRE INSURANCE COMPANY, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer, by authority of its Board of directors; and the aforesaid officer acknowledged said instrument to be the free act and deed of said corporat' Notary Public, (Notary Seal) TERESA HAMMERS Notary Public-Minnesota WV�n M�n Expires Jan 31,2010 n THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 1843325 This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Fire Insurance Company (the 'Company"), a Massachusetts stock insurance company,pursuant to and by authority of the By-law and Authorization hereinafter set forth,does hereby name,constitute and appoint TONY D. BECKER, NATHAN R HUGHES, STEVEN C.ARONSON, JANET D. BUERG, TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON, TODD A. KELSEY,AMY M. BURNS,ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA......................................... ,each individually if there be more than one named, its true and lawful attomey-in-fact to make,execute, seal, acknowledge and deliver,for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding .. FIFTY MILLION AND 00/100 DOLLARS($ 50,000,000.00 )each,and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed.pursuant to and by authority of the following By-law and Authorization. ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such 'O attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seat of the Company. When so executed such instruments shall be d CL as binding as if signed by the president and attested by the secretary. N By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact sr Pursuant to Article XIII,Section 5 of the By-Laws,Garnet W. Elliott,Assistant Secretary of Liberty Mutual Fire Insurance Company,is hereby to .; authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. C to v F- d) That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. d W O— C W L MOR > IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of L Liberty Mutual Fire Insurance Company has been affixed thereto in Plymouth Meeting,Pennsylvania this 8th day of November =o 2005 Q c) ° o4 L LIBERTY MUTUAL FIRE INSURANCE COMPANY C � Garnet W.Elliott,Assistant Secretary H o , COMMONWEALTH OF PENNSYLVANIA ss COUNTY OF MONTGOMERY C L L' On this 8th day of November 2005 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and N 0.= acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he a N executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the direction of said corporation. p v IN TESTIMONY WH P unto subscribed my nameand affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year w W L first above written. ON kY ! ' N COMMONWEALTH OF PENNSYLVANIA Go NotOMSed OF T~Pastak NotaryRtAc . By V Ter spa Pastetla,Notary Pub lc 0 Ads'Comtow E.Vcaa Mar.28, -. CERTIFICATE ht°mem•t+a"`wyhahiatu`acceo"otu€'a RY I, the undersigned, Assistan ecretary of Liberty Mutual Fire insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy,is in full force and effect on the date of this certificate;and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attomeys-in-fact as provided in Article XIII,Section 5 of the By-laws of Liberty Mutual Fire Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the .r following vote of the board of directors of Liberty Mutual Fire Insurance Company at a meeting duly called and held on the 12th day of March.1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds,shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF,I have hereunto subscribed my name and affixed the corporate seal of the said company,this day of By David M.Carey,Assi,. Ft Secretary so .. �• MAINTENANCE BOND THE STATE OF TEXAS § Bond No. 190-016-232 COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: That S.J. Louis Construction of TX Ltd.(Contractor), as principal, and *** a corporation organized under the laws of the State of M111111ugentSurety), do hereby acknowledge themselves to be — held and bound to pay unto the City of Fort Worth,a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas,("City")in Tarrant County,Texas the sum of Three Million Nine Hundred Eighty-nine Thousand One Hundred Sixty-seven and 57/100................................Dollars($3.989,167.57) lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors,jointly and severally. ***-Liberty Mutual Fire Insurance Company This obligation is conditioned,however;that, WHEREAS,said Contractor has entered into a written Contract with the City of Fort Worth,dated the JUN 2 0 2006 _day of 2006copy of which is hereto attached and made a part hereof,the performance of the following described public improvements: 36-inch Water Main Extension along Trinity Railway Express Right-of-Way(Greenbelt Road to FM 157) Contract 1,Units 1 and 2 the same being referred to herein and in said contract as the Work and being designated as project P264- 605140035283and said contract, including all of the specifications, conditions,addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and made a part hereof,and, WHEREAS, in said Contract,Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of Two (2)Years after the date of the final acceptance of the work by the City;and WHEREAS,said Contractor binds itself to maintain said work in good repair and condition for said term of Two(2)Years;and, WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be .o necessary;and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or - reconstruct said work in accordance with all the terms and conditions of said Contract, these_presents shall be null and void,and have no force or effect. Otherwise this Bond shall be and remain in full force and effect,and the City shall have and recover from the Contractor and Surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 8 counterparts, each one of which shall be .. deemed an original,this day of ,A.D. 2006. ATTEST: Jui, e-0 LUOQ (SEAL) S.J. Louis Construction of TX Ltd. .., Contractor By: ` Secretary Name: Le-s .Whitman Title: General Manager ATTEST: _ (SEAL) Liberty Mutual Fire Insurance Company Surety — B N/A Secretary Name: Laurent R. Laventure Title: Attorney-in-Fact 4300 MarketPointe Drive Bloomington, MN 55435 Address LIMITED PARTNERSHIP ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF TARRANT On this day ofd_ ,01AO6 before me personally appeared Les V. Whitman to me known, who being by me duly sworn that he is the General Manager the S. J. LOUIS CONSTRUCTION OF TEXAS LTD. the Limited Partnership described in and which executed the foregoing instrument; that he signed his name thereto by order of the Board of Governors of said Limited Partnership. � '��• SECKY JONES Notary Public ' + MY COMMISSION EXPIRES pecember19,2006 (NotaSea :s. 0 ACKNOWLEDGMENT OF CORPORATE SURETY STATE OF MINNESOTA COUNTY OF HENNEPIN On this day of_j"1 before me appeared Laurent R. Laventure to be known, who being by me duly sworn, did say that he is the aforesaid Attorney-in-Fact of the LIBERTY MUTUAL FIRE INSURANCE COMPANY, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer, by authority of its Board of directors; and the aforesaid officer acknowledged said instrument to be the free act and deed of said corpor ion. Notary Publi , (Notary Seal) /W1MM y TERES=/VIMMMMHAMMERM/�S " Notary Public-Minnesota My Commission Expires Jan 31,2010 TRINITY BLVD. WATER MAIN EXTENSION POLYETHYLENE ENCASEMENT - FORT WORTH,TEXAS FOR DUCTILE IRON PIPE 3.05 QUALITY ASSURANCE A. Freedom from Defects: All polyethylene film shall be clean, sound and free from defects. B. Inspection: All parts of this Section are subject to inspection by the owner or its designated representative. C. Non-Compliance: The Contractor will correct any deficiencies in materials or installation at his expense, including excavating the pipe subsequent to backfilling and re- installing the polyethylene wrap. END OF SECTION _ December 2005 15643 Page 9 of 9