HomeMy WebLinkAboutContract 45817-CO5 0TY SECRETARY f L
FO T WORTH City of Fort Worth or"NTRACTNO. 458�1'Co5
DECEIVED Change Order Request
-Mlkoject Name:1 Clear Fork Drainage Basin M-210 Sewer Improvements,Part 4 City sec No.: 45817
C�(OY VOR�wPect No.(s): 59601/59607 0600430/0700430-5740010-001783/87 DOE 1 6809 1 City Proj.No. 01022
Project Description: Water and Sanitary Sewer Improvments,Part 4 on Colonial Parkway,Simondale Drive,Wilshire Boulevard,Glenco Terrace,
Ward Parkway,Lynncrest Drive,and Heritage Park Plaza
Contractor: William J.Schultz,Inc.dba Circle C Consrtuction,Co. Change Order# 0 Date: 1 10/30/2018
City Project Mgr-J Liam Conlon City Inspector: I Judy Die
Phone Number: 817-392-6824 Phone Number:1 817-392-8452
Dept. Unit IA Water Unit IB Water Unit IB Unit II Sewer Totals Contract Time
Sewer (Calender days)
Original Contract Amount $731,641.00 $1,623,825.00 $166,660.00 $1,622,955.00 $4,145,081.00 354
Extras to Date °33,215.00 .,1$225.00 $385,145.00 $14491.00 $944,076.00 0464
�,,
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,264,856.00 $1,635,050.00 $551,805.00 $1,637,446.00 $5,089,157.00• Al.A
Amount of Proposed Change Order $0.00 $12,090.00 $0.00 $79,497.00 $91,587.00
Revised Contract Amount $1,264,856.00 $1,647,140.00 $551,805,00 $1,716,943.00 $5,180,744.00 818
Original Funds Available for Change Orders $70,664.00 $53,688.00 $124,352.00
Remaining Funds Available for this CO
Additional Funding(if necessary) $12,090.00 $79,497.00 $91,587.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT I-,-
MAX
:MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%)I $ 8t3 25_.
fffi�oil
This change order will provide for the following:
• The installation of a 31 foot segment of a project 16-inch water main with cement stabilized subgrade
due to its closeness to other utilities.
• Mill and overlay of some projects streets as required by the Transportation and Public Works
Department subsequent to permanent pavement repair, .water and sanitary sewer installation.
10
Attrested by:
U
3 �
Mary J. Ka C Secretary
NAB
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
William J.Schultz,Inc.dba Circle C Consrtuction,Co. Teri Skelly ' /
0-
t� vI J tl� vi) ..J Jf\ V
1 l ° 4
M&C Number N/A ,
FCl RT' Wo RT H City of Fort Worth
W '` Change Order Additions
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements,Part 4 City Sec No.: 45817
Project No.(s): 59601/59607 0600430/0700430-5740010-001783/87 DOE No. 6809 City Proj. No.: 01022
Project Water and Sanitary Sewer Improvments,Part 4 on Colonial Parkway,Simondale Drive,Wilshire Boulevard,Glenco
Description Terrace,Ward Parkway,Lynncrest Drive,and Heritage Park Plaza
Contractor William J.Schultz, Inc.dba Circle C Consrtuction,Co. D Change Order: Date: 10/30/2018
City Project Mgr. Liam Conlon City Inspector Judy Die
I ADDITIONS I
ITEM - DEPT tJ�i"t__ � `ow
3 16"Water Pipe, CSS Backfill Unit IB Water 31.00 LF $390.00 $12,090.00
18 2"Surface Milling Unit II Sewer 5918.00 SY $4.00 $23,672.00
19 2"Asphalt Pavement Type D Unit II Sewer 3,850.00 SY $14.50 $55,825.00
Unit IA Water
Unit IB Water $12,090.00
Page 2 of 4 Unit II Sewer 1$79,497.00
Additions Sub Total 1$91,587.00
FORT W4RTH City of Fort Worth
WE Change Change Order Deletions
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 4 City Sec No.: 45817
Project No.(s): 59601159607 060043010700430-5740010-001783187 1 DOE No. 6809 City Proj.No.: 01022
Project Description Water and Sanitary Sewer Improvments,Part 4 on Colonial Parkway,Simondale Drive,Wilshire Boulevard,
Glenco Terrace,Ward Parkway, L nncrest Drive,and Heritage Park Plaza
Contractor William J.Schultz, Inc.dba Circle C Consrtuction,Co. Change Order: [i] Date 10/30/2018
City Project Mgr. Liam Conlon City Inspector: Judy Die
DELETIONS
ITEM DESCRIPTION DEPT Unit hft Cost Tial
Unit IA Water
Unit IB Water
Unit II Sewer
Page 3 of 4 Deletions Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
4 ltm
(a
Si ture
ri-(,oq M fCNA 0A/
Name of Employee
D XC,T /W4Aa RL.
Title