Loading...
HomeMy WebLinkAboutContract 33681 AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.���p� (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 29785 (the Contract)which was authorized by the City Council by M&C C-19937 on the 20th day of January, 2005; and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for Sanitary Sewer Rehabilitation Contract LXIX (69) Village Creek Drainage Basin (Enchanted Bay). WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 15, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $9,520.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$314,784.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. RIGINA EXECUTED on this the day of , 200i�, in Fort Worth, Tarrant County,Texas. 0 APPROVAL RECOMMENDED: APPROVED: A.Douglas Rademaker,P.E. Marc Ott Director,Department of Assistant City Manager Engineering TranSystems Corporation Consultants ENGINEER ATTEST: :Marq Hendrix, City Secretary By: Name: Raul Pena III. P.E. Regional Vice-President APPROVED S TO FORM AND LEGALITY: NO Marc ;t Assistant y Attorney TWwSYSTEAAS COl2P0/?AT/ON/�/® C O N S U L T A N T S AMENDMENT NO. 2 SUMMARY OF FEE February 15, 2006 Gopal Sahu, P.E. Department of Engineering City of Ft. Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Reference to: Scope of Services Contract XLIX (69), DOE 4157 Contract 1 Construction Service TranSystems Project No. P202030059 Dear Mr. Sahu, As requested, attached is a request for additional fee for Contract 1 construction services. These services include shop drawing review and coordination, site visits/meetings (2), and providing assistance for request for information (RFI) for a lump sum fee of$9520.00. Services do not include "requests for change orders." AMENDMENT NO. 2 -TOTAL LUMP SUM $ 9,520.00 Original Contract Fee $248,784.00 Amendment No. 1 $ 56,480.00 Amendment No. 2 $ 9,520.00 CONTRACT - TOTAL LUMP SUM $314,784.00 If you have any questions or require additional information please give me a call. Sincerely, TranSystems Corporation Consultants -Joseph C. Masterson, P.E. Senior Associate G:\FW03\0059\ProjectMgmt\Contracts\amendment\amend Zamend 2 shop drawings.doc 1